SPRTA126R1375.pdf
PDF 1 MB Posted
- Attached to
- DUCT, FAN, AIRCRAFT G
- Solicitation number
- SPRTA1-26-R-1375
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Request for Proposal (RFP) solicitation for the manufacture of aircraft engine fan ducts and related deliverables. The Defense Logistics Agency Aviation (DLA Aviation) at Tinker Air Force Base, Oklahoma, is seeking offers for NSN 2840-01-428-7655NZ, Part Number 4081642, a titanium alloy fan duct designed for maximum load and temperature operation with mounting points for engine accessories. The solicitation number is SPRTA1-26-R-1375, issued under sealed bid procedures with a closing date of April 24, 2026, at 3:00 PM Central Time.
Offerors must submit firm fixed-price bids and maintain pricing for 120 calendar days from bid opening. The contract requires first article approval under FAR clause 52.209-3, with deliverables including a First Article Test Plan, First Article Test Report, one destructive test exhibit, two non-destructive test exhibits, and production items with a required delivery date of December 29, 2027. The procurement is rated under the Defense Priorities and Allocations System (DPAS) and is designated as a Critical Safety Item (CSI) requiring higher-level contract quality requirements (ISO 9001:2015). Offerors must be "Export Controlled" certified to access engineering drawings and controlled data through the Joint Certification Program. The solicitation is unrestricted, though the small business size standard is 1,500 employees. F.O.B. Origin delivery is required to multiple locations including Tinker AFB and DLA Distribution Depot Oklahoma. Qualification requirements under FAR 52.209-1 must be met, and the government anticipates adequate price competition. The attachment materials include comprehensive manufacturing qualification requirements (MQR-PSD-1), first article test procedures, and data item descriptions for test plans, test reports, and Comprehensive Engine Management System (CEMS) reporting, establishing detailed technical and quality assurance standards for contract performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRTA126R1375-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
(Agency Use)
ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES
IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A
DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE
CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE
ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT
SUBJECT TO THE TERMS AND CONDITIONS STATED HEREIN.
ADMINISTERED BY CODE
CONTRACTOR
OFFEROR
CODE FACILITY
CODE
PAYMENT WILL BE MADE BY CODE
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
PROMPT PAYMENT DISCOUNT AUTHORITY FOR USING OTHER
THAN FULL AND OPEN COMPETITION
10 U.S.C. 3204(a) 41 U.S.C. 253
UNDER THE UNITED STATES CODE AT: ( ) ( )
ITEM NUMBER SCHEDULE OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ACCOUNTING AND APPROPRIATION DATA TOTAL AWARD AMOUNT
(For Government Use Only)
CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
SIGNATURE OF OFFEROR/CONTRACTOR 28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
NAME AND TITLE OF SIGNER (Type or Print) DATE SIGNED NAME OF CONTRACTING OFFICER
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 1447 (REV. 12/2022)
DO: A1
X
SPRTA1-26-R-1375
DLA WEAPONS SUPPORT AT OKLAHOMA CIT
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
BUYER: Jayson Skalla jayson.skalla@us.af.mil Phone: (445) 737- 0625-0000
SPRTA1
CLASSIFICATION
336412
1,500
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE
BLOCKS 11, 13, 15, 21, 22, and 27
1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at
15 CFR 700.
RATING PAGE OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. SOLICITATION NUMBER 5. SOLICITATION TYPE
SEALED BIDS
(IFB) INVITATION
FOR BID
NEGOTIATED
(RFP) REQUEST
FOR PROPOSAL
6. SOLICITATION
ISSUE DATE
7. ISSUED BY CODE 8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
NO COLLECT CALLS
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
HISTORICALLY ELIGIBLE UNDER THE WOSB PROGRAM
UNDERUTILIZED ECONOMICALLY DISADVANTAGED
BUSINESS ZONE WOMEN-OWNED SMALL BUSINESS (EDWOSB)
(HUBZone) SMALL BUSINESS NORTH AMERICAN INDUSTRY CLASSIFICATIO
SERVICE-DISABLED VETERAN- SYSTEM (NAICS):
OWNED SMALL BUSINESS
8(A) SIZE STANDARD:
LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL
24-APR-2026 3:00PM
Aircraft Engine and Engine Parts Manufacturing X
SCD:B
(SEE ESP CLAUSE 252.232-7003.)
EFT:T14**R
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
New Manufacture - Surplus is "NOT AUTHORIZED" for this procurement
SEE LINE ITEM SCHEDULE
Total
SEE SCHEDULE
X
DATE SIGNED
Prescribed by GSA - FAR (48 CFR) 53.214(d)
NO RESPONSE FOR REASONS CHECKED
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
UNABLE TO IDENTIFY THE ITEM(S) DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
OTHER (Specify)
WE DO WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE
OF ITEMS INVOLVED
NAME AND ADDRESS OF FIRM (Include ZIP Code) SIGNATURE
TYPE OR PRINT NAME AND TITLE OF SIGNER
FROM: AFFIX
STAMP
HERE
TO:
SOLICITATION NUMBER
DATE AND LOCAL TIME
ATTN: Jayson Skalla
DLA WEAPONS SUPPORT AT OKLAHOMA CIT
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
SPRTA126R1375
24 APR 2026 3:00 PM
STANDARD FORM 1447 (REV. 12/2022) BACK
SPRTA1-26-R-1375
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
-It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors would not be required to provide additional information necessary to determine price reasonableness. However, if after receipt of proposals it is determined that adequate price competition does not exist; cost or pricing data shall be required IAW 52.215-20 in Section L of this solicitation. The offeror shall provide “cost or pricing data” within 14 calendar days after receipt of the Government’s request.
-Qualification requirements may be found under clause 52.209-1. You are REQUIRED to be “Export Controlled” certified in order to receive and view the drawings for this solicitation. The web site for registration is http://www.dlis.dla.mil/jcp/. Engineering Instructions and Engineering Data List will be available to certified contractors via www.sam.gov. Contractor can request controlled data from the Buyer by submitting an approved DD2345, or proof of current certification in the Joint Certification Program.
-If the price exceeds $900,000 then a small business plan will be required.
Informational CLIN
Critical Safety Item Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
NSN: 2840 01 428 7655 NZ
DUCT,FAN,AIRCRAFT G
Ducts are designed to maximum load/maximum temperature plus margin during engine operation and have mounting points for engine accessories/tubes/cables.
Titanium Alloy Manufacturer Part Number 23163 4081642 52661 4081642 Associated Document(s) Line Item(s)
FD20302501375 01 0001
Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity None N/A N/A
Bid A First Article Test Plan
Bid A First Article Required Item No.
0001AA
Firm Fixed Price Quantity U/I Unit Price Amount
Bid A First Article Test Plan
Bid A First Article Required 1 LO Not Seperately Priced
CLIN ACRN ACRN Total
0001AA AB
NSN: 2840 01 428 7655 NZ
FIRST ARTICLE TEST PLAN
First Article Test Plan IAW DD Form 1423 Associated Document(s) Line Item(s)
FD20302501375 01 0005
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001 2015 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FA8111 ORIGIN
Type / Ship To PACRN Mark For A FA8111 PAD FA Monitor Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A FA8111 1 LO *30 Calendar Days Non MilStrip
Proposed Delivery
A FA8111 1 LO
Bid A First Article Test Report
Bid A First Article Required Item No.
0001AB
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Seperately Priced
CLIN ACRN ACRN Total
0001AB AB
NSN: 2840 01 428 7655 NZ
FIRST ARTICLE TEST REPORT
Test Report IAW DD Form 1423 Associated Document(s) Line Item(s)
FD20302501375 01 0004
Bid A First Article Test Report
Bid A First Article Required Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001 2015 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A FA8111 ORIGIN
Type / Ship To PACRN Mark For A FA8111 PAD FA Monitor Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A FA8111 1 LO *120 Calendar Days Non MilStrip
Proposed Delivery
A FA8111 1 LO
Bid A First Article Required (Destructive Exhibit)
Bid A First Article Required Item No.
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AC AB
Note: This item will ship in place at the contractor’s facility and will be held until the First Article Test Report isapproved and the QAR has signed the WAWF receiving report confirming the first article has been accepted and can be invoiced for payment.
Note: This First Article is one of the requirements set forth in FAR Clause 52.209-3.
Note: The contractor may present this first article exhibit to the Government Quality Assurance Representative (QAR) for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.
NSN: 2840-01-428-7655 NZ
First Article First Article to be destroyed Associated Document(s) Line Item(s)
FD20302501375 01 0003
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2015 2008
Type / Ship To PACRN Mark For A FA8111 PAD FA Monitor Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A FA8111 1 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A FA8111 1 EA
Bid A - First Article Required (Non-Destructive Exhibit)
Bid A - First Article Required Item No.
0001AD
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
CLIN ACRN ACRN Total
0001AD AB
Note: These First Article exhibits are the remaining two first articles required by FAR Clause 52.209-3. Do not ship these exhibits with the First Article Test Report. These two exhibits may be presented to the Government QAR for Inspection and Acceptance when the Contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.
NSN: 2840 01 428 7655 NZ
First Article Exhibits for Non Destructive Testing Associated Document(s) Line Item(s)
FD20302501375 01 0002
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001 2015 2008
Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A SW3211 2 EA *120 Calendar Days Non MilStrip
Proposed Delivery
A SW3211 2 EA
Bid A First Article Required (Production Items)
Bid A First Article Required Item No.
0001AE
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
1 EA
Minimum Quantity
1 EA
Maximum Quantity
5 EA
CLIN ACRN ACRN Total
0001AE AB
NSN: 2840 01 428 7655 NZ
PRODUCTION ITEMS
Associated Document(s) Line Item(s)
FD20302501375 01 0001
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001 2015 2008
Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) Specified Date _ Req No / Pri
Required Delivery
A SW3211 1 EA 29 DEC 2027
Proposed Delivery
A SW3211 1 EA
Bid B First Article Not Required (Production Items)
Bid B First Article Not Required Item No.
0001AF
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Minimum Quantity
1 EA
Maximum Quantity
5 EA
CLIN ACRN ACRN Total
0001AF AB
NSN: 2840 01 428 7655 NZ
PRODUCTION ITEMS
Associated Document(s) Line Item(s)
FD20302501375 01 0001
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001 2015 2008
Buy American Act/Balance of Payments Program
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) Specified Date _ Req No / Pri
Required Delivery
A SW3211 3 EA 29 DEC 2027
Proposed Delivery
A SW3211 3 EA
Comprehensive Engine Management System
PN: 4081642 (Applicable to SubClin: 0001) Item No.
Firm Fixed Price Quantity U/I Not Seperately Priced Amount 1 LT Not Seperately Priced
NSN: 2840 01 428 7655 NZ
Data CEMS Tracked Associated Document(s) Line Item(s)
FD20302501375 01 0006
Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) Specified Date _ Req No / Pri
Required Delivery
A SW3211 1 LT 29 DEC 2027 Non MilStrip
Proposed Delivery
A SW3211 1 LT
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + ATBDTBD
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + CNOTE
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A FA8111
FA8111 AFLCMC LZPED
CP 405 736 7455
3001 STAFF DR STE 1AF1 105A
TINKER AFB OK 73145 3303 73145 3303
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145 8000
TINKER AFB OK
TINKER AFB OK
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A TBDTBD
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
CEMS TRACKING
PART I THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higher level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
Title Number Date Tailoring *See Individual Line Item Schedule
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
PART I THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2))
(a) The Government requires delivery to be made according to the following schedule:
DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH ITEM IN THE
SCHEDULE.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
52.211-8 TIME OF DELIVERY -- ALTERNATE I (APR 1984)
(IAW FAR 11.404(a)(2))
If the delivery schedule is expressed in terms of specific calendar dates or specific periods and is based on an assumed date of award, the contracting officer may substitute the following paragraph (b) for paragraph (b) of the basic clause. The time may be expressed by substituting "on or before"; "during the months ..."; or "not sooner than ... or later than ..." as headings for the third column of paragraph (a) the basic clause.
(b) The delivery dates or specific periods above are based on the assumption that the Government will make award by 00 0000 . Each delivery date in the delivery schedule above will be extended by the number of calendar days after the above date that the contract is in fact awarded. Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed or otherwise furnished to the successful offeror results in a binding contract.
Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails.
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c))
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f))
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b))
Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address:
[CONTRACTOR FILL IN]
PART I THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step by step procedures for self registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
SEE DFARS CLAUSE 252.232 7003 (b)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
SEE SCHEDULE, SECTION B
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF SOLICITATION Issue By DoDAAC SEE FRONT PAGE OF SOLICITATION Admin DoDAAC SEE FRONT PAGE OF SOLICITATION Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC SEE SCHEDULE SECTION E LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
SEE FRONT PAGE OF SOLICITATION
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
CONTACT LOCAL DCMA OFFICE
(2) For technical WAWF help, contact the WAWF helpdesk at 866 618 5988.
(The above Clause/Provision has been modified.)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AB 97 X4930 .FC04 64 6 47 GT 15380F 01N000 00000 503000 F03000 $0.00
PSR: K42932 FSR: 013352 DSR: 226342 CIN: F3YCAB5309A0120000AB
ACRN TOTAL $ 0.00
PART I THE SCHEDULE
SECTION H
SPECIAL CONTRACT REQUIREMENTS
DLAD Procurement Notes
C01 Superseded Part Numbered Items (FEB 2025)
When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.
C02 Manufacturing Phase Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components
(DEC 2016)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase out to DLA DMSMS at dscc.dmsms@dla.mil.
C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)
By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of Defense Logistics Acquisition Directive (DLAD) Procurement Notes Effective April 3, 2025 2 this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.
Supply Chain Traceability Documentation (i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing source’s Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. (ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit Detection AvoidanceProgram/). (iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.
The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
C14 Correction of Nonconforming Packaging or Marking (MAY 2020)
(1) The Government may correct nonconforming packaging or marking for receipts of DLA owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
(2) If the estimated costs of correction for receipts of DLA owned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
H04 Sourcing for Critical Safety Items (APR 2024)
The contractor procuring, modifying, repairing, or overhauling a critical safety item shall only use a source approved by the head of the design control activity.
L06 Agency Protests (DEC 2016)
Interested parties may file an agency level protest with the contracting officer or may request an independent review by the chief of the contracting office (CCO). Independent review by the CCO is an alternative to consideration by the contracting officer and is not available as an appellate review of a contracting officer decision on a protest previously filed with the contracting officer. Absent a clear indication of the intent to file an agency level protest with the CCO for independent review, protests will be presumed to be protests to the contracting officer.
PART II CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (JUN 2023)
(IAW DAFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.
The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee employer actions, contests of OMB Circular A 76 competition performance decisions).
(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION – AOCA’s CA/ombudsman can be reached at 385 591 1672, facsimile (405) 734 8129. Complaints which cannot be so resolved shall be forwarded to the HQ through J 72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the Contracting Officer.
(The above Clause/Provision has been modified.)
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-
CONTRACT-RELATED FELONIES (JAN 2023)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(DEC 2022)
(IAW DFARS 203.970)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)
(IAW FAR 4.2004)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW 4.2105(b))
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)
(IAW FAR 4.2203)
52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION
(DEC 2023)
(IAW FAR 4.2306(c))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)
(IAW Class Deviation 2024-O0013 Rev. 1)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (JAN 2023)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
(IAW DFARS 204.2105(c))
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)
(IAW DFARS 204.7304(e))
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.
(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.
(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
Item No Agency Name/Address
0001AA
0001AB
0001AC
0001AD
0001AE
0001AF
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name ______________________________
Manufacturer's Name _________________________
Source's Name ______________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
FA Test Report Item ***Type/Location **Calendar Days
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR
VOLUNTARILY (JAN 2025)
(IAW FAR 9.409)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)
(IAW DFARS 209.270-5)
(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:
Line Item Description
0001 NSN: 2840 01 428 7655NZ
0001AA NSN: 2840 01 428 7655NZ
0001AB NSN: 2840 01 428 7655NZ
0001AC NSN: 2840 01 428 7655NZ
0001AD NSN: 2840 01 428 7655NZ
0001AE NSN: 2840 01 428 7655NZ
0001AF NSN: 2840 01 428 7655NZ
0002 NSN: 2840 01 428 7655NZ
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.302)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b))
This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)
(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique id.html.
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique id.html.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232 7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
(IAW FAR 15.209(b)(1))
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h))
52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)
(IAW FAR 15.408(f)(1))
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (OCT 2022)
(IAW FAR 19.1309(b))
(b) Waiver of evaluation preference.
__ Offeror elects to waive the evaluation preference.
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)
(IAW FAR 19.708(a))
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)
(IAW FAR 19.708(b))
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN -- ALTERNATE II (NOV 2016)
(IAW FAR 19.708(b)(1)(ii))
52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (SEP 2021)
(IAW FAR 19.708(b)(2))
52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)
(IAW FAR 19.309(c)(1))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women owned small business concern.
(4) Women owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(5) Economically disadvantaged women owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service disabled veteran owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019) (IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I
(DEC 2019)
(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))
252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (DEC 2022)
(IAW DFARS 219.708(b)(1)(B))
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2025)
(IAW FAR 22.1505(b))
52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)
(IAW FAR 22.610)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(a) Definitions. As used in this clause “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60 300.5(a), as of March 24, 2014.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .