SPRTA126Q0251.pdf
PDF 2 MB Posted
- Attached to
- Stator, Engine Gener
- Solicitation number
- SPRTA1-26-Q-0251
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Letter Solicitation issued by the Defense Logistics Agency (DLA) Aviation at Oklahoma City to Unison Industries LLC for a sole-source procurement of engine stator components. The solicitation requests pricing and delivery information for National Stock Number (NSN) 2925-01-425-7087PN (Part Number 44376-1 or 9974M82P03), with a required quantity of 2-9 units for delivery on or before March 13, 2028. The item is designated as a Critical Safety Item requiring new manufacture only, with surplus prohibited. Inspection and acceptance will occur at origin with receiving report required. Quality assurance requirements include FAR 52.246-2 through 52.246-6 as applicable, and higher-level contract quality requirements per FAR 52-246-11, ISO 9001:2000, AS 9100, and NATO AQAP2070 or equivalent standards. The procurement is governed by Blanket Order Agreement SPE4A1-24-G-0003, and the solicitation closing date is April 14, 2026. Unison must provide capacity, production lead time, and pricing based on the specified quantity ranges, with shipment directed to DLA Distribution Depot Oklahoma at Tinker AFB (Ship-To Code SW3211).
The solicitation includes Item Unique Identification (IUID) requirements per DFARS 252.211.7003 with bag/tag marking methodology, and references four attachments covering packaging requirements (MIL-STD-129 and MIL-STD-2073-1 standards with wood packaging material compliance), transportation data (F.O.B. Origin with DCMA coordination required), IUID checklist, and qualification requirements per MQR-PSD-1 Revision 2. Packaging specifications detail preservation level MIL Long Line with specific dimensions and weight parameters. The contracting officer is Keith J. Russ, DLA Weapons Support at OKC-AOAB, reachable at keith.russ@us.af.mil. The qualification requirements document establishes sourcing criteria including mandatory Company Profile submission with valid quality certifications (ISO 9001, AS9100, or NATO AQAP-2070), Source Approval Request (SAR) procedures with two-package structure addressing engineering data and manufacturing capability demonstration, and periodic resubstantiation every three years for Critical Safety Items.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
MEMORANDUM FOR: James Anderson / Unison Industries LLC (Unison)
FROM: DLA Aviation – AOAB / 3001 Staff Dr., 2B95 / Tinker AFB, OK 73145
SUBJECT: Letter Solicitation SPRTA1-26-Q-0251
This Solicitation is issued for the purpose of acquiring the supply below, which is sole sourced to Unison Industries LLC.
CLIN P/N NSN Noun BEQ Quantity 0001 44376-1 or 9974M82P03 2925-01-425-7087PN Stator, Engine Gener 6 EA
Please provide pricing and delivery for purchase of this NSN in accordance with the terms and conditions of BOA SPE4A1-24-G-0003.
Unison is requested to provide capacity, PLT and pricing based upon the quantity listed below.
New Manufacture - Surplus is "NOT AUTHORIZED" for this procurement / Early Delivery Acceptable.
CLIN 0001: Quantity 2-9 each: Unit $ / Delivery Date:
IUID APPLIES: DFARS 252.211.7003
Critical Safety Item (CSI): YES
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required.
Quality Assurance: Contract Quality Requirements/Special Inspection Requirements:
Standard inspection Far 52.246-2,-3,-4,-5,-6 AS APPLICABLE TO CONTRACT Higher Level Contract Quality Requirements FAR 52-246-11, ISO 9001:2000, AS 9100, NATO AQAP2070, (or equivalent) ODS CERTIFICATION (Provided in lieu of Block 8a./Ozone Depleting Substances):
The subject requirement does not include any specification, standard, drawing, or other document that mandates the use of a Class I ODS in the manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; nor does it establish a test, operation, or maintenance requirement that can only be met by use of a Class I ODS.
Buy American Act/balance of Payments Program
Requested BEQ Delivery: 2-9 each – “On or Before” 13 Mar 2028.
Ship to:
CLIN 0001 – SW3211
The terms and conditions of BOA # SPE4A1-24-G-0003 will apply to this NSN. Please respond with your pricing and delivery for the item by the solicitation closing date of 14 Apr 2026. If you have any further questions, please contact Keith Russ at keith.russ@us.af.mil.
Sincerely, DEFENSE LOGISTICS AGENCY
AVIATION AT OKLAHOMA CITY
3001 STAFF DRIVE POST 2B95
TINKER AIR FORCE BASE, OKLAHOMA 73145-3015
10 Mar 2026 mailto:keith.russ@us.af.mil
//SIGNED//
Keith J. Russ Contracting Officer DLA Weapons Support at OKC-AOAB
ATTACHMENTS:
NOTE 1 – Packaging Requirements NOTE 2 – Transportation Data NOTE 3 – IUID Checklist NOTE 4 – Qualification Requirements
PACKAGING REQUIREMENTS
PURCHASE INSTRUMENT NUMBER: FD20302600865-00 VERSION: 1
MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN
PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAA MIL Long Line Packaging MIL B
ITEM(S):
2925014257087PN
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
1 000 41 1 00 EA NA A NR 00 B 17 4.55 10.5 10.5 12.5 0.797 M
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
ORGANIZATION / OFFICE SYMBOL:
406 SCMS / GULAA
PACKAGING SPECIALIST:
Davis, Richard R
PHONE NUMBER:
405-371-9037 / 582-5972
SIGNATURE:
//SIGNED//Davis, Richard R
DATE:
26012 - 12 JAN 2026
Page 1 of 1AFMC 158 Version 1Generated by PRPS using Jasper Reports on 12 Jan 2026
TRANSPORTATION DATA FOR SOLICITATIONS
COMMODITY: See Continuation
PURCHASE INSTRUMENT NUMBER:
FD20302600865-00
DATE INITIATED:
12 JAN 2026
STOCK NUMBER: See Continuation
X ORIGIN DESTINATION OTHER DATA / FIRST ARTICLE F.O.B. DESTINATION(Specify)
F.O.B. TERMS RECOMMENDED AS BEST SUITED FOR THIS PROCUREMENT
TRANSPORTATION PROVISIONS / CLAUSES FAR CITATION
F.O.B. Origin 52.247-29 Freight Classification Description 52.247-53 Marking of Shipments 47.305-10 Contact DCMA Transportation Contact DCMA Transportation on ALL "DCMA Administered" contracts prior to shipment for shipping instructions using the DCMA Shipment Instruction Request (SIR) eTool System, at http://www.dcma.mil <http://www.dcma.mil/> for ALL FOB:
Origin, Foreign Military Sales (FMS), and FOB: Destination OCONUS/Export movements to obtain the appropriate DOD regulatory clearances, shipping documentation and instructions from your cognizant DCMA Transportation Office. If you are new to DCMA, and do not already have a SIR eTool account, you will first need to request an account via DCMA External Web Access Management (EWAM) application which can be accessed at http://www.dcma.mil. If you need additional assistance, email DCMA Transportation Group at: Transportation.Division@dcma.mil. Do not move any freight to a water or aerial port prior to contacting DCMA or it will become frustrated. Failure to contact the responsible DCMA may result in vendor incurring additional expenditures.
Vendor Transportation Instructions
TACRN:
AAA
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 97X4930.FC04 646 47GT 15119E 01N000 00000 000000 503000 F03000 FSR: 013352 PSR: K42941
First Destination Transportation Account Code: FRS2
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code:
FMS LOA:
Additional Funding Information:
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 2925014257087PN
Purchase Instrument Line Item Number: 0001
Ship to (DoDAAC / MAPAC): SW3211
Mark For: Acct 09
Ship To (Address): DLA DISTRIBUTION DEPOT OKLAHOMA
TINKER AFB OK 73145-8000
73145 - 8000
USA
WPOD:
APOD:
BBP / CCP:
RIC: 1
Requisition Number:
Supplemental Address:
FMS Case:
3301 F AVE CEN REC BLDG 506 DR 22
Ship To (Remarks):
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
OTHER TRANSPORTATION DATA:
NAME
Respert, Woodnell M
ORGANIZATION / OFFICE
SYMBOL
406 SCMS / GULAA
COMMERCIAL / DSN
PHONE
478-327-3412 / 497-3412
SIGNATURE
//SIGNED//Respert, Woodnell M
DATE
12 JAN 2026
Page 1 of 1DD FORM 1653 Version 1Generated by PRPS using Jasper Reports on 12 Jan 2026
ITEM UNIQUE IDENTIFICATION (IUID) CHECKLIST
I. IUID DETAILS: DFARS 252.211.7003
SECTION (c) (1) (ii) APPLIES TO THE FOLLOWING:
ITEM REQUIRING IUID MARKING
NSN
2925014257087PN
VERSION NUMBER
NOUN
STATOR,ENGINE GENER
INITIATOR
Williams, Jacqueline N
ORGANIZATION CODE / OFFICE SYMBOL
AFLCMC / LPSEB
COMMERCIAL PHONE
405-736-4335
DSN PHONE
336-4335
CAGE / REFERENCE NUMBER
MARKING IS TO BE PERFORMED IN ACCORDANCE WITH THE LATEST VERSION OF MIL-STD-130
MARKING GUIDANCE
Recommended Marking Instruction
ENGINEERING DRAWING / ECP / ECO NUMBER
MARKING TYPE
Bag/Tag
MARKING METHOD
BAG/TAG
DESCRIPTION / LOCATION
This is an commercial item. The government does not own the data needed to determine the marking location or method.
REMARKS
Williams, Jacqueline NNAME: 02 JUN 2021DATE:
This is an commercial item. The government does not own the data needed to determine the marking location or method.
ATTACHMENT(S)
II. EMBEDDED ITEMS
SECTION (c) (1) (iii) APPLIES TO THE FOLLOWING:
NSN NOUN
CAGE / REFERENCE NUMBER
ITEM IS AN EMBEDDED ITEM FOR NSN / PSEUDO NSN: 2925014257087PN
MARKING GUIDANCE ENGINEERING DRAWING / ECP / ECO NUMBER
MARKING TYPE MARKING METHOD
DESCRIPTION / LOCATION
REMARKS
ATTACHMENT(S)
Page 1 of 1IUID Version 3Generated by PRPS using Jasper Reports on 12 Jan 2026
29 October 2019 MQR-PSD-1
Revision 2
Page | 1
MANUFACTURE QUALIFICATION REQUIREMENTS (MQR) FOR
PROPULSION CRITICAL SAFETY ITEMS (CSI) & CRITICAL
APPLICATION ITEMS (CAI)
1. APPLICATION
2. SCOPE
3. SUBMITTAL CONSIDERATION
4. TECHNICAL DATA REQUEST
5. FORMAT FOR ALL SUBMITTED DOCUMENTATION
6. USE OF PROPRIETARY DATA
7. COMPANY PROFILE
8. SOURCE APPROVAL REQUEST (SAR)
9. DOCUMENT SUBMITTAL
10. EVALUATION METHODS
11. APPROVAL DURATION
12. SOURCE RESUBSTANTIATION REQUEST (SRR)
13. PROCESS CHANGE REQUEST (PCR)
APPENDIX A: SELF-ASSESMENT CHECKLIST (SAC)
APPENDIX B: SIGNIFICANT INDUSTRIAL PROCESS FORM
APPENDIX C: COVER LETTER REQUIREMENTS
APPENDIX D: SOURCE OF SUPPLY MATRIX FOR MODULES/ASSEMBLIES
APPENDIX E: TECHNICAL DATA RIGHTS CERTIFICATION LETTER
APPENDIX F: SIMILAR ITEM COMPARISON MATRIX
APPENDIX G: PROCESS CHANGE REQUEST (PCR) / SOURCE RESUBSTANTIATION REQUEST (SRR)
APPENDIX H: DEFINITIONS
Page | 2
1. APPLICATION
1.1. This MQR applies to CSI and CAI with an Acquisition Method Suffix Code (AMSC) of C, D, K, M, N, P, Q, R, S, V, and Z within the Propulsion Sustainment Division. This MQR does not apply to
1.2. This MQR establishes technical requirements, which Potential Sources (PS) must satisfy in order to obtain Engineering Support Activity (ESA) approval to manufacture propulsion items.
2. SCOPE
2.1. The PS must have a valid Company Profile on record with the ESA in order to gain source approval status. If one does not exist the PS must submit one. Company Profile requirements are described in section 7.
2.2. In order to gain source approval status, the PS must submit a SAR. The SAR requirements are described in section 8.
2.3. The Company Profile and SAR will be reviewed by the ESA and the PS will either be made an approved source, or denied source approval. See section 10.
2.4. Source approval status expires after 3 years for CSI, and 7 years for CAI. Sources that deliver parts on government contract, maintain source approval status. See section 11.
2.5. Approved sources shall submit a Source Resubstantiation Request (SRR) prior to expiration of the current approval period (recommended 60 days) in order to renew the approval status duration. See section 12.
2.6. Any time a change to the SAR documentation occurs, the approved source must submit a Process Change Request (PCR) for review by the ESA. See section 13.
2.7. The ESA may revoke the approval status of a PS at any time per FAR 9.207.
3. SUBMITTAL CONSIDERATION
3.1. The PS should consider submitting a SAR for evaluation after determining that the USAF is in need of the subject item. This can be done by considering the following:
3.1.1. Has the United States Air Force (USAF) listed a requirement in the System for
Award Management (SAM) at https://beta.sam.gov or DLA Bid Board System
(DIBBS) at https://www.dibbs.bsm.mil?
Page | 3
3.1.2. Has the procurement history for the item been researched and determined to be active?
3.1.3. Is the subject item listed in the Requirement Projection on the Web (RPOW)?
3.1.3.1. The RPOW can be found on the Strategic Alternative Sourcing Program
Office (SASPO) website: www.tinker.af.mil/Home/429SCMSSASPO/.
3.1.3.2. The forecasts contained on the RPOW may or may not generate due to variability in customer demands and priorities. The forecast data is for planning purposes only and does not constitute an invitation for bid or request for proposal and is not a commitment by the government to purchase the described items.
3.2. Any questions regarding SAR submission or the RPOW should be directed to either the
Air Force Small Business Office (SBO) or SASPO.
4. TECHNICAL DATA REQUEST
4.1. Requests related to any procurement announcement should be submitted to the announcing Contracting Officer.
4.2. If no procurement announcement exists, requests should be submitted to the Tinker
Engineering Drawing Public Sales Office at the following address/email:
AFLCMC/LZPEF
Tinker Engineering Drawing Public Sales
3001 Staff Drive, Suite 1AB82A
Tinker AFB, OK 73145-3041
Phone: 405-736-4676
Email: OCALC.LGLDO.PUBLIC@US.AF.MIL
4.3. Requests should identify the specific drawing(s) and specification(s) being requested, along with the solicitation information (if a procurement announcement exists).
4.4. Requests should be made on company letterhead along with an approved DD Form
2345 or Export Control License.
Page | 4
5. FORMAT FOR ALL SUBMITTED DOCUMENTATION
5.1. All financial data must be redacted from submitted documentation.
5.2. Packages should be submitted on a Compact Disk-Recordable (CD-R), Digital Versatile
Disc Recordable (DVD-R), or through an approved government file transfer system, in a
.pdf file format.
5.2.1. The package can be a single .pdf file with indexes linked to each element, or a series of files/folders for each element.
5.2.2. If the PS is submitting Company Profile documents at the same time as a SAR package, the Company Profile documents should be provided in a separate .pdf file and/or in a separate and clearly identified folder.
5.2.3. All documents should be scanned for viruses prior to submission.
5.2.4. If the CD-R is encrypted or password protected, provide a point of contact that can give access to the documentation. Zip files cannot be encrypted.
5.3. Packages submitted on a Compact Disk-Rewritable (CD-RW), Digital Versatile Disc
Rewritable (DVD-RW), or flash drive will not be accepted.
5.4. Company Profile and SAR packages must follow the order called out in Tables 1 and 2.
5.5. For all Company Profile and SAR submissions, a table of contents is expected.
5.6. Certain elements may not be required depending on the circumstances of the submittal. If an element is not applicable, the PS must provide a statement explaining why this is the case. Do not leave any element blank.
6. USE OF PROPRIETARY DATA
6.1. The PS is not to utilize intellectual property (IP) of any third parties without appropriate authorization of the IP owner. The PS is cautioned that no part of the government MQR is intended to endorse or encourage the improper use of IP developed by the Original
Equipment Manufacturer (OEM) or any other third party.
Page | 5
7. COMPANY PROFILE
Note: Any PS seeking source approval must have a valid Company Profile on record with the ESA.
Initial submission of a Company Profile should include all of the requirements listed in Table 1 and described in Elements 1-9. Company Profiles can be submitted at any time, standalone or in conjunction with a SAR. All information provided in the Company Profile may be kept by the ESA for use in future SAR reviews. A Company Profile is required for each unique CAGE code.
Company Profile Requirements
ELEMENT 1. Company Brochure/Website
ELEMENT 2. Quality Assurance Certificate (QAC)
ELEMENT 3. Self-Assessment Checklist (SAC)
ELEMENT 4. Quality Assurance System (QAS) Manual
ELEMENT 5. Equipment List
ELEMENT 6. DD Form 2345 or Export Control License
ELEMENT 7. Quality History
ELEMENT 8. Significant Industrial Process (SIP) Certifications
ELEMENT 9. Sub-Tier Supplier Info.
1. List of all Sub-Tier Suppliers (STS)
2. All STS Quality Assurance Certifications
3. Any STS Significant Industrial Process Certifications
Table 1. Company Profile Requirements
7.1. Element 1, COMPANY BROCHURE/WEBSITE
7.1.1. Provide a company brochure and/or website.
7.2. Element 2, QUALITY ASSURANCE CERTIFICATE (QAC)
7.2.1. Provide one of the following QAC with a valid expiration date: ISO 9001, AS9100, or NATO AQAP-2070.
7.3. Element 3, SELF-ASSESMENT CHECKLIST (SAC)
7.3.1. The PS must complete and submit a SAC (Appendix A).
7.3.2. The SAC must be signed by an authorized binding company official (i.e. President, Owner, or Facility General Manager).
7.3.3. If artifacts are used to support any of the items on the checklist, they can be attached to the checklist. However, not all items require artifacts.
Page | 6
7.4. Element 4, QUALITY ASSURANCE SYSTEM (QAS) MANUAL
7.4.1. Provide a copy of the PS’s QAS manual and all supporting/referenced documentation.
7.5. Element 5, EQUIPMENT LIST
7.5.1. Provide a complete list of all equipment owned and used for the manufacturing and repair of parts by the PS.
7.6. Element 6, DD FORM 2345 OR EXPORT CONTROL LICENSE
7.6.1. If located within the United States or Canada, provide a copy of the PS’s DD Form
2345 with a valid expiration date.
7.6.2. If not located within the United States or Canada, provide a copy of the PS’s
Export Control License with a valid expiration date.
7.7. Element 7, QUALITY HISTORY
Note: Nonconformance is not necessarily perceived as an increase in risk when considering source approval. Identification of nonconformance can illustrate a successful quality assurance program.
7.7.1. Provide a PS quality history summary of Deficiency Reports (DR) experienced for the last 36 months including but not limited to: internal deficiencies, commercial deficiencies, FAA Service Bulletins, Maintenance Review Board (MRB) actions, Quality Deficiency Reports (QDR), Laboratory Quality Review Orders (LQRO), Offeror Report of Nonconformance (ORON), Supplier Reports of Non-conformance (SRON), Material Deficiency Reports (MDR), statistical reports of nonconformance and nonconforming material rejection reports. If the PS facilities have not experienced any quality deficiencies within the last 36 months, provide a document stating as such.
7.7.1.1. If government source inspections were conducted, the Government Quality
Assurance Representative will coordinate on the summary. Otherwise, an authorized binding company official (i.e. President, Facility General
Manager, or Quality Assurance Manager) must coordinate on the summary.
7.7.1.2. The summary will include the following data: part number, nomenclature, feature, deficiency, quantity, date, and corrective action.
Page | 7
7.7.2. Provide an example corrective action request and corrective action plan or resolution for an identified deficiency, if one exists.
Note: Elements 8 and 9 may be reviewed during the SAR, SRR, and PCR evaluation processes. If the PS claims the use of a SIP or STS in any of these requests, the referenced SIP or STS must be included in, or added to the Company Profile at that time.
7.8. Element 8, SIGNIFICANT INDUSTRIAL PROCESS (SIP) CERTIFICATIONS
7.8.1. Provide any SIP certifications possessed by the PS with a valid expiration date.
7.8.2. SIP certification is required for those processes denoted by grey highlight in
Appendix B. Methods of certification include:
7.8.2.1. National Aerospace & Defense Contractors Accreditation Program
(NADCAP) certification.
7.8.2.2. OEM Certification and/or audit.
7.8.2.3. Department of Defense (Air Force, DCMA, Navy, or Army) certification and/or audit.
7.8.2.4. Other external audit and/or certification.
7.8.2.4.1. Requires the submission of documents showing the process and procedure used for certification to be reviewed by the ESA in order to determine acceptability of alternative certification.
7.9. Element 9, SUB-TIER SUPPLIER (STS) INFORMATION
7.9.1. Provide a complete list of all STS that the PS is currently using for government contracts, or may use in future source approval requests. List must include the
STS company name and CAGE code.
7.9.2. For each STS, provide one of the following QAC with a valid expiration date: ISO
9001, AS9100, NATO AQAP-2070, or Aerospace Quality System (AQS) NADCAP.
7.9.3. Provide any SIP certifications possessed by each STS listed, with a valid expiration date. See Section 7.8.2 for requirements.
Page | 8
7.10. COMPANY PROFILE EVALUATION
Note: The Company Profile does not have an inherent expiration date. However, elements within the profile do expire and must be updated to maintain a valid Company Profile.
7.10.1. The initial review of the Company Profile includes the examination of all elements described in sections 7.1-7.7.
7.10.2. During the review of any future SAR, SRR, or PCR submitted by the PS, the
Company Profile will be reviewed in order to determine if the following requirements are met:
7.10.2.1. All certificates must not be expired.
7.10.2.1.1. Elements 2 and 6 have inherent expiration dates that, if expired, must be renewed before source approval status can be granted.
7.10.2.1.2. If a SIP requiring certification is identified in the request, a valid certificate must be included in either Elements 8 or 9.
7.10.2.2. Any STS identified in the request must be included in Element 9 with a valid
QAC provided.
7.10.3. If any deficiency in the Company Profile is identified at the time of review, the PS may be issued a conditional approval letter pending resolution of these issues.
See section 10 for details on corrective actions.
7.11. COMPANY PROFILE AMENDMENTS
Note: It is encouraged for the PS to maintain a valid and up to date Company Profile at all times in order to expedite the SAR evaluation process.
7.11.1. At any time, the PS may submit amendments or updates to the Company Profile.
7.11.1.1. Common updates include: Replacing expired certificates (QAC, SIP, DD
Form 2345), adding a new STS, or notification of a significant change to any element of the Company Profile.
7.11.2. Company Profile amendments can be submitted per section 9.
7.11.3. If the PS is bought or sold by a third party the PS must submit a novation letter detailing the specifics of this change in company makeup/structure.
Page | 9
8. SOURCE APPROVAL REQUEST (SAR)
Note: Any PS seeking source approval must have a valid Company Profile on record with the ESA.
If one does not exist, the PS cannot be awarded source approval. See section 7 for details.
8.1. SAR Categories Determination
8.1.1. CATEGORY I (Actual Item)
8.1.1.1. This category covers PS who manufacture the exact subject item, using
OEM technical data, for the prime contractor, OEM, DOD, civil agency, foreign government, or the civil sector under Federal Aviation
Administration (FAA).
8.1.2. CATEGORY II (Similar Item)
8.1.2.1. This category covers PS who have not previously manufactured the exact subject item, but have manufactured other items similar in material, coatings, design features, industrial processes, etc. for the prime contractor, OEM, DOD, civil agency, foreign government, or the civil sector under FAA. Multiple similar items may be used to demonstrate relevant experience. Similarity is not limited to aerospace applications.
Note: Category III (No Experience) and IV (Reverse Engineering) SARs as defined by the AFMCI
23-113 are not covered by this QR document. The ESA will direct sources when a need arises for reverse engineered components and will provide relevant requirements at that time. Category
III and IV SARs submitted under this QR will not be evaluated.
8.2. A SAR consists of two (2) packages of information:
8.2.1. SUBJECT ITEM PACKAGE (Elements A-I)
8.2.1.1. Includes all of the required engineering data, proposed manufacturing plan, and other legal documents required to manufacture the subject item.
8.2.2. DEMONSTRATION PACKAGE (Elements J-M)
8.2.2.1. Demonstrates that the PS has recently manufactured and delivered either the subject item, or part(s) of similar complexity compared to the subject item.
Page | 11
8.6. Element B, SUBJECT ITEM TECHNICAL DATA
8.6.1. Provide the subject item Engineering Data List (EDL).
8.6.1.1. The EDL is the complete list of all technical data required to manufacture an item. This may include drawings (casting, forging, source control, master, assembly, detail, schematic, airfoil data, etc.), specifications, parts lists, etc.
8.6.2. Provide the latest legible revision of all technical data listed on the EDL.
8.6.2.1. For specifications, only the title page is required.
8.6.2.2. Proprietary technical data may be redacted to only reveal the drawing/ specification number, title, revision, and proprietary statement.
8.7. Element C, PROPOSED PRODUCTION DOCUMENTS
Note: Proposed Production Documents consist of Travelers, Process Operation Sheets (POS) and
Inspection Method Sheets (IMS). Together, these documents must demonstrate that the PS has an adequate manufacturing plan and that traceability of the work being performed is achieved.
8.7.1. All Proposed Production Documents must meet the following requirements:
8.7.1.1. Must be created and owned by the PS.
8.7.1.2. Must include any and all proprietary production documents.
8.7.1.2.1. The process description may be redacted for proprietary processes.
8.7.1.3. Must establish traceability.
8.7.1.3.1. Proper traceability connects the work being performed to the facility, performing operator, specific part, and the date that the work is being performed.
8.7.1.3.2. An example of adequate traceability is the use of page numbers along with a unique document number that is present on each page. On the first page of the document, the date, company name, cage code is present, and the travelers have stamp blocks that allow the operator to indicate the work that is accomplished by the specific operator.
Page | 12
8.7.1.4. Any sub-vended process listed must identify the STS by name and CAGE at each applicable operational step with clearly identified process or procedure.
8.7.1.4.1. Any STS referenced in the production documents must be included in
Element D, and the PS Company Profile.
8.7.2. TRAVELERS
8.7.2.1. Travelers are a detailed step-by-step account of the proper sequenced procedures necessary to manufacture the subject item.
8.7.2.2. Must include the following:
8.7.2.2.1. The operation number, process description, location, software data file name, etc. necessary to control the manufacture operations.
8.7.2.2.2. Signature blocks for in-process operator and/or inspector signing or stamping.
8.7.2.2.3. Tracked disposition of all parts during the entire manufacturing operation to include rejects and laboratory samples.
8.7.2.2.4. References to specific IMS or POS in applicable steps.
Note: Travelers enclosed in this section are not to be considered a replacement for detailed
Process Operation Sheets (POS). Lack of detailed POS pertaining to manufacture may be cause for disapproval of the PS’s SAR.
8.7.3. PROCESS OPERATION SHEETS (POS)
8.7.3.1. POS are a detailed description of the process being performed.
8.7.3.2. POS should include an identification of the equipment/tooling used in the process, material handling procedures, set-up procedures, necessary safety precautions, any process specific drawings/graphics and a description of the in-process parameters used (i.e. speed and feed rates).
8.7.4. INSPECTION METHOD SHEETS (IMS)
8.7.4.1. IMS are a detailed step-by-step account of the proper sequenced procedures necessary to inspect the subject item.
Page | 13
8.7.4.2. Must include part number(s), exact dimensions and proper units.
8.7.4.3. Pass/Fail dimensions are not acceptable, except when using a part specific
“go-no-go” gage. This type of gage must be included in Element F.
8.7.4.4. If a sampling plan is used, provide the sampling plan to be reviewed.
8.8. Element D, SUB-TIER SUPPLIER (STS) LIST
Note: All STS identified in this section must be included in the PS Company Profile, or the SAR will not be approved until the issue is resolved. If a new STS must be added to the PS Company Profile, submit a Company Profile amendment per sections 7.9 and 7.11 of this document.
8.8.1. Provide a matrix, Table 3, with the CAGE, Company Name, and a short description of any work being performed by STS.
Sub-Tier Suppliers Used to Manufacture Subject Item
CAGE: Company Name: Description of support:
XXXXX Example Company #1 Provides raw material
YYYYY Example Company #2 Performs SIP for the PS (See Element E)
Table 3. Example of Sub-Tier Supplier Matrix
8.9. Element E, SIGNIFICANT INDUSTRIAL PROCESSES (SIP)
Note: Any SIP that requires quality certification, identified in this section, must be included in the
PS Company Profile or the SAR will not be approved until the issue is resolved. If a new SIP certification must be added to the PS Company Profile, submit a Company Profile amendment per sections 7.8 and 7.11 of this document.
8.9.1. Provide a matrix (Appendix B) indicating the performing cage code (PS or STS) for any and all SIP performed during the manufacturing of the subject item.
8.10. Element F, CALIBRATED EQUIPMENT LIST
8.10.1. Provide a matrix listing all equipment/tooling requiring calibration to include:
part number, serial number, location, and date of calibration and expiration for each item used in the manufacturing of the subject item.
8.10.1.1. This includes any “go-no-go” gages referenced in section 8.7.4.
Page | 14
8.11. Element G, TECHNICAL DATA RIGHTS CERTIFICATION STATEMENT
8.11.1. The PS must provide a certification of rights to use technical data in the format and wording provided in Appendix E, signed on company letterhead by an authorized binding company official (i.e. President, Owner, or Facility General
Manager).
8.11.2. This Certificate states that the technical data was obtained by legal means and the company has the rights to use the data supplied in the SAR for manufacture purposes.
8.11.3. It is acceptable for the certificate to address multiple PN/NSN on a single certificate.
8.12. Element H, LICENSE AGREEMENTS
8.12.1. For an item where proprietary data is used, or with an AMSC code of V, provide an ownership statement or a copy of the licensee agreement between the PS and the data owner.
8.12.2. If a STS owns a proprietary process, the PS will provide a letter of support from the STS. The letter should state the duration of the proprietary process support, availability and capacity.
8.12.3. MASTER TOOLING CERTIFICATION
8.12.3.1. Provide certification of the right to use, and access the following, as applicable to the latest item technical data and/or drawing(s) required for manufacture: any required master tooling, special tooling/test equipment, mylars (stable base drawings), glass layout, loft data, and contour data.
8.13. Element I, GOVERNMENT QUALITY ASSURANCE COMPLIANCE
8.13.1. Provide a statement that the PS will comply with all government imposed quality assurance provisions, testing requirements, etc. as identified in the solicitation or contract for the subject item.
Note: For Category I SAR submittals, Elements J and K are not required.
Note: For Category II SAR submittals, if more than one similar item is required to demonstrate relevant experience, multiple demonstration packages consisting of elements J-M must be submitted.
Page | 15
8.14. Element J, SIMILARITIES AND DIFFERENCES BETWEEN SUBJECT AND SIMILAR ITEM(S)
8.14.1. Provide a comparison matrix (Appendix F) identifying the specific similarities and differences in materials, coatings, design features, industrial processes, etc.
between the subject and similar item(s).
8.14.1.1. If more than one similar item is being used to demonstrate relevant experience, the comparison matrix should include a column for each item being compared in a single matrix. Provide a copy of this matrix in each demonstration package submitted.
8.15. Element K, SIMILAR ITEM TECHNICAL DATA
8.15.1. Provide all technical data used in the manufacturing of the similar item.
8.16. Element L, DEMONSTRATION PRODUCTION DOCUMENTS
8.16.1. Provide copies of all demonstration travelers, POS, and IMS used in the manufacturing of the demonstration item. Blank documents do not meet this requirement.
8.17. Element M, PURCHASE ORDERS AND SHIPPING DOCUMENTS
8.17.1. Provide copies of the purchase orders and shipping documents that demonstrate that the PS manufactured and delivered the demonstration item.
8.17.1.1. These documents must be from the same contract as the demonstration production documents provided in Element L.
8.17.1.2. Contracts must be with the Prime/OEM, DOD, foreign government, or other commercial customers.
8.17.1.3. These documents must be from a date within three (3) years for CSI, and seven (7) years for CAI, as evidenced by the latest shipping document provided. The threshold will be evaluated against the date that the SBO receives the SAR.
8.17.1.3.1. Highlight the date on all documents in this section.
8.17.1.4. All financial information must be removed, else the SAR may be returned.
8.17.1.5. If a contract was terminated, state the reason for the termination.
Page | 16
9. DOCUMENT SUBMITTAL
9.1. If the part is AF managed, documents should be submitted to:
AFSC/SB
Solicitation Number: (If known)
3001 Staff Drive, Suite 1AG85A
Tinker AFB, OK 73145-3009
Email: afsc.sb.workflow@us.af.mil
9.2. If the part is DLA managed, documents should be submitted to:
DLA Aviation Richmond
ATTN: Small Business Office/DU
SAR Program Manager
Solicitation Number: (If known)
8000 Jefferson Davis Highway
Richmond, VA 23297
9.3. All Company Profile documents should be submitted to the SBO per section 9.1.
10. EVALUATION METHODS
10.1. The ESA will evaluate the submitted SAR package using the criteria specified within this requirements document.
10.1.1. If the ESA identifies any issues, missing data, or discrepancies during the evaluation of the submitted package, the ESA will provide the PS with a list of issues that need to be resolved.
10.1.1.1. The PS will be given a Data Submission Date (DSD) of 5 working days to provide the requested data. A longer DSD may be provided upon the PS request, if determined acceptable by the ESA.
10.1.1.1.1. If the DSD is met and the PS provides all missing/required data then the ESA will approve the package per section 10.1.2.
10.1.1.1.2. If the DSD is not met, or the PS cannot provide the required missing data, then the ESA will complete the evaluation and forward a disapproval letter with a list of issues that need to be resolved. The
PS will be encouraged to resubmit the request once all identified issues have been resolved.
Page | 17
10.1.2. If the PS provides all of the specified data in the required format, the ESA will issue an approval letter with an expiration date in accordance with section 11 and update the approved source list accordingly.
10.2. All transactions required to evaluate the approval request will be documented. All necessary artifacts will be recorded and retained in an ESA designated information system.
10.3. The PS is responsible for retaining all disposition letters received from the government.
10.4. The ESA retains the right to request an on-site audit of the vendor’s facility during
Company Profile, SAR, SRR, or PCR evaluation, or at any time during the vendor’s approval period.
11. APPROVAL DURATION
11.1. ESA source approval expiration is three (3) years for CSI and seven (7) years for CAI. The expiration date will be based off of the date printed on the ESA approval letter.
11.2. Prior to source approval expiration, the approved source must submit an SRR in accordance with section 12 in order to renew their approval status.
11.3. Sources that are delivering the subject item on a government contract maintain their approval status and do not require source resubstantiation until there is a lapse in delivery/contract award of greater than three (3) years for CSI and seven (7) years for
CAI.
11.4. The ESA may decide to revoke source approval status at any time per FAR 9.207.
12. SOURCE RESUBSTANTIATION REQUEST (SRR)
Note: Only sources that are currently approved to manufacture the subject item (must have been approved through the USAF SAR process and be listed on the AFMC Form 761) may submit an
SRR. Sources that are delivering the subject item on government contract maintain their approval status and do not require source resubstantiation until there is a lapse in delivery/contract award of greater than three (3) years for CSI and seven (7) years for CAI (this does not include sources who were awarded government contracts without going through the USAF SAR process).
12.1. The SRR provides an approved source the opportunity to renew the approval status of a previously approved SAR through the review of any and all changes to the contents of the referenced SAR since the time of approval.
Page | 18
12.2. Provide the SRR (Appendix G).
12.2.1. Describe any and all changes made to the contents of the referenced SAR package since the time of approval.
12.2.2. The original SAR approval letter should be attached to the SRR.
12.2.3. The SRR must be in the format provided in Appendix G and signed on company letterhead by an authorized binding company official (i.e. President, Owner, or
Facility General Manager).
12.2.4. Any SAR element identified as “Updated” must be submitted for review.
12.2.4.1. All changes within the submitted documents should be highlighted.
12.3. For sources that previously delivered the subject item on a government contract, submit the quality history, any DRs, and the latest purchase orders and shipping documents from the referenced contract.
12.4. Upon review of the SRR, the ESA may request additional information and documentation for review.
12.5. If the changes are determined to be acceptable, the ESA will issue a new approval letter.
13. PROCESS CHANGE REQUEST (PCR)
13.1. The approved source is responsible for submitting a PCR any time a change to the contents of the Subject Item Package occurs.
13.1.1. This may include, but is not limited to: changes to the STS list, using different equipment/tooling, and/or changing the sequence of operations on the travelers.
13.1.2. Failure to provide a formal PCR when a significant change occurs could result in a revocation of the source’s approval status.
13.2. Provide the PCR (Appendix G) in accordance with section 12.2.
13.3. Upon review of the PCR, the ESA may request additional information and documentation for review.
13.4. If the changes are determined to be acceptable, the ESA will issue a new approval letter.
29 October 2019
This document reviewed and signed by:
Competition Advocate AFSC/PZCAB Competition Advocate DLA Aviation/AOCA
Head of Contracting DLA Aviation /AO Head of Contracting AFSC/PZA
Chief Engineer Fighter Engines AFLCMC/LPE Chief Engineer Tanker/Bomber Engines AFLCMC/LPE
Small Business Office AFSC/SB SASPO Office AFSC/429 SCMS
Signatures kept on file by AFLCMC/LPE
For a copy of the signatures, please contact AFLCMC.LPE.SourceEvalTeam@us.af.mil.
MQR-PSD-1
Revision 2
Page | 19
The authority granted by the signatures for qualification requirement shall not exceed seven (7) years past the signed date. Qualification requirements shall be examined and revalidated if the last signed date is over seven (7) years old per FAR 9 .202(f).
Page | 24
APPENDIX C:
COVER LETTER REQUIREMENTS
The following information is required for the cover letter:
Solicitation Number (if applicable):
Contracting Officer POC (if applicable):
Engine Type:
Company Name:
Company CAGE:
Company Address:
Primary Company POC: Name, phone, fax and email
Secondary Company POC: Name, phone, fax and email
Company Size: (Large or Small)
Qualification Requirement Designation and Revision: (i.e. MQR-PSD-1, Rev 1)
Technical Data Proprietary: No, Yes or Partial (Select One)
NSN(s):
PN(s):
Nomenclature:
ERRC Code (if known):
Assembly/Module/Whole Engine SAR: (Yes or No)
SAR Waiver Included: (Yes or No)
Page | 25
APPENDIX D:
SOURCE OF SUPPLY MATRIX FOR MODULES/ASSEMBLIES
1. SAR package submissions for parts that are made up of multiple embedded items, such as modules or assemblies, must include a matrix (see table below) that describes the PS’s method of procurement for all of the embedded items. Approved methods include:
1.1. Organic – The PS is an approved source of supply or has submitted a SAR package for the embedded item. Provide the SAR approval letter or SAR control number.
1.2. OEM – The PS will purchase the embedded item from the OEM. Provide the company name and CAGE code along with an offer letter, on company letterhead, stating that the parts are available for procurement to the PS.
1.3. USAF Approved Source – The PS will purchase the embedded item from a SAR approved source (must be listed on the AFMC Form 761). Provide the company name and CAGE code along with an offer letter, on company letterhead, stating that the parts are available for procurement to the PS.
1.4. Common Part – The embedded item is common and does not have any critical design elements requiring procurement from an approved source and is readily available.
2. The Assembly SAR does not qualify the PS to manufacture any of the embedded items. If the
PS wishes to become an approved source of supply for any of the embedded items, a unique
SAR package must be submitted for each embedded item.
3. Include the matrix in Element A of any SAR submitted for a Module/Assembly.
Assembly PN: XXXXXXXX
Part Number Noun/Nomenclature Source of Supply Details
XXXXXXX Embedded Item #1 Organic
SAR submitted for review on
(DD MM YY). SAR control number: XXXXXXXX
XXXXXXX Embedded Item #2 Organic
The PS is already an approved source. See attached ESA approval letter
XXXXXXX Embedded Item #3 OEM See attached letter of support from OEM (CAGE: XXXXX)
XXXXXXX Embedded Item #4 USAF Approved
Source
See attached letter of support from Approved Source (CAGE:
XXXXX)
XXXXXXX Embedded Item #5 Common Part Part is standard/common
*Example Source of Supply Matrix for Modules/Assemblies
Page | 26
APPENDIX E:
TECHNICAL DATA RIGHTS CERTIFICATION LETTER
I am an officer and employee of the above name legal entity with the responsibility for investigating the facts upon which this certification is made. To the best of my knowledge and information obtained from my recent investigation:
I certify that the technical data submitted as a part of my company's request for approval as potential source for the purpose of obtaining a contract were obtained by legal means by my company, without breach of any contractual or confidential relations pertaining to said technical data by my company, its current or recent employees; and
I certify that my company, its current or recent employees did not obtain or receive any technical data marked with a company's proprietary rights legend or a Government limited rights legend from any U.S. Governments agency or employee or other third parties that were used in the preparation of or were incorporated into the request for approval or its supporting technical data other than as described herein; and
I certify that my company has the legal right to use said technical data to manufacture/repair the below identified part for the United States Government. To the extent that said technical data are marked with a company's proprietary rights or a Government limited rights legend or are otherwise believed to be or have in the past been the proprietary data of another company, the following documents which are attached hereto and made a part of the certification have formed the basis for claiming legal right to use said technical data. Such documentation must clearly cover the data necessary for source approval.
THIS CERTIFICATION CONCERNS A MATTER WITHIN THE JURISDICTION OF AN AGENCY OF THE
UNITED STATES AND THE MAKING OF A FALSE, FICTITIOUS, OR FRAUDULENT CERTIFICATION MAY
RENDER THE MAKER SUBJECT TO PROSECUTION UNDER THE TITLE 18, UNITED STATES CODE,
SECTION 1001.
THIS CERTIFICATION APPLIES TO:
NSN______________________P/N__________________ Noun__________________
Note: If SAR package is for multiple NSNs, all NSNs, Part Numbers, Nouns must be listed. The list can be attached to the letter.
(Signature) (Date) (Typed or printed name & title)
This document must be signed by the Company President, Owner or Plant Manager
Page | 27
APPENDIX F:
SIMILAR ITEM COMPARISON MATRIX
*This table to be used as an example for the required matrix.
Subject Item Nomenclature Similar Item Nomenclature
Subject Item NSN Similar Item NSN
Subject Item Part Number Similar Item Part Number
Subject Item TMS (if known) Similar Item TMS (if known)
Subject Item Material Similar Item Material
Subject Item Function Similar Item Function
Subject Item Coatings Similar Item Coatings
Subject Item Manufacturing/ROMM Processes
Similar Item Manufacturing/ROMM Processes
Subject Item Inspection Processes Similar Item Inspection Processes
Subject Item Surface Finish Similar Item Surface Finish
Subject Item Tightest Tolerance Similar Item Tightest Tolerance
Page | 28
APPENDIX G:
PROCESS CHANGE REQUEST (PCR) /
SOURCE RESUBSTANTIATION REQUEST (SRR)
MEMORANDUM FOR AFSC/SB DATE MM/DD/YYYY
3001 Staff Drive Ste. 1AG85A Tinker AFB, OK 73145-3009
FROM: COMPANY NAME
CAGE Code
ADDRESS
PHONE NUMBER
SUBJECT: Process Change Request/Source Resubstantiation Request for NSN 1234-00-567-
8910, PN 12345678, NOMENCLATURE
SOURCE RESUBSTANTIATION REQUEST (SRR) PROCESS CHANGE REQEST (PCR)
1. COMPANY (CAGE: NUMBER) was approved to manufacture PN: 12345678 on
MM/DD/YYYY. This (PCR or SRR) is a notification of the changes to the subject item package that have occurred since that date.
2. The SAR contents have been changed as follows:
Required Element Remain Unchanged Update Provided
A: Cover Letter □ □
B: Subject Item Technical Data □ □
C: Proposed Production Documents □ □
D: Sub-Tier Supplier (STS) List □ □
E: Significant Industrial Processes (SIP) □ □
F: Calibrated Equipment List □ □
G: Technical Data Rights Cert. Statement □ □
H: License Agreements □ □
I: Gov’t Quality Assurance Compliance □ □
3. The items that have been updated are provided with changes noted.
4. Please review the (PCR or SRR) and consider renewing the approval status of our company for the subject item.
Respectfully, (Signature)
ATTACHMENTS: (Typed or printed name & title)
Page | 29
APPENDIX H:
DEFINITIONS
AFMC Form 761 – The “Screening Analysis Worksheet” that lists all USAF approved sources of supply for a specific NSN. The document also lists the AMSC code for the NSN.
Company Profile – A collection of all quality assurance documentation, SIP certification, and STS network that fully describes the capability of the PS at the time of submittal. The Company
Profile is reviewed during SAR review to ensure agreement with any STS and SIP certification called out in the SAR. All relevant certificates must not be expired in order to receive SAR approval.
Critical Application Item (CAI) – An item, part, assembly, installation, or production system that is essential to weapon system performance or operation, or the preservation of life or safety of operating personnel, as determined by the military services.
Critical Characteristic – Any feature throughout the life cycle of a Critical Item, such as dimension, tolerance, finish, material, or assembly, manufacture, manufacture or inspection process, operation, field maintenance, or depot overhaul requirement that if non-conforming, missing, or degraded may cause the failure or malfunction of the item.
Critical Safety Items (CSI) – An item, part, assembly, installation or production system with one or more critical characteristic that, if missing or not conforming to the design data or quality requirements, would result in an unsafe condition that could cause loss or serious damage to the end item or major items, loss of control, uncommanded engine shutdown, or serious injury or death to personnel. Unsafe conditions relate to hazard severity categories I and II of MIL-STD-882, System Safety Requirements. The determining factor in CSI is the consequence of failure, not the probability that the failure or consequence would occur.
Engineering Support Activity (ESA) – The Military Service organization assigned responsibility and authority to perform and approve engineering and quality assurance actions necessary to evolve detail design disclosures for systems, subsystems, equipment and components exhibiting attributes essential for products to meet specific military requirements. During the operational phase, it includes any engineering activity, the results of which would add to or alter the design of equipment in such a manner, or to such an extent, as to change its operational capabilities or its design attributes of performance, reliability, maintainability and parts interchangeability, or to render it capable of alternative or additional use. For the purpose of this QR, the ESA is synonymous with the Designated Air Force Single Manager for the Weapon System, Design Control Activity, the Cognizant Engineering Authority (CEA) and the USAF Propulsion Division Engineering Chief.
Page | 30
Inspection Method Sheets (IMS) – document used to describe the steps involved in executing an inspection or series of inspections to include tooling, gages, fixtures, dimensions and other parameters necessary to execute the required inspections(s). Sheets must be certified by an authorized representative empowered to comply with the inspection process.
Material – A general term referring to material at any stage in the manufacture/repair process.
National Aerospace & Defense Contractors Accreditation Program (NADCAP) – The accreditation program through which the Performance Review Institute (an independent, non-profit trade association affiliated with the Society of Automotive Engineers), accredits subcontractors and sub-tier suppliers to aerospace and defense industry consensus standards.
Original Equipment Manufacturer (OEM) –An individual, activity, or organization that performs the physical fabrication processes that produce the deliverable part or other items of supply for the prime contractor and performed the original development of the subject item or assembly. The OEM must produce the part in-house. The OEM may or may not be granted design responsibility by the prime contractor for preparation and technical currency of technical data.
Potential Source – Any potential offeror who wants to be considered as a source…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .