SPRTA121R0025_______0001.pdf

PDF 292 KB Posted

Attached to
CHAMBER, COMBUSTION
Solicitation number
SPRTA1-21-R-0025
Issued by

View the file

Other files

File Type Posted
SPRTA121R0025_______0003.pdf PDF
SPRTA121R0025_______0002.pdf PDF
Sample Consent and Authorization Letter.pdf PDF
DD 2169.pdf PDF
AFMC 158.pdf PDF
DD 1653.pdf PDF
SPRTA121R0025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

SPRTA1-21-R-0025-0001

3. EFFECTIVE DATE

18 DEC 2020

4. REQUISITION/PURCHASE REQ. NO.

FD20302000384 01

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Antonino D. Lenora/DLA-AOAB antonino.lenora@us.af.mil Phone: (405) 739- 5408

7. ADMINISTERED BY (If other than item 6) CODESPRTA1

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

SPRTA121R0025

9B. DATED (SEE ITEM 11)

1-DEC-2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 17-JAN-2020 4:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FMS REQUIREMENT

SEE PAGE 2 FOR DESCRIPTION OF THE AMENDMENT.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SPRTA1-21-R-0025-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to add Cage Code 00518, C.F. Roark Welding and Engineering as an approved source. As a result, the CLIN structure has been re‐structured to include First Article Line items, various additional clauses added, including Addendum to 52.212‐1 Instructions to Offerors, and Addendum 52.212‐2 Evaluation Factors For Award.

SUPPLIES OR SERVICES AND PRICES/COSTS

INFO CLIN

Item No.

NSN: 2840-00-632-8150 OJ

CHAMBER,COMBUSTION,

Contain the engine gas flame AMS 5646, 5510,5521 and 5651 Manufacturer Part Number 00518 6789748 63005 6789748 Associated Document(s) Line Item(s)

FD20302000384 01 0001

Priority: E Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Government Test First Article Unit (Expended)

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AA AA

NSN: 2840-00-632-8150 OJ

CHAMBER,COMBUSTION,

Contain the engine gas flame AMS 5646, 5510,5521 and 5651 Manufacturer Part Number 00518 6789748 63005 6789748 Priority: E

Inspection: Destination Acceptance: Destination Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

B FY2303 FAGT PAA FIRST ARTICLE

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Government Test First Article Unit (Expended)

Bid A - First Article Required Required Delivery

B FY2303 FAGT 1 EA *180 Calendar Days

Proposed Delivery

B FY2303 FAGT 1 EA

Government Test First Article Units (Non-Expended)

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AB AA

NSN: 2840-00-632-8150 OJ

CHAMBER,COMBUSTION,

Contain the engine gas flame AMS 5646, 5510,5521 and 5651 Manufacturer Part Number 00518 6789748 63005 6789748 Priority: E

Inspection: Destination Acceptance: Destination Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Type / Ship To PACRN Mark For

B FY2303 FAGT PAA FIRST ARTICLE

Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

B FY2303 FAGT 2 EA *180 Calendar Days Non-MilStrip

Proposed Delivery

B FY2303 FAGT 2 EA

Production Units, First Article Required

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

Production Units, First Article Required

Bid A - First Article Required

98 EA

CLIN ACRN ACRN Total

0001AC AA

NSN: 2840-00-632-8150 OJ

CHAMBER,COMBUSTION,

Contain the engine gas flame AMS 5646, 5510,5521 and 5651 Manufacturer Part Number 00518 6789748 63005 6789748 Priority: E

Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Foreign Military Sales :FMS Case:SR-D-KDB Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DSR004 ORIGIN

Type / Ship To PACRN Mark For

* DSR004 PAA DSRF00

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

* DSR004 98 EA 1 MAR 2021 DSRF5V91937718 / PRI: 2

Proposed Delivery

* DSR004 98 EA

New Manufactured Material

Bid B - First Article NOT Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

100 EA

CLIN ACRN ACRN Total

0001AD AA

NSN: 2840-00-632-8150 OJ

CHAMBER,COMBUSTION,

Contain the engine gas flame AMS 5646, 5510,5521 and 5651 Manufacturer Part Number 00518 6789748 63005 6789748 Priority: E

New Manufactured Material

Bid B - First Article NOT Required

Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Foreign Military Sales :FMS Case:SR-D-KDB Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DSR004 ORIGIN

Type / Ship To PACRN Mark For

* DSR004 PAA DSRF00

Type / Ship To Quantity (U/I) On or Before Req No / Pri

Required Delivery

* DSR004 100 EA 1 MAR 2021 DSRF5V91937718 / PRI: 2

Proposed Delivery

* DSR004 100 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: B FY2303 FAGT

DEPARTMENT OF THE AIR FORCE

OC-ALC ATTN DD00-SOP/1ST ARTICLE

BLDG 18 CML PHN 405-739-8596

8080 PERIMETER RD DR 16

TINKER AFB OK 73145-9156

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

SHIP TO (FOREIGN MILITARY SALES)

TYPE/CODE: * DSR004

SUPPLEMENTAL ADDRESS CODE: DA4KDB

FMS CASE CODE/LOA: SR-D-KDB/002

MAPAC SHIP TO CODE: DSR004

MAPAC MARK FOR: DSRF00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

ADDENDUM TO CLAUSE 52.212-4

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

0001AA/AB 3EA 180 FY2303

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

0001AA/AB 150

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(The above Clause/Provision has been modified.)

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING -- ALTERNATE I (JAN 1997)

(IAW FAR 9.308-2(a)(2), FAR 9.308-2(b)(2))

As prescribed in 9.308-2(a)(2) and (b)(2), add the following paragraph (j) to the basic clause:

(j) The Contractor shall produce both the first article and the production quantity at the same facility.

(The above Clause/Provision has been modified.)

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING -- ALTERNATE II (SEP 1989)

(IAW FAR 9.308-2(a)(3), FAR 9.308-2(b)(3))

As prescribed in 9.308-2(a)(3) and (b)(3), substitute the following paragraph (h) for paragraph (h) of the basic clause:

(h) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules.

Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.

(The above Clause/Provision has been modified.)

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Item No(s) Test Criteria/Technical Requirements 0001AA/AB See Below

Disposition of the First Article shall be as follows:

Item No(s) Quantity Approved 0001AA 1EA Expended in Government Testing 0001AB 2EA Non Expended in testing. Will be forwarded to USAF Supply

Item No(s) Quantity Disapproved

0001AA/AB Will be retained by USAF pending disposition instructions from the contractor

(The above Clause/Provision has been modified.)

FIRST ARTICLE APPLICABILITY AND/OR CONDITIONS FOR WAIVER (FEB 2013)

(IAW FAR 9.306(c))

(a) First Article Testing is a requirement of this contract. This requirement may be waived by the Contracting Officer, if the bidder/offeror meets any one of the conditions for waiver listed below *** and in the instance of a prior contract, not more than __*__ months have elapsed since the completion of that contract:

*Item No *Months Since Completion of Contract

0001AA/AB 36

(b) Bidders who meet the conditions for waiver set forth below shall submit a bid or proposal on Bid/Offer "B" which does not require compliance with the First Article Approval provision set forth herein and furnish the following information in the individual solicitation: Contract No. __________________________, Contract Item No. _________, Date of Contract. __________, Name & Address of Government Agency issuing the Contract.

Failure to include this information will render the IFB(s) non-responsive and may cause rejection of RFP(s).

(c) Bidders/offerors who do not meet the conditions for waiver set forth below shall submit a bid on Bid/Offer, “A” which includes compliance with First Article Approval.

(d) Performance or other characteristics, which the First Article must meet, and detailed technical data requirements for testing of the First Article (including necessary data to be submitted in First Article Test Report, if applicable) are as set forth in this solicitation.

(e) The approved First Article ___**___ serve as a manufacturing standard.

**Item No **Serve as a Manufacturing Standard

0001AA/AB WILL NOT

(f) Waivers

***Item No ***Conditions for Waiver 0001AA/AB Previously furnished to GOVT

Previously furnished to DoD Previously furnished to Air Force

(The above Clause/Provision has been modified.)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 9711X8242 0002 4F X 47 5W CKDBSR 000000 00000 002000 503000 F03000 $0.00

PSR: G24369 FSR: 052036 DSR: 302804 CIN: F3YTBK0204B001

ACRN TOTAL $ 0.00

252.204‐7019, Notice of NIST SP 800‐171 DoD Assessment Requirements

252.204‐7020, NIST SP 800‐171 DoD Assessment Requirements

ADDENDUM TO PROVISION 52.212-1

EVALUATION COST FACTOR FOR FIRST ARTICLE (OCT 1988)

(IAW FAR 9.306(i))

The cost to the Government for first article testing or engineering review and approval of first article test reports (where preliminary Contractor testing is required), as applicable, shall be a factor in the evaluation of this solicitation. The factor to be used in evaluation shall be

Lot/Item Evaluation cost

0001AA/AB $13,343.00

(The above Clause/Provision has been modified.)

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JUN 2020)

(IAW FAR 12.301(b)(1))

Addendum to FAR 52.212-1

INSTRUCTIONS TO OFFERORS (ITO)

PAST PERFORMANCE and PRICE TRADEOFF With Small Business Participation Factor

13. GENERAL INSTRUCTIONS

1.1 General Guidance

This section of the ITO provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated in the solicitation and the attachments of the solicitation.

1.2 Proposal Content

The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government’s requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror’s proposal. Elaborate brochures or documentation, binding, detailed artwork, or other embellishments are unnecessary and are not desired.

1.3 Proposal Acceptance Period

The proposal acceptance period is specified in the solicitation. The offer shall make a clear statement in the proposal documentation volume that the proposal is valid until this date.

1.4 Retention of Proposals

In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offer requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.

2.0 GENERAL INFORMATION

2.1 Point of Contact

Address any questions or concerns you may have to the Point of Contract (POC) or the Contracting Officer (KO) identified on the front page of the solicitation. Written requests for clarification may be sent to the POC or KO at the address located on the front page of the solicitation.

2.2 Debriefings

The KO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The KO will notify unsuccessful offerors in accordance with FAR 15.503. Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.

2.3 Discrepancies

If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the KO in writing with supporting rationale as well as the remedies the offeror is asking the KO to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussions.

2.4 Electronic Reference Documents

All referenced documents for this solicitation are available on the Beta Sam Website under Contract Opportunities (formerly FedBizOpps) at https://beta.sam.gov/, unless indicated otherwise. Potential Offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

2.5 Amendments to Solicitation

If this RFP is amended, all terms and conditions that are not amended remain unchanged and in full force and effect.

Offerors shall acknowledge receipt of any amendment and provide confirmation upon submission of the offeror’s proposal.

2.6 Proposal Submission

Proposals may be e-mailed or sent by mail to the KO and received by the closing date. Proposals sent by mail shall be submitted in sealed envelopes or packages addressed to the KO at the address shown on the front page of solicitation.

3.0 PROPOSAL SUBMISSION AND DOCUMENTATION

The purpose of this section is to provide information to the Government for preparing the contract document and supporting file. The offeror’s proposal shall include a signed copy of the solicitation, Sections A through K, and all other information described in this section and shown in the table below.

ITO

Paragraph Number Volume Title

3.1 Model Contract/Solicitation

3.1 Small Business Subcontracting Plan (if required)

3.4 Past Performance Information (Up to (insert number) contracts)

3.4.2 Significant Subcontractor Consent Letters

3.4.2 Client Authorization Letter

3.5 Small Business Participation Plan

3.6.1 Authorized Offeror Personnel

3.6.2 Government Offices

3.6.3 Company/Division Address, Identifying Codes, and Applicable Designations

3.7 Exceptions to Terms and Conditions (if applicable)

An offer may be made in accordance with a current Department of Defense (DoD) Basic Ordering Agreement (BOA), if lieu of the signed Model Contract. However, eligibility for award will be dependent upon the KO’s ability to make a determination that the terms and conditions are either identical to those of the solicitation or differ in a way that has no impact on the evaluation factors listed. The offeror is responsible for identifying the differences or exceptions between the BOA and the RFP as detailed in paragraph (2) Exceptions to Terms and Conditions below. If the Contracting Officer cannot make the determination above, the BOA offer may not be eligible for award.

3.1 Solicitation/Model Contract

Sections A-K (or the corresponding sections if the solicitation is a commercial acquisition) includes:

Section A – Solicitation/Contract Form Completion of blocks 12, 13, 14, 15, and 27, with name, title, and date included in block 27 of the SF 1447 is required.

Signature by the offeror on the SF 1447 constitutes an offer which the Government may accept.

Section B – Supplies or Services and Costs/Prices All pricing information shall be addressed in Section B – The Schedule of the solicitation. Information shall be limited to Contract Line Item Number (CLIN), Sub-CLIN or ELIN level pricing, including unit and extended pricing as specified in Section B.

Section E – Inspection and Acceptance Completion of Inspection and Acceptance clause shall be completed.

Section F – Deliveries or Performance Complete F.O.B. Origin Clause IAW FAR 47.305(b).

Section G – Contract Administration Data Complete Activity Address Clause and if applicable, annotate remittance address within proposal.

Section H – Special Contract Requirements Not applicable.

Section I – Contract Clauses Complete clauses as applicable to your proposal.

Section K – Representation, Certifications, and Other Statement of Offerors Offerors are required to complete electronic annual representations and certifications in SAM accessed via https://www.sam.gov as a part of required registration.

Section J – Attachments Small Business Subcontracting Plan (if required in accordance with the solicitation)

3.2 Technical (Evaluation Faction 1) Information

A separate technical proposal volume is not required; however the proposal must comply with all aspects of the technical requirements as established by the National Stock Number, Part Number, and accompanying technical data attachments in order to be eligible for award and be considered technically acceptable in accordance with Section M (or addendum to FAR 52.212-2 if commercial).

3.3 Price (Evaluation Factor 2) Information

All pricing information shall be addressed in Section B – The Schedule of the solicitation. Information shall be limited to Contract Line Item Number (CLIN), Sub-CLIN or ELIN level pricing, including unit and extended pricing as specified in Section B.

In accordance with FAR 15.403-3(a), information other than certified cost or pricing data may be required to support price reasonableness. FAR 15.403-3(a)(1) provides for obtaining information other than certified cost or pricing data if needed to determine price reasonableness. Therefore, the FAR does not preclude the requirement for obtaining other than certified cost or pricing data under certain circumstances and the Government reserves the right to obtain data as appropriate. Should the contracting officer determine proposed prices to appear unreasonable or the possibility that an Offeror does not fully understand the requirement, the Offerors may be required to support price reasonableness via other than certified cost or pricing data. If, after receipt of proposals, the contracting officer determines that there is insufficient information available to determine price reasonableness and none of the exceptions in FAR 15.403-1 apply, the offeror shall be required to submit certified cost or pricing data.

3.4 Past Performance (Evaluation Factor 3) Information

3.4.1 General Information

The offeror is not required to provide past performance information, however they may submit it with their proposal in a format that is readable and that communicates in a clear and concise manner. If the offeror submits past performance information, the submittal should contain information on the offeror and/or all significant subcontractors. A significant subcontractor is defined as a contractor who is proposed to perform over 60% of the total effort.

The Government may use past performance information provided by each offeror and information obtained from other sources in the evaluation of past and present performance. Other sources include the Supplier Performance Risk System (SPRS). Past performance may also be obtained through the contractor Performance Assessment Reporting System (CPARS), similarly systems of other Government departments and agencies (MOCAS, etc), Defense Contract Management Agency (DCMA) channels, interviews with program managers and contracting officers, and other sources known to the Government, including commercial sources.

3.4.2 Relevant and Recent Contracts

Each offeror may submit information on past and present performance that they consider most relevant in demonstrating their ability to perform the proposed effort. Offerors may also include information on recent contracts performed by each of their significant subcontractors that they consider most relevant in demonstrating their ability to perform the proposed effort. For description of the characteristics or aspects the Government will consider in determining relevance, see Section M (or addendum to FAR 52.212-2 if commercial). Information on past and present performance should be limited to contracts within the past seven (7) years.

If the offeror submits past performance reference for a significant subcontractor, the offeror must submit a consent letter (Attachment (insert number)) executed by each significant subcontractor, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror must also submit a client authorization letter (Attachment (insert number)) authorizing release to the Government of requested information on the offeror’s performance.

3.4.3 Specific Content

Offerors may explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate. This may include a discussion of efforts accomplished by the offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk. Merely having problems does not automatically equate to a little or no confidence rating, since the problems encountered may have been on a more complex program, or an offeror may have subsequently demonstrated the ability to overcome the problems encountered. The offeror may submit documentation that clearly demonstrates their management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This may allow the offeror to be considered a higher confidence candidate.

3.4.4 Format and Length of Documentation

Documentation is limited to addressing up to 5 contracts. Each contract that is addressed is also limited to a one (1) page narrative concerning subject contract.

3.4.5 Protection of Information

Past performance information and the past performance sources are confidential and are not to be released to anyone outside the government source selection team. Offerors are cautioned that contacting or seeking our source(s) of adverse information is strictly prohibited. Any attempts to contact individuals concerning the past performance information will be perceived negatively and could impact your performance ratings. Any questions regarding source selection information and Evaluation Notices (ENs) should be addressed directly to the contracting officer only and not to any other individuals. Prime contractors are responsible for ensuring that all their subcontractors are aware of this information and are in compliance.

3.5 Small Business Participation (Evaluation Factor 4) Information The offeror shall submit a Small Business Participation Plan. The Small Business Participation Plan is required from all offerors, including small businesses and companies with Master, Individual, commercial subcontracting plans and/or comprehensive subcontracting plans. The offeror shall include only the first tier of subcontractors for this effort.

Offerors are advised that the Small Business Participation Plan is not the same as the Small Business Subcontracting Plan required by FAR 52.219-9. Large business offerors shall not utilize the Small Business Subcontracting Plan in the place of the Small Business Participation Plan.

The Small Business Participation Plan shall address (1) the extent of participation of proposed Small Businesses when subcontracting possibilities exist to include the (2) description of the subcontracted work these proposed firms are to perform, (3) the company names/CAGE codes planned for use in the performance of this resultant contract along with the (4) associated goals to include service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns (5) expressed in terms of percentages of both the total planned subcontracted dollars and total contract dollars.

If limited or no subcontracting possibilities exist for these socio-economic entities, provide rationale for such. Offerors are cautioned against only acknowledging a goal is not met, if applicable. Rather, adequate rationale includes specific reasons why a goal is unmet and any actions being taken to increase any unmet goals. Additionally, if the offeror is a small business concern, it should include the work it will be performing when calculating the goals for your Small Business participation information.

When an evaluation assesses the extent that small businesses are specifically identified in proposals, the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9 to facilitate compliance with 252.219-7003(e).

3.6 Other Information Required

3.6.1 Authorized Offeror Personnel

Provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.

3.6.2 Government Offices

Provide the mailing address, telephone and fax numbers and facility codes for the cognizant Contract Administration Office, DCAA, and Government Paying Office. Also, provide the name and telephone and fax number for the Administrative Contracting Officer (ACO).

3.6.3 Company/Division Address, Identifying Codes, and Applicable Designations Provide company/division's street address, county and facility code; CAGE code; DUNS code; TIN; size of business (large or small); and labor surplus area designation. This same information must be provided if the work for this contract will be performed at any other location(s). List all locations where work is to be performed and indicate whether such facility is a division, affiliate, or subcontractor, and the percentage of work to be performed at each location.

3.7 Exceptions to Terms and Conditions

Exceptions taken to terms and conditions of this prospective contract, to any of its formal attachments or to other parts of the solicitation shall be identified. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which exception is taken. Provide rationale in support of the exception and fully explain its impact, if any, on the performance, schedule, cost and specific requirements of the solicitation. This information shall be provided in the format shown below. Failure to comply with the terms and conditions of the solicitation may result in the offeror being removed from consideration for award.

(The above Clause/Provision has been modified.)

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(IAW FAR 12.301(c))

Addendum to FAR 52.212-2

EVALUATION FACTORS FOR AWARD

PAST PERFORMANCE and PRICE TRADEOFF

(WITH SMALL BUSINESS PARTICIPATION FACTOR)

1.0 Source Selection

1.1 Basis for Contract Award

This acquisition will utilize the Tradeoff source selection procedures to make an integrated assessment for a best value award decision. Tradeoffs may be made only between price and past performance. Award will be made to the offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR) Part 15, as supplemented, whose proposal conforms to the solicitation's requirements (to include all stated terms, conditions, representation, certifications, its attachments, and all other information required by Addendum to FAR 52.212-1 of this solicitation) and judged, based on the evaluation factors to represent the best value to the Government. The Government seeks to award to the qualified (See FAR 52.209-1 of this solicitation) offeror who gives the Government the greatest confidence that they will best meet the requirement affordably. This may result in an award to a higher rated, higher priced offeror, where the decision is consistent with the evaluation factors and the Source Selection Authority (SSA) reasonably determines that the past performance of a higher price offeror outweighs the cost difference. While the Government SSA will strive for maximum objectivity, the source selection process, by its nature, is subjective and, therefore, professional judgment is implicit throughout the entire process.

1.2 Number of Contracts to be Awarded

The Government intends to award one contract for this acquisition resulting from this solicitation. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

1.3 Rejection of Unrealistic Offers

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program.

1.4 Correction Potential of Proposals

The Government will consider, throughout the evaluation, the "correction potential" of any deficiency or proposal inadequacy. The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal not meeting the Government's requirements is not considered correctable, the offeror may be eliminated from the competitive range.

1.5 Discussions

It is the Governments intent to award without discussions; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold discussions, offeror responses to Evaluation Notices (ENs), and the Final Proposal Revision (FPR) will be considered in making the source selection decision.

1.6 Competitive Range Determination

If discussions are conducted, the Government shall establish a competitive range comprised of the most highly rated proposals, in accordance with FAR 15.306(c). The competitive range determination can be based on any evaluation factor, or a combination of the three factors. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range they may request a debriefing IAW

FAR 15.505.

1.7 Pre-Award Survey

The Government may conduct a pre-award survey (PAS) as part of this source selection. Results of the PAS (if conducted) will be evaluated to determine each offeror's capability to meet the requirements of the solicitation.

1.8 Solicitation Requirements (Terms and Conditions)

Offerors are required to meet all solicitation requirements, such as terms and conditions, and representations and certifications, in addition to those identified as factors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.

2.0 EVALUATION FACTORS

2.1 Evaluation Factors

Award will be made to the offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the evaluation factors and subfactors described below.

Factor 1: Technical Factor 2: Price Factor 3: Past Performance Factor 4: Small Business Participation

2.2 Relative Importance of Factors

For this solicitation, technical and small business participation acceptability is a prerequisite to the best value analysis and potential trade-off between Past Performance and Price. The Order of Importance is used to explain how the other factors will be traded off on technically acceptable proposals.

For all technically and small business participation acceptable proposals, Factor 2 (Past Performance) will be evaluated on a basis approximately equal to Factor 3 (Price). Tradeoffs may only be made between past performance and price among those offerors.

2.3 Evaluation Methodology of Factors

All proposals will first be evaluated for technical and small business plan acceptability as described in paragraph 2.3.1 below. Second, price will be evaluated as described in paragraph 2.3.2 below. Concurrent with the price evaluation, past performance will be evaluated in accordance with paragraph 2.3.3 on each proposal deemed technically acceptable. A decision will then be made as to which proposal provides the best value to the Government.

2.3.1 Technical Factor

There is no requirement that a technical proposal be submitted. Each offer will be determined technically acceptable if deemed compliant with specified requirements and is listed as an approved, qualified source or gains qualification prior to award. Failure to meet the specified requirements as included in Addendum to FAR 52.212-1 may render the offer technically unacceptable. Only those proposals determined to be technically acceptable, either initially, or as a result of discussions, will be considered for award. Each offeror will receive one of the technical ratings described below:

Rating Description Acceptable Proposal meets the minimum requirements of the solicitation.

Unacceptable Proposal does not meet the minimum requirements of the solicitation.

2.3.2 Price Factor

The proposed price will be evaluated for completeness, reasonableness, unbalanced pricing, and Total Evaluated Price. Offerors whose price is determined to be incomplete, unreasonable, or unbalanced will not be considered for award.

2.3.2.1 Completeness

Proposals will be reviewed for completeness and compliance. Incomplete proposals will be considered unawardable.

2.3.2.2 Price Reasonableness

The proposed prices will be evaluated for reasonableness. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404 in order to determine price reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404.

2.3.2.3 Unbalanced Pricing: Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced. Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items is significantly over or understated as demonstrated by application of price analysis techniques, such that: (a) there is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced Offeror; or (b) the offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.

2.3.2.4 Total Evaluated Price (TEP): The Offeror’s TEP will be determined by multiplying the proposed unit price by the Best Estimated Quantity (BEQ) of each contract line item (CLIN), then adding all CLINs together; however, the actual quantity awarded may differ based on the Government required quantity at award. (At award, the quantity type may be changed from BEQ to Fixed Quantity). Any price related factors (i.e. transportations costs, first article testing) will be added to the amount for its respective CLIN.

Quotes for Bid A will be evaluated as follows:

The contractor’s proposal for Line Item 0001AA (First Article Unit Expend in Testing), Line Item 0001AB (First Article Unit Non-Expend in Testing), and Line Item 0001AC (New Manufactured Material – Production Quantity. The estimated cost factor of $13,343.00 for Government First Article test/inspection evaluation will be added to this total.

The cumulative price of these factors will be used in evaluation of quotes submitted under Bid A.

Quotes for Bid B will be evaluated as follows:

The contractor’s proposal for range quantity under Line Item 0001AD (New Manufactured Material – First Article Waiver) are the price factors that will be used in evaluation. The quantity that will be used within the range will be determined by the Government Requirements group prior to award. Evaluation will be based on the proposed unit price multiplied by the required quantity.

2.3.2.5 Data Other than Certified Cost or Pricing Data: If requested by the Contracting Officer, data other than certified cost or pricing data shall be evaluated to support a determination of reasonable and balanced pricing. This information will only be requested if all other sources have been insufficient to support a determination of reasonable and/or balanced pricing. However, if the contracting officer does not receive proposals from two or more responsible offerors, competing independently, the sole offeror shall be required to submit certified cost or pricing data if the proposed dollar amount exceeds the Truth in Negotiations Act (TINA) threshold IAW FAR 15.403-4 or data other than certified cost or pricing data in sufficient detail to support a determination of reasonable and balanced pricing as determined by the contracting officer if the proposed dollar amount does not exceed the TINA threshold IAW FAR 15.403-4.

2.3.3 Past Performance Factor

The Government will evaluate the offeror's past performance by reviewing the offeror’s record of supplying products that comply with contract requirements, including cost and schedule. Under the Past Performance factor, a Performance Confidence Assessment Rating represents the evaluation of an offeror's present and past work record to assess the Government’s confidence in the offeror's probability of successfully performing as proposed.

2.3.3.1 Evaluation Process

The Past Performance Evaluation is accomplished by reviewing aspects of an offeror's (1) relevant past performance and (2) recent past performance, focusing on and targeting performance, which is relevant to the technical requirement.

In determining relevance, consideration will be given to the likeliness and similarity of the effort to include contract scope, contract type, and contract schedule. This information may include data on parts manufactured by other divisions, critical subcontractors, or teaming contractors, if such resources significantly influence the proposed requirement. The Government may consider relevant work as those performed for agencies of the federal, state, or local governments and commercial customers. Where relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any corrective actions taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and to evaluate their effectiveness. To be recent, contract delivery must have occurred within the past seven (7) years from the date of issuance of this solicitation. Past performance information that fails this condition will not be evaluated.

Offerors with adverse past performance information to which they have not previously had an opportunity to respond will be given the opportunity to provide clarifications concerning the adverse information.

Past performance information will be determined primarily based on the offeror’s “Supplier Risk Score” in the Supplier Performance Risk System (SPRS) at the time of the close of the solicitation period. Past performance may also be obtained through information provided by the offerors, the contractor Performance Assessment Reporting System (CPARS), similarly systems of other Government departments and agencies (MOCAS, etc), Defense Contract Management Agency (DCMA) channels, interviews with program managers and contracting officers, and other sources known to the Government, including commercial sources. Offerors are to note that, in conducting this assessment, the Government reserves the right to use both data provided by the offeror and data obtained from other sources.

2.3.3.2 Past Performance Ratings

Each offeror will receive an integrated Performance Confidence Assessment rating, which is the rating for the Past Performance factor. Although the past performance evaluation focuses on performance that is recent and relevant to the technical requirement, the resulting Performance Confidence Assessment is made at the factor level and represents an overall evaluation of contractor performance. The Past Performance factor will receive one of the following performance confidence assessment ratings in accordance with the Department of Defense (DoD) Source Selection Procedures.

Note: With regards to the best value award decision, all offerors receiving the same past performance rating will be considered equal for the Past Performance Factor.

More recent and relevant performance will have a greater impact on the Performance Confidence Assessment than less recent or relevant effort. A strong record of relevant past performance may be considered more advantageous to

Rating Description

SATISFACTORY

CONFIDENCE

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

NEUTRAL

CONFIDENCE

No…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .