CDRL_REPORT.pdf
PDF 98 KB Posted
- Attached to
- SEAL, AIR, AIRCRAFT G, AMC 1 C
- Solicitation number
- SPRTA1-16-R-0242
About this file
CDRL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRTA116R0242_______0001.RTF | RTF text file | |
| DI-MGMT-81324C.pdf | ||
| SPRTA116R0242.pdf | ||
| Special_Packaging.pdf | ||
| DID_81020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F101-102 / Seal, Air, A/C G
E. CONTRACT / PR NO.
FD20301600340
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Comprehensive Engine Management System (CEMS) Reporting
3. SUBTITLE
CEMS
4. AUTHORITY
DI-MGMT-81324C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
AFLCMC/LPZC CEMS PMO
7. DD 250 REQ
N/A
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 23 NOV 2015DATE:
Block D: NSN: 2840-01-146-7482JF P/N ~ R/N: 9527M70P03
Blocks: 10, 11, 12, & 13:
Contractor shall provide CEMS reporting for all Engines and/or Parts that have been identified as CEMS serially tracked items.
1. (U.S.) Contractor reporting responsibilities are described in T.O. 00-25-254-1 and update requirements are described in T.O. 00-25-254-2.
(a) CEMS reporting should be accomplished by contractor no later than Close of Business of the next business day following the date/time of the occurrence.
(b) Contractor shall obtain AF Portal and CEMS access. The contractor shall complete the forms required to obtain CEMS access per the New Contractor CEMS Access Process. All forms and instructions are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.
(c) Once access is granted, the contractor shall update all serially tracked assets whether repaired or new production into
CEMS.
(d) THE PRIME CONTRACTOR IS RESPONSIBLE FOR PROCESSING SECURITY INVESTIGATION
PACKAGES FOR SUBCONTRACTOR PERSONNEL.
2. (Foreign Military Sales) Contractor shall e-mail or fax an AF Form 1534 (CEMS CDB Report), or a spreadsheet with the pertinent data to CEMS.PMO.Helpdesk@us.af.mil for fax to 405-734- 3807. All forms and documents are located on the CEMS web page: https://my.af.mil/gimmsprod/cpmo/.
CII: PF10167
COORDINATORS:
AFLCMC/LPZC
CEMS Program Management Office
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 NOV 2015
I. APPROVED BY
//DIGITALLY SIGNED//
BAKER.STEPHEN.J.1404930083
AFLCMC / LPSEBA 405-734-4860 / 884-4860
J. DATE
23 NOV 2015
Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Feb 2016
PREVIOUS EDITION MAY BE USED.
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
F101-102 / Seal, Air, A/C G
E. CONTRACT / PR NO.
FD20301600340
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Certification Data for Material
3. SUBTITLE
N/A
4. AUTHORITY
DI-MISC-81020/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
AFLCMC/LZPED
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 29 MAY 2014DATE:
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION UTILIZING WAWF. A
COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL BE SUBMITTED THROUGH WAWF IN
ORDER TO RECEIVE PAYMENT FOR DATA REPORTS.
BLOCKS 10 & 12: WITH FIRST ARTICLE SUBMITTAL.
1. CONTRACTOR FORMAT AUTHORIZED, MATERIAL CERTIFICATION SHALL BE SUPPLIED WITH ALL FIRST ARTICLES. COPIES OF ORIGINAL CERTIFICATION SHALL BE PROVIDED IF THE CONTRACT IS
AWARDED TO THE ORIGINAL MANUFACTURER, AND THE ITEM SHALL BE MADE FROM THE SAME
LOT OF MATERIAL. IF A NEW LOT OF MATERIAL IS USED TO PRODUCE THE ITEM, A NEW MATERIAL
CERTIFICATION SHALL BE REQUIRED. IF THE FIRST ARTICLE IS WAIVED, THE MATERIAL
CERTIFICATION IS ALSO WAIVED.
2. CHANGES TO THE DATA ITEM DESCRIPTION:
2.1 CHANGE TITLE (BLOCK 3) TO READ CERTIFICATION DATA FOR MATERIAL.
2.2 PARAGRAPH 3.1 (FIRST LINE) DELETE THE WORDS "FOR NON-NUCLEAR LEVEL 1" AND (FOURTH
LINE) DELETE THE WORDS "LEVEL 1".
COORDINATORS:
421 SCMS/GUEA
3001 Staff Dr.
Tinker AFB, OK 73145-3033
0 1 0
AFLCMC/LZPED
FA MONITOR, DODAAC
FA8111
3001 STAFF DR., STE 1AB
85A
TINKER AFB, OK 73145-
0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAA
405-736-7976
H. DATE
24 NOV 2015
I. APPROVED BY
//DIGITALLY SIGNED//
BAKER.STEPHEN.J.1404930083
AFLCMC / LPSEBA 405-734-4860 / 884-4860
J. DATE
23 NOV 2015
Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Feb 2016
PREVIOUS EDITION MAY BE USED.
File details come from the government source that posted it. Updated .