SPRTA1-26-R-0410.pdf
PDF 4 MB Posted
- Attached to
- Fairing, Aircraft (Nose Dome)
- Solicitation number
- SPRTA1-26-R-0410
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a cover page or portfolio introduction image for a PDF document. The image displays the Adobe Acrobat logo (the red stylized "A" symbol) on a white background with red accent corners. The page contains instructional text directing users to open the PDF portfolio in Acrobat X or Adobe Reader X or later for optimal viewing experience, along with a "Get Adobe Reader Now!" button. No substantive contract information, solicitation details, or technical requirements are present on this page.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
BID SET REQUEST Page 1 of 1
DATE GENERATED
14 AUG 2026 1
VERSION
FD20302600985-00
PURCHASE INSTRUMENT NUMBER
INITIATOR
Ladd, Ronald S
ORG / OFFICE SYMBOL
424 SCMS / GUMA
DSN PHONE
336-7624
COMMERCIAL PHONE
405-736-7624 27 JAN 2026
DATE INITIATED
BID SET REQUEST DELAYED FOR THE FOLLOWING REASON
METHOD OF DELIVERY
SAM.GOV
LOCATION OF BID SET
REMARKS
BID SET REQUEST LINE ITEM DATA
0001LINE ITEM
82918CAGE:1560007353588FGNSN: REFERENCE NUMBER: 35-17375-1
FAIRING,AIRCRAFTNOUN:
1 / C 17 JAN 2029EXP DATE:
10USE VERSION: 17 JAN 2024DATED:
Complete, Use RevisionBID SET STATUS:
JOB/QUEUE ID: DISTRUBUTION CODE: IMAGES:
AMC / AMSC AMC / AMSC:
EDLEDL
0007LINE ITEM
82918CAGE:1560007353589FGNSN: REFERENCE NUMBER: 35-17375-2
FAIRING,AIRCRAFTNOUN:
1 / C 18 JAN 2029EXP DATE:
7USE VERSION: 18 JAN 2024DATED:
Complete, Use RevisionBID SET STATUS:
JOB/QUEUE ID: DISTRUBUTION CODE: IMAGES:
AMC / AMSC AMC / AMSC:
EDLEDL
BID SET REQUEST COMPLETED BY
Do, Tiffany T
ORG / OFFICE SYMBOL
429 SCMS / GUMAC
DSN PHONE
884-7100
COMMERCIAL PHONE
405-734-7100
DATE COMPLETED
02 FEB 2026
BIDSET Generated by PRPS using Jasper Reports on 14 Aug 2026 Version 1 Page 1 of 1
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20302600985
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Certification Data for Material
3. SUBTITLE
First Article Inspection Test Report
4. AUTHORITY
DI-MISC-81020/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
AFLCMC/LZPED
7. DD 250 REQ
NO
8. APP CODE
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 XTIME
11. AS OF DATE
Test Day
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Ladd, Ronald SNAME: 27 JAN 2026DATE:
NSN: 1560-00-735-3588FG, 1560-00-735-3589FG
P/N: 35-17375-1, 35-17375-2
COORDINATORS:
424 SCMS/GUMEAB
3001 Staff Drive Tinker AFB, OK 73145
0 1 0
3001 Staff Dr, Ste 1AB85A Tinker AFB, OK 73145-3041 Attn: FA Monitor
0 2 015. TOTAL
G. PREPARED BY
405-736-7624
H. DATE
20 AUG 2026
I. APPROVED BY
//ELECTRONICALLY SIGNED//
Flanagan, Essan K
424 SCMS / GUEAB 919-621-0004 / 736-5271
J. DATE
17-AUG-26
Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
PREVIOUS EDITION MAY BE USED.
A003
Certification of Compliance
First Article Inspection Test Report
DI-MISC-81356A
Test Day
See Block 16
Ladd, Ronald SNAME: 27 JAN 2026DATE:
424 SCMS/GUMEAB
3001 Staff Drive Tinker AFB, OK 73145
0 2 015. TOTAL
Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
A007
FIRST ARTICLE TEST PLAN
FIRST ARTICLE INSPECTION TEST REPORT
DI-NDTI-81307A
AFCMC/LZPED
TEST DAY
SEE BLOCK 16
Ladd, Ronald SNAME: 01 APR 2026DATE:
AFLCMC/LPZC
CEMS PROGRAM
MANAGEMENT OFFICE
0 1 015. TOTAL
Page 6 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A001
PRODUCTION SURGE PLAN
SURGE CDLR CAPABILITY PLAN
DI-MGMT-80969
10 MAR 2026
Ladd, Ronald SNAME: 17 MAR 2026DATE:
NSN: 1560-00-735-3588FG, 1560-00-735-3589
P/N: 35-17375-1 35-17375-2
AFLCMC/LPZC
CEM PROGRAM
MANAGEMENT OFFICE
Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
A006
TEST/INSPECTION REPORT
FIRST ARTICLE INSPECTION TEST REPORT
DI-NDTI-80809B/T
AFCMC/LZPED
TEST DAY
Ladd, Ronald SNAME: 01 APR 2026DATE:
Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
!"!�#"$%� $&'(#)"#*+�",-./0��1����2�1��� ������2 ��
�14����4�5�4��� ������4��+678/90���3 ��13:;<=<�� !>>9?@A.� A-/0�=<==<:<=�!%&'�+678/90�
;<BB:�� C,7,-A-,?D0�
E�� "#'�!>>.,FA8./0�
�� G# $)�!>>.,FA8./0�
��)9/>A9,DH�!F-,@,-I0���J� � � � � )9?K/F-�+678/90��
��13=<==3<<L�!>>.,FA8./�M?97N0�
E���ON/P(/.A-,?DNQ,>R���S��1����������������������
��3 �������4������� ���������������T�������������S��U����������T��S������������������S��������������������������������������������V���W���������������S������������������X����S�����������������X����������������Y���W��������������4�������������������S�����������������������������������S��V�������������X��������X�����������������������������������S���������������V����������Y��S���������������������������Z���W���������������������������S��������������S��������������������3 ��13:;<=<���(/[6,9/7/D-N0��;����������������������R���S�����������������������S������������������S�����X���������V��S����������������������������������Y����������������������X��������X��������������X��S��������������������S��������������������S��� ���������S�����������S�����������������=���2��������2�����������S����W�������������������������������������������������Y��S���\���������������������V���]�����L���B���1������R���S�� ����������������������������S������������W�������������S��������������������������S��������������������W�������Y������������������������������ ������������������������������������S���������������������S������������S���VS����W��������������Y����������Z�������S��������������������������������������S����������������������Y����Z��V��S�������������������S���VS������S������������������������������������V����]�������2�������� ����������������������������S��������������������S��������V�������Ŷ��������S���������������������������������������������S����������������V����������������������S����������X������_�Y��������������̀X���V���a�������������X�������V�����������S�����S���a����������������������S��������Y�bcd�bdebfgh�ijklmgnoe�mppqdeer�mgp�ijgbmib�fgsjqkmbfjg�etic�me������S��������������E���������������������V����������Y����S���T������������������������������������V���������1�������������������������������S��U�����������S��������S�����V��������������������������������������S��������V��������Y�TS������������S��������V������S�����������S�����������������������������\�����S�������������������������������������������������� � uvwxyz{�|}}~{�������}�������������v���v��z�{��������������{����|zy��}|z��vwxyz�}v��zx����}|�}�}|������}|z�ywxxz�}��zx��v���z�vxz�w�z�
(�����#��� !#��$��!#!���)�����������#��� !#��$��!#!�%�"#������"�$#�#*����$�"*�������� #������#*��"#!�#�$+�%!#���!������!,�"#� -��"���� �""����$�!�%!$$���#*!#�,����$�#�!��� #��#"� *�%� !�� �%��"�#��$����%� *!$� !��������#��"�.��+��%! *�$�$+/0�#*�����+�$!��%���� ��#��� !#��$��"�! ��#!�������� ��#��� !#��$����#*��%� *!$� !��������#��"���� *�%� !�� �%��"�#��$��"���)���������!�%�#!��,��-�$+���� �""0�*�!#�#��!#%�$#����!���1�$+��"�������$+��!��� !#��$�!�#��"�#*�����+�$!�� �$��#��$����#*��%!#���!���� *��!�#�����%!#���!��"*!�������$�)���1�������$#������.%!�-��/0�!$��#�! �!����#�� ��#��� !#��$��!#!���2��3����+$����#��� !#��$����$�!���#��$�#��#*���!�!+�!�*�4��!#!����%!#���)����%�$#"0� ��$#�1�������+�$�"*!���������$#��������3����+$��!$+�!+�"��$�#*�� ��#��� !#��$"�%�"#����#�!$"�!#����$#���$+��"*��� *���$�#"����%�!"����%�"#����#*��"!%��!"�#*�"����)�������1�#*�� �$#�! #����"�� ��� !#��$��� �!$"�!#��$"�!$�� �$���"��$"�%!1����!$$�#!#����$�#*�� ��#��� !#��$"0����"�! �����%�#"0������! ����$�!$�!���$��%��$�#*��"!%�����%!#�!"�#*�������+$� ��#��� !#��$��!#!����� *�#�!$"�!#��$���� �$���"��$�"*!�����%!�$�#�! �!����#��#*��%!#���!��!$��������$#������!"�#�����+�$�,�#*�$!%�0�#�#��0�"�+$!#���0�!$���!#�����#*��!�#*���5��������"�$#!#�������#*�� �%�!$1�%!-�$+�#*��#�!$"�!#��$���� �$���"��$���6����+$!#������ *�����#��� !#��$������#�"*!��� �$#!�$�#*��"�+$!#�������789�:;<7=>:7;=?@�>A78;=BC9D������"�$#!#������"��$"����������$"���$+�#*!#�#*���)���%�$#����$+����������E"���� �����$+�������%����"��$�! ���!$ ��,�#*� �$#�! #���)����%�$#"������ #��$� �"�+$!#���"�!���! ��#!�������������#*�1�%��#�!���#��$!����)����%�$#"����#*�"����������
FGHIJKL�MNNOLPPQRRSRNTUVQTWSV�XX�YGZ[VGQUKUL�\]\̂X]_X\̀a\]L\bcdMKJe�NMK�RGHIJK�NG�fKISgh�NMQN�NMSR�SR�NMK�JHIIK[N�fKIRSG[�iKgGIK�HRKT
'()*+,'�-.�/'012.2/)12-3�4)1)�0'+-01�/'012.2/)12-3�-.�1'515��1'51236�,)7-0)1-08�3)*'9�)440'559�1','+:-3'�3;*7'09�)34�'*)2,�)440'55���� 4)1'�<<<<<<<<<<<<<<�*)1'02),=�*>?@A�18+'=�� 22�/-34212-3=�)33'),'4�� /;51�-04'0�3-B�3CCDCEFGEF*�10HI���-;0�-04'0�3-B� � �+CJEIGE�.2325:=�:>K�.L?LMN@O�/,)55=���� )���5+'/=��PPF3FQGD�/:'*2/),�/-*+�F�+'0/'31��� � � � � 0'R=��4�)SB�Q��21'*� :')1�3-� /� *3� 5;,� 52� 32� .'� /;� ),�D� )DQJ7�BCDT� DBCT� BCDH� BQU� TEBIG�DBTT� JDBUD�BDQ�Q� )DQE7�BDI� DBDH� BCDJ� BQU� TEBGE�DBTU� JDBTT�BDE��*'/:)32/),�+0-+'012'5�� � � � � VBQW�-..5'1X� �21'*��:')1�3-B��1'352,'�510'361:� 82',4�510'361:���',-36)12-3�� � � � V+52X� � � � � ��23�Q�23/:'5����D� )DQJ7� GE9JCC� JT9JCC� EJW�Q� )DQE7� GE9CCC� JT9DCC� EJW���5YSZAL?[�\>]�K@MKM�̂YM�O>?@�L?�Y__>]OY?_@�̂LKN�PPF3FQGD4�)SB�QB��@̀�N@]@ab�_@]KL\b�KNYK�KN@�Ya>c@�K@MK�OYKY�Y]@�L?�Y__>]OY?_@�L̂KN�KN@�MZ@_L\L_YKL>?�]@deL]@S@?KMB��<<<<<<<<<<<<<<<<<<<<<<<<�5L[?YKe]@� � �<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<<�3YS@�VKbZ@O�>]�Z]L?K@OX�Y?O�>][Y?LfYKL>?YA�KLKA@� ���!%��g#h����������$#��i�!$����j!$�k!#��$!��#�#���� � lmnopqr�stturvvwxxyxtz{|wz}y|�~~��m��|mw{q{r�����~��~�����r����sqp��tsq�xmnopq�tm��qoy���tswt�tsyx�yx�tsq�pnooq�t��qoxym���q�moq�nxqz
�/��*����0���������
��1��0����� � � � ������������������-�� �2&3���� ����)-������2 &42 ���-������)���� � � � ����������(��-���������55���672�+�*���� ��55���672*+��� ��0�8��,�����)����)/���� �*������+���/�����0,+��1����,�8��� �))��0���)� �9�+�(�������������,�����)����(�:�(�����
| ������������ �$� ���� ����� �������(����������������������������������������' | �2&��� |
| �&�� | �7 |
�����&27�����&� �&��� ���2 ����2&;������� �������������������������<� ������������*����� � 23���� 6������
| 6������ |
| 6������� |
| ����� |
2�������������������,�����)�(��(�� @�����)��0� �����������*���� ������ �>1��@�� /��)��>1��@�� ���&��� ������ ' �2&�� ���;��6�� ��������& � �� ������������3 �6?�������������63�;?��,!��$�""�!"�"A����������,����2���������������� �������1�������������0�!�$���B����6� �����������������������������������������! ������1���$#��C�!$��!�������"��$������1����������9��A����D� ��#��D�#A!#�#A��!�����#�"#��!#!�!����$�! ���!$ ��E�#A�#A��"�� ��� !#��$���F����%�$#"���� � � � � ....................................� �� � � � � � ��C$!#����� � � � � ....................................��!%��>#D����������$#��@�!$����C!$�B!#��$!��#�#������$��������������
GHIJKLM�NOOPMQQRSSTSOUVWRUXTW�YY�ZH[\WHRVLVM�]̂]_Ŷ Ỳ]ab]̂M]cdeNLKf�ONL�SHIJKL�OH�gLJThi�ONRO�ONTS�TS�ONL�KIJJL\O�gLJSTH\�jLhHJL�ISLU
| ��������� | �������������� | ���������� |
| ������������ | ��� !"�������������������#���������$%%&�$������ | � |
�-� �� �.���&/�������������0���,�� )���1,�)
| �������,2������2�� | �������������� | �������������#�.�,���������������������2��������������2����2�����������,������.��,��������������������3��2����������������4��������,5���2�,������������,��2��������6��������6���.������.�.��,�������������������2��.����.���#���������4����.��+��2����������5�����2�,�����,����,�.�,������� | ��� !"5�� | |||||||
| �4��������,����5�0�����5���2�� | �������������� | ����������,2����������,����.�������������,�����������2�������0�7�����5��$5� | ������5���2�� | �������������� | ����������,2����������������5�� | ���������8,�����5���5�� | ���������8,��..��,,5���5�� | ���������8,��2����������5��.5������5���5�� | ���������7��7���+8,�����5���5�� | �������� |
�����5��75�� ������������9�
;5��25�������������������5���5����,���������������+��7��2�����������,������,2�.�����2����������������������������������3��2������������,���������������.������������4��������,5����<5�����2���=�.����,�����8,�,�7������5��95�����2���=�.����,�����8,�������.��������.������5��������� ��7�������>?@ABCD�EFFGDHHIJJKJFLMNILOKN�PP�Q?RSN?IMCMD�TUTVPUWPTXYTUDTXZ[ECB\�FEC�J?@ABC�F?�]CAK̂_�FEIF�FEKJ�KJ�FEC�B@AACSF�]CAJK?S�̀Ĉ?AC�@JCL
!!�"##����������������������������������������$$���� ��%&�'"�()�*"����������������������������������+,�����-�.�� ���/0"������������������� �1����������������������������2�3�43���5 ����'0�/60�()�*"��������������������(/07�'/8��0�69�()�*"���������������������0"��(��"'68/0)�"�����������������������:
88�70"�#�;)�'7#&"!��'�0&7#�6�'0�/60�/�"�7'�;)88�6��<87/'6"�=70&�/88�#<"67;76/07�'�/'!�6�'0�/60��">)7�"�"'0#?@� ��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������A23���-����B�4-�,��2C�$�D�������E��������������������������������������������������������������������������������������������������������������������������������������������������������������������������D�2���$�F������$�G2�E���B�4-�,��2C�$�D�������E ��� �(�0"��1&"��"6��!7'H��;�;/8#"I�;760707�)#I����;�/)!)8"'0�#0/0"�"'0#����"'0�7"#��'�0&7#�!�6)�"'0��/J�*"�<)'7#&"!�/#�/�;"8�'J�)'!"���"!"�/8��0/0)0"#?��� ?��K'!��;����������
��������������������������������������������������������������������������%/H"�L����������������������������������7H)�"� �M��/�<8"�;���/0�;���/��"�07;76/0"��;����<87/'6"�NOPQRST�UVVWTXXYZZ[ZV\]̂Y\_[̂�̀̀�aObĉOY]S]T�dedf̀eg̀dhideTdhjkUSRl�VUS�ZOPQRS�VO�mSQ[no�VUYV�VU[Z�[Z�VUS�RPQQScV�mSQZ[Oc�pSnOQS�PZS\
DATA ITEM DESCRIPTION
Title: First Article Qualification Test Plan and Procedures
Number: DI-NDTI-81307A Approval Date: 21 NOV 2006 AMSC Number: 7649 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/I522 Applicable Forms: N/A
Use/relationship:
To establish test procedures, test equipment, and the inspection criteria that will be used by the contractor for first article qualification.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID supercedes DI-NDTI-81307.
Requirements:
1. Reference documents. None.
2. Format:
The plan shall be in the contractor’s format.
3. Content:
This test plan shall include the following:
a. Purpose of test.
b. Applicable documents.
c. Description of units to be tested.
d. Test description to include the following:
(1) Step-by-step procedures which are to be followed by the operator when performing each test.
(2) Define readings to be taken, settings to be used, and description of the test equipment, including commercial identification.
Source: https://assist.dla.mil -- Downloaded: 2026-04-01T12:18Z
Check the source to verify that this is the current version before use.
DI-NDTI-81307A
(3) Drawings, schematics, photographs, etc, of noncommercial fixtures and testers necessary for test evaluation.
e. Inspection criteria that defines the minimum performance requirements that the unit under test must meet in order to be considered acceptable to the Government. This shall include, as a minimum, worst case prime power input, worst case signal level and timing inputs, and signal level and timing outputs.
4. END OF DI-NDTI-81307A
Source: https://assist.dla.mil -- Downloaded: 2026-04-01T12:18Z
DATA ITEM DESCRIPTION
Requirements:
DATA ITEM DESCRIPTION
Title: Production Surge Plan
Number: DI-MGMT-80969A Approval Date: 20260406
AMSC Number: 10632 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: CR Project Number: MGMT-2026-010
Applicable Forms: N/A
Use/Relationship: The Production Surge Plan delineates a contractor’s capability to rapidly accelerate and sustain production utilizing existing facilities and equipment in a peace time acquisition environment without a declaration of war or mobilization and subsequent use of emergency war powers.
The Production Surge Plan provides data on the maximum sustainable production rate; long lead-time, critical or pacing items/components; other contracts with production surge provisions;
probable surge impact; additional skilled labor requirements; strategic or critical materials, precious metals, and substitute materials; and suggested tooling to include equipment to improve surge protection capability. This data provides for surge (accelerated production) planning of select items.
a. This Data Item Description (DID) contains the format, and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID is applicable in contracts for which a production surge capability for select critical items is required.
c. This DID reinstates DI-MGMT-80969.
Requirements:
1. Reference document. None.
2. Format. The report shall be in the contractor’s format.
3. Content. The Production Surge Plan shall consist of the following:
3.1. Rate. The maximum rate of sustainable production, to include a production buildup schedule by the month until the maximum sustainable production rate is achieved.
When applicable, a subcontractor’s or vendor’s capability to accelerate production/delivery of components and materials must be taken into consideration and a
Reinstated after 06 April 2026
Source: https://assist.dla.mil -- Downloaded: 2026-04-07T15:20Z
DI-MGMT-80969A
statement shall be included in the plan verifying that this vertical planning has been done.
3.2. List of Items. Two lists, one of subcontracted and one of non-subcontracted items/components, by nomenclature, part number, leadtime, and production buildup of long-leadtime, critical or pacing items/components which could adversely impact the production rates. (See paragraph 3.1 above). Subcontractors and vendors shall be identified by name and address for each item. This requirement shall flow down to whichever contractor tier (level) is necessary to adequately identify the long-leadtime, critical, and pacing items/components.
3.3. List of contracts. A list of Government contracts being performed at the contractor’s facility that have a production surge provision or could reasonably be presumed to be surged. The list shall identify the contract number, the item(s), and the Defense
Materials System and Defense Priorities Systems priorities assigned to each contract.
3.4. Impact. Describe what impact surging this contract would have on the performance of any other Government contract that might be currently surged with this contract, or what impact surging of the other Government contract(s) would have on the ability to surge this contract. Describe what impact surging this contract would have on the contractor’s commercial business.
3.5. Labor. Identify all additional skilled labor requirements, i.e., machinist, tool makers, quality assurance, etc., necessary to support the maximum sustainable production rate.
3.6. List of materials. A list identifying any combination of strategic materials, critical materials, and precious metals, by type, quantity and cost, required to produce the item on contract or the subcontracted/non-subcontracted long-leadtime, critical or pacing items/components. This list should include rolling inventory to attain and maintain surge production within six months. Additionally, a list identifying any substitute materials that could be utilized in place of any combination of strategic materials, critical materials, and precious metals.
3.7. List of production equipment. A list of tooling, equipment and costs, down to the lowest tier subcontractor, that if acquired, would increase surge production rate capability or reduce leadtime by at least 10 percent, or as specified in the contract within current facilities limitations. The estimated increase in the surge production rate or decrease in leadtime shall be included. Data obtained under this paragraph will not be used in the preparation of the basic plan but may be used by the Government for developing additional surge capability if deemed essential.
End of DI-MGMT-80969A
Source: https://assist.dla.mil -- Downloaded: 2026-04-07T15:20Z
| ��������������������� ! | ��"� |
| ��������� |
| ������ |
| �������� |
| ��������������������� ! | ��"� |
| ��������� |
| ������ |
| �������� |
| ��������������������� ! | ��"� |
| ��������� |
| ������ |
| �������� |
| ��������������������� ! | ��"� |
| ��������� |
| ������ |
| �������� |
FIRST ARTICLE REQUIREMENTS 1. DATE
26 MAR 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
82918 / 35-17375-1
4. NSN
1560007353588FG
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM EA
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
DEFINED BY ENGINEERING DWG: DOCUMENTED IN FIRST ARTICLE INSPECTION (TEST) REPORT
B. The detailed technical requirements for First Article approval tests are contained in
ENGINEERING DWG AND GOVERNMENT EVALUATION
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
Tinker.First.Article@us.af.mil
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
FA MONITOR, DODAAC FA8111
(4) Government written notice of approval / disapproval due
(2) Due days after receipt of contractor's report.
calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 8Generated by PRPS using Jasper Reports on 14 Aug 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at see block 12
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$13,300.1200
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be retained by USAF supply
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 60 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Medina, BeckyNAME: 15 MAR 2024DATE:
CERTIFICATE OF COMPLIANCE & MATERIAL CERTIFICATION REQUIRED
WAIVERS MAY BE CONSIDERED WHEN REQUESTED BY THE CONTRACTING OFFICER.
Only the ESA is authorized to determine if an item is similar, except when the items are opposites detailed on the same drawing, such as 123456-12/-13(OPPOSITE).
JUSTIFICATION STATEMENT: PER FAR 9.304(D), FIRST ARTICLE TESTING AND APPROVAL IS REQUIRED BECAUSE THE REQUIREMENTS ARE SO NOVEL OR EXACTING THAT IT IS QUESTIONABLE WHETHER THE PRODUCTS WOULD MEET THE REQUIREMENTS WITHOUT TESTING AND APPROVAL. THE ITEM IS A CRITICAL SAFETY ITEM. FAILURE TO PERFORM FIRST ARTICLE TESSTING AND APPROVAL WILL ALLOW DEFECTS NOT WHOLLY VISIBLE TO DAMAGE SURROUNDING PARTS OF THE WEAPON SYSTEM, INJURE PERSONNEL, AND/OR REDUCE THE OPERATIONAL LIFE OF THE ITEM.
INCLUDE REQUIREMENTS OF FAR 52.209-9018 AS SUPPLEMENTED BY ATTACHED CONTRACT DATA REQUIREMENTS LIST (CDRL)
-- BLK 9F(3) --
MARK FOR: FIRST ARTICLES
ATTN: DDOO-SOP
DO NOT POST, NOT ACCOUNTABLE: DO NOT PUT INTO SUPPLY
DODAAC: FY2303
ENSURE THE WORDS "FIRST ARTICLES" ARE MARKED ON THE OUTSIDE OF THE BOX IN LARGE RED CONSPICUOUS LETTERS ePub version 3 Block 3: Part Number_____________________ ePub version 3 Block 9:
C.1. DD Form 1423 ELIN___________
2. Delivery Due ___ calendar days from date of contract.
E.1. DD Form 1423 ELIN___________
2. Due Calendar Days from date of contract.
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Medina, Becky
424 SCMS / GUEAB
405-736-7258
336-7258
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Medina, Becky
424 SCMS / GUEAB
405-736-7258
336-7258
03 NOV 2025(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
82918 / 35-17375-2
4. NSN
1560007353589FG
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM Item
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A.
X
CONTRACTOR TESTING
GOVERNMENT TESTING
DEFINED BY ENGINEERING DWG: DOCUMENTED IN FIRST ARTICLE INSPECTION (TEST) REPORT
B. The detailed technical requirements for First Article approval tests are contained in
ENGINEERING DWG AND GOVERNMENT EVALUATION
(Cite Spec and Para number)
C. TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
(Requesting Activity) of test time and location due days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
FA MONITOR, DODAAC FA8111
(4) Government written notice of approval / disapproval due
(2) Due days after receipt of contractor's report.180 calendar days from date contract.
Version 3Generated by PRPS using Jasper Reports on 14 Aug 2026
F. FIRST ARTICLE DELIVERY
(1) Due within 180 calendar days from date contract.
(2) Notify 30 calendar days prior to shipment.
(3) Delivered to government at
SEE BLOCK 12
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 180 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$13,300.1200
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles
X First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be returned to the contractor
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, X DoD, Air Force.
b. X Offerors currently in production of the same or similar article for a Government, X DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, X DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 36 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Phan, PhilipNAME: 03 NOV 2025DATE:
EPUB VERSION 3: Part Number 35-17375-2
EPUB BLOCK 9:
C. 1. DD FORM 1423 ELIN _________________________________
2. DELIVERY DUE ______________________ CALENDAR DAYS FROM DATE OF CONTRACT
E. 1. DD FORM 1423 ELIN _________________________________
2. DUE 180 CALENDAR DAYS FROM DATE OF CONTRACT
CERTIFICATE OF COMPLIANCE & MATERIAL CERTIFICATION REQUIRED
WAIVERS MAY BE CONSIDERED WHEN REQUESTED BY THE CONTRACTING OFFICER.
Only the ESA is authorized to determine if an item is similar, except when the items are opposites detailed on the same drawing, such as 123456-12/-13(OPPOSITE).
JUSTIFICATION STATEMENT: PER FAR 9.304(D), FIRST ARTICLE TESTING AND APPROVAL IS REQUIRED BECAUSE THE REQUIREMENTS ARE SO NOVEL OR EXACTING THAT IT IS QUESTIONABLE WHETHER THE PRODUCTS WOULD MEET THE REQUIREMENTS WITHOUT TESTING AND APPROVAL. THE ITEM IS AN ASSEMBLY OF 4 OR MORE COMPONENTS. FAILURE TO PERFORM FIRST ARTICLE TESTING AND APPROVAL WILL ALLOW DEFECTS NOT WHOLLY VISIBLE TO DAMAGE SURROUNDING PARTS OF THE WEAPON SYSTEM, INJURE PERSONNEL, AND/OR REDUCE THE OPERATIONAL LIFE OF
THE ITEM.
INCLUDE REQUIREMENTS OF FAR 52.209-9018 AS SUPPLEMENTED BY ATTACHED CONTRACT DATA REQUIREMENTS LIST (CDRL)
Contractor's notification to ACO and this office (424 SCMS/GUEA) of test time and location due 30 days prior to start of testing
-- BLK 9F(3) --
DDOO-SOP/FIRST ARTICLES
PHONE 405-739-8596
DO NOT POST, NOT ACCOUNTABLE: DO NOT PUT INTO SUPPLY
ENSURE THE WORDS "FIRST ARTICLES" ARE MARKED ON THE OUTSIDE OF THE BOX IN LARGE RED CONSPICUOUS LETTERS
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Phan, Philip
424 SCMS/GU E A
405-736-3791
336-3791
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Phan, Philip
424 SCMS/GU E A
405-736-3791
336-3791
PACKAGING REQUIREMENTS
PURCHASE INSTRUMENT NUMBER: FD20302600985-01 VERSION: 1
MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN
PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAF MIL-STD-2073-1 / SPI MIL B F007353588 C 16218 - 05 AUG 2016
ITEM(S):
1560007353588FG 1560007353589FG 1560DTH260162FG 1560DTH260163FG 1560DTH260164FG 1560DTH260165FG 1560DTH260168FG 1560DTH26016AFG 1560DTH26016BFG 1560DTH260263
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
LENGTH
WIDTH
DEPTH
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
ORGANIZATION / OFFICE SYMBOL:
406 SCMS / GULAA
PACKAGING SPECIALIST:
Davis, Richard R
PHONE NUMBER:
405-371-9037 / 582-5972
SIGNATURE:
//SIGNED//Davis, Richard R
DATE:
26232 - 20 AUG 2026
Page 1 of 1AFMC 158 Version 1Generated by PRPS using Jasper Reports on 24 Aug 2026
DATE
SUPPLEMENT TO AFLC FORM 761/762
NOUN NATIONAL STOCK NUMBER PART NUMBER
Only the checked statement applies to this NSN.
QUALIFICATIONS REQUIREMENTS PRIOR TO 19 OCT 84
• Section F.1 This item qualifies under FAR 9.206-1(a)(2) and the requirements of FAR 9.202(a) are not applicable.
Prequalification of sources is essential to maintain high quality and maximum operational safety.
• Section F.2
(a) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, can be considered approved sources for this item.
(c) _____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet.
Category III capability is permissible.
• Section F.3 The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and B apply. Qualification requirements were established prior to 19 Oct 84.
QUALIFICATION REQUIREMENTS AFTER 19 OCT 84
Justification for Qualification Requirement (JQR) is required.
Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply.
(a)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers, that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and D apply. Qualification requirements were established after 19 Oct 84.
EVALUATING ENGINEER/TECHNICIAN (Signature) SYMBOL EXTENSION
OC-ALC Form O-367, JUN 01 (TI)
DATE: 28-Jan-2026
NOUN: FAIRING, AIRCRAFT
PART NUMBER: 35-17375-1
SYMBOL: 424 SCMS/GUEA
EXTENSION: 4057365271
a1: Off b1: Yes a2: Off c1: Off b2: Off
2026-01-28T11:57:49-0600
FLANAGAN.ESSAN.KOFI ASIAMAH.1591759236
NATIONAL STOCK NUMBER: 1560-00-735-3588
SUPPLEMENT TO AFLC FORM 761/762
NOUN NATIONAL STOCK NUMBER PART NUMBER
Only the checked statement applies to this NSN.
QUALIFICATIONS REQUIREMENTS PRIOR TO 19 OCT 84
This item qualifies under FAR 9.206-1(a)(2) and the requirements of FAR 9.202(a) are not applicable.
Prequalification of sources is essential to maintain high quality and maximum operational safety.
(a) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b) _____Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality,
(c) _____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet.
Category III capability is permissible.
The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and B apply. Qualification requirements were established prior to 19 Oct 84.
QUALIFICATION REQUIREMENTS AFTER 19 OCT 84
Justification for Qualification Requirement (JQR) is required.
Prequalification of sources is essential to maintain high quality and maximum operational safety. The requirements of FAR 9.202(a) apply.
(a)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufactures that have successfully completed all testing required by the original company responsible for the design, can be considered approved sources for this item.
(b)_____ Qualification requirements are set forth in OC-ALC Source Approval Information Booklet. Due to the complexity and criticality of this part, only actual manufacturers, that have successfully completed all testing required by the original company responsible for the design, or manufacturers that have successfully completed all testing on items determined by the government to be similar in complexity and criticality, The provisions of FAR 9.206-1 and -2, as supplemented, apply. In accordance with AFMCFARS, 1 July 97, Part 5309.206-1(e)(1), Notes A and D apply. Qualification requirements were established after 19 Oct 84.
EVALUATING ENGINEER/TECHNICIAN (Signature) SYMBOL EXTENSION
OC-ALC Form O-367, JUN 01 (TI)
DATE: 28-Jan-2026
NOUN: FAIRING, AIRCRAFT
PART NUMBER: 35-17375-2
SYMBOL: 424 SCMS/GUEA
EXTENSION: 4057365271
a1: Off b1: Yes a2: Off c1: Off b2: Off
2026-01-28T11:54:15-0600
FLANAGAN.ESSAN.KOFI ASIAMAH.1591759236
NATIONAL STOCK NUMBER: 1560-00-735-3589
AutoCAD SHX Text
LAMINATE TO REQUIRED THICKNESS WITH ADHESIVE 6 OR EQUAL.
A-A-59692
COMPUTER GENERATED
AS REQUIRED
19 7/8 X 19 7/8 X 7/8
20 X 20 X 21 1/4
26 X 26 X 5/16
ADHESIVE
TOP HOLD DOWN
TAPE
ASTM-D-5486
NOTES:
NATIONAL STOCK NO.
1560-00-735-3588 FG
ITEM NOMENCLATURE
SPECIAL PACKAGING INSTRUCTION
PART OR DRAWING NO.
CURR REV
ORIG DATE
78303
98748
CODE ID
OF
SHEET
SPI NO (TPO)
F 00-735-3588
DOME ASSEMBLY
MIL-PRF-121
ASTM-D-4727, WR, DW
ASTM-D-4727, WR
SPI N0.
WRAP
BOTTOM PAD
1)
35-17375-1
C
DESIGN FRAGILITY G
GROSS WT LBS
GROSS CU FT
B
AS SPECIFIED BELOW AND BILL OF MATERIALS
PACKING
CLOSURE
SPECIAL MARKINGS:
IAW MIL-STD-129
IAW MIL-STD-2073
ICQ
QUP
IAW MIL-STD-2073
SERVICEABLE METHOD:
CLEANING & DRYING
MARKING
PRESERVATION
PRESERVATIVE
RSC
CF
WR
SW
LEVEL A:
V3C
5.285
LEVEL A
LEVEL B
UNSERVICEABLE METHOD:
LEVEL B:
ASTM-D-1974
DO NOT DESTROY.
B)
A)
C)
REUSABLE CONTAINER AND DUNNAGE
SPI NO.
NOT FOR OUTSIDE STORAGE.
ASTM-D-5118
ITEM WT LBS
ITEM DIM
17 5/8
13 LBS.
17 5/8
CNTNR O.D.
CNTNR I.D.
21 1/4
20 3/8
20 3/8
DESCRIPTION
LTR
REVISIONS
78303
NEW
REVISED AND REDRAWN
00252
LEVEL
SPEC
STYLE
TYPE
CL
VRTY
GR
TR
11146
B
INCREASED DEPTH OF CONTAINER
& DIAMETER OF P/N 2.
PART
NO.
QTY.
MATERIAL SPECIFICATION
SIZE (INCHES UNLESS SPECIFIED)
DESCRIPTION
NOMENCLATURE OR
TOLERANCES ON FRAC. 1/8,
DECIMAL .10, ANGLES 1 .
O
SEE LEVEL OF PACK
CONTAINER I.D.
DD 2169 MOD
form
MAR 87
D. CHOI
C. TROTTER
PS
CHKR
AUTH
ILL
M. HEADLEE
ENGR
T.C. JONES
C. QUICK
16218
C
DECREASED BOTTOM PAD
DIMENSIONS
SHEET OF
SPI NO. ( TPO )
ITEM
TOP HOLD DOWN
SHEET OF
SPI NO. ( TPO )
BOTTOM PAD
3 3/16" TYP
17 7/8" DIA.
19 7/8"
9 15/16"
9 15/16"
19 7/8"
9/16"
7/8"
26"
13"
13"
26"
5/16"
7" DIA.
3 3/16"
THRU.
TYP.
N
9. (Agency Use)
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A
DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE
CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE
ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT
SUBJECT TO THE TERMS AND CONDITIONS STATED HEREIN.
12. ADMINISTERED BY CODE
13. CONTRACTOR
OFFEROR
CODE FACILITY
CODE
14. PAYMENT WILL BE MADE BY CODE
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
15. PROMPT PAYMENT DISCOUNT
16. AUTHORITY FOR USING OTHER
THAN FULL AND OPEN COMPETITION
10 U.S.C. 3204(a) 41 U.S.C. 253
UNDER THE UNITED STATES CODE AT: ( ) ( )
17.
ITEM NUMBER
18.
SCHEDULE OF
SUPPLIES/SERVICES
19.
QUANTITY
20.
UNIT
21.
UNIT PRICE
22.
AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT
(For Government Use Only)
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
27. SIGNATURE OF OFFEROR/CONTRACTOR 28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
NAME AND TITLE OF SIGNER (Type or Print) DATE SIGNED NAME OF CONTRACTING OFFICER
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 1447 (REV. 12/2022)
DO: A1
SPRTA1-26-R-0410 21 SEP 2026
DLA WEAPONS SUPPORT AT OKLAHOMA CIT
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
BUYER: Christine Turnage/DLA/AOBB christine.turnage@us.af.mil Phone: (385) 591- 8545
100X
SPRTA1
CLASSIFICATION
336413
1,250
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE
BLOCKS 11, 13, 15, 21, 22, and 27
1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at
15 CFR 700.
RATING PAGE OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
4. SOLICITATION NUMBER 5. SOLICITATION TYPE
SEALED BIDS
(IFB) INVITATION
FOR BID
NEGOTIATED
(RFP) REQUEST
FOR PROPOSAL
6. SOLICITATION
ISSUE DATE
7. ISSUED BY CODE 8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
NO COLLECT CALLS
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
HISTORICALLY ELIGIBLE UNDER THE WOSB PROGRAM
UNDERUTILIZED ECONOMICALLY DISADVANTAGED
BUSINESS ZONE WOMEN-OWNED SMALL BUSINESS (EDWOSB)
(HUBZone) SMALL BUSINESS NORTH AMERICAN INDUSTRY CLASSIFICATIO
SERVICE-DISABLED VETERAN- SYSTEM (NAICS):
OWNED SMALL BUSINESS
8(A) SIZE STANDARD:
LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL
21-OCT-2026 4:00PM
Other Aircraft Part and Auxiliary Equipment Manufacturing X
SCD:B
(SEE ESP CLAUSE 252.232-7003.)
EFT:T14
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
Total
SEE SCHEDULE
DATE SIGNED
Prescribed by GSA - FAR (48 CFR) 53.214(d)
NO RESPONSE FOR REASONS CHECKED
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
UNABLE TO IDENTIFY THE ITEM(S)
DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
OTHER (Specify)
WE DO
WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE
OF ITEMS INVOLVED
NAME AND ADDRESS OF FIRM (Include ZIP Code) SIGNATURE
TYPE OR PRINT NAME AND TITLE OF SIGNER
FROM: AFFIX
STAMP
HERE
TO:
SOLICITATION NUMBER
DATE AND LOCAL TIME
ATTN: Christine Turnage/DLA/AOBB
DLA WEAPONS SUPPORT AT OKLAHOMA CIT
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
SPRTA126R0410
21 OCT 2026 4:00 PM
STANDARD FORM 1447 (REV. 12/2022) BACK
SPRTA1-26-R-0410
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION NOTES
Early or partial delivery is acceptable at no additional cost to the Government.
IUID required for this item.
Surge Option included IAW DFARS 252.217-7001.
Subject to availability of funds. FY27 funds apply to this requirement. No award can be made until FY27 funds become available.
COMPETITION EXPECTED. Award will be made only if the offeror, the product/service, or the manufacturer meets qualification requirements at the time of award in accordance with FAR Clause 52.209-1. AWARD WILL NOT BE WITHHELD WAITING QUALIFICATION. Potential sources are not to utilize intellectual property of third parties without appropriate authorization of the intellectual property owner. Potential sources are cautioned that no part of the Government property qualification requirement is intended to endorse or encourage the improper use of intellectual property developed by the Original Equipment Manufacturer or any other third party. See attached Qualification Requirements.
Contractors are REQUIRED to be “EXPORT CONROLLED” certified in order to receive and view drawings for this solicitation. The website for registration is https://www.dla.mil/Logistics-Operations/Services/JCP/
Engineering instructions and Engineering Data List will be available to certified contractors via www.sam.gov (Notice: FD2030- 26-00985 / Special Notice / Posting Date: 30 JAN 2026).
First Article requirement will not be waived except for manufacturers that have produced EXACT production articles and whose design has been approved through the First Article process. See attached Form AFMC IMT 260, Section 11 for Conditions for Waiver of First Article Approval.
NOTES APPLICABLE TO FIRST ARTICLE CLINS 0001AA - 0001AF and 0002AA - 0002AA - 0002AE
The quantity of First Articles exhibits for Line Item 0001AA and 0002AA will be considered part of the production quantity if the First Article is approved by the Government as required by FAR Clause 52.209-3.
Articles will not serve as the manufacturing standard.
The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .