DD_FORM_1423.pdf

PDF 105 KB Posted

Attached to
RING, MOUNT
Solicitation number
SPRTA120R0014
Issued by

About this file

DD FORM 1423

View the file

Other files

File Type Posted
AFMC_158.pdf PDF
DI-MGMT-81324A.pdf PDF
DD_FORM_1653.pdf PDF
SPRTA120R0014.pdf PDF
DD_Form_1423_Supp.pdf PDF
DI-MGMT-81324C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F110 / Ring, Mount

E. CONTRACT / PR NO.

FD20302000024

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 09 AUG 2019DATE:

Block D: NSN : 2840-01-191-1809PR P/N : 9530M56G13

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 421st SCMS/GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: PF11CF1

COORDINATORS:

Vega Recalde, Carolina L AFLCMC / LPSB 405-734-4650 / 334-4650 09 AUG 2019

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

Page 1 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 23 Aug 2019

PREVIOUS EDITION MAY BE USED.

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

09 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

VEGA RECALDE.CAROLINA.LUCIA.1515656355

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

09 AUG 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F110 / Ring, Mount

E. CONTRACT / PR NO.

FD20302000024

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Comprehensive Engine Management System (CEMS) Reporting

3. SUBTITLE

CEMS

4. AUTHORITY

DI-MGMT-81324C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPZC CEMS PMO

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 09 AUG 2019DATE:

Block D: NSN : 2840-01-191-1809PR P/N : 9530M56G13

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 421st SCMS/GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Blocks: 10, 11, 12, & 13:

Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.

1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.

(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.

(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into

CEMS.

(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION

PACKAGES FOR SUBCONTRACTOR PERSONNEL.

2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.

CII: PF11CF1

COORDINATORS:

Vega Recalde, Carolina L AFLCMC / LPSB 405-734-4650 / 334-4650 09 AUG 2019

AFLCMC/LPZC

CEMS Program Management Office

0 1 0

0 1 015. TOTAL

Page 2 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 23 Aug 2019

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

09 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

09 AUG 2019

Page 3 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 23 Aug 2019

File details come from the government source that posted it.