JA_for_PR__FD2030-17-00066_Redacted.pdf
PDF 387 KB Posted
- Attached to
- J&A REDACTION
- Solicitation number
- SPRTA116R0478
About this file
J&A REDACTION
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and
Approval(J& A)forO therThan Fulland
O pen
C om petition
Page of4
Pursuitofeitherreverse engineering effortsorvalidation ofalternative specificationsw ould require an
A M
T, w hich w ould be both costand schedule prohibitive forthe A irForce.
To date,no such effortshave been initiated orfunded.
Further,considering the investm entrequired,itisanticipated the only circum stance to triggerinitiation and funding ofsuch a requirem entw ould be ifno sources,including the
O
EM
,w ere available.
R equestsfortechnicaldata required are continually m ade to the contractoraspartofthe
Screening A nalysis W orksheetprocess.
D ata review discloses thatrequired data ordata use rightsare notin G overnm ent possession and cannotbeeconom ically obtained.
VI.D
escription ofefforts m ade to ensure thatoffers are solicited from as m any potentialsources as practicable.
In accordance w ith
FA
R
5.201,thisrequirem entshallbe synopsized and the R equestforProposalposted on the FederalB usinessO pportunitiesw ebsite.
Q ualification requirem entsdo notapply asonly the
O
EM
approvesadditionalsources.
VII.
D eterm ination by the
C ontracting
O fficer thatthe anticipated costto the
G overnm entw illbe fair and reasonable.
The contracting officerw illensure thatthe item sdescribed herein are negotiated ata fairand reasonable price to the
G overnm ent.
The contractorm ay be required to provide otherthan certified costand pricing data.
A detailed costanalysisand a price analysism ay be accom plished.
A technicalevaluation from the D efense C ontractM anagem entA gency
(D
CM
A )m ay be contacted to assistw ith the analysis.
VIII.
D escription ofthe m arketresearch conducted and the results,or a statem entofthe reasons m arket research w as not conducted.
M arketresearch,in accordance w ith
FA
R Part10,w asconducted on
Jan by inquiriesofH aystack, Parts M anufacturerA pprovals,G oogle,and theThom asR egister.
Thisresearch revealed thata com m ercial item suitable to m eetthe requirem entisnotavailable.
The item described in Section
IIIisused in m ilitary applicationsand no com m ercialornon-developm entalsubstitutesareavailable.
A SourcesSoughtSynopsisw asalso conducted during the m arketresearch effortdescribed above to notify
U nison licensees,vendorsorothersourcesw ith the accessto the necessary data ofthe pending acquisition.
Thisposting w as created on the
FederalB usinessO pportunitiesw ebsite underthe
PR
num berw ith the response date of10 N ov w ith no response asofyet.
B ased on the above,a high levelofconfidence existsthatU nison iscurrently the only responsible source able to fulfilltherequirem ent.
IX.
A ny other factssupporting the use ofO ther T han F ulland O pen C om petition.
Thereareno im m ediateactionsthatcould be taken to develop com petition.Since neitherqualification testing ofanotherpartoruse ofa second source partin the intended application isperm itted,reverse engineering isnotfeasible.
X.L istofsources,ifany thatexpressed interestin the acquisition.
U nison
IndustriesLLC
C A
G E: 59501
B ay M eadow sW ay Jacksonville
FL
32256
Phone 904-739-4131
XI.
A statem entofthe actions,ifany,the agency m ay take to rem ove or overcom e any barriers to com petition before m aking subsequent acquisitions for the supplies or services required.
The A
FLCM
C/LPSB
BB
engineering group w illcontinue to m onitorthe m arketplace forsource developm ent.
Justification and
Approval(J& A)forO therThan Fulland
O pen
C om petition
Page of4
The G overnm entw illcontinueto synopsize the requirem entand rescreen theitem
XII.C
ertification by theC ontracting O fficer.
Thecontracting officer'ssignatureon the C oordination and
A pprovalD ocum entevidencesthatcontracting officerhasdeterm ined thisdocum entto be both accurate and com plete to the bestofcontracting officer's know ledgeand belief.
XIII.
C ertification by the technical/requirem ents personnel.
A sevidenced by theirsignatureson the C oordination and
A pprovalD ocum ent,thetechnicaland/or requirem ents personnelhave certified thatany supporting data contained herein w hich istheirresponsibility isboth accurateand com plete.
File details come from the government source that posted it. Updated .