_QUALRQMT.pdf
PDF 72 KB Posted
- Solicitation number
- SPRTA1-24-Q-0316
- Issued by
-
Defense Logistics Agency Aviation
About this file
This document is a Supplement to an AFLC Form 761, which provides details on qualification requirements for the National Stock Number (NSN) 1650-00-723-1166, Part Number 3-43040-1, for a Tank, Hydraulic Fluid.
The qualification requirements vary depending on whether they were established before or after October 19, 1984. For requirements established prior to that date, prequalification of sources is essential to maintain high quality and operational safety. Approved sources are limited to actual manufacturers that have completed all required testing. For requirements established after October 19, 1984, a Justification for Qualification Requirement (JQR) is required, and the provisions of FAR 9.206-1 and -2 apply.
The related federal contract opportunity is Solicitation Number SPRTA1-24-Q-0316, issued by the Defense Logistics Agency Aviation, for the procurement of the same NSN, Noun, and Part Number. No other details about the solicitation are provided in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENT TO AFLC FORM 761
DATE
NOUN NATIONAL STOCK NUMBER PART NUMBER
Only the checked statement applies to this NSN.
QUALIFICATIONS REQUIREMENTS PRIOR TO 19 OCT 84
Section F.1
This item qualifies under FAR 9.206-1(a)(2) and the requirements of FAR 9.202(a) are not applicable.
Prequalification of sources is essential to maintain high quality and maximum operational safety.
Section F.2
(a) Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b) Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, can be considered approved sources for this item.
(c) Qualification requirements are set forth in OC-ALC Source Approval Information Booklet.
Category III capability is permissible.
Section F.3
The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and B apply. Qualification requirements were established prior to 19 Oct 84.
QUALIFICATION REQUIREMENTS AFTER 19 OCT 84
Justification for Qualification Requirement (JQR) is required.
Section F.1
Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply.
Section F.2
(a) Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b) Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, can be considered approved sources for this item.
Section F.3
The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and D apply. Qualification requirements were established after 19 Oct 84.
EVALUATING ENGINEER/TECHNICIAN (Signature) SYMBOL EXTENSION
OC-ALC Form O-367, JUN 01 (TI) http://www.tinker.af.mil/shared/media/document/AFD-070109-194.doc http://www.tinker.af.mil/shared/media/document/AFD-070109-194.doc http://www.tinker.af.mil/shared/media/document/AFD-070109-194.doc http://www.tinker.af.mil/shared/media/document/AFD-070109-194.doc http://www.tinker.af.mil/shared/media/document/AFD-070109-194.doc
| DATE: 31 MAY 2024 | |
| NOUN: TANK, HYDRAULIC FLUID | |
| NATIONAL STOCK NUMBER: 1650-00-723-1166 | |
| PART NUMBER: 3-43040-1 | |
| Radio Button1: No | |
| 2024-05-31T12:09:20-0500 | |
| JENKINS.DENA.L.1385757421 |
| SYMBOL: 423SCMS/GUEA |
| EXTENSION: 405-582-9977 |
File details come from the government source that posted it. Updated .