This is a Request for Proposal (RFP) for a Seal, Air, Aircraft G component (NSN: 2840-01-445-4017NZ) for the Defense Logistics Agency Aviation. The solicitation is a 100% small business set-aside for Women-Owned Small Business (WOSB) with a size standard of 1,500 employees and NAICS code 336412. The government requires a new manufacture of 1,374 air seals used in the F100 series turbine engine, with potential quantities ranging from 345 to 2,067 units.

The solicitation requires first article testing and approval, with bidders required to submit both a first article test plan and test report. The contract includes detailed manufacturing specifications, including significant industrial processes, sub-tier supplier requirements, and compliance with quality assurance standards. Key dates include a solicitation closing on 10 July 2025 at 2:00 PM, with proposed delivery of production units by 30 November 2025. Bidders must be export control certified and able to view technical drawings through secure government websites. The contract will be awarded on a best value basis, evaluating technical acceptability, pricing, and past performance.

View the file

Other files

File Type Posted
SPRTA125R0311______0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

SPRTA1-25-R-0311

X X

6.SOLICITATION ISSUE DATE

30 MAY 2025

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336412

8(A) SIZE STANDARD: 1,500

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

NEW MANUFACTURE ONLY - Surplus Not Authorized / Early Delivery Acceptable / Critical Safety Item / IUID Required

Qualification requirements may be found under clause 52.209-1. You are REQUIRED to be “EXPORT CONTROLLED" certified in order to receive and view the drawings for this solicitation. The web site for registration is https://www.dla.mil/Logistics-Operations/Services/JCP/. Engineering Instructions and Engineering Data List will be available to certified contractors via https://sam.gov. Contractor can request controlled data from the Buyer by submitting an approved DD2345, or proof of current certification in Joint Certification Program.

Due to export control restrictions, the Engineering Data List (EDL) and drawings can only be obtained through https://sam.gov via secure link to the solicitation notice for view only by vendors authorized to view export controlled data.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

SPRTA1

2. CONTRACT NUMBER

X

17.

ITEM NUMBER

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAYMENT DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES Aircraft Engine and Engine Parts Manufacturing

9. (Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH

PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.

SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

10-JUL-2025 2:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Keith Russ/DLA/AOAA keith.russ@us.af.mil Phone: (405) 203- 6862

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

STANDARD FORM 1447 (REV. 8/2016) BACK

NO RESPONSE FOR REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

UNABLE TO IDENTIFY THE ITEM(S)

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

DATE AND LOCAL TIME 10 JUL 2025 2:00 PM

SOLICITATION NUMBER SPRTA125R0311

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Keith Russ/DLA/AOAA

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA1-25-R-0311

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Quantity Range Note: The current required quantity is 1374 ea. However, the required quantity may change therefore contractor shall provide proposed prices to the following ranges. If the quantity ranges provided in this solicitation do not provide the best pricing option then the contractor shall submit quantity ranges that yield the best prices to the Government based on the Min quantity of 345 ea. and Max quantity of 2067 ea. See Clause 52.207-4.

The quantity of this solicitation will be re-evaluated upon receipt of the contractor's proposal.

The Final fixed-quantity of this requirement is at the sole discretion of the Government and the Government reserves the right to award no contract at all depending on the quality and prices of proposal(s) received. The final buy quantity will be re-evaluated and determined upon receipt of proposal(s) and the closing date of the Solicitation.

Qualification Requirements Apply. Evaluation of offers and award will be made to only the source(s) that has successfully completed all qualification requirements prior to award. The Government will NOT delay contract award to review pending Source Approval Requests (SARs).

First Article Waiver: First article waiver will be considered for:

1. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the DoD.

2. Offerors currently in production of the same or similar article for a DoD contract and who have received First Article approval under the existing contract.

3. Offerors who have previously furnished production quantities of the same or similar articles to the DoD, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

4. Provided not more than 36 months have elspsed sonce completion of the contract.

First Article Note: First Article Offeror will be accepted under Bid A (CLINs 0001AA, 0001AB, 0001AC, 0001AD and 0001AE). If your company meets the condition for First Article Waiver, please propose ONLY under Bid B (CLIN 0002).

PRICING NOTE 1: In order to maintain unit price integrity, contractor must individually price Line Items or clearly state that there is a "ZERO DOLLAR CHARGE" for these items.

PRICING NOTE 2: If certified cost and pricing data is required to determine a fair and reasonable price, the contractor will submit along with the proposal IAW 15-408 Table 15-2. If offeror does not comply with the requirement to submit data for a contract or subcontract in accordance IAW FAR 15.403-3(a)(4), and DFARS 252.215-7009 they will be considered ineligible for award.

PRICING NOTE 3: Any NRE expenses shall be proposed separately. NRE expenses as defined by FAR 17.106-1(c)(2) shall be submitted at time of proposal submission. If offeror does not comply with a requirement to submit data for a contract or subcontract in accordance IAW FAR 15.403-3(a)(4), they will be considered ineligible for award.

PRICING NOTE 4: If uncertified cost and pricing data is required to determine a fair and reasonable price, the contractor will submit along with proposal submission IAW FAR 15-403-3. As specified in Section 808 of Public Law 105-261, an offeror who does not comply with a requirement to submit information for a contract or subcontract in accordance with paragraph (a)(1) of this subsection and Strom Thurmond Act is ineligible for award.

PRICING NOTE 5: The Government will not pay excessive pass-through charges IAW FAR 52.215-22. The

Contracting Officer, or authorized representative, shall have the right to examine and audit all the Contractor's records (as defined at FAR 52.215-2(a) necessary to determine whether the Contractor proposed, billed, or claimed excessive pass-through charges.

Informational - New Manufacture - Basic Item

Bid A - First Article Required Item No.

Firm Fixed Price

NSN: 2840-01-445-4017 NZ

SEAL,AIR,AIRCRAFT G

Stationary 3rd BOAS get rubbed on by the 3rd Stage Turbine blades to create a blade tip-to honeycomb airseal, therby obtaining the least amount of loss of compressed air for rotation/thrust.

Nickle Alloy Manufacturer Part Number 32816 4083716-01 50595 4083716-01 Associated Document(s) Line Item(s)

FD20302501303PLN 0001

Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity None N/A N/A

First Article Test Report

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AA AA

Data First Article Test Report IAW DD Form 1423-1 attached hereto Associated Document(s) Line Item(s)

FD20302501303PLN 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A 1423 DESTINATION

Type / Ship To PACRN Mark For A 1423 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

First Article Test Report

Bid A - First Article Required A 1423 1 LO *120 Calendar Days Non-MilStrip

Proposed Delivery

A 1423 1 LO

NOTE 1: A combination of an invoice and Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF) in order to receive payment for data reports.

First Article Test Plan

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0001AB AA

Data First Article Test Plan IAW DD Form 1423-1 attached hereto Associated Document(s) Line Item(s)

FD20302501303PLN 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A 1423 DESTINATION

Type / Ship To PACRN Mark For A 1423 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

A 1423 1 LO *30 Calendar Days Non-MilStrip

Proposed Delivery

A 1423 1 LO

NOTE 1: A combination of an invoice and Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF) in order to receive payment for data reports.

First Article Unit (Expended)

Bid A First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

First Article Unit (Expended)

Bid A First Article Required

1 EA

CLIN ACRN ACRN Total

0001AC AA

NSN: 2840014454017 NZ

SEAL,AIR,AIRCRAFT G

First Article Same as Basic item above Manufacturer Part Number 32816 408371601 50595 408371601 Associated Document(s) Line Item(s)

FD20302501303PLN 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS FAR 52.24611ISO 9001:2015 Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A 1423 ORIGIN

Type / Ship To PACRN Mark For A 1423 PAB First Article Monitor Type / Ship To Quantity (U/I) *ARO See Notes

Below _ Req No / Pri

Required Delivery

A 1423 1 EA *120 Calendar Days

Proposed Delivery

A 1423 1 EA

NOTE 1: First article test requirements shall be per LPF-QAR-003 and the following:

a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and

3.5 of LPF-QAR-003.

b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPF-QAR-003 prior to assembly.

c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPF-QAR-003.

NOTE 2: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract.

Acertification to this effect must accompany each First Article which is offered.

NOTE 3: First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.

NOTE 4: Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

First Article Units (Non-Expended)

Bid A - First Article Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AD AA

NSN: 2840-01-445-4017 NZ

SEAL,AIR,AIRCRAFT G

First Article - Same as Basic item above Manufacturer Part Number 32816 4083716-01 50595 4083716-01 Associated Document(s) Line Item(s)

FD20302501303PLN 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS FAR 52.246-11ISO 9001:2015 Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAB First Article Monitor Type / Ship To Quantity (U/I) Sooner *ARO

Contract Req No / Pri

Required Delivery

A SW3211 2 EA *60 Calendar Days Non-MilStrip

Proposed Delivery

A SW3211 2 EA

NOTE 1: The quantity of the First Article exhibit for Line Item 0001AD will be considered part of the contract quantity if the First Articles on Line Item 0001AD are approved by the Government as required by FAR Clause 52.2093.

NOTE 2: First article test requirements shall be per LPFQAR003 and the following:

a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of

LPFQAR003.

b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR003 prior to assembly.

c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPFQAR003.

NOTE 3: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 4: The contractor SHALL NOT take any action on Line Item 0001AE until approval/disapproval is received for the First Article unit required in the above line items.

NOTE 5: Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

New Manufacture Production Units

Bid A First Article Required Item No.

0001AE

Firm Fixed Price From Quantity U/I To Quantity Unit Price

1,374 EA

Quantity Range A

345 EA 1,373 EA

Quantity Range B

1,374 EA 2,067 EA

CLIN ACRN ACRN Total

0001AE AA

NSN: 2840014454017 NZ

SEAL,AIR,AIRCRAFT G

Stationary 3rd BOAS get rubbed on by the 3rd Stage Turbine blades to create a blade tipto honeycomb airseal, therby obtaining the least amount of loss of compressed air for rotation/thrust.

Nickle Alloy Manufacturer Part Number 32816 408371601 50595 408371601 Associated Document(s) Line Item(s)

FD20302501303PLN 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS FAR 52.24611ISO 9001:2015 Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAB Account 09 Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

New Manufacture Production Units

Bid A First Article Required A SW3211 1,374 EA 30 NOV 2025 NonMilStrip

Proposed Delivery

A SW3211 1,374 EA

NOTE 1: The contractor SHALL NOT take any action on Line Item 0001AE until approval/disapproval is received for the First Article unit required in the above line items.

NOTE 2: 0001AD is considered part of the production quantity and will be added to 0001AE to obtain the total amount of deliverable units.

NOTE 3: Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

New Manufacture

Bid B First Article NOT Required Item No.

Firm Fixed Price From Quantity U/I To Quantity Unit Price

1,376 EA

Quantity Range A

345 EA 1,375 EA

Quantity Range B

1,376 EA 2,067 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 2840014454017 NZ

SEAL,AIR,AIRCRAFT G

Stationary 3rd BOAS get rubbed on by the 3rd Stage Turbine blades to create a blade tipto honeycomb airseal, therby obtaining the least amount of loss of compressed air for rotation/thrust.

Nickle Alloy Manufacturer Part Number 32816 408371601 50595 408371601 Associated Document(s) Line Item(s)

FD20302501303PLN 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS FAR 52.24611ISO 9001:2015 Buy American Act/Balance of Payments Program IUID Required: Yes

New Manufacture

Bid B First Article NOT Required

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Class I ODS Substance Application/Use Quantity None N/A N/A Type / Ship To PACRN Mark For A SW3211 PAB Account 09 Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

A SW3211 1,376 EA 30 NOV 2025 NonMilStrip

Proposed Delivery

A SW3211 1,376 EA

NOTE 1: Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A 1423

IAW DD Form 1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 731458000 731458000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.3082)

Test criteria are as follows:

Item No(s) Test Criteria/Technical Requirements

0001AA IAW CDRL 14231

0001AB

0001AC

0001AD

IAW CDRL 14231

See Notes on CLIN 0001AC See Notes on CLIN 0001AD

First article test requirements shall be per LPFQAR003 and the following:

a. All three first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and

3.5 of LPFQAR003.

b. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR003 prior to assembly.

c. After completion of inspections per 9.B.a above, one article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPFQAR003.

NOTE: Deliveries (FAT test plan and Reports) are preferably submitted on ISO10149 compliant CDROM in Adobe Acrobat Portable Document Format.

Disposition of First Articles:

First Article part will be destructively tested. This item will be condemned and disposed of at vendor's facility.

The cognizant Government engineering authority shall be the final authority for determining if a contractor meets the conditions of waiver.

This is a critical part used in the F100 series turbine engine. Poor quality parts will have an adverse effect on mission capability and system safety. For this reason, First Article Testing is required to insure first time manufacturers or manufacturers that have not produced the item within three years manufacture parts in accordance with the drawing and specification requirements.

Disposition of the First Article shall be as follows:

Item No(s) Quantity Approved

0001AC 1 EA See Above and Notes on CLIN 0001AC 0001AD 2 EA See Above and Notes on CLIN 0001AD

Item No(s) Quantity Disapproved

0001AC 1 EA See Above and Notes on CLIN 0001AC 0001AD 2 EA See Above and Notes on CLIN 0001AD

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILLIN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

PART I THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT (FEB 1999)

(IAW FAR 47.305-4(c))

Applicable Item No(s)

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILLIN]

PART I THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.2327003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the stepbystep procedures for selfregistration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF WebBased Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

SEE DFARS CLAUSE 252.2327003 (b)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

SEE SCHEDULE, SECTION B

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC SEE FRONT PAGE OF SOLICITATION Issue By DoDAAC SEE FRONT PAGE OF SOLICITATION Admin DoDAAC SEE FRONT PAGE OF SOLICITATION Inspect By DoDAAC SEE SCHEDULE SECTION B Ship To Code SEE SCHEDULE SECTION B Ship From Code SEE SCHEDULE SECTION B Mark For Code SEE SCHEDULE SECTION B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC SEE SCHEDULE SECTION E

LPO DoDAAC N/A DCAA Auditor DoDAAC CONTACT LOCAL DCMA OFFICE Other DoDAAC(s) N/A

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant backup documentation, as defined in DFARS Appendix F, (e.g.

timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

SEE FRONT PAGE OF SOLICITATION

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

CONTACT LOCAL DCMA OFFICE

(2) For technical WAWF help, contact the WAWF helpdesk at 8666185988.

(The above Clause/Provision has been modified.)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 .FC04 64 5 47 GT 15380N 01N000 00000 503000 F03000 $0.00

PSR: K38807 FSR: 013352

ACRN TOTAL $ 0.00

PART I THE SCHEDULE

SECTION H

SPECIAL CONTRACT REQUIREMENTS

DLAD Procurement Notes

C01 Superseded Part Numbered Items (FEB 2025)

When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.

C02 Manufacturing PhaseOut or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components

(DEC 2016)

The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phaseout or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the GovernmentIndustry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phaseout to DLA DMSMS at dscc.dmsms@dla.mil.

C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)

12. By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of Defense Logistics Acquisition Directive (DLAD) Procurement Notes Effective April 3, 2025 2 this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.

13. Supply Chain Traceability Documentation (i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification; national stock number; manufacturing source; manufacturing source’s Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. (ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/CounterfeitDetection AvoidanceProgram/). (iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

14. The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

C14 Correction of Nonconforming Packaging or Marking (MAY 2020)

(1) The Government may correct nonconforming packaging or marking for receipts of DLA owned materiel if the estimated costs of correction are $1,000 or less. The contracting officer will advise the contractor of the discrepancy and that the Government has corrected the packaging or marking. The contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

(2) If the estimated costs of correction for receipts of DLAowned materiel are more than $1,000, the contracting officer will advise the contractor of the discrepancy and have the materiel returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor’s expense. If the Government remediates the discrepancy, the contracting officer will make a determination concerning appropriate reimbursement by the contractor for the Government’s costs to correct the deficiencies. Upon determining that reimbursement is required, the contracting officer will send a notice to the contractor. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.

E08 First Article Testing Requirements (MAR 2025)

(1) If there is not a separate contract line item number (CLIN) for FAT, the offeror shall include all costs and risk associated with completion of the FAT requirement in the production CLIN price.

(2) If there is a separate FAT CLIN, the offeror shall include all costs and risk associated with completion of the FAT requirement in the FAT CLIN price. The unit of issue for the FAT CLIN, EACH, is equal to one First Article Test (1EA=1FAT). To receive payment for any costs associated with FAT, the offeror shall propose costs associated with FAT on a separate CLIN. The offeror shall base the production CLIN price solely on all costs associated with completion of the production units and shall exclude all FATrelated costs.

(3) The contracting officer will use the total award price in selecting the best value offer from among all eligible offerors.

However, for an offeror to be eligible for award, the contracting officer must determine that the FAT CLIN price (unless FAT is waived) and the production CLIN price are fair and reasonable; and, if setaside under FAR Part 19, a fair market price. The offeror shall not propose a FAT CLIN price that is materially unbalanced in relation to the production CLIN price. In the event an offeror receives a waiver of the FAT requirement, the contracting officer will deduct the FAT CLIN price for the waived source in determining the total award price.

(4)(a) Notwithstanding the conditions for waiving first article, the contracting officer may order an additional first article sample, or portion thereof, in writing if there is a— (i) Major change to the technical data; (ii) Lapse in production for a period in excess of 90 days; or (iii) Change in the place of performance (manufacturing facility), manufacturing process, material used, drawing, specification or source of supply. (b) When conditions in paragraphs (4)(a)(i), (ii), or (iii) occur, the contractor shall notify the contracting officer; who will determine whether to order an additional first article sample or portion thereof and provide instructions concerning the submission, inspection, and notification of results. The contractor shall bear the costs of the additional first article testing resulting from any of the causes in paragraphs (4)(a)(i)(iii) instituted by the contractor and not due to changes directed by the Government.

(5) Waivers. The offeror may submit a request for FAT waiver to the contracting officer, who may waive the FAT requirement when all of the following criteria apply: (a) The offeror requesting waiver has successfully manufactured, delivered and the government accepted the item or a similar item. The offeror shall provide the following information and be prepared to provide documentary evidence upon the contracting officer’s request: (i) Contract number(s), date(s), and issuing Government agency or agencies. (ii) Description of item previously furnished, identified by part number, type, model number and/or other identifying information. If the item previously furnished is similar but not identical to the item being acquired under the current buy, the offeror shall explain why manufacture of the item previously furnished is sufficient to demonstrate its ability to manufacture the item being acquired under the current buy without need for a first article test. (iii) Engineering control document/change number of item previously furnished. (b) There have been no changes to manufacturing processes, tooling, or place of performance. (c) There have been no changes to manufacturing data (e.g., drawing revisions that change materials, dimensions, processes, inspection or testing requirements; or subcontractors used to manufacture the items successfully in the past). (d) The offeror shall supply an item of the same design and manufactured by the same method at the same facilities as the item or similar item previously furnished and accepted under subparagraph (5)(a).

(6) ContractorPerformed FAT. (a) The contractor shall test the quantities as outlined in paragraph (a) of FAR clause 52.209 3 as specified in the contract. The contractor shall submit reports in accordance with paragraph (b) of FAR clause 52.2093, as supplemented in this procurement note. (b) For test report preparation and delivery of contractor FAT, the contractor shall— (i) Use the data item description DINDTI80809B report format. (ii) Mark the test report with the following: “First article test report – Contract number: [insert contract number] and lot/item number: [insert lot/item number]. (iii) Sign the FAT Report, accompanied by the system of record receiving report (i.e., WAWF or] DD Form 250) and contractor confirmation that the same process and facilities used to manufacture the first article units will be used to manufacture the production units, to the contracting officer at the applicable address shown below: (A) For awards issued by DLA Aviation; or DLA Troop Support Clothing and Textile (C&T), Medical Materiel, or Subsistence, submit the report to the procuring activity in Block 6 of the DD Form 1155, Block 7 of Standard Form (SF) 33, Block 5 of SF 26, or Block 9 of SF 1449 award. (B) For awards issued by DLA Land (SPE7L), submit the report to the following address: DLA Land – FLSEB, ATTN: FAT Monitor, P. O. Box 3990, Columbus, OH 43218 3990, or email to: Land.FAT.Monitor@dla.mil. (C) For awards issued by DLA Maritime (SPE7M), submit the report to the following address: DLA Maritime – FMSE, ATTN: FAT Monitor, P. O. Box 3990, Columbus, OH 432183990, or email to:

maritime.fat.monitor@dla.mil. (D) For awards issued by DLA Troop Support Construction and Equipment (SPE8E), email the report to Construction and Equipment FAT Monitor at trpsptcandefatmonitor@dla.ml. If report file exceeds email limitations, submit to the following address: DLA Troop Support, Attention: First Article Testing Monitor, Building 3, 700 Robbins Avenue, Philadelphia, Pennsylvania 19111.

(7) The contractor shall— (a) Provide and maintain an inspection system acceptable to the Government in accordance with FAR Clause 52.2462 or 52.2463; (b) Maintain and make available all records evidencing those details at the Government’s request.

(c) At least fourteen (14) calendar days (or as otherwise specified in the contract) prior to shipment to the Government, provide written notice to the contracting officer and to the cognizant DCMA Functional Specialist when full administration or Quality Support administration is delegated to DCMA.

(8) Governmentperformed FAT. The contractor shall— (a) For delivery of separately priced Government first article samples for Government performed FAT ship the units and system of record receiving report (i.e., WAWF or DD Form 250) to the test facility specified in paragraph (a) of FAR clause 52.2094. (b) For delivery of Government first article samples that are not separately priced, ship the units with a commercial shipping document to the test facility. (c) Prepare the shipping container(s) by marking the external packages in bold letters, “First Article Exhibits – Do Not Post to Stock," adjacent to the MILSTD129 (latest revision) identification markings. (d) Use a hard copy of the system of record receiving report (i.e., WAWF DD Form 250), or commercial shipping document as a packing list, in accordance with DFARS Appendix F. (e)Mark the exterior of the shipping container in accordance with MILSTD129 (latest revision), paragraph 5.11. (f) In the interior package, include hard copies of the contract, test reports, material certifications/process operation sheets, drawings used to manufacture the units, and a prepaid return label or shipping account for payment. (g)Send units by traceable means (e.g., certified or registered mail, United Parcel Service, Federal Express). (h)Send an email with subject titled “Notification of Test Exhibits [insert Government Lab DODAAC]” to the corresponding address in (i) or (ii) below and to the contracting officer specified in the contract. In the email, provide the shipment date, contract/purchase order number, National Stock Number, means of transportation, tracking number, and summary of container contents. Attach a copy of the system of record receiving report (i.e., WAWF or DD Form 250) documenting the Government has performed the contract quality assurance within the system or record. (i) DLA Land & Maritime – DSCCProdVerif@dla.mil (ii) DLA Aviation – DSCR.Test&EvaluationOffice@dla.mil

(9) At its discretion, the Government may return FAT units to the contractor at no cost to the Government. The contractor shall submit the return address and prepaid return label or shipping account for payment.

(10) If the Government disapproves or conditionally approves Governmentperformed FAT units, the Government will take action in accordance with FAR 52.2094.

E09 Contractor First Article Test (FAT) Information (JUL 2022)

(1) For FAT requirements, the Government will conduct inspection at source and acceptance at destination. The FOB point is destination. Due to known systems limitations, solicitations may contain erroneous inspection, acceptance, and FOB points. This procurement note takes precedence over any conflicting terms.

(2) CONTRACTOR FAT DELIVERY SCHEDULE

(a) _____ Days: To Deliver FAT Report to the Government

(b) _____ Days: Government FAT Report Evaluation and Notification to Contractor

(c) _____ Days: To Deliver Final Production Quantity After Approval of FAT Report. If PLT applies, this line will be blank; the number of delivery days for final production quantity will appear in procurement note E03, Production Lot Testing – Contractor, or E04, Production Lot Testing – Government, as applicable

(d) _____Total Delivery Days for FAT (Sum of Paragraphs (2)(a) through (2)(c))

H04 Sourcing for Critical Safety Items (APR 2024)

The contractor procuring, modifying, repairing, or overhauling a critical safety item shall only use a source approved by the head of the design control activity.

L06 Agency Protests (DEC 2016)

Interested parties may file an agency level protest with the contracting officer or may request an independent review by the chief of the contracting office (CCO). Independent review by the CCO is an alternative to consideration by the contracting officer and is not available as an appellate review of a contracting officer decision on a protest previously filed with the contracting officer. Absent a clear indication of the intent to file an agency level protest with the CCO for independent review, protests will be presumed to be protests to the contracting officer.

L08 Use of Supplier Performance Risk System (SPRS) in Past Performance Evaluations (JUN 2020)

(1) The Government will use the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) (formerly Past Performance Information Retrieval System – Statistical Reporting (PPIRSSR)) and may use other performance history to evaluate suppliers past performance.

(2) SPRS collects quality and delivery data on previously awarded contracts and orders from existing Department of Defense reporting systems to classify each supplier’s performance history by Federal supply class (FSC) and product or service code (PSC). The SPRS application provides the contracting officer quantifiable past performance information regarding a supplier's quality and delivery performance for the FSC and PSC of the supplies the Government is purchasing.

(3) The contracting officer will use the quality and delivery classifications identified for a supplier in SPRS to evaluate a supplier’s past performance in conjunction with the supplier’s references (if requested). The Government will use this past performance information in accordance with the basis for award stated in the solicitation.

(4) SPRS generates classifications daily for each contractor. The SPRS Software User's Guide for Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf) and the SPRS Government User Guide (https://www.sprs.csd.disa.mil/pdf/SPRS_Government.pdf) provide instructions for accessing SPRS classifications. Contractors have access to SPRS for their own classifications only. Suppliers are encouraged to review their own classifications; the SPRS reporting procedures and classification methodology detailed in the SPRS Software User's Guide for Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf); and the SPRS Evaluation Criteria (https://www.sprs.csd.disa.mil/pdf/SPRS_DataEvaluationCriteria.pdf). The SPRS Software User's Guide for Awardees/Contractors (https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf) provides the method to challenge a rating generated by SPRS.

PART II CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employeeemployer actions, contests of OMB Circular A76 competition performance decisions).

(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION/AOCA’s CA/ombudsman can be reached at (405) 8553552.

Complaints which cannot be so resolved shall be forwarded to the HQ through J72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

(The above Clause/Provision has been modified.)

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (NOV 2021)

(IAW FAR 3.1004(a))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (AUG 2019)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

252.203-7004 DISPLAY OF HOTLINE POSTERS (JAN 2023)

(IAW DFARS 203.1004(b)(2)(ii))

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7021 Contractor Compliance with the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .