SPRTA126R0140_______0001.pdf

PDF 108 KB Posted

Attached to
SUPPORT, TURBINE COM
Solicitation number
SPRTA126R0140
Issued by

About this file

This is a Standard Form 30 amendment to solicitation SPRTA1-26-R-0140, issued by DLA Weapons Support at Oklahoma City on June 11, 2026, with an effective date of June 11, 2026. The amendment makes three key changes to the procurement: (1) adds a new approved supply source, manufacturer part number 32816, to the existing list of approved sources (61344 and 51992, all producing part number 4084713); (2) extends the solicitation proposal due date from June 12, 2026 to July 11, 2026; and (3) states that all other terms and conditions remain unchanged. Offerors must acknowledge receipt of this amendment prior to the new deadline through completion of items 8 and 15, acknowledgment on each copy of the offer, or separate written communication referencing the solicitation and amendment numbers.

The underlying solicitation seeks 415 units (with a range of 104 to 623 units) of a turbine combustor support assembly (NSN 2840-01-446-6205 NZ) fabricated from nickel alloy for use as a critical safety item in F-100 series turbine engines. The procurement requires first article approval testing in accordance with FAR 52.209-3 and DD Form 1423, with qualification requirements per FAR 52.209-1. Offerors must be approved sources and must meet ISO 9001-2015 standards. Two bidding options are available: Bid A includes first article testing and requires submission of a test plan, test report, one destructively tested exhibit, and two non-destructively tested exhibits plus production units; Bid B waives first article testing and proposes 415 production units directly. Delivery is required by January 31, 2028, with F.O.B. origin at the contractor's facility. Payment will be made via Wide Area Workflow (WAWF) in accordance with FAR 52.232-25 (Prompt Payment). Award will be made on a firm fixed-price basis to one contractor using best value source selection procedures, with technical acceptability as a prerequisite, followed by evaluation of price and past performance on approximately equal weight. The Government will use the contractor's Supplier Risk Score and other past performance data to assess confidence levels. The estimated cost factor for first article testing is $2,500.00 and will be added to evaluated Bid A proposals.

View the file

Other files

File Type Posted
SPRTA126R0140.pdf PDF
TRNSPDATA_REPORT.pdf PDF
PKGRQMT_REPORT.pdf PDF
FA_CDRL1_REPORT.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2. AMENDMENT/MODIFICATION NUMBER

PAGE OF PAGES

5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE

(X)

4. REQUISITION/PURCHASE REQUISITION NUMBER3. EFFECTIVE DATE

1. CONTRACT ID CODE

SPRTA1-26-R-0140-0001

DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: James Headington/DLA/AOAA james.headington.1@us.af.mil Phone: (385) 591- 1663

SPRTA1

11 JUN 2026 FD20302600244ADV

J

X

SPRTA126R0140

11-JUN-2025

X X

X

New Manufactured Materials / Critical Safety Item

To be eligible for contract award, offerors must be approved sources, in accordance with the Qualification Requirements clause. Note that the Government is not required to delay the

SPRTA1-26-R-0140-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to make the following changes to the solicitation:

First: Adding new supply sources:

From: 61344 51992

To: 61344 51992 32816

Second: Change solicitation proprosal due date:

From: 12 Jun 2026

To: 11 July 2026

Third: All other terms and conditions shall remain unchanged under this solicitation.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Qualification Requirements apply. Evaluation of offers and award will be made to only the source(s) that has successfully completed all qualification requirements prior to award. The Government will NOT delay contract award to review pending Source Approval Requests (SARs).

First Article Waiver: First article waiver will be considered for offerors who have previously furnished production quantities in the last 36 months of the same or similar articles to the Government, provided articles thus furnished have exhibited satisfactory performance in service, in the opinion of the Air Force.

Offerors who have previously furnished production quantities of the same to the prime contractor for delivery to the Government. Also, First article testing is waived if the offeror is the prime contractor, Pratt & Whitney.

First Article Note: First Article Offeror will be accepted under Bid A (CLINs 0001AA, 0001AB, 0001AC, 0001AD and 0001AE). If your company meets the condition for First Article Waiver, please propose ONLY under Bid B (CLIN 0001AF).

PRICING NOTE 1: In order to maintain unit price integrity, contractor must individually price Line Items or clearly state that there is a "ZERO DOLLAR CHARGE" for these items.

PRICING NOTE 2: If certified cost and pricing data is required to determine a fair and reasonable price, the contractor will submit along with the proposal IAW 15-408 Table 15-2. If offeror does not comply with the requirement to submit data for a contract or subcontract in accordance IAW FAR 15.403-3(a)(4), and DFARS 252.215-7009 they will be considered ineligible for award.

PRICING NOTE 3: Any NRE expenses shall be proposed separately. NRE expenses as defined by FAR 17.106-1(c)(2) shall be submitted at time of proposal submission. If offeror does not comply with a requirement to submit data for a contract or subcontract in accordance IAW FAR 15.403-3(a)(4), they will be considered ineligible for award.

PRICING NOTE 4: If uncertified cost and pricing data is required to determine a fair and reasonable price, the contractor will submit along with proposal submission IAW FAR 15-403-3. As specified in Section 808 of Public Law 105-261, an offeror who does not comply with a requirement to submit information for a contract or subcontract in accordance with paragraph (a)(1) of this subsection and Strom Thurmond Act is ineligible for award.

PRICING NOTE 5: The Government will not pay excessive pass-through charges IAW FAR 52.215-22.

The Contracting Officer, or authorized representative, shall have the right to examine and audit all the Contractor's records (as defined at FAR 52.215-2(a) necessary to determine whether the Contractor proposed, billed, or claimed excessive pass-through charges.

The required quantity is for 415 each. However, this is a range requirement with a minimum: 104 each and maximum: 623 each. Quantity will be revalidated with Item Manager prior to award.

Informational CLIN

Item No.

Informational CLIN

Firm Fixed Price Best Estimated Qty

U/I Quantity

415 EA

Quantity Range A

1 EA 155 EA

Quantity Range B

156 EA 310 EA

Quantity Range C

311 EA 466 EA

Quantity Range D

467 EA 623 EA

NSN: 2840-01-446-6205 NZ

SUPPORT,TURBINE COM

PROVIDES SUPPORT FOR 2ND STAGE DUCT SEGMENTS

NICKEL ALLOY

Manufacturer Part Number 32816 4084713 51992 4084713 61344 4084713 Priority: R Applicability: None ;

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

FIRST ARTICLE TEST PLAN

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AA AA

First Article Test Plan First Article Test Plan IAW DD Form 1423

2840DTH260007NZ

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 2008

FIRST ARTICLE TEST PLAN

Bid A - First Article Required

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FA8111 ORIGIN

Type / Ship To PACRN Mark For A FA8111 PAC First Article Monitor Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A FA8111 1 LO *30 Calendar Days Non-MilStrip

Proposed Delivery

A FA8111 1 LO

NOTE: DO NOT proceed with line items 0001AB and 0001AC until the First Article Test Plan has been reviewed by the Engineering Activity. Estimated approval/disapproval time is 45 days.

NOTE: Contractor First Article Test Plan IAW DD 1423-1, attached hereto.

FIRST ARTICLE TEST REPORT

Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced

CLIN ACRN ACRN Total

0001AB AA

First Article Test Report

TEST REPORT IN ACCORDANCE WITH DD FORM 1423, ATTACHED HERETO.

2840DTH260006NZ

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

A FA8111 ORIGIN

Type / Ship To PACRN Mark For A FA8111 PAC First Article Monitor Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A FA8111 1 LO *120 Calendar Days Non-MilStrip

FIRST ARTICLE TEST REPORT

Bid A - First Article Required Proposed Delivery

A FA8111 1 LO

NOTE: Contractor First Article Test Report IAW DD 1423-1, attached hereto.

BID A-FIRST ARTICLE REQUIRED (DESTRUCTIVE EXHIBIT)

Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AC AA

First Article - First Article to Be Destroyed

SUPPORT,TURBINE COM

2840014466205NZ

Note: This item will ship in place at the contractor's facility and will be held until the First Article Test Report is approved and the QAR has signed the WAWF receiving report confirming the first article has been accepted and can be invoiced for payment.

Note: This First Article is one of the requirements set forth in FAR Clause 52.209-3.

Note: The contractor may present this first article exhibit to the Government Quality Assurance Representative (QAR) for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

B FA8111 ORIGIN

Type / Ship To PACRN Mark For

B FA8111 PAC FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

B FA8111 1 EA *120 Calendar Days Non-MilStrip

Proposed Delivery

B FA8111 1 EA

NOTE: The first article exhibit shall be destructively tested/evaluated IAW LPF-QAR-003 (attached hereto) and will be condemned and disposed of at the contractor’s facility.

BID A-FIRST ARTICLE REQUIRED (NON-DESTRUCTIVE EXHIBIT)

Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AD AA

First Article - First Article Non-Destructive Units

SUPPORT,TURBINE COM

NOTE: These First Article exhibits are the remaining two first articles required by FAR Clause 52.209-3. Do not ship these exhibits with the First Article Test Report. These two exhibits may be presented to the Government QAR for Inspection and Acceptance when the Contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

B FA8111 ORIGIN

Type / Ship To PACRN Mark For

B FA8111 PAC FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

B FA8111 2 EA 31 DEC 2027 Non-MilStrip

Proposed Delivery

B FA8111 2 EA

NOTE 1: The quantity of First Article exhibits for Line Item 0001AD may be considered part of the contract quantity if the First Articles on Line Item 0001AC are approved by the Government as required by FAR Clause 52.209-3.

NOTE 2: These items will ship in place at the contractor's facility and will be held until the First Article Test Report has been reviewed and approved and the Government Quality Assurance (QAR) has signed the WAWF receiving report confirming the First Articles have been accepted and can be invoiced for payment. This note refers to the "TYPE/SHIP TO" block of this item number and the data associated with the block.

NOTE 3: The contractor may present these First Article exhibits to the QAR for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification data associated with that block.

NOTE 4: The First Articles offered must be manufactured at the facilities in which those items are to be produced under the contract ,or if the First Articles are a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 5: The contractor SHALL NOT take any action on Line Item 0001AE until approval/disapproval is received for the First Article Units required in above line items.

BID-A FIRST ARTICLE REQUIRED (PRODUCTION ITEMS)

Item No.

0001AE

Firm Fixed Price Best Estimated Qty

U/I Unit Price Amount

413 EA

CLIN ACRN ACRN Total

0001AE AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

A SW3211 ORIGIN

Type / Ship To PACRN Mark For

A SW3211 PAC ACCT 09

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A SW3211 413 EA 31 JAN 2028 Non-MilStrip

Proposed Delivery

A SW3211 413 EA

INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW (WAWF) .

NOTE: If the First Article units for Line Item 0001AD are approved by the Government, then 2 each will become a part of production for Line Item 0001AE and combine to make the current required quantity of 415 each.

The required quantity is for 415 each. However, this is a range requirement with a minimum: 104 each and maximum: 623 each. Quantity will be revalidated with Item Manager prior to award.

BID B-FIRST ARTICLE NOT REQUIRED (PRODUCTION ITEMS)

Bid B- First Article Not Required Item No.

0001AF

Firm Fixed Price Quantity U/I Unit Price Amount

415 EA

CLIN ACRN ACRN Total

0001AF AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Priority: R

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

ISO 9001-2008 2008

A SW3211 ORIGIN

Type / Ship To PACRN Mark For

A SW3211 PAC ACCT 09

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A SW3211 415 EA 31 JAN 2028 Non-MilStrip

Proposed Delivery

A SW3211 415 EA

INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW (WAWF) .

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + CNOTE

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FA8111

FA8111 AFLCMC LZPED

CP 405 736-7455

3001 STAFF DR STE 1AF1 105A

TINKER AFB OK 73145-3303 73145-3303

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B FA8111

DEPARTMENT OF THE AIR FORCE

AFLCMC/LZPED SO-TINKER

3001 STAFF DR STE 1AB85A

ATTN: FIRST ARTICLE MONITOR

TINKER AFB OK 73145-3303

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements

N/A

Lot/Item Contractor Test/Inspection Requirements See Below

Contractor Testing Criteria:

Identified in drawing 4084713, sub-tier drawings (if an assembly), and specifications identified therein.

NOTE 1: First Article testing requirements shall be per LPF-QAR-003 and the following:

A. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003.

B. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

C. After completion of the inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

Contractor Testing Report Forwarded To:

AFLCMC/EZGED

3001 STAFF DRIVE, STE 1AB85A

TINKER AFB, OK 73145-3041

ATTN: FIRST ARTICLE MONITOR

DODAAC: FA8111

NOTE 2: First Article Quantity is 3 Parts:

- 2 Parts will be part of production quantity

- 1 Part will be expended in testing

NOTE 3: Disposition of First Articles: Destructively tested First Articles will be condemned and disposed of at vendors facility.

NOTE 4: The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver identified. First Article testing is waived if the offeror is the prime contractor OEM, Pratt & Whitney.

NOTE 5: This is a critical part used in the F-100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article testing is required to ensure first time manufacturers or manufacturers that have not produced the item within three years of manufacture in accordance with the drawing and specification requirements.

Disposition of the First Article shall be as follows:

Lot/Item Approved

0001AC

0001AD

Expended in Testing Returned to Contractor for Shipment with Production Item(s).

Lot/Item Disapproved

0001AC

0001AD

Returned to Contractor Returned to Contractor

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and re(a) Definitions. As used in this clause— ceiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

SEE DFARS CLAUSE 252.232-7003 (b)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

SEE SCHEDULE, SECTION B

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF SOLICITATION Issue By DoDAAC SEE FRONT PAGE OF SOLICITATION Admin DoDAAC SEE FRONT PAGE OF SOLICITATION Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC SEE SCHEDULE SECTION E LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

SEE FRONT PAGE OF SOLICITATION

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTACT LOCAL DCMA OFFICE

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 5 47 GT 15380N 01N000 00000 000000 503000 F03000 $0.00

PSR: K38807 FSR: 013352

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes.

The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION – AOCA’s CA/ombudsman can be reached at 385-591-1672, facsimile (405) 734-8129. Complaints which cannot be resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)

(IAW FAR 3.1004(a))

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

(IAW FAR 3.906)

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-

CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

252.203-7004 DISPLAY OF HOTLINE POSTERS (JAN 2023)

(IAW DFARS 203.1004(b)(2)(ii))

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(OCT 2024)

(IAW DFARS 205.470)

252.208-7000 INTENT TO FURNISH PRECIOUS METALS AS GOVERNMENT-FURNISHED

MATERIAL (DEC 1991)

(IAW DFARS 208.7305(a))

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address AFSC Small Business Office (AFSC/SB) 3001 Staff Drive Suite 1AG85A Tinker AFB OK 73145-3009 Email: afsc.sb.workflow@us.af.mil Email: jenise.lucero.1.ctr@us.af.mil Email: Cory Wilson.1@us.af.mil

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity 0001AC/0001AD 10 day 3 each

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No_______ Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

0001AB 60 day

FA Test Report Item ***Type/Location **Calendar Days 0001AB FA8111 120 Day

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)

(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2)) As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:

(i) The Contractor shall produce both the first article and the production quantity at the same facility.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE II (SEP 1989)

(IAW FAR 9.308-1(a)(3), FAR 9.308-1(b)(3)) As prescribed in 9.308-1(a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause:

(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR

VOLUNTARILY (JAN 2025)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)

(IAW DFARS 209.270-5)

52.210-1 MARKET RESEARCH (NOV 2021)

(IAW FAR 10.003)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b))

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

(IAW FAR 19.507(c))

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE -- ALTERNATE I (MAR 2020)

(IAW FAR 19.507(c))

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)

(IAW FAR 19.708(a))

52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (FEB 2023)

(IAW Deviation 2021-O0008 Rev 1.)

52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)

(IAW FAR 19.309(c)(1))

52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2025)

(IAW FAR 22.1505(b))

52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)

(IAW FAR 22.610)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(IAW FAR 22.810(a)(1))

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

(IAW FAR 22.1408(a))

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

(IAW FAR 22.1310(b))

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-50 COMBATING TRAFFICKING IN PERSONS (OCT 2025)

(IAW FAR 22.1705(a)(1))

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)

(IAW FAR 22.1803)

252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS

(JAN 2023)

(IAW DFARS 222.7405)

52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL

HYDROFLUOROCARBONS (MAY 2024)

(IAW FAR 23.109(d)(1))

52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION 2025-O0004) (MAR 2025)

(IAW 23.109(a))

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)

(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))

252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING

FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS

(MAR 2024)

(IAW DFARS 223.7404)

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a))

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

(IAW FAR 25.1103(a))

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024)

(IAW DFARS 225.1101(2)(i) and (2)(ii))

252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022)

(IAW DFARS 225.1101(3))

252.225-7008 RESTRICTION ON ACQUISITION OF SPECIALTY METALS (MAR 2013)

(IAW DFARS 225.7003-5(a)(1), DFARS 212.301(f)(xxiv))

252.225-7009 RESTRICTION ON ACQUISITION OF CERTAIN ARTICLES CONTAINING SPECIALTY

METALS (JAN 2023)

(IAW DFARS 225.7003-5(a)(2), DFARS 212.301(f)(xxv))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)

(IAW DFARS 225.7002-3(a))

252.225-7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JAN 2023)

(IAW DFARS 225.7009-5)

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND

TUNGSTEN (MAY 2024)

(IAW DFARS 225.7018-5)

252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT

AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)

(IAW DFARS 225.7023-4)

252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS

(DEVIATION 2024-O0006, REVISION 1) (FEB 2024) (FEB 2024)

(IAW CLASS DEVIATION 2024-O0006, REVISION 1)

252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)

(IAW Deviation 2024-O0014)

52.226-7 DRUG-FREE WORKPLACE (MAY 2024)

(IAW FAR 26.506)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (MAY 2024)

(IAW FAR 26.605)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (JAN 2023)

(IAW DFARS 226.104)

52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

(IAW FAR 27.201-2(a)(1))

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (JUN 2020)

(IAW FAR 27.201-2(b))

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(IAW FAR 29.401-3(a))

252.229-7014 FULL EXEMPTION FROM TWO-PERCENT EXCISE TAX ON CERTAIN FOREIGN

PROCUREMENTS. (OCT 2022)

(IAW DFARS 229-402(k))

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1))

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1))

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-25 PROMPT PAYMENT (JAN 2017)

(IAW FAR 32.908(c)) Notwithstanding any other payment clause in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer (EFT). Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(4) of this clause concerning payments due on Saturdays, Sundays, and legal holidays.)

(a) Invoice payments—

(1) Due date.

(i) Except as indicated in paragraphs (a)(2) and (c) of this clause, the due date for making invoice payments by the designated payment office is the later of the following two events:

(A) The 30th day after the designated billing office receives a proper invoice from the Contractor (except as provided in paragraph (a)(1)(ii) of this clause).

(B) The 30th day after Government acceptance of supplies delivered or services performed. For a final invoice, when the payment amount is subject to contract settlement actions, acceptance is deemed to occur on the effective date of the contract settlement.

(ii) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(2) Certain food products and other payments.

(i) Due dates on Contractor invoices for meat, meat food products, or fish; perishable agricultural commodities; and dairy products, edible fats or oils, and food products prepared from edible fats or oils are-

(A) For meat or meat food products, as defined in section 2(a)(3) of the Packers and Stockyard Act of 1921 (7 U.S.C. 182(3)), and as further defined in Pub. L. 98-181, including any edible fresh or frozen poultry meat, any perishable poultry meat food product, fresh eggs, and any perishable egg product, as close as possible to, but not later than, the 7th day after product delivery.

(B) For fresh or frozen fish, as defined in section 204(3) of the Fish and Seafood Promotion Act of 1986 (16 U.S.C. 4003(3)), as close as possible to, but not later than, the 7th day after product delivery.

(C) For perishable agricultural commodities, as defined in section 1(4) of the Perishable Agricultural Commodities Act of 1930 (7 U.S.C. 499a(4)), as close as possible to, but not later than, the 10th day after product delivery, unless another date is specified in the contract.

(D) For dairy products, as defined in section 111(e) of the Dairy Production Stabilization Act of 1983 (7 U.S.C. 4502(e)), edible fats or oils, and food products prepared from edible fats or oils, as close as possible to, but not later than, the 10th day after the date on which a proper invoice has been received. Liquid milk, cheese, certain processed cheese products, butter, yogurt, ice cream, mayonnaise, salad dressings, and other similar products, fall within this classification. Nothing in the Act limits this classification to refrigerated products. When questions arise regarding the proper classification of a specific product, prevailing industry practices will be followed in specifying a contract payment due date. The burden of proof that a classification of a specific product is, in fact, prevailing industry practice is upon the Contractor making the representation.

(ii) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the due date will be as specified in the contract.

(3) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(3)(i) through (a)(3)(x) of this clause. If the invoice does not comply with these requirements, the designated billing office will return it within 7 days after receipt (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, dairy products, edible fats or oils, and food products prepared from edible fats or oils), with the reasons why it is not a proper invoice. The Government will take into account untimely notification when computing any interest penalty owed the Contractor.

(i) Name and address of the Contractor.

(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of the mailing or transmission.)

(iii) Contract number or other authorization for supplies delivered or services performed (including order number and line item number).

(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed.

(v) Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.

(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.

(viii) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(ix) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer--Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by

EFT.

(x) Any other information or documentation required by the contract (e.g., evidence of shipment).

(4) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(4)(i) through…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .