This is a Request for Quotation (RFQ) issued by DLA Weapons Support at Oklahoma City for cylinder assembly actuators used in KC-135 aircraft main landing gear doors. The solicitation number is SPRTA1-26-Q-0182, issued March 31, 2026, with quotations due by May 15, 2026. The requisition is FD20302500811 02, and the National Stock Number is 1650-00-591-8287, with manufacturer part number 5-84045-9.

The solicitation contains two primary bids: Bid A requires First Article approval with a quantity range of 3 to 17 units (including the base quantity of 9 units) at firm fixed prices, while Bid B offers the same quantity ranges for new manufactured material without First Article requirements. First Article testing must be completed at Hill Air Force Base (SW3210) within 180 calendar days, with test notifications required 45 days in advance. Contractor testing is required per FAR 52.209-3, followed by government testing per FAR 52.209-4. The contract includes a surge option per DFARS 252.217-7001, requiring submission of a Capabilities Analysis Plan within 30 days of award. All items require Item Unique Identification (IUID) marking, compliance with ISO 9001-2015 and AS9100 standards, and inspection/acceptance at origin. The contractor must be "Export Controlled" certified and submit a signed Boeing Rights Guard Attachment A within 5 working days to access the Technical Data Package. Deliveries are scheduled for January 7, 2027, to DLA Distribution Depot Hill with FOB Origin terms. The solicitation requires compliance with Buy American Act provisions, critical safety item protocols, and various military packaging and marking standards (MIL-STD-129 and MIL-STD-2073-1).

View the file

Other files

File Type Posted
SPRTA126Q0182-0004.pdf PDF
SPRTA126Q0182-0003.pdf PDF
SPRTA126Q0182-0002.pdf PDF
SPRTA126Q0182-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (Rev. 6-95) Previous edition not usable Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

J

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDEX

1. REQUEST NO.

SPRTA1-26-Q-0182

2. DATE ISSUED

31 MAR 2026

3. REQUISITION/PURCHASE REQUEST NO.

FD20302500811 02

4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1 �

RATING

DO: A1

5a. ISSUED BY CODE: SPRTA1

DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Howard Heflin howard.heflin@us.af.mil Phone: (385) 591- 3149

6. DELIVERY BY (Date)

SEE SCHEDULE

SCD:B

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME

Howard Heflin

b. COMPANY

TELEPHONE NUMBER

AREA CODE

(385 )

NUMBER

591 -3149

8. TO

a. NAME

7. DELIVERY

FOB DESTINATION OTHER

(See Schedule) X

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

10. PLEASE FURNISH QUOTATIONS

TO THE ISSUING OFFICE IN BLOCK

5A ON OR BEFORE CLOSE OF

BUSINESS (Date)

15 MAY 2026

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5A. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

d. CITY e. STATE

c. COUNTY

c. TITLE (Type or print) NUMBER

b. STREET ADDRESS

a. NAME OF QUOTER

CAGE:

13. NAME AND ADDRESS OF QUOTER

NOTE: Additional provisions and representations are are not attached.X

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print) b. TELEPHONE

AREA CODE

d. CALENDAR DAYS

NUMBER PERCENTAGE

c. 30 CALENDAR DAYS (%)b. 20 CALENDAR DAYS (%)a. 10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT

PAYMENT �

SEE SCHEDULE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

NAICS CODE: 336413

SIZE STD: 1,250

COMPETITION EXPECTED. First Article / New Manufacture. Early or partial delivery is acceptable at no additional cost to the Government. IUID Required. Surge Option included IAW DFARS 252.217-7001. Sourcing for Critical Safety (CSI) Items. Inspection and Acceptance at Origin.

You are REQUIRED to be “EXPORT CONTROLLED” certified in order to receive and view the Technical Data Package / drawings for this solicitation. The website for registration is https://www.dla.mil/Logistics-Operations/Services/JCP/ .

This is a Boeing Rights Guard requirement. In order to receive/view the Technical Data Package (TDP) or drawings for this solicitation, the vendor must submit a signed Attachment “A” within 5 working days from receipt of solicitation to the Contracting Officer Howard Heflin, at howard.heflin@us.af.mil for the TDP request.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (Rev. 6-95) Previous edition not usable Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

FOLD FOLD

SOLICITATION NO. SPRTA126Q0182

DUE: 15 -MAY -2026

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Howard Heflin

DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-26-Q-0182

SUPPLIES OR SERVICES AND PRICES/COSTS

Note 1: it is the intention of DLA Weapons Support at Oklahoma City to allow a 45-Day Solicitation period for Boeing Rights Guard applicable acquisitions with days 1 through 15 being allotted to allow time for additional potential sources to submit requests for, and receive, the BRG Technical Data Package. This additional time over-and-above the standard 30-day Solicitation timeframe is a courtesy and serves as constructive notice that it is the affirmative responsibility of potential offerors to monitor SAM.gov and quickly process requests for the BRG Technical Data Package and that Solicitation Closing Dates WILL NOT be extended for the sole-purpose to allow for additional time to propose.

Note 2: For Qualification Requirements inquiries: DLA Weapons Support/OKC, Attn: Howard Heflin, SPRTA126Q0182, 3001 Staff Drive, Ste 2B95, Tinker AFB OK, 73145-3070.

NOTE 3: APPLICABLE TO FIRST ARTICLE LINE ITEMS 0001AA - 0001AE

First Article requirement will not be waived except for manufacturers that have produced EXACT production articles for the DoD and who's design has been approved through the First Article process, and not more than 36 months have elapsed since completion of contract. First Article Part of Production and buy quantity.

There is a requirement for a Fit Check, First Article Test Report, Certificate of Compliance, Material Certification. After the Non-Expended Testing has been performed by the contractor in accordance with 52.209-3 (Contractor Test), the FA item is to be shipped to Hill AFB (SW3210). The Government will perform a Proper Fit/Function Test in accordance with 52.209-4 (Government Test). If the First Article Report and Fit Check are approved, this exhibit will remain on the aircraft and will not be forwarded to USAF supply but will be considered part of the contract quantity. The contractor shall not proceed with production quantities until notice of First Article approval is received from the Contracting Officer.

Contractor's notification to ACO and this office (423 SCMS/GUEA) of test time and location due 45 days prior to start of testing.

The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

Ship first article to address below:

DLA Distribution Depot Hill

DDHU CML

7537 Wardleigh Rd. BLDG 849W Hill AFB, UT, 84056-5734

DODAAC: FA8111

Phone: 385-519-8103

The Contractor shall notify the Government 30 days prior to shipping the asset by notifying:

Tinker.First.Article@us.af.mil.

MARK FOR FIRST ARTICLES

ATTN: ACCT 09

DO NOT POST, NON-ACCOUNTABLE; DO NOT PUT INTO SUPPLY

DODAAC: FA8111

ENSURE THE WORDS "FIRST ARTICLE" ARE MARKED ON THE OUTSIDE OF THE BOX IN LARGE

RED CONSPICUOUS LETTERS.

INFORMATIONAL CLIN

Bid A - First Article Required Item No.

Firm Fixed Price

NSN: 1650-00-591-8287

INFORMATIONAL CLIN

CYLINDER ASSEMBLY,ACTUATOR

The main landing gear door actuator assembly is a doubleacting,extend and retract the main landing gear door.

Aluminum, steel and rubber Manufacturer Part Number 65506 5-84045-9 81205 5-84045-9 Associated Document(s) Line Item(s)

FD20302500811 02 0002

Buy American Act/Balance of Payments Program IUID Required: Yes

Bid A - First Article Required - FIRST ARTICLE TEST EXHIBIT

Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AA AB

NSN: 1650-00-591-8287

CYLINDER ASSEMBLY,ACTUATOR

The main landing gear door actuator assembly is a doubleacting,extend and retract the main landing gear door.

Aluminum, steel and rubber Manufacturer Part Number 66506 5-84045-9 81205 5-84045-9 Associated Document(s) Line Item(s)

FD20302500811 02 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2015 2008

AS9100 9100

Buy American Act/Balance of Payments Program IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3210 ORIGIN

Class I ODS Substance Application/Use Quantity None N/A N/A Type / Ship To PACRN Mark For

A SW3210 PAB ACCT 09

Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

A SW3210 2 EA *180 Calendar Days Non-MilStrip

Proposed Delivery

A SW3210 2 EA

UID REQUIREMENT: Reference IUID Checklist.

Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

Bid A - First Article Required - FIRST ARTICLE TEST REPORT

Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AB AB

Data First article test report.

Associated Document(s) Line Item(s)

FD20302500811 02 0003

Priority: R

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

Bid A - First Article Required - FIRST ARTICLE TEST REPORT

A FA8111 ORIGIN

Type / Ship To PACRN Mark For A FA8111 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

A FA8111 1 LO *180 Calendar Days Non-MilStrip

Proposed Delivery

A FA8111 1 LO

Bid A - First Article Required - CERTIFICATION DATA

Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AC AB

Data Certification Data For Material Associated Document(s) Line Item(s)

FD20302500811 02 0004

Priority: R

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FA8111 ORIGIN

Type / Ship To PACRN Mark For A FA8111 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

A FA8111 1 LO *180 Calendar Days Non-MilStrip

Proposed Delivery

A FA8111 1 LO

Bid A - First Article Required - CERTIFICATE OF COMPLIANCE

Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AD AB

Data Certificate of Compliance Associated Document(s) Line Item(s)

FD20302500811 02 0005

Priority: R

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FA8111 ORIGIN

Type / Ship To PACRN Mark For A FA8111 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

A FA8111 1 LO *180 Calendar Days Non-MilStrip

Proposed Delivery

A FA8111 1 LO

Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

Note 4: The required quantity may change. Contractors should provide an offer to the following ranges. If the quantity ranges provided in this solicitation do not provide the best pricing option, then the contractor should submit quantity ranges that yield the best prices to the Government based on the Min quantity of (3) each and Max quantity of (17) each including the current required quantity of (9) each. See FAR clause 52.207-4. The final quantity of this solicitation will be re-evaluated upon receipt of the contractor's offer and closing of the solicitation.

The contractor shall not proceed with production quantities until notice of First Article approval is received from the Contracting Officer.

Bid A - First Article Required - FIRST ARTICLE PRODUCTION

Item No.

0001AE

Firm Fixed Price From Quantity U/I To Quantity Unit Price

9 EA

Quantity Range A

Bid A - First Article Required - FIRST ARTICLE PRODUCTION

3 EA 7 EA

Quantity Range B

8 EA 12 EA

Quantity Range C

13 EA 17 EA

CLIN ACRN ACRN Total

0001AE AB

NSN: 1650-00-591-8287

CYLINDER ASSEMBLY,ACTUATOR

The main landing gear door actuator assembly is a doubleacting,extend and retract the main landing gear door.

Aluminum, steel and rubber.

Manufacturer Part Number 66506 5-84045-9 81205 5-84045-9 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3210 ORIGIN

Class I ODS Substance Application/Use Quantity None N/A N/A Type / Ship To PACRN Mark For

A SW3210 PAB ACCT 09

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3210 9 EA 7 JAN 2027

Proposed Delivery

A SW3210 9 EA

UID REQUIREMENT: Reference IUID Checklist.

******* END OF BID A - FIRST ARTICLE REQUIRED*******

Note 5: The required quantity may change. Contractors should provide an offer to the following ranges. If the quantity ranges provided in this solicitation do not provide the best pricing option, then the contractor should submit quantity ranges that yield the best prices to the Government based on the Min quantity of (3) each and Max quantity of (17) each including the current required quantity of (9) each. See FAR clause 52.207-4. The final quantity of this solicitation will be re-evaluated upon receipt of the contractor's offer and closing of the solicitation.

Bid B - First Article NOT Required - New Manufactured Material

Item No.

Firm Fixed Price From Quantity U/I To Quantity Unit Price

9 EA

Quantity Range A

3 EA 7 EA

Quantity Range B

8 EA 12 EA

Quantity Range C

13 EA 17 EA

CLIN ACRN ACRN Total

0002 AB

NSN: 1650-00-591-8287

CYLINDER ASSEMBLY,ACTUATOR

The main landing gear door actuator assembly is a doubleacting,extend and retract the main landing gear door.

Aluminum, steel and rubber.

Manufacturer Part Number 66506 5-84045-9 81205 5-84045-9 Associated Document(s) Line Item(s)

FD20302500811 02 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

IUID Required: Yes

Bid B - First Article NOT Required - New Manufactured Material

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3210 ORIGIN

Class I ODS Substance Application/Use Quantity None N/A N/A Type / Ship To PACRN Mark For

A SW3210 PAB ACCT 09

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3210 9 EA 7 JAN 2027

Proposed Delivery

A SW3210 9 EA

UID REQUIREMENT: Reference IUID Checklist.

Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

******* END OF BID B - FIRST ARTICLE NOT REQUIRED*******

Note 6: Surge option clause 252.217-7001 is included in this solicitation. The successful offeror who is awarded this contract will be required to submit a Capabilities Analysis Plan (CAP) as stated and in accordance with clause 252.217-7001 (b)(2) and Data Item Description attachment DI-MGMT-80969 Production Surge Plan within 30 days after award. Pricing will only be required if the surge option is exercised. Do not include pricing with the CAP and Surge Plan. In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

Surge Capability Analysis Plan (CAP)

Item No.

To Be Negotiated Quantity U/I Unit Price

1 LO TBN

Data Surge Capability Analysis Plan (CAP) See DD FORM 1423-1 Contract Data Requirements List Production Surge Plan Associated Document(s) Line Item(s)

FD20302500811 02 0006

Priority: R

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

Surge Capability Analysis Plan (CAP)

A SW3210 ORIGIN

Type / Ship To PACRN Mark For

A SW3210 ACCT 09

Type / Ship To Quantity (U/I) IAW CDRLS Req No / Pri

Required Delivery

A SW3210 1 LO IAW CDRLS

Proposed Delivery

A SW3210 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A FA8111

FA8111 AFLCMC LZPED

CP 405 736-7455

3001 STAFF DR STE 1AF1 105A

TINKER AFB OK 73145-3303

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

DDHU CML 385-519-8103

7537 WARDLEIGH RD BLDG 849W

HILL AFB UT 84056-5734

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION/AOB’s CA/ombudsman can be reached at (385) 591-1672, facsimile (405) 734-8129. Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

(The above Clause/Provision has been modified.)

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.

(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.

(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address

0001 DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB, OK 731453070

Howard.heflin@us.af.mil

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the

Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)

(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))

(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.

*Lot/Item ***Calendar Days Before Test **Quantity

0001AA 45 2

(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***__ marked "FIRST ARTICLE TEST REPORT: Contract No. **** Lot/Item No. __*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item ****Approval Days ELIN No.

0001AB 90

FA Test Report Item ***Type/Location **Calendar Days

FA8111 180

(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

*First Article Item **Quantity ***Calendar Days ****Type/Location

0001AA 2 180 SW3210

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

0001AA 90

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)

(IAW DFARS 209.270-5)

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

Line Item Description

0001AA

0001AE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS

(FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements 0001AA Performance or other characteristics which the First Articles must meet are

DEFINED BY ENGINEERING DWG: DOCUMENTED IN FIRST ARTICLE

INSPECTION (TEST) REPORT

Lot/Item Contractor Test/Inspection Requirements 0001AA The detailed technical requirements for First Article approval tests are contained in

ENGINEERING DWG AND GOVERNMENT EVALUATION

Disposition of the First Article shall be as follows:

Lot/Item Approved

0001AA Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, and will be considered part of the contract quantity

Lot/Item Disapproved 0001AA Will be returned to the contractor

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES) (DEVIATION 2025-O0003

and 2025-O0004) (MAR 2025) (IAW FAR 13.302-5(d))

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(IAW FAR 17.208(g))

(a) The Government may extend the term of this contract by written notice to the Contractor within 7 ; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 36 .

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

(IAW FAR 19.1309(b))

(b) Waiver of evaluation preference.

__ Offeror elects to waive the evaluation preference.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)

(IAW FAR 19.708(a))

52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)

(IAW FAR 19.309(c)(1))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.

(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—

(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and

(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.

[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

[Contractor to sign and date and insert authorized signer’s name and title.]

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (JAN 2025)

(IAW FAR 22.1803)

(c) Web site. Information on registration for and use of the E-Verify program can be obtained via the Internet at the Department of Homeland Security Web site: https://www.e-Verify.gov .

52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION 2025-O0004) (MAR 2025)

(IAW 23.109(a))

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)

(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))

252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING

FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS

(MAR 2024)

(IAW DFARS 223.7404)

5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS)

(JUN 2024)

(IAW DAFFARS 5323.804-90)

(a) Contractors shall not:

(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or

(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.

(b) For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:

(1) Halons: 1011, 1202, 1211, 1301, and 2402;

(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and

(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.

[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Department of the Air Force definition of a Class I ODS.]

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a))

252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (FEB 2024)

(IAW DFARS 225.1101(2)(i) and (2)(ii))

252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (MAR 2022)

(IAW DFARS 225.1101(3))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)

(IAW DFARS 225.7002-3(a))

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND

TUNGSTEN (MAY 2024)

(IAW DFARS 225.7018-5)

252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT

AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)

(IAW DFARS 225.7023-4)

252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS

(DEVIATION 2024-O0006, REVISION 1) (FEB 2024) (FEB 2024)

(IAW CLASS DEVIATION 2024-O0006, REVISION 1)

252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)

(IAW Deviation 2024-O0014)

(a) Definition. As used in this clause—

Covered foreign country means any of the following:

(1) The People’s Republic of China.

(2) The Russian Federation.

(3) The Islamic Republic of Iran.

(4) The Democratic People’s Republic of Korea.

(b) Prohibition. In accordance with section 848 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2020 and section 817 of the NDAA for FY 2023, the Contractor shall not—

(1) Provide or use an unmanned aircraft system (UAS), or any related services or equipment, that—

(i) Is manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country;

(ii) Uses flight controllers, radios, data transmission devices, cameras, or gimbals manufactured in a covered foreign country, or by an entity domiciled in a covered foreign country;

(iii) Uses a ground control system or operating software developed in a covered foreign country, or by an entity domiciled in a covered foreign country; or

(iv) Uses network connectivity or data storage located in, or administered by an entity domiciled in, a covered foreign country;

(2) Provide or use a system for the detection or identification of a UAS, or any related services or equipment, that is manufactured in a covered foreign country or by an entity domiciled in a covered foreign country; or

(3) On or after October 1, 2024, be an entity that operates equipment, as determined by the Secretary of Defense, from—

(i) Da-Jiang Innovations, or any subsidiary or affiliate of Da-Jiang Innovations;

(ii) Any entity that produces or provides unmanned aircraft systems and is included on the Consolidated Screening List maintained by the International Trade Administration of the Department of Commerce (https://www.trade.gov/consolidated-screening-list); or

(iii) Any entity that produces or provides unmanned aircraft systems and—

(A) Is domiciled in a covered foreign country; or

(B) Is subject to unmitigated foreign ownership, control, or influence by a covered foreign country, as determined by the Secretary of Defense in accordance with the National Industrial Security Program.

(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts or other contractual instruments, including subcontracts for the acquisition of commercial products and commercial services.

(End of clause)

52.226-7 DRUG-FREE WORKPLACE (MAY 2024)

(IAW FAR 26.506)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (MAY 2024)

(IAW FAR 26.605)

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(IAW FAR 29.401-3(a))

52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

(IAW 29.402-3(b))

252.229-7014 FULL EXEMPTION FROM TWO-PERCENT EXCISE TAX ON CERTAIN FOREIGN

PROCUREMENTS. (OCT 2022)

(IAW DFARS 229-402(k))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (MAR 2023)

(IAW FAR 32.009-2)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a))

(a) Definitions. As used in this clause— “Contract financing payment” means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include—

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include—

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

“Electronic form” means any automated system that transmits information electronically from the initiating system to affected systems.

“Invoice payment” means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include—

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .