SQS.pdf

PDF 147 KB Posted

Attached to
F-16 Fuel cell Federal contract opportunity
Solicitation number
FA821224R0003
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This notice provides details for a pre-solicitation related to an F-16 fuel cell contract opportunity. The Department of the Air Force Materiel Command Air Force Sustainment Center will release solicitation number FA821224R0003 seeking proposals to supply F-16 fuel cells. Interested parties should monitor the Federal Business Opportunities website for additional details regarding response date, award timing, and other requirements as the pre-solicitation notice indicates further information will be forthcoming in a subsequent solicitation document.

The opportunity involves supplying F-16 jet fuel cells to support the Air Force's fleet of F-16 aircraft. The pre-solicitation notice serves to make interested contractors aware of an upcoming solicitation for this product but does not include pricing terms, response deadlines, or other contractual particulars. Parties involved in aircraft fuel system manufacturing and sustainment should take note of this pre-announcement as the forthcoming solicitation may represent a competitive opportunity to provide F-16 fuel cells to the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Fuel cell, newest first.
File Type Posted
Presolicitation-01.docx DOCX document
Item_Description_1560010541246WF.pdf PDF
Unmarked Eng Data 2022.pdf PDF
Item_Description_1560012240803WF.pdf PDF
Presolicitation.pdf PDF
Item_Description_1560013229987WF.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING QUALIFICATION REQUIREMENTS

NSN: 1560010542800, 1560013229987, 1560010541246, 1560012240803

P/N: (Lockheed Martin: 16VB004001, 16VB004002) 37516-3, 320-4-45550-105, 37517-7,320-4- 45551-105 Noun: Fuel Cell Application: F-16 Aircraft

19-Sep-22 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice/Sources Sought: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Fuel Cell.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to manufacture, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government. Lockheed Martin wet test fixtures are required for the manufacture of the Fuel Cells; see section g for an estimated cost of these fixtures.

c. Data Verification: The offeror must verify that he has a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Lockheed Martin (81755) drawing 16VB004001, 16VB004002, and 16ZB004. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Manufacture/Process Verification: The offeror must manufacture this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA. The offeror shall also identify its sources for materials and its standards for internally used processes The offeror must also provide evidence in the form of a management process in which they will manage Critical Safety Items (CSIs) and all of the critical characteristics and critical safety processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing 16VB004001, 16VB004002, and 16ZB004 . After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing. To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for

P/N: (Lockheed Martin: 16VB004001, 16VB004002) 37516-3, 320-4-45550-105, 37517-7,320-4- 45551-105

19-Sep-22 Section C 2/3 qualification. The offeror’s facilities shall be made available for government inspection during these tests.

f. Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 16VB004001, 16VB004002, and 16ZB004. This article shall be subjected to a form, fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the manufacturing capability of the offeror. Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 180 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability.

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $50000. 16VB004001, 16VB004002, and 16ZB004 detail the development and testing of materials and systems that will be incurred by the offeror. Additionally, the manufacture of F-16 fuel cells require approved wet test fixtures; fixtures can be purchased from Lockheed Martin at a current estimated cost of

1.2 million dollars, or independently designed, manufactured, and submitted for approval, by USAF Engineering.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 730 days. This is based on complexity of the Fuel Cell, the phase gated development/testing, and the 16ZB004 specified duration of materials testing.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: (Lockheed Martin: 16VB004001, 16VB004002) 37516-3, 320-4-45550-105, 37517-7,320-4- 45551-105

19-Sep-22 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

c. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

d. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.

File details come from the government source that posted it. Updated .