SPRTA1-24-Q-1897-0001.pdf
PDF 142 KB Posted
- Solicitation number
- SPRTA124Q1897
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is an Amendment to Solicitation SPRTA124Q1897 for the procurement of F100 Turbine Shroud Segment PN 4077434-01. The amendment extends the solicitation closing date to September 23, 2024 at 4:00 PM Central Time. The solicitation is seeking first article testing and production units, with the production quantity ranging from a minimum of 4 to a maximum of 23 units. Contractors must submit a first article test plan and report in accordance with the requirements. The first article unit and 2 non-expended first article units must be manufactured at the same facilities as the production units. Payment for the data reports will be through Wide Area Workflow. All other terms and conditions of the solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRTA124Q1897 (With Attachments).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
SPRTA1-24-Q-1897-0001
3. EFFECTIVE DATE
21 AUG 2024
4. REQUISITION/PURCHASE REQ. NO.
FD20302301897PLN
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DLA AVIATION AT OKLAHOMA CITY, OK
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
BUYER: Breann Irving/DLA-AOAB breann.irving@us.af.mil Phone: (405) 734- 8107 Fax: (405) 734-8106 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODESPRTA1
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
SPRTA124Q1897
9B. DATED (SEE ITEM 11)
17-OCT-2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 23-SEP-2024 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to extend the solicitation closing date.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
SPRTA1-24-Q-1897-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to extend the solicitation closing date to 23 Sep 24 at 4:00 PM Central Time. All other terms and conditions remain unchanged and in full force and effect.
SPRTA124Q18970001
PART I THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
First Article Note: Contractor must comply with all First Article requirements set forth below in order to be eligible for award. Test Plan and Test Report shall be submitted in accordance with Section B of the Schedule and all supporting documents attached to the end of this Solicitation.
Transportation Account Code (TAC) for ALL CLINs: FRS2
Production Unit Range Quantity: The quantity for this requirement will be reevaluated after receipt of the contractor's proposal and, if changed from the current required quantity for Item 0001AE, the contractor will be notified of the final required quantity prior to award. The current quantity ranges from a Minimum of 4 EA to a Maximum of 23 EA. If this quantity range does not provide the best pricing option, then the contractor shall submit separate quantity ranges that yield the best prices to the Government based on the stated range above.
INFORMATIONAL CLIN
All Contractors Must Submit FA Item No.
NSN: 2840013214453 NZ
SHROUD SEGMENT,TURB
DESIGNED TO RETAIN BUSHINGS
NICKLE ALLOY
Manufacturer Part Number 51992 407743401 Priority: R Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity
NONE N/A N/A
FIRST ARTICLE TEST PLAN
All Contractors Must Submit FA Item No.
0001AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
CLIN ACRN ACRN Total
0001AA AB
FIRST ARTICLE TEST PLAN IAW DD FORM 1423
Limitations of Liability: Other Than High Value Item
FIRST ARTICLE TEST PLAN
All Contractors Must Submit FA
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Type / Ship To PACRN Mark For A FA8111 First Article Monitor Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A FA8111 1 LO *30 Calendar Days NonMilStrip
Proposed Delivery
A FA8111 1 LO
A combination of an invoice and Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF) in order to receive payment for data reports.
FIRST ARTICLE TEST REPORT
All Contractors Must Submit FA Item No.
0001AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
CLIN ACRN ACRN Total
0001AB AB
TEST REPORT IAW DD FORM 1423
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Type / Ship To PACRN Mark For A FA8111 First Article Monitor Type / Ship To Quantity (U/I) *ARO Government
Approval of First Article Test Plan
_ Req No / Pri
Required Delivery
FIRST ARTICLE TEST REPORT
All Contractors Must Submit FA A FA8111 1 LO *120 Calendar Days NonMilStrip
Proposed Delivery
A FA8111 1 LO
A combination of an invoice and Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF) in order to receive payment for data reports.
Expended First Article Unit
All Contractors Must Submit FA Item No.
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
1 EA
CLIN ACRN ACRN Total
0001AC AB
FIRST ARTICLE SAME AS INFO CLIN 0001 ABOVE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Type / Ship To PACRN Mark For
FA MONITOR
Type / Ship To Quantity (U/I) *ARO Government
Approval of First Article Test Plan
_ Req No / Pri
Required Delivery
1 EA *120 Calendar Days NonMilStrip
Proposed Delivery
1 EA
NOTE 1: First article test requirements shall be per LPFQAR003 and the following: All first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR003. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR 003 prior to assembly. After completion of inspections above, First Article shall be destructively tested/evaluated in accordance with the requirements of paragraph 3.6 of LPFQAR003. Destructively tested first article assets will be condemned and disposed of at vendor's facility.
NOTE 2: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.
NOTE 3: The Contractor shall notify the Government 10 days prior to start of testing by notifying the DCMA ACO.
Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).
NonExpended First Article Units
All Contractors Must Submit FA Item No.
0001AD
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
CLIN ACRN ACRN Total
0001AD AB
FIRST ARTICLE SAME AS INFO CLIN 0001 ABOVE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAB ACCT 09
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
A SW3211 2 EA TBD NonMilStrip
Proposed Delivery
A SW3211 2 EA
NOTE 1: The quantity of the First Article exhibit for Line Item 0001AD will be considered part of the contract quantity if the First Article Test Report is approved by the Government as required by FAR Clause 52.2093.
NOTE 2: First article test requirements shall be per LPFQAR003 and the following: All first articles shall be inspected in accordance with the requirements of paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR003. The assembly detail part numbers (if an assembly), shall be inspected per paragraphs 3.1, 3.2, 3.3, 3.4, and 3.5 of LPFQAR 003 prior to assembly.
NOTE 3: The First Article offered must be manufactured at the facilities in which the item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.
NOTE 4: The contractor SHALL NOT take any delivery action on this or subsequent Line Items until approval/disapproval is received for the First Article Test Report required in the above line item 0001AB. Once approved, a contract modification will be issued to establish the delivery schedule for Line Items 0001AD0001AE.
Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).
New Manufactured Material Production Units
All Contractors Must Submit FA Item No.
0001AE
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0001AE AB
SAME AS INFO CLIN 0001 ABOVE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAC ACCT 09
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
A SW3211 15 EA TBD NonMilStrip
Proposed Delivery
A SW3211 15 EA
Inspection & Acceptance Receiving Reports shall be submitted using Wide Area Workflow (WAWF).
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A FA8111
FA8111 AFLCMC LZPED
CP 405 736 7455
3001 STAFF DR
BLDG 3001 STE 1AF1 105A
TINKER AFB OK 731453303
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 731458000
TINKER AFB OK 731458000
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
File details come from the government source that posted it. Updated .