SPRTA1-26-R-0410.pdf

PDF 4 MB Posted

Attached to
Fairing, Aircraft (Nose Dome)
Solicitation number
SPRTA1-26-R-0410
Issued by

About this file

This is a cover page or portfolio introduction image for a PDF document. The image displays the Adobe Acrobat logo (the red stylized "A" symbol) on a white background with red accent corners. The page contains instructional text directing users to open the PDF portfolio in Acrobat X or Adobe Reader X or later for optimal viewing experience, along with a "Get Adobe Reader Now!" button. No substantive contract information, solicitation details, or technical requirements are present on this page.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

BID SET REQUEST Page 1 of 1

DATE GENERATED

14 AUG 2026 1

VERSION

FD20302600985-00

PURCHASE INSTRUMENT NUMBER

INITIATOR

Ladd, Ronald S

ORG / OFFICE SYMBOL

424 SCMS / GUMA

DSN PHONE

336-7624

COMMERCIAL PHONE

405-736-7624 27 JAN 2026

DATE INITIATED

BID SET REQUEST DELAYED FOR THE FOLLOWING REASON

METHOD OF DELIVERY

SAM.GOV

LOCATION OF BID SET

REMARKS

BID SET REQUEST LINE ITEM DATA

0001LINE ITEM

82918CAGE:1560007353588FGNSN: REFERENCE NUMBER: 35-17375-1

FAIRING,AIRCRAFTNOUN:

1 / C 17 JAN 2029EXP DATE:

10USE VERSION: 17 JAN 2024DATED:

Complete, Use RevisionBID SET STATUS:

JOB/QUEUE ID: DISTRUBUTION CODE: IMAGES:

AMC / AMSC AMC / AMSC:

EDLEDL

0007LINE ITEM

82918CAGE:1560007353589FGNSN: REFERENCE NUMBER: 35-17375-2

FAIRING,AIRCRAFTNOUN:

1 / C 18 JAN 2029EXP DATE:

7USE VERSION: 18 JAN 2024DATED:

Complete, Use RevisionBID SET STATUS:

JOB/QUEUE ID: DISTRUBUTION CODE: IMAGES:

AMC / AMSC AMC / AMSC:

EDLEDL

BID SET REQUEST COMPLETED BY

Do, Tiffany T

ORG / OFFICE SYMBOL

429 SCMS / GUMAC

DSN PHONE

884-7100

COMMERCIAL PHONE

405-734-7100

DATE COMPLETED

02 FEB 2026

BIDSET Generated by PRPS using Jasper Reports on 14 Aug 2026 Version 1 Page 1 of 1

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20302600985

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Certification Data for Material

3. SUBTITLE

First Article Inspection Test Report

4. AUTHORITY

DI-MISC-81020/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LZPED

7. DD 250 REQ

NO

8. APP CODE

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

Test Day

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Ladd, Ronald SNAME: 27 JAN 2026DATE:

NSN: 1560-00-735-3588FG, 1560-00-735-3589FG

P/N: 35-17375-1, 35-17375-2

COORDINATORS:

424 SCMS/GUMEAB

3001 Staff Drive Tinker AFB, OK 73145

0 1 0

3001 Staff Dr, Ste 1AB85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 015. TOTAL

G. PREPARED BY

405-736-7624

H. DATE

20 AUG 2026

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Flanagan, Essan K

424 SCMS / GUEAB 919-621-0004 / 736-5271

J. DATE

17-AUG-26

Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

PREVIOUS EDITION MAY BE USED.

A003

Certification of Compliance

First Article Inspection Test Report

DI-MISC-81356A

Test Day

See Block 16

Ladd, Ronald SNAME: 27 JAN 2026DATE:

424 SCMS/GUMEAB

3001 Staff Drive Tinker AFB, OK 73145

0 2 015. TOTAL

Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

A007

FIRST ARTICLE TEST PLAN

FIRST ARTICLE INSPECTION TEST REPORT

DI-NDTI-81307A

AFCMC/LZPED

TEST DAY

SEE BLOCK 16

Ladd, Ronald SNAME: 01 APR 2026DATE:

AFLCMC/LPZC

CEMS PROGRAM

MANAGEMENT OFFICE

0 1 015. TOTAL

Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A001

PRODUCTION SURGE PLAN

SURGE CDLR CAPABILITY PLAN

DI-MGMT-80969

10 MAR 2026

Ladd, Ronald SNAME: 17 MAR 2026DATE:

NSN: 1560-00-735-3588FG, 1560-00-735-3589

P/N: 35-17375-1 35-17375-2

AFLCMC/LPZC

CEM PROGRAM

MANAGEMENT OFFICE

Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

A006

TEST/INSPECTION REPORT

FIRST ARTICLE INSPECTION TEST REPORT

DI-NDTI-80809B/T

AFCMC/LZPED

TEST DAY

Ladd, Ronald SNAME: 01 APR 2026DATE:

Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

!"!�#"$%� $&'(#)"#*+�",-./0��1����2�1��� ������2 ��

�14����4�5�4��� ������4��+678/90���3 ��13:;<=<�� !>>9?@A.� A-/0�=<==<:<=�!%&'�+678/90�

;<BB:�� C,7,-A-,?D0�

E�� "#'�!>>.,FA8./0�

�� G# $)�!>>.,FA8./0�

��)9/>A9,DH�!F-,@,-I0���J� � � � � )9?K/F-�+678/90��

��13=<==3<<L�!>>.,FA8./�M?97N0�

E���ON/P(/.A-,?DNQ,>R���S��1����������������������

��3 �������4������� ���������������T�������������S��U����������T��S������������������S��������������������������������������������V���W���������������S������������������X����S�����������������X����������������Y���W��������������4�������������������S�����������������������������������S��V�������������X��������X�����������������������������������S���������������V����������Y��S���������������������������Z���W���������������������������S��������������S��������������������3 ��13:;<=<���(/[6,9/7/D-N0��;����������������������R���S�����������������������S������������������S�����X���������V��S����������������������������������Y����������������������X��������X��������������X��S��������������������S��������������������S��� ���������S�����������S�����������������=���2��������2�����������S����W�������������������������������������������������Y��S���\���������������������V���]�����L���B���1������R���S�� ����������������������������S������������W�������������S��������������������������S��������������������W�������Y������������������������������ ������������������������������������S���������������������S������������S���VS����W��������������Y����������Z�������S��������������������������������������S����������������������Y����Z��V��S�������������������S���VS������S������������������������������������V����]�������2�������� ����������������������������S��������������������S��������V�������Ŷ��������S���������������������������������������������S����������������V����������������������S����������X������_�Y��������������̀X���V���a�������������X�������V�����������S�����S���a����������������������S��������Y�bcd�bdebfgh�ijklmgnoe�mppqdeer�mgp�ijgbmib�fgsjqkmbfjg�etic�me������S��������������E���������������������V����������Y����S���T������������������������������������V���������1�������������������������������S��U�����������S��������S�����V��������������������������������������S��������V��������Y�TS������������S��������V������S�����������S�����������������������������\�����S�������������������������������������������������� � uvwxyz{�|}}~{�������}�������������v���v��z�{��������������{����|zy��}|z��vwxyz�}v��zx����}|�}�}|������}|z�ywxxz�}��zx��v���z�vxz�w�z�

(�����#��� !#��$��!#!���)�����������#��� !#��$��!#!�%�"#������"�$#�#*����$�"*�������� #������#*��"#!�#�$+�%!#���!������!,�"#� -��"���� �""����$�!�%!$$���#*!#�,����$�#�!��� #��#"� *�%� !�� �%��"�#��$����%� *!$� !��������#��"�.��+��%! *�$�$+/0�#*�����+�$!��%���� ��#��� !#��$��"�! ��#!�������� ��#��� !#��$����#*��%� *!$� !��������#��"���� *�%� !�� �%��"�#��$��"���)���������!�%�#!��,��-�$+���� �""0�*�!#�#��!#%�$#����!���1�$+��"�������$+��!��� !#��$�!�#��"�#*�����+�$!�� �$��#��$����#*��%!#���!���� *��!�#�����%!#���!��"*!�������$�)���1�������$#������.%!�-��/0�!$��#�! �!����#�� ��#��� !#��$��!#!���2��3����+$����#��� !#��$����$�!���#��$�#��#*���!�!+�!�*�4��!#!����%!#���)����%�$#"0� ��$#�1�������+�$�"*!���������$#��������3����+$��!$+�!+�"��$�#*�� ��#��� !#��$"�%�"#����#�!$"�!#����$#���$+��"*��� *���$�#"����%�!"����%�"#����#*��"!%��!"�#*�"����)�������1�#*�� �$#�! #����"�� ��� !#��$��� �!$"�!#��$"�!$�� �$���"��$"�%!1����!$$�#!#����$�#*�� ��#��� !#��$"0����"�! �����%�#"0������! ����$�!$�!���$��%��$�#*��"!%�����%!#�!"�#*�������+$� ��#��� !#��$��!#!����� *�#�!$"�!#��$���� �$���"��$�"*!�����%!�$�#�! �!����#��#*��%!#���!��!$��������$#������!"�#�����+�$�,�#*�$!%�0�#�#��0�"�+$!#���0�!$���!#�����#*��!�#*���5��������"�$#!#�������#*�� �%�!$1�%!-�$+�#*��#�!$"�!#��$���� �$���"��$���6����+$!#������ *�����#��� !#��$������#�"*!��� �$#!�$�#*��"�+$!#�������789�:;<7=>:7;=?@�>A78;=BC9D������"�$#!#������"��$"����������$"���$+�#*!#�#*���)���%�$#����$+����������E"���� �����$+�������%����"��$�! ���!$ ��,�#*� �$#�! #���)����%�$#"������ #��$� �"�+$!#���"�!���! ��#!�������������#*�1�%��#�!���#��$!����)����%�$#"����#*�"����������

FGHIJKL�MNNOLPPQRRSRNTUVQTWSV�XX�YGZ[VGQUKUL�\]\̂X]_X\̀a\]L\bcdMKJe�NMK�RGHIJK�NG�fKISgh�NMQN�NMSR�SR�NMK�JHIIK[N�fKIRSG[�iKgGIK�HRKT

'()*+,'�-.�/'012.2/)12-3�4)1)�0'+-01�/'012.2/)12-3�-.�1'515��1'51236�,)7-0)1-08�3)*'9�)440'559�1','+:-3'�3;*7'09�)34�'*)2,�)440'55���� 4)1'�<<<<<<<<<<<<<<�*)1'02),=�*>?@A�18+'=�� 22�/-34212-3=�)33'),'4�� /;51�-04'0�3-B�3CCDCEFGEF*�10HI���-;0�-04'0�3-B� � �+CJEIGE�.2325:=�:>K�.L?LMN@O�/,)55=���� )���5+'/=��PPF3FQGD�/:'*2/),�/-*+�F�+'0/'31��� � � � � 0'R=��4�)SB�Q��21'*� :')1�3-� /� *3� 5;,� 52� 32� .'� /;� ),�D� )DQJ7�BCDT� DBCT� BCDH� BQU� TEBIG�DBTT� JDBUD�BDQ�Q� )DQE7�BDI� DBDH� BCDJ� BQU� TEBGE�DBTU� JDBTT�BDE��*'/:)32/),�+0-+'012'5�� � � � � VBQW�-..5'1X� �21'*��:')1�3-B��1'352,'�510'361:� 82',4�510'361:���',-36)12-3�� � � � V+52X� � � � � ��23�Q�23/:'5����D� )DQJ7� GE9JCC� JT9JCC� EJW�Q� )DQE7� GE9CCC� JT9DCC� EJW���5YSZAL?[�\>]�K@MKM�̂YM�O>?@�L?�Y__>]OY?_@�̂LKN�PPF3FQGD4�)SB�QB��@̀�N@]@ab�_@]KL\b�KNYK�KN@�Ya>c@�K@MK�OYKY�Y]@�L?�Y__>]OY?_@�L̂KN�KN@�MZ@_L\L_YKL>?�]@deL]@S@?KMB��<<<<<<<<<<<<<<<<<<<<<<<<�5L[?YKe]@� � �<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<�3YS@�VKbZ@O�>]�Z]L?K@OX�Y?O�>][Y?LfYKL>?YA�KLKA@� ���!%��g#h����������$#��i�!$����j!$�k!#��$!��#�#���� � lmnopqr�stturvvwxxyxtz{|wz}y|�~~��m��|mw{q{r�����~��~�����r����sqp��tsq�xmnopq�tm��qoy���tswt�tsyx�yx�tsq�pnooq�t��qoxym���q�moq�nxqz

�/��*����0���������

��1��0����� � � � ������������������-�� �2&3���� ����)-������2 &42 ���-������)���� � � � ����������(��-���������55���672�+�*���� ��55���672*+��� ��0�8��,�����)����)/���� �*������+���/�����0,+��1����,�8��� �))��0���)� �9�+�(�������������,�����)����(�:�(�����

������������ �$� ���� ����� �������(����������������������������������������'�2&���
�&���7

�����&27�����&� �&��� ���2 ����2&;������� �������������������������<� ������������*����� � 23���� 6������

6������
6�������
�����

2�������������������,�����)�(��(�� @�����)��0� �����������*���� ������ �>1��@�� /��)��>1��@�� ���&��� ������ ' �2&�� ���;��6�� ��������& � �� ������������3 �6?�������������63�;?��,!��$�""�!"�"A����������,����2���������������� �������1�������������0�!�$���B����6� �����������������������������������������! ������1���$#��C�!$��!�������"��$������1����������9��A����D� ��#��D�#A!#�#A��!�����#�"#��!#!�!����$�! ���!$ ��E�#A�#A��"�� ��� !#��$���F����%�$#"���� � � � � ....................................� �� � � � � � ��C$!#����� � � � � ....................................��!%��>#D����������$#��@�!$����C!$�B!#��$!��#�#������$��������������

GHIJKLM�NOOPMQQRSSTSOUVWRUXTW�YY�ZH[\WHRVLVM�]̂]_Ŷ Ỳ]ab]̂M]cdeNLKf�ONL�SHIJKL�OH�gLJThi�ONRO�ONTS�TS�ONL�KIJJL\O�gLJSTH\�jLhHJL�ISLU

���������������������������������
��������������� !"�������������������#���������$%%&�$�������

�-� �� �.���&/�������������0���,�� )���1,�)

�������,2������2�����������������������������#�.�,���������������������2��������������2����2�����������,������.��,��������������������3��2����������������4��������,5���2�,������������,��2��������6��������6���.������.�.��,�������������������2��.����.���#���������4����.��+��2����������5�����2�,�����,����,�.�,���������� !"5��
�4��������,����5�0�����5���2��������������������������,2����������,����.�������������,�����������2�������0�7�����5��$5�������5���2��������������������������,2����������������5�����������8,�����5���5�����������8,��..��,,5���5�����������8,��2����������5��.5������5���5�����������7��7���+8,�����5���5����������

�����5��75�� ������������9�

;5��25�������������������5���5����,���������������+��7��2�����������,������,2�.�����2����������������������������������3��2������������,���������������.������������4��������,5����<5�����2���=�.����,�����8,�,�7������5��95�����2���=�.����,�����8,�������.��������.������5��������� ��7�������>?@ABCD�EFFGDHHIJJKJFLMNILOKN�PP�Q?RSN?IMCMD�TUTVPUWPTXYTUDTXZ[ECB\�FEC�J?@ABC�F?�]CAK̂_�FEIF�FEKJ�KJ�FEC�B@AACSF�]CAJK?S�̀Ĉ?AC�@JCL

!!�"##����������������������������������������$$���� ��%&�'"�()�*"����������������������������������+,�����-�.�� ���/0"������������������� �1����������������������������2�3�43���5 ����'0�/60�()�*"��������������������(/07�'/8��0�69�()�*"���������������������0"��(��"'68/0)�"�����������������������:

88�70"�#�;)�'7#&"!��'�0&7#�6�'0�/60�/�"�7'�;)88�6��<87/'6"�=70&�/88�#<"67;76/07�'�/'!�6�'0�/60��">)7�"�"'0#?@� ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������A23���-����B�4-�,��2C�$�D�������E��������������������������������������������������������������������������������������������������������������������������������������������������������������������������D�2���$�F������$�G2�E���B�4-�,��2C�$�D�������E ��� �(�0"��1&"��"6��!7'H��;�;/8#"I�;760707�)#I����;�/)!)8"'0�#0/0"�"'0#����"'0�7"#��'�0&7#�!�6)�"'0��/J�*"�<)'7#&"!�/#�/�;"8�'J�)'!"���"!"�/8��0/0)0"#?��� ?��K'!��;����������

��������������������������������������������������������������������������%/H"�L����������������������������������7H)�"� �M��/�<8"�;���/0�;���/��"�07;76/0"��;����<87/'6"�NOPQRST�UVVWTXXYZZ[ZV\]̂Y\_[̂�̀̀�aObĉOY]S]T�dedf̀eg̀dhideTdhjkUSRl�VUS�ZOPQRS�VO�mSQ[no�VUYV�VU[Z�[Z�VUS�RPQQScV�mSQZ[Oc�pSnOQS�PZS\

DATA ITEM DESCRIPTION

Title: First Article Qualification Test Plan and Procedures

Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A

Use/relationship:

To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID supercedes DI-NDTI-81307.

Requirements:

1. Reference documents. None.

2. Format:

The plan shall be in the contractor’s format.

3. Content:

This test plan shall include the following:

a. Purpose of test.

b. Applicable documents.

c. Description of units to be tested.

d. Test description to include the following:

(1) Step-by-step procedures which are to be followed by the operator when performing each test.

(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.

Source: https://assist.dla.mil -- Downloaded: 2026-04-01T12:18Z

Check the source to verify that this is the current version before use.

DI-NDTI-81307A

(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.

e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.

4. END OF DI-NDTI-81307A

Source: https://assist.dla.mil -- Downloaded: 2026-04-01T12:18Z

DATA ITEM DESCRIPTION

Requirements:

DATA ITEM DESCRIPTION

Title: Production Surge Plan

Number: DI-MGMT-80969A Approval Date: 20260406

AMSC Number: 10632 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: CR Project Number: MGMT-2026-010

Applicable Forms: N/A

Use/Relationship: The Production Surge Plan delineates a contractor’s capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace time acquisition environment without a declaration of war or mobilization and subsequent use of emergency war powers.

The Production Surge Plan provides data on the maximum sustainable production rate; long lead-time, critical or pacing items/components; other contracts with production surge provisions;

probable surge impact; additional skilled labor requirements; strategic or critical materials, precious metals, and substitute materials; and suggested tooling to include equipment to improve surge protection capability. This data provides for surge (accelerated production) planning of select items.

a. This Data Item Description (DID) contains the format, and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

b. This DID is applicable in contracts for which a production surge capability for select critical items is required.

c. This DID reinstates DI-MGMT-80969.

Requirements:

1. Reference document. None.

2. Format. The report shall be in the contractor’s format.

3. Content. The Production Surge Plan shall consist of the following:

3.1. Rate. The maximum rate of sustainable production, to include a production buildup schedule by the month until the maximum sustainable production rate is achieved.

When applicable, a subcontractor’s or vendor’s capability to accelerate production/delivery of components and materials must be taken into consideration and a

Reinstated after 06 April 2026

Source: https://assist.dla.mil -- Downloaded: 2026-04-07T15:20Z

DI-MGMT-80969A

statement shall be included in the plan verifying that this vertical planning has been done.

3.2. List of Items. Two lists, one of subcontracted and one of non-subcontracted items/components, by nomenclature, part number, leadtime, and production buildup of long-leadtime, critical or pacing items/components which could adversely impact the production rates. (See paragraph 3.1 above). Subcontractors and vendors shall be identified by name and address for each item. This requirement shall flow down to whichever contractor tier (level) is necessary to adequately identify the long-leadtime, critical, and pacing items/components.

3.3. List of contracts. A list of Government contracts being performed at the contractor’s facility that have a production surge provision or could reasonably be presumed to be surged. The list shall identify the contract number, the item(s), and the Defense

Materials System and Defense Priorities Systems priorities assigned to each contract.

3.4. Impact. Describe what impact surging this contract would have on the performance of any other Government contract that might be currently surged with this contract, or what impact surging of the other Government contract(s) would have on the ability to surge this contract. Describe what impact surging this contract would have on the contractor’s commercial business.

3.5. Labor. Identify all additional skilled labor requirements, i.e., machinist, tool makers, quality assurance, etc., necessary to support the maximum sustainable production rate.

3.6. List of materials. A list identifying any combination of strategic materials, critical materials, and precious metals, by type, quantity and cost, required to produce the item on contract or the subcontracted/non-subcontracted long-leadtime, critical or pacing items/components. This list should include rolling inventory to attain and maintain surge production within six months. Additionally, a list identifying any substitute materials that could be utilized in place of any combination of strategic materials, critical materials, and precious metals.

3.7. List of production equipment. A list of tooling, equipment and costs, down to the lowest tier subcontractor, that if acquired, would increase surge production rate capability or reduce leadtime by at least 10 percent, or as specified in the contract within current facilities limitations. The estimated increase in the surge production rate or decrease in leadtime shall be included. Data obtained under this paragraph will not be used in the preparation of the basic plan but may be used by the Government for developing additional surge capability if deemed essential.

End of DI-MGMT-80969A

Source: https://assist.dla.mil -- Downloaded: 2026-04-07T15:20Z

��������������������� !��"�
���������
������
��������
��������������������� !��"�
���������
������
��������
��������������������� !��"�
���������
������
��������
��������������������� !��"�
���������
������
��������

FIRST ARTICLE REQUIREMENTS 1. DATE

26 MAR 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

82918 / 35-17375-1

4. NSN

1560007353588FG

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM EA

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

DEFINED BY ENGINEERING DWG: DOCUMENTED IN FIRST ARTICLE INSPECTION (TEST) REPORT

B. The detailed technical requirements for First Article approval tests are contained in

ENGINEERING DWG AND GOVERNMENT EVALUATION

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

Tinker.First.Article@us.af.mil

(Requesting Activity) of test time and location due 30 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

FA MONITOR, DODAAC FA8111

(4) Government written notice of approval / disapproval due

(2) Due days after receipt of contractor's report.

calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 8Generated by PRPS using Jasper Reports on 14 Aug 2026

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at see block 12

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$13,300.1200

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be retained by USAF supply

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 60 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Medina, BeckyNAME: 15 MAR 2024DATE:

CERTIFICATE OF COMPLIANCE & MATERIAL CERTIFICATION REQUIRED

WAIVERS MAY BE CONSIDERED WHEN REQUESTED BY THE CONTRACTING OFFICER.

Only the ESA is authorized to determine if an item is similar, except when the items are opposites detailed on the same drawing, such as 123456-12/-13(OPPOSITE).

JUSTIFICATION STATEMENT: PER FAR 9.304(D), FIRST ARTICLE TESTING AND APPROVAL IS REQUIRED BECAUSE THE REQUIREMENTS ARE SO NOVEL OR EXACTING THAT IT IS QUESTIONABLE WHETHER THE PRODUCTS WOULD MEET THE REQUIREMENTS WITHOUT TESTING AND APPROVAL. THE ITEM IS A CRITICAL SAFETY ITEM. FAILURE TO PERFORM FIRST ARTICLE TESSTING AND APPROVAL WILL ALLOW DEFECTS NOT WHOLLY VISIBLE TO DAMAGE SURROUNDING PARTS OF THE WEAPON SYSTEM, INJURE PERSONNEL, AND/OR REDUCE THE OPERATIONAL LIFE OF THE ITEM.

INCLUDE REQUIREMENTS OF FAR 52.209-9018 AS SUPPLEMENTED BY ATTACHED CONTRACT DATA REQUIREMENTS LIST (CDRL)

-- BLK 9F(3) --

MARK FOR: FIRST ARTICLES

ATTN: DDOO-SOP

DO NOT POST, NOT ACCOUNTABLE: DO NOT PUT INTO SUPPLY

DODAAC: FY2303

ENSURE THE WORDS "FIRST ARTICLES" ARE MARKED ON THE OUTSIDE OF THE BOX IN LARGE RED CONSPICUOUS LETTERS ePub version 3 Block 3: Part Number_____________________ ePub version 3 Block 9:

C.1. DD Form 1423 ELIN___________

2. Delivery Due ___ calendar days from date of contract.

E.1. DD Form 1423 ELIN___________

2. Due Calendar Days from date of contract.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Medina, Becky

424 SCMS / GUEAB

405-736-7258

336-7258

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Medina, Becky

424 SCMS / GUEAB

405-736-7258

336-7258

03 NOV 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

82918 / 35-17375-2

4. NSN

1560007353589FG

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

DEFINED BY ENGINEERING DWG: DOCUMENTED IN FIRST ARTICLE INSPECTION (TEST) REPORT

B. The detailed technical requirements for First Article approval tests are contained in

ENGINEERING DWG AND GOVERNMENT EVALUATION

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

FA MONITOR, DODAAC FA8111

(4) Government written notice of approval / disapproval due

(2) Due days after receipt of contractor's report.180 calendar days from date contract.

Version 3Generated by PRPS using Jasper Reports on 14 Aug 2026

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

SEE BLOCK 12

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$13,300.1200

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles

X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.

b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Phan, PhilipNAME: 03 NOV 2025DATE:

EPUB VERSION 3: Part Number 35-17375-2

EPUB BLOCK 9:

C. 1. DD FORM 1423 ELIN _________________________________

2. DELIVERY DUE ______________________ CALENDAR DAYS FROM DATE OF CONTRACT

E. 1. DD FORM 1423 ELIN _________________________________

2. DUE 180 CALENDAR DAYS FROM DATE OF CONTRACT

CERTIFICATE OF COMPLIANCE & MATERIAL CERTIFICATION REQUIRED

WAIVERS MAY BE CONSIDERED WHEN REQUESTED BY THE CONTRACTING OFFICER.

Only the ESA is authorized to determine if an item is similar, except when the items are opposites detailed on the same drawing, such as 123456-12/-13(OPPOSITE).

JUSTIFICATION STATEMENT: PER FAR 9.304(D), FIRST ARTICLE TESTING AND APPROVAL IS REQUIRED BECAUSE THE REQUIREMENTS ARE SO NOVEL OR EXACTING THAT IT IS QUESTIONABLE WHETHER THE PRODUCTS WOULD MEET THE REQUIREMENTS WITHOUT TESTING AND APPROVAL. THE ITEM IS AN ASSEMBLY OF 4 OR MORE COMPONENTS. FAILURE TO PERFORM FIRST ARTICLE TESTING AND APPROVAL WILL ALLOW DEFECTS NOT WHOLLY VISIBLE TO DAMAGE SURROUNDING PARTS OF THE WEAPON SYSTEM, INJURE PERSONNEL, AND/OR REDUCE THE OPERATIONAL LIFE OF

THE ITEM.

INCLUDE REQUIREMENTS OF FAR 52.209-9018 AS SUPPLEMENTED BY ATTACHED CONTRACT DATA REQUIREMENTS LIST (CDRL)

Contractor's notification to ACO and this office (424 SCMS/GUEA) of test time and location due 30 days prior to start of testing

-- BLK 9F(3) --

DDOO-SOP/FIRST ARTICLES

PHONE 405-739-8596

DO NOT POST, NOT ACCOUNTABLE: DO NOT PUT INTO SUPPLY

ENSURE THE WORDS "FIRST ARTICLES" ARE MARKED ON THE OUTSIDE OF THE BOX IN LARGE RED CONSPICUOUS LETTERS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Phan, Philip

424 SCMS/GU E A

405-736-3791

336-3791

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Phan, Philip

424 SCMS/GU E A

405-736-3791

336-3791

PACKAGING REQUIREMENTS

PURCHASE INSTRUMENT NUMBER: FD20302600985-01 VERSION: 1

MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E

THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN

PALLET AND PACKAGING/CONTAINER STATEMENT:

ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."

PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:

AAF MIL-STD-2073-1 / SPI MIL B F007353588 C 16218 - 05 AUG 2016

ITEM(S):

1560007353588FG 1560007353589FG 1560DTH260162FG 1560DTH260163FG 1560DTH260164FG 1560DTH260165FG 1560DTH260168FG 1560DTH26016AFG 1560DTH26016BFG 1560DTH260263

CODED DATA:

QUP ICQ

PRES

METH CD

PRES

MTL

WRAP

MTL

CUSH

DUNN CT

UNIT

CONT

INT

CONT UCL

SPEC

MKG

UNIT PACK

WEIGHT

LENGTH

WIDTH

DEPTH

CUBE OPI

ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:

SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:

VENDOR PACKAGING INSTRUCTIONS:

Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.

Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.

ORGANIZATION / OFFICE SYMBOL:

406 SCMS / GULAA

PACKAGING SPECIALIST:

Davis, Richard R

PHONE NUMBER:

405-371-9037 / 582-5972

SIGNATURE:

//SIGNED//Davis, Richard R

DATE:

26232 - 20 AUG 2026

Page 1 of 1AFMC 158 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026

DATE

SUPPLEMENT TO AFLC FORM 761/762

NOUN NATIONAL STOCK NUMBER PART NUMBER

Only the checked statement applies to this NSN.

QUALIFICATIONS REQUIREMENTS PRIOR TO 19 OCT 84

• Section F.1 This item qualifies under FAR 9.206-1(a)(2) and the requirements of FAR 9.202(a) are not applicable.

Prequalification of sources is essential to maintain high quality and maximum operational safety.

• Section F.2

(a) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.

(b) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, can be considered approved sources for this item.

(c) _____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet.

Category III capability is permissible.

• Section F.3 The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and B apply. Qualification requirements were established prior to 19 Oct 84.

QUALIFICATION REQUIREMENTS AFTER 19 OCT 84

Justification for Qualification Requirement (JQR) is required.

Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply.

(a)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.

(b)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers, that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and D apply. Qualification requirements were established after 19 Oct 84.

EVALUATING ENGINEER/TECHNICIAN (Signature) SYMBOL EXTENSION

OC-ALC Form O-367, JUN 01 (TI)

DATE: 28-Jan-2026

NOUN: FAIRING, AIRCRAFT

PART NUMBER: 35-17375-1

SYMBOL: 424 SCMS/GUEA

EXTENSION: 4057365271

a1: Off b1: Yes a2: Off c1: Off b2: Off

2026-01-28T11:57:49-0600

FLANAGAN.ESSAN.KOFI ASIAMAH.1591759236

NATIONAL STOCK NUMBER: 1560-00-735-3588

SUPPLEMENT TO AFLC FORM 761/762

NOUN NATIONAL STOCK NUMBER PART NUMBER

Only the checked statement applies to this NSN.

QUALIFICATIONS REQUIREMENTS PRIOR TO 19 OCT 84

This item qualifies under FAR 9.206-1(a)(2) and the requirements of FAR 9.202(a) are not applicable.

Prequalification of sources is essential to maintain high quality and maximum operational safety.

(a) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.

(b) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality,

(c) _____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet.

Category III capability is permissible.

The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and B apply. Qualification requirements were established prior to 19 Oct 84.

QUALIFICATION REQUIREMENTS AFTER 19 OCT 84

Justification for Qualification Requirement (JQR) is required.

Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply.

(a)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.

(b)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers, that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and D apply. Qualification requirements were established after 19 Oct 84.

EVALUATING ENGINEER/TECHNICIAN (Signature) SYMBOL EXTENSION

OC-ALC Form O-367, JUN 01 (TI)

DATE: 28-Jan-2026

NOUN: FAIRING, AIRCRAFT

PART NUMBER: 35-17375-2

SYMBOL: 424 SCMS/GUEA

EXTENSION: 4057365271

a1: Off b1: Yes a2: Off c1: Off b2: Off

2026-01-28T11:54:15-0600

FLANAGAN.ESSAN.KOFI ASIAMAH.1591759236

NATIONAL STOCK NUMBER: 1560-00-735-3589

AutoCAD SHX Text

LAMINATE TO REQUIRED THICKNESS WITH ADHESIVE 6 OR EQUAL.

A-A-59692

COMPUTER GENERATED

AS REQUIRED

19 7/8 X 19 7/8 X 7/8

20 X 20 X 21 1/4

26 X 26 X 5/16

ADHESIVE

TOP HOLD DOWN

TAPE

ASTM-D-5486

NOTES:

NATIONAL STOCK NO.

1560-00-735-3588 FG

ITEM NOMENCLATURE

SPECIAL PACKAGING INSTRUCTION

PART OR DRAWING NO.

CURR REV

ORIG DATE

78303

98748

CODE ID

OF

SHEET

SPI NO (TPO)

F 00-735-3588

DOME ASSEMBLY

MIL-PRF-121

ASTM-D-4727, WR, DW

ASTM-D-4727, WR

SPI N0.

WRAP

BOTTOM PAD

1)

35-17375-1

C

DESIGN FRAGILITY G

GROSS WT LBS

GROSS CU FT

B

AS SPECIFIED BELOW AND BILL OF MATERIALS

PACKING

CLOSURE

SPECIAL MARKINGS:

IAW MIL-STD-129

IAW MIL-STD-2073

ICQ

QUP

IAW MIL-STD-2073

SERVICEABLE METHOD:

CLEANING & DRYING

MARKING

PRESERVATION

PRESERVATIVE

RSC

CF

WR

SW

LEVEL A:

V3C

5.285

LEVEL A

LEVEL B

UNSERVICEABLE METHOD:

LEVEL B:

ASTM-D-1974

DO NOT DESTROY.

B)

A)

C)

REUSABLE CONTAINER AND DUNNAGE

SPI NO.

NOT FOR OUTSIDE STORAGE.

ASTM-D-5118

ITEM WT LBS

ITEM DIM

17 5/8

13 LBS.

17 5/8

CNTNR O.D.

CNTNR I.D.

21 1/4

20 3/8

20 3/8

DESCRIPTION

LTR

REVISIONS

78303

NEW

REVISED AND REDRAWN

00252

LEVEL

SPEC

STYLE

TYPE

CL

VRTY

GR

TR

11146

B

INCREASED DEPTH OF CONTAINER

& DIAMETER OF P/N 2.

PART

NO.

QTY.

MATERIAL SPECIFICATION

SIZE (INCHES UNLESS SPECIFIED)

DESCRIPTION

NOMENCLATURE OR

TOLERANCES ON FRAC. 1/8,

DECIMAL .10, ANGLES 1 .

O

SEE LEVEL OF PACK

CONTAINER I.D.

DD 2169 MOD

form

MAR 87

D. CHOI

C. TROTTER

PS

CHKR

AUTH

ILL

M. HEADLEE

ENGR

T.C. JONES

C. QUICK

16218

C

DECREASED BOTTOM PAD

DIMENSIONS

SHEET OF

SPI NO. ( TPO )

ITEM

TOP HOLD DOWN

SHEET OF

SPI NO. ( TPO )

BOTTOM PAD

3 3/16" TYP

17 7/8" DIA.

19 7/8"

9 15/16"

9 15/16"

19 7/8"

9/16"

7/8"

26"

13"

13"

26"

5/16"

7" DIA.

3 3/16"

THRU.

TYP.

N

9. (Agency Use)

10. ITEMS TO BE PURCHASED (Brief Description)

SUPPLIES SERVICES

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN

CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A

DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE

CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE

ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT

SUBJECT TO THE TERMS AND CONDITIONS STATED HEREIN.

12. ADMINISTERED BY CODE

13. CONTRACTOR

OFFEROR

CODE FACILITY

CODE

14. PAYMENT WILL BE MADE BY CODE

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:

15. PROMPT PAYMENT DISCOUNT

16. AUTHORITY FOR USING OTHER

THAN FULL AND OPEN COMPETITION

10 U.S.C. 3204(a) 41 U.S.C. 253

UNDER THE UNITED STATES CODE AT: ( ) ( )

17.

ITEM NUMBER

18.

SCHEDULE OF

SUPPLIES/SERVICES

19.

QUANTITY

20.

UNIT

21.

UNIT PRICE

22.

AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT

(For Government Use Only)

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET

FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION

NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR

CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS

TO ITEMS:

27. SIGNATURE OF OFFEROR/CONTRACTOR 28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

NAME AND TITLE OF SIGNER (Type or Print) DATE SIGNED NAME OF CONTRACTING OFFICER

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION NOT USABLE

STANDARD FORM 1447 (REV. 12/2022)

DO: A1

SPRTA1-26-R-0410 21 SEP 2026

DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: Christine Turnage/DLA/AOBB christine.turnage@us.af.mil Phone: (385) 591- 8545

100X

SPRTA1

CLASSIFICATION

336413

1,250

SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE

BLOCKS 11, 13, 15, 21, 22, and 27

1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at

15 CFR 700.

RATING PAGE OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

4. SOLICITATION NUMBER 5. SOLICITATION TYPE

SEALED BIDS

(IFB) INVITATION

FOR BID

NEGOTIATED

(RFP) REQUEST

FOR PROPOSAL

6. SOLICITATION

ISSUE DATE

7. ISSUED BY CODE 8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

NO COLLECT CALLS

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

HISTORICALLY ELIGIBLE UNDER THE WOSB PROGRAM

UNDERUTILIZED ECONOMICALLY DISADVANTAGED

BUSINESS ZONE WOMEN-OWNED SMALL BUSINESS (EDWOSB)

(HUBZone) SMALL BUSINESS NORTH AMERICAN INDUSTRY CLASSIFICATIO

SERVICE-DISABLED VETERAN- SYSTEM (NAICS):

OWNED SMALL BUSINESS

8(A) SIZE STANDARD:

LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

21-OCT-2026 4:00PM

Other Aircraft Part and Auxiliary Equipment Manufacturing X

SCD:B

(SEE ESP CLAUSE 252.232-7003.)

EFT:T14

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

Total

SEE SCHEDULE

DATE SIGNED

Prescribed by GSA - FAR (48 CFR) 53.214(d)

NO RESPONSE FOR REASONS CHECKED

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

UNABLE TO IDENTIFY THE ITEM(S)

DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE

OF ITEMS INVOLVED

OTHER (Specify)

WE DO

WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE

OF ITEMS INVOLVED

NAME AND ADDRESS OF FIRM (Include ZIP Code) SIGNATURE

TYPE OR PRINT NAME AND TITLE OF SIGNER

FROM: AFFIX

STAMP

HERE

TO:

SOLICITATION NUMBER

DATE AND LOCAL TIME

ATTN: Christine Turnage/DLA/AOBB

DLA WEAPONS SUPPORT AT OKLAHOMA CIT

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

SPRTA126R0410

21 OCT 2026 4:00 PM

STANDARD FORM 1447 (REV. 12/2022) BACK

SPRTA1-26-R-0410

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

SOLICITATION NOTES

Early or partial delivery is acceptable at no additional cost to the Government.

IUID required for this item.

Surge Option included IAW DFARS 252.217-7001.

Subject to availability of funds. FY27 funds apply to this requirement. No award can be made until FY27 funds become available.

COMPETITION EXPECTED. Award will be made only if the offeror, the product/service, or the manufacturer meets qualification requirements at the time of award in accordance with FAR Clause 52.209-1. AWARD WILL NOT BE WITHHELD WAITING QUALIFICATION. Potential sources are not to utilize intellectual property of third parties without appropriate authorization of the intellectual property owner. Potential sources are cautioned that no part of the Government property qualification requirement is intended to endorse or encourage the improper use of intellectual property developed by the Original Equipment Manufacturer or any other third party. See attached Qualification Requirements.

Contractors are REQUIRED to be “EXPORT CONROLLED” certified in order to receive and view drawings for this solicitation. The website for registration is https://www.dla.mil/Logistics-Operations/Services/JCP/

Engineering instructions and Engineering Data List will be available to certified contractors via www.sam.gov (Notice: FD2030- 26-00985 / Special Notice / Posting Date: 30 JAN 2026).

First Article requirement will not be waived except for manufacturers that have produced EXACT production articles and whose design has been approved through the First Article process. See attached Form AFMC IMT 260, Section 11 for Conditions for Waiver of First Article Approval.

NOTES APPLICABLE TO FIRST ARTICLE CLINS 0001AA - 0001AF and 0002AA - 0002AA - 0002AE

The quantity of First Articles exhibits for Line Item 0001AA and 0002AA will be considered part of the production quantity if the First Article is approved by the Government as required by FAR Clause 52.209-3.

Articles will not serve as the manufacturing standard.

The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .