SRC.23601. Cathedral caverns generator install.pdf
PDF 106 KB Posted
- Solicitation number
- SRC0000023601
- Issued by
- Jackson County, Alabama
About this file
The attached document is a Scope of Work for a state and local contract opportunity issued by the Alabama Department of Conservation and Parks for the Cathedral Caverns State Park. The contract entails the installation of a 13kW standby generator, including the provision and installation of a propane tank, transformer, conduit, wiring, and reworking of the existing emergency lighting panel. The work must be completed during normal business hours Monday through Friday. A mandatory site visit is scheduled for August 9, 2024, at 1 PM at the Cathedral Caverns, 637 Cave Rd., Woodville, AL 35776. The contract opportunity is open to all qualified bidders.
The Scope of Work provides detailed specifications for the generator installation and associated electrical work. Pricing terms, set-asides, and funding information are not included in the document. The contract will be awarded to the successful bidder, but the duration and any renewal options are not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quick Quote Standard Boilerplate updated 08.31.2023.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generator installation at Cathedral Caverns Labor and Materials to Install a 13kw Generator for Cave Emergency Lights
Scope of Work:
1. Provide and install a Cummins 13kw standby rated air-cooled generator with a sound and weather enclosure.
2. Provide a pad for generator.
3. Provide a cranking battery for generator.
4. Provide and install a 100pound propane tank with 25 gallons of propane.
5. Provide and install gas regulators for propane tank and generator.
6. Provide and install gas line from propane tank to generator.
7. Provide and install a 15kva 240volt 1phase to 480volt 1phase transformer inside power building.
8. Provide and install conduit and wire from generator to transformer for power connections.
9. Provide and install conduit and wire from power building to generator for battery charger circuit.
10. Provide connection from transformer to existing emergency lighting feed to cave.
11. Rework breakers in existing emergency lighting panel.
12. Demo existing transfer switch and wire generator emergency feed to emergency lighting panel.
13. Provide startup and testing after installation.
Based on work being done during normal working hours Monday thru Friday 7:00am to 5:
30pm.
Mandatory site visit for Friday, August 9th @ 1PM Located @ Cathedral Caverns, 637 Cave Rd., Woodville, AL 35776 POC: Chris Bentley 256-738-3684 or 256-888-0230