Waste water plant and sewers inspection and maintenance services
Solicitation number
SRB10015Q0006
Issued by

About this file

SRB10015Q0006 Waste water plant and sewers inspection and maintenance services RFQ

View the file

Other files

File Type Posted
RFQ_Cover_letter_SRB10015Q0006.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)

PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR3507487

PAGE 1 OF

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

5. SOLICITATION NUMBER

S-RB100-15-Q-0006

6. SOLICITATION ISSUE DATE

December 12, 2014

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Zoran Djordjevic

b. TELEPHONE NUMBER(No collect calls)

+381-11/706-4166

8. OFFER DUE DATE/ LOCAL TIME

17:00 on January 12, 2015

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

U.S. Embassy

GSO

Bul. Kneza A. Karadjordjevica 92

11040 Belgrade

Serbia

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

U.S. Embassy

GSO/Contracting Officer

Bul. Kneza A. Karadjordjevica 92

11040 Belgrade, Serbia

17a. CONTRACTOR/

OFFERER

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY

U.S. Embassy

B&F

Bul. Kneza A. Karadjordjevica 92

11040 Belgrade, Serbia

CODE

DUNS # _____________________

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Sewer maintenance services Base Year

Sewer maintenance services 1 st Option Year

Sewer maintenance services 2 nd

Option Year

Sewer maintenance services 3 rd

Option Year

Sewer maintenance services 4 th

Option Year

Year

Year

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL

ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED

____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS

TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

U.S. Embassy Belgrade S-RB100-15-Q-0006

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIAL FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NO.

39. S/R VOUCHER NO. 40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

TABLE OF CONTENTS

Section 1 - The Schedule

SF 1449 cover sheet

Continuation To SF-1449, RFQ Number S-RB100-15-Q-0006, Prices, Block 23

Continuation To SF-1449, RFQ Number S-RB100-15-Q-0006, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement

Attachment 1 to Description/Specifications/Performance Work Statement – Statement of Work

Attachment 2 to Description/Specifications/Performance Work Statement - Checklist for

Sewage System Preventive Maintenance

Attachment 3 to Description/Specifications/Performance Work Statement - Government

Furnished Property

Section 2 - Contract Clauses

Contract Clauses

Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

Solicitation Provisions

Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part 12

Section 4 - Evaluation Factors

Evaluation Factors

Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in Part 12

Section 5 - Representations and Certifications

Offeror Representations and Certifications

Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not

Prescribed in Part 12

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER S-RB100-15-Q-0006

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price contract is for regular maintenance of the Embassy waste water treatment plant, sewers and ancillary equipment, including furnishing all labor, material, equipment and services, for the U.S. Embassy Belgrade. The price listed below shall include all labor, materials, insurance (see FAR 52.228-4 and 52.228-5), overhead, and profit. The Government will pay the

Contractor the fixed price per month for standard services that have been satisfactorily performed.

B. The performance period of this contract is from starting on date of award and continuing for 12 months, with 4 (four), one-year options to renew. The initial period of performance includes any transition period authorized under the contract.

C. Temporary Additional Services are services that are defined as Standard Services but are required at times other than the normal workday. These services shall support special events at the Post. The

Contractor shall provide Temporary Additional Services in addition to the scheduled services specified in this contract. The COR shall order Temporary Additional Services on an as needed basis. This work shall be performed by Contractor trained employees, and shall not be subcontracted. The COR may require the

Contractor to provide Temporary Additional Services with 24 hour advance notice.

The Contractor shall include in its next regular invoice details of the Temporary Additional Services and, if applicable, materials, provided and requested under Temporary Additional Services. The Contractor shall also include a copy of the COR’s written confirmation for the Temporary Additional Services.

D. Because Temporary/Additional Services are based on indefinite delivery/indefinite quantity, the minimum and maximum amounts are defined below:

Minimum: The Government shall place orders totaling a minimum of the equivalent of $100.00.

This reflects the contract minimum for the base year and each option period.

Maximum: The amount of all orders shall not exceed the equivalent of $10,000.00. This reflects the contract maximum for the base year and each option period for temporary/additional services.

E. All payments shall be made in local currency.

F. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective

Performance

Work

Statement

(PWS)

Paragraph

Performance Threshold

Services.

Performs maintenance of the Embassy waste water treatment plant, sewers and ancillary equipment set forth in the performance work statement (PWS)

Attachment 1

– Statement of Work

All required services are performed and no more than one

(1) customer complaint is received per month.

1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

2. STANDARD. The performance standard is that the Government receives no more than one (1) [Note to Contracting Officer: Insert other number if desired] customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions-Commercial Items

(May 2001), if any of the services exceed the standard.

3. PROCEDURES.

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the

Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting

Officer for appropriate action under the Inspection clause.

II PRICING

A. BASE YEAR PRICES

(1) Standard Services. The fixed price for the first year of the contract (starting on the date stated in the

Notice to Proceed and continuing for a period of 12 months) is:

# Description Quantity Unit Unit Price Total Price

1a 4.1(a) Waste Water Treatment Plant

(WWTP) blowers 10 Monthly

1b 4.1(b) Waste Water Treatment Plant

(WWTP) blowers 1 Semi-annually

1c 4.1(c) Waste Water Treatment Plant

(WWTP) blowers 1 Annual

2 4.2 Storm drain manhole inspections 4 Quarterly

4.3 Sanitary sewage manhole

inspections 2 Semi-annual

4.4 Waste Water Treatment Plant

(WWTP) pumps 1 Annual

5a 4.5(a) Waste Water Treatment Plant

(WWTP)

11 Monthly

5b 4.5(b) Waste Water Treatment Plant

(WWTP)

1 Annual

6 4.6 Lift Station 1 Annual

7 Oil/Water Separators 2 Semi-annual

Total Base Year Standard Services

(2) Temporary Additional Services. The unit price (fixed-price) is:

Labor Category Estimated hours Price/Hour Total Price

Maintenance Engineer 40

Technician/Tradesman 120

Technician/Tradesman - helper 120

Total Base Year Temporary Additional Services

(3) Materials or equipment. The Government will reimburse the Contractor for any materials or equipment that the government requests contractor to order to be delivered in conjunction with any order for

Temporary Additional Services. All reimbursements shall be at the Contractor's out of pocket cost, with no overhead, profit, or other charge added.

Material/Equipment Not to Exceed Per Year: $1,000.00 or equivalent in the currency quoted at the median rate of exchange of the National Bank of Serbia on the solicitation offer due date.

TOTAL for BASE YEAR (a + b+ c): ___________________

B. FIRST OPTION YEAR PRICES

(1) Standard Services. The fixed price for the first year of the contract (starting on the date stated in the

# Description Quantity Unit Unit Price Total Price

1a 4.1(a) Waste Water Treatment Plant

(WWTP) blowers 10 Monthly

1b 4.1(b) Waste Water Treatment Plant

(WWTP) blowers 1 Semi-annually

1c 4.1(c) Waste Water Treatment Plant

(WWTP) blowers 1 Annual

2 4.2 Storm drain manhole inspections 4 Quarterly

4.3 Sanitary sewage manhole

inspections 2 Semi-annual

4.4 Waste Water Treatment Plant

(WWTP) pumps 1 Annual

5a 4.5(a) Waste Water Treatment Plant

(WWTP)

11 Monthly

5b 4.5(b) Waste Water Treatment Plant

(WWTP)

1 Annual

6 4.6 Lift Station 1 Annual

Total First Option Year Standard Services

Estimated hours Price/Hour Total Price

Maintenance Engineer 40

Technician/Tradesman 120

Total First Option Year Temporary Additional Services

(3) Materials or equipment. The Government will reimburse the Contractor for any materials or equipment

Temporary Additional Services. All reimbursements shall be at the Contractor's out of pocket cost, with no overhead, profit, or other charge added.

TOTAL for FIRST OPTION YEAR (a + b+ c): ___________________

C. SECOND OPTION YEAR PRICES

(1) Standard Services. The fixed price for the first year of the contract (starting on the date stated in the

# Description Quantity Unit Unit Price Total Price

1a 4.1(a) Waste Water Treatment Plant

(WWTP) blowers 10 Monthly

1b 4.1(b) Waste Water Treatment Plant

(WWTP) blowers 1 Semi-annually

1c 4.1(c) Waste Water Treatment Plant

(WWTP) blowers 1 Annual

2 4.2 Storm drain manhole inspections 4 Quarterly

4.3 Sanitary sewage manhole

inspections 2 Semi-annual

4.4 Waste Water Treatment Plant

(WWTP) pumps 1 Annual

5a 4.5(a) Waste Water Treatment Plant

(WWTP)

11 Monthly

5b 4.5(b) Waste Water Treatment Plant

(WWTP)

1 Annual

6 4.6 Lift Station 1 Annual

Total Second Option Year Standard Services

Estimated hours Price/Hour Total Price

Maintenance Engineer 40

Technician/Tradesman 120

Total Second Option Year Temporary Additional Services

(3) Materials or equipment. The Government will reimburse the Contractor for any materials or equipment

Temporary Additional Services. All reimbursements shall be at the Contractor's out of pocket cost, with no overhead, profit, or other charge added.

TOTAL for SECOND OPTION YEAR (a + b+ c): ___________________

D. THIRD OPTION YEAR PRICES

(1) Standard Services. The fixed price for the first year of the contract (starting on the date stated in the

# Description Quantity Unit Unit Price Total Price

1a 4.1(a) Waste Water Treatment Plant

(WWTP) blowers 10 Monthly

1b 4.1(b) Waste Water Treatment Plant

(WWTP) blowers 1 Semi-annually

1c 4.1(c) Waste Water Treatment Plant

(WWTP) blowers 1 Annual

2 4.2 Storm drain manhole inspections 4 Quarterly

4.3 Sanitary sewage manhole

inspections 2 Semi-annual

4.4 Waste Water Treatment Plant

(WWTP) pumps 1 Annual

5a 4.5(a) Waste Water Treatment Plant

(WWTP)

11 Monthly

5b 4.5(b) Waste Water Treatment Plant

(WWTP)

1 Annual

6 4.6 Lift Station 1 Annual

Total Third Option Year Standard Services

Estimated hours Price/Hour Total Price

Maintenance Engineer 40

Technician/Tradesman 120

Total Third Option Year Temporary Additional Services

(3) Materials or equipment. The Government will reimburse the Contractor for any materials or equipment

Temporary Additional Services. All reimbursements shall be at the Contractor's out of pocket cost, with no overhead, profit, or other charge added.

TOTAL for THIRD OPTION YEAR (a + b+ c): ___________________

E. FOURTH OPTION YEAR PRICES

(1) Standard Services. The fixed price for the first year of the contract (starting on the date stated in the

# Description Quantity Unit Unit Price Total Price

1a 4.1(a) Waste Water Treatment Plant

(WWTP) blowers 10 Monthly

1b 4.1(b) Waste Water Treatment Plant

(WWTP) blowers 1 Semi-annually

1c 4.1(c) Waste Water Treatment Plant

(WWTP) blowers 1 Annual

2 4.2 Storm drain manhole inspections 4 Quarterly

4.3 Sanitary sewage manhole

inspections 2 Semi-annual

4.4 Waste Water Treatment Plant

(WWTP) pumps 1 Annual

5a 4.5(a) Waste Water Treatment Plant

(WWTP)

11 Monthly

5b 4.5(b) Waste Water Treatment Plant

(WWTP)

1 Annual

6 4.6 Lift Station 1 Annual

Total Fourth Option Year Standard Services

Estimated hours Price/Hour Total Price

Maintenance Engineer 40

Technician/Tradesman 120

Total Fourth Option Year Temporary Additional Services

(3) Materials or equipment. The Government will reimburse the Contractor for any materials or equipment that the government requests contractor to order to be delivered in conjunction with any order for

Temporary Additional Services. All reimbursements shall be at the Contractor's out of pocket cost, with no overhead, profit, or other charge added.

TOTAL for FOURTH OPTION YEAR(a + b+ c): ___________________

F CONTRACT GRAND TOTAL

Base Year

First Option Year

Second Option Year

Third Option Year

Fourth Option Year

Grand Total – Base plus All Option Years

III VALUE ADDED TAX

The Government will not reimburse the Contractor for VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the U.S. Embassy has a tax exemption certificate with the host government.

CONTINUATION TO SF-1449,

RFQ NUMBER S-RB100-15-Q-0006

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

I WORK REQUIREMENTS

The U.S. Embassy Belgrade requires regular maintenance of the waste water treatment plant, sewers and ancillary equipment at the Embassy compound at Bulevar kneza Aleksandra Karadjordjevica 92, Belgrade. The Contractor shall furnish all managerial, administrative, and direct labor personnel necessary to accomplish the work in this contract. Contractor employees shall be on site only for contractual duties and not for other business purposes.

II DEFINITIONS

"General Instructions" mean those instructions, directives and guidelines that apply to all maintenance personnel.

"Chancery" means the Embassy building.

III PERSONNEL

The Contractor shall provide a qualified work force meeting the contract requirements. The workforce shall be able to provide the services identified in Attachment 1 – Statement of Work.

IV GENERAL MAINTENANCE REQUIREMENTS

The Embassy Compound, located at Bulevar kneza Aleksandra Karadjordjevica 92, 11040 Belgrade, Serbia, is equipped with two waste water treatment plants including 5 blowers, 2 lift station pumps, 4 effluent pumps and 2 sludge pumps. The sewage system includes the following components: 98 storm drain manholes, 21 sanitary sewage manholes and 5 oil/water separators.

The contractor shall maintain the complete sewage system in proper working order over its expected lifespan. All work shall be done in accordance with the project Statement of Work and Department of

State Overseas Building Operations (OBO) Specifications 333700 available at http://designstandards.obo.state.gov/2014/division_33_utilities.html.

The Contractor shall prepare general instructions for the work force. The Contractor shall provide drafts to the Contracting Officer’s Representative (COR) for review within thirty days after award of the contract. The COR must approve these general instructions before issuance.

V DUTIES AND RESPONSIBILITIES

A Certain areas of the Embassy require an escort and can only be entered during scheduled times. The

General Instructions shall emphasize security requirements so that accidental security violations do not occur.

http://designstandards.obo.state.gov/2014/division_33_utilities.html

B The Contractor shall schedule standard maintenance requirements to ensure that these are done in the order and time frame that are most efficient and have the least impact on normal operations. All work and testing of systems shall be coordinated with the COR in advance.

C Contractor shall schedule periodic maintenance requirements so that it causes minimal disruption to the normal operation of the facility. The COR shall determine the schedules presented which meet the needs of the individual facility.

VI TEMPORARY ADDITIONAL SERVICES

A1 Temporary Additional Services are services that are defined as Standard Services but are not regularly scheduled, such as emergency interventions or other work which does not fall under regularly scheduled maintenance. The Contractor shall provide these services in addition to the scheduled services specified in paragraph C.2.1. of this contract. The COR shall order these services as needed by separate Task

Orders. This work shall be performed by trained employees of the Contractor, and shall not be subcontracted. The COR may require the Contractor to provide temporary additional services with 24 hour advance notice.

B Ordering of Temporary Additional Services. The contractor shall, within seven (7) calendar days of receipt of a Task Order Proposal Request, submit to the COR a proposal for the project. The costs shall be in accordance with prices in Section B.4. Site visit and work shall be coordinated via phone or email. The contratcor’s cost proposal shall include the following:

a. The required number of labor hours by labor classification and labor rates,

b. Cost loading,

c. Total proposed price, and

d. A project schedule showing at a minimum the project start/completion dates.

VII ACCEPTANCE OF WORK

Each month the contractor shall submit the maintenance checklist (Section J.2, Exhibit D) to the COR for approval and acceptance of work. The certified checklist shall be submitted with the request for payment.

The Contractor shall include in its next regular invoice details of the temporary additional services and, if applicable, materials, provided and requested under temporary additional services. The Contractor shall also include a copy of the Task Order and checklist for the temporary additional services certified by the

COR.

VIII MANAGEMENT AND SUPERVISION

A Supervision. The Contractor shall designate a project manager who shall be responsible for on-site supervision of the Contractor's workforce at all times. This project manager shall be the focal point for the Contractor and shall be the point of contact with U.S. Government personnel. The project manager shall have sufficient English language skill to be able to communicate with members of the U.S.

Government staff. The project manager shall have supervision as his or her sole function.

B The Contractor shall maintain schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post.

For those items other than routine daily services, the Contractor shall provide the COR with a detailed plan of the personnel to be used and the time frame to perform the service.

C The Contractor shall be responsible for quality control. The Contractor shall perform inspection visits to the work site on a regular basis. The Contractor shall coordinate these visits with the COR. These visits shall be surprise inspections to those working on the contract.

D The Contractor shall control overtime through efficient use of the work force. Individual work schedules shall not exceed 40 hours per week to preclude overtime being part of the standard services provided under the contract. Overtime may be necessary under Temporary Additional Services.

IX PERSONAL INJURY, PROPERTY LOSS OR DAMAGE (LIABILITY).

The Contractor assumes absolute responsibility and liability for any and all personal injuries or death and property damage or losses suffered due to negligence of the Contractor's personnel in the performance of this contract. The Contractor's assumption of absolute liability is independent of any insurance policies.

X INSURANCE

A Certificate of Insurance. The Contractor shall furnish to the Contracting Officer a current certificate of insurance as evidence of the insurance required. In addition, the Contractor shall furnish evidence of a commitment by the insurance carrier to notify the Contracting Officer in writing of any material change, expiration or cancellation of any of the insurance policies required not less than thirty (30) days before such change, expiration or cancellation is effective. If Contractor is self-insured then the Contractor shall not change or decrease the coverage without the Contracting Officer's approval.

B Amount of Insurance. The Contractor is required to provide whatever insurance is legally necessary.

The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

General Liability

1. Bodily Injury on or off the site stated in US Dollars:

Per Occurrence $10,000

Cumulative $50,000

2. Property Damage on or off the site in US Dollars:

Per Occurrence $10,000

Cumulative $50,000

The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

For those Contractor employees assigned to this contract who are either United States citizens or hired in the United States or its possessions, the Contractor shall provide workers' compensation insurance in accordance with FAR 52.228-3.

The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:

(a) any property of the Contractor,

(b) its officers,

(c) agents,

(d) servants,

(e) employees, or

(f) any other person, arising from and incident to the Contractor's performance of this contract.

The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.

The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

C Permits. Without additional cost to the Government, the Contractor shall obtain all permits, licenses, and appointments required for the performance of work under this contract. The Contractor shall obtain these permits, licenses, and appointments in compliance with applicable host country laws. The

Contractor shall provide evidence of possession or status of application for such permits, licenses, and appointments to the Contracting Officer with its proposal. Application, justification, fees, and certifications for any licenses required by the host government are entirely the responsibility of the

Contractor.

XI LOCATIONS AND TIMES FOR SEWER INFRASTRUCTURE MAINTENANCE SERVICES

(a) All standard services are to be delivered on regular Embassy working days.

Location

Bul. Kneza A. Karadjordjevica 92

(b) All work shall be performed during regular workdays from 08:30 to 17:00. Other hours, if requested by the Contractor, may be approved by the Contracting Officer's Representative (COR).

The Contractor shall give 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours, initiated by the Contractor, will not be a cause for a price increase.

Attachment 1 to Description/Specifications/Performance Work Statement

Statement of Work

1.0 INTRODUCTION

1.1 The United States Department of State (DOS) requires services to provide maintenance for the sewage system at the U.S. Embassy in Belgrade.

1.2 Work on the sewage system must be completed in accordance with the following specifications:

OBO Specifications 333700 which are available at

1.3 The Embassy Compound, located at Bulevar kneza Aleksandra Karadjordjevica 92, 11040

Belgrade, Serbia, is equipped with two waste water treatment plants (WWTP) including 5 blowers, 2 lift station pumps, 4 effluent pumps and 2 sludge pumps. The sewage system includes the following components: 98 storm drain manholes, 21 sanitary sewage manholes and 5 oil/water separators.

2.0 OBJECTIVES

2.1 The purpose of this scope of work is to define the requirements for the scheduled maintenance of complete sewage system equipment and components within the New Embassy Compound. The intent of this Task Order is to fully maintain the proper working order of the sewage system over its expected lifespan. Work shall be done in accordance with the project SOW and specifications.

2.2 Identify worn parts for replacement.

3.0 GENERAL REQUIREMENTS

3.1 The Contractor shall provide all maintenance services necessary to meet objectives shown in 2.0 above.

3.2 All replacement parts will be government furnished equipment (GFE).

3.3 The Government’s Point of Contact (POC) at post will provide the following tools at the work-site:

a) Replacement parts

b) Maintenance manuals and system documentation.

3.4 Contractor is expected to provide all specialty tools and materials needed for maintenance services.

3.5 Contractor shall dispose of any excess materials or other construction debris.

3.6 Acceptance of Work. The Contractor shall provide certification that work was approved and accepted by the POC at post. The Contractor shall fill out the work order completion form showing work was completed as required in section 3.0 and 4.0 of this SOW and provide the form to the Facilities Manager. The contractor must submit validation that work was completed satisfactorily with request for payment.

3.7 The Contractor shall coordinate all work and testing of systems with the POC at post.

3.8 Contractor shall provide security information to Post POC for access and escort requirements at least 14 days prior to commencement of work. This will include:

a) Company name and names of workers

b) Copies of worker national identification cards and their number

c) Dates of scheduled work

d) Level of clearance

e) Name of Company for third party contractors

f) State whether laptop, digital cameras or other electronics is needed for the task

4.0 SPECIFIC REQUIREMENTS

1. Waste Water Treatment Plant (WWTP) blowers (5 each)

a) Monthly – check delivery blower temperature, operating pressure, motor current, wipe down blower and motor

b) Semiannual –monthly maintenance + perform vibration analysis (as per manufacturer`s recommendation)

c) Annually – semiannual maintenance + evaluate the blower replacement based on equipment history (expected life of this unit is four years)

2. Storm drain manholes (98 each)

a) Quarterly – remove cover, remove mud and debris, examine interior, clean storm outfalls and sediment ponds, clean work area and remove all debris

3. Sanitary sewage manholes (21 each)

a) Semiannual - remove cover, observe flow through manhole, remove mud and debris, examine interior, thoroughly ventilate manhole if cleaning is required (follow confined space work requirements), clean work area and remove all debris

4. Waste Water Treatment Plant (WWTP) pumps (2 lift station, 4 effluent, 2 sludge)

Annual – open tank and remove pump, thoroughly clean pump prior to performing maintenance, check the pump and motor housing for signs of damage and corrosion, check for evidence of oil leaks, check oil level and add oil if necessary, check electrical connections and cabling, perform motor insulation test, reinstall the unit and test operate, measure current and voltage

5. Waste Water Treatment Plant (WWTP) (2 each)

a) Monthly – review daily maintenance logs and validate adequacy of daily maintenance: make a daily visual inspection of the plant, check to see that there is equal air distribution along entire length of tank, that sludge return pumps are returning sludge to the aeration chamber, that air lift skimmer is working, check and break up scum in settling tank to insure proper return through skimmer, perform a thirty minute settling test, clean the grease and floating solids from walls and water surface of aeration and settling tanks, check all equipment to see that if it is operating properly and if any fuses are blown or circuit breakers opened, clean the growths and accumulated solids from weirs and pipe inlets, check to see if diffusers and aerators are all working properly and not plugged, if airlift sludge return pump or skimmers is clogged or about to clog, run pH and dissolved oxygen tests, check trash trap and air filters and clean when necessary

b) Annual – monthly + check structural soundness of all mounting bolts, tank walkways, gratings and handrails, piping for cracks and overall condition, all fasteners, supports and flanges to insure solid connections, wire brush and paint all rusted metal

6. Lift Station

a) Annual – tag out unit, block doors to toilets and other areas feeding water into the sewer system, remove cover plates, flush pit and pump out, check bail, floats, rods and switches, make sure float operates as designed, check the condition of the pump lifting handles and chains, cycle all valves and check for leaks, inspect check valves and interior of pit for cracks, check for corrosion, treat and paint as needed, inspect cover plate gaskets and replace if necessary, close and seal cover, return unit to service, remove blocks from toilet doors and other locations blocked in support of this maintenance procedure

7. Oil/Water Separators (5 each)

Semiannual – clean out separator, inspect for clogging, scale and improper positioned or missing baffles, tighten loose parts as necessary, dispose of waste properly

5.0 Point of Contact at post is the Contracting Officer Representative (COR)

5.1 All questions concerning the scope and requirements of the U.S. Embassy Belgrade shall be directed to the COR:

NEC Mechanical Engineer

Telephone # +381-65-306-3637

5.2 The COR will be the contractor’s contact at the U.S. Embassy. The COR will assist and direct the contractor when scheduling work, obtaining approved local supplies, and liaison with Embassy personnel during the course of the Project. All questions concerning coordination of installation activities while at post shall be directed to the COR.

Attachment 2

Checklist For Sewage System Preventive Maintenance

Month of _____________________ 201____

Quarterly (storm drain manholes) Date

Remove cover (manholes)

Remove mud and debris

Examine structural features of sewer line, interior of culvert or manhole, manhole frame and cover etc.

Clean storm outfalls

Clean sediment ponds

Clean work area and remove all debris

Semiannually (WWTP blowers) Date

Perform vibration analysis. Values must be within those stated in the owner maintenance manual

Semiannually (sanitary sewage manholes) Date

Remove cover

Observe flow through manhole

Clean out debris, mud etc. from bottom of sewer. Determine if cleaning is necessary

Visually examine structural features of sewer line, interior of manhole, manhole frame and cover etc.

Thoroughly ventilate manhole if cleaning is required

Enter and clean the manhole

Replace cover

Clean work area and remove all debris manual

Semiannually (oil/water separators) Date

Clean out separator

Inspect for clogging, scale and improper positioned or missing baffles

Tighten loose parts as necessary

Dispose of waste properly

Monthly (NOB atrium toilets and Health

Unit sewage lines) Date

Block the toilets and put them out of service, pressure wash sewage lines, remove blocks and put the toilets back in service.

Semiannually (Waste water treatment plant) Date

Clean deposited sludge if necessary.

Evacuate the sludge from the compound.

Dispose of waste properly.

Semiannually (Lift station) Date

Flush pit and pump out.

Clean deposited sludge if necessary.

Evacuate the sludge from the compound.

Dispose of waste properly.

Attachment 3

Government Furnished Equipment

The Government will furnish all replacement parts for maintenance and repairs as required.

SECTION 2 - CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERICAL ITEMS (MAY 2014), is incorporated by reference (see SF-1449, Block 27A)

The following FAR clause(s) is/are provided in full text:

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS—COMMERCIAL ITEMS (OCT 2014)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).

___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)"(Public Laws 108-77 and

108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or

Executive orders applicable to acquisitions of commercial items:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I

(Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of

2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American

Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013)

(Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts

(Jan 2014) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters

(Jul 2013) (41 U.S.C. 2313).

_ X _ (10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012)

(section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of

Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).

__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011)

(15 U.S.C. 657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

(OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (JAN 2011) of 52.219-4.

http://www.acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html#wp1151848 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113329 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113344 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html#wp1137622 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html#wp1141983 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html#wp1144881 http://www.acquisition.gov/far/current/html/52_200_206.html#wp1141649 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html#wp1151163 http://www.acquisition.gov/far/current/html/52_200_206.html#wp1151299 http://www.acquisition.gov/far/current/html/52_207_211.html#wp1140926 http://www.acquisition.gov/far/current/html/52_207_211.html#wp1145644 http://www.acquisition.gov/far/current/html/52_207_211.html#wp1146366 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1135955 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1135955 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1135970 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1135970

__ (13) [Reserved]

__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Oct 2001) of 52.219-9.

__ (iii) Alternate II (Oct 2001) of 52.219-9.

__ (iv) Alternate III (Oct 2014) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)).

__ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C.

637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011)

(15 U.S.C. 657 f).

__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.

632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small

Business (EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns

Eligible Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).

__ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

__ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014)

(E.O. 13126).

__ (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

__ (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

__ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

__ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

__ (31) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

__ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act

(Dec 2010) (E.O. 13496).

__ (33) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (34)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated

Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (35)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.

13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-13.

__ (36)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (E.O. 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

__ (37) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136004 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136017 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136032 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136174 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136175 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136186 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1136387 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1139913 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html#wp1144950 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html#wp1144420 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html#wp1147479 http://www.acquisition.gov/far/current/html/52_222.html#wp1147630 http://www.acquisition.gov/far/current/html/52_222.html#wp1147656 http://www.acquisition.gov/far/current/html/52_222.html#wp1147711 http://www.acquisition.gov/far/current/html/52_222.html#wp1158632 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html#wp1162802 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html#wp1148123 http://www.acquisition.gov/far/current/html/52_222.html#wp1160019 http://www.acquisition.gov/far/current/html/52_222.html#wp1156645 http://www.acquisition.gov/far/current/html/Subpart%2022_18.html#wp1089948 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1168892 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_223_226.html#wp1168892 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+250+1286++%2842%29%20%20AND%20%28%2842%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1168933 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1168933 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1194330 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1194330 http://www.acquisition.gov/far/current/html/52_223_226.html#wp1194323 http://uscode.house.gov/

__ (38)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (JUN 2014)

(E.O. 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

_ X _ (39) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011) (E.O. 13513).

__ (40) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).

__ (41)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41

U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

__ (42) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_ X _ (43) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (44) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul

2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10

U.S.C. 2302 Note).

__ (45) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (46) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)

(42 U.S.C. 5150).

__ (47) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002)

(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (48) 52.232-30, Installment Payments for Commercial Items (Oct 1995)

(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_ X _ (49) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management

(Jul 2013) (31 U.S.C. 3332).

__ (50) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award

Management (Jul 2013) (31 U.S.C. 3332).

__ (51) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (52) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (53)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006)

(4…