SRC21891. WMA boundary line specs.pdf
PDF 77 KB Posted
- Solicitation number
- SRC0000021891
- Issued by
- Alabama
About this file
This document outlines the specifications for a state and local contract opportunity for Boundary Line Maintenance on the Skyline Wildlife Management Area (WMA) in Alabama. The scope of work includes providing 88 aluminum fasteners for 44 boundary line signs, painting approximately 6 miles of boundary lines using specified paint, and placing the signs 120 feet (40 yards) apart. The work is to start around May 13, 2024, and the signage will be provided by the Skyline WMA. A map detailing the specific location of the boundary lines is attached.
The contract is an "All or None" opportunity, and the total scope of work is for the maintenance of the boundary lines on the Skyline WMA. No additional pricing terms, set asides, or funding information is provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DCNR Standard_Terms_and_Conditions 1-2023.pdf | ||
| Quick Quote Standard Boilerplate updated 08.31.2023.pdf | ||
| SRC21891. map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boundary Line Maintenance for Skyline WMA
Add signs and paint boundary lines on approximately 6 miles located on Poplar Springs Tract @ Skyline WMA 37 Co Rd 138, Scotsboro, AL 35768
Specifica�ons for job:
1. Vendor must provide 88 aluminum fasteners for boundary line signage. There are 44 signs, each sign will need 2 fasteners.
2. Vendor must provide paint for remarking boundary lines Paint Type: Sherman Williams Prop Park Waterbone Traffic Marking Paint.
Color: Yellow
3. Vendor must provide equipment used to mark boundary lines (brushes, sprayers, etc.)
4. Vendor must place signs 120� apart from each other (approx. 40 yards).
5. Signage will be provided by Skyline WMA. There are 44 signs, each sign is aluminum and measures 7.5”x 11.25” .
5. See atached map for specific loca�on of the boundary lines.
6. Work is to start around 5/13/2024.