SPRTA1-26-Q-0385.pdf
PDF 1 MB Posted
- Attached to
- Valve, Fuel Pressuring
- Solicitation number
- SPRTA1-26-Q-0385
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Letter Solicitation for the procurement of a fuel pressuring valve as a sole-source acquisition from General Electric Company. The Defense Logistics Agency (DLA) Aviation at Oklahoma City is soliciting one unit of NSN 2915-00-143-6107 (part number 3006T88G05), with a requested delivery date of on or before August 11, 2027. The solicitation closing date is August 26, 2026. Respondents must provide pricing and delivery information in accordance with the terms and conditions of an unspecified Blanket Order Agreement (BOA). New manufacture is required; surplus items are not authorized. The item is designated as a Critical Safety Item (CSI) requiring inspection and acceptance at origin, with higher-level contract quality requirements per ISO 9001:2000. FY26 funds apply to this acquisition, with the Availability of Funds clause (FAR 52.232-18) in effect. The solicitation includes requirements for Item Unique Identification (IUID) marking per DFARS 252.211.7003, Buy American Act compliance, and applicable packaging, transportation, and quality assurance documentation. The receiving report is required as the inspection/acceptance report.
The package includes comprehensive supporting documentation: Packaging Requirements specifying MIL-STD-129 and MIL-STD-2073-1 standards with emphasis on wood packaging material restrictions, heat treatment certification, and special packaging instructions for items with residual fuel (SPI F WF-117-2012); Transportation Data indicating F.O.B. Destination with first destination transportation account code DFMS and contact requirements with DCMA prior to shipment; an IUID Checklist requiring bag/tag marking with CAGE code, part number, and serial number on external containers; and Manufacture Qualification Requirements (MQR-PSD-1 Revision 2) establishing technical requirements for source approval including company profile submissions, Source Approval Request (SAR) packages with demonstrated manufacturing capability, quality assurance certifications, and sub-tier supplier documentation. Ship-to location is DTH003, marked for DTH100 at supplemental address DA3RBO with TAC Code DFMS.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
MEMORANDUM FOR: Joshua Grear/ GENERAL ELECTRIC COMPANY
FROM: DLA Weapons Support OKC – AOAB / 3001 Staff Dr., 2B97 / Tinker AFB, OK 73145
SUBJECT: Letter Solicitation SPRTA1-26-Q-0385 – PR FD20302600799
This Solicitation is issued for the purpose of acquiring the supply below, which is sole sourced to GENERAL ELECTRIC COMPANY.
CLIN P/N NSN Noun BEQ Quantity 0001 3006T88G05 2915-00-143-6107 OK Valve, Fuel Pressuring 1 EA
Please provide pricing and delivery for purchase of this NSN in accordance with the terms and conditions of BOA. GENERAL ELECTRIC COMPANY is requested to provide capacity, PLT and pricing based upon the quantity listed below.
New Manufacture - Surplus is "NOT AUTHORIZED" for this procurement / Early Delivery Acceptable.
Quantity 1 each: $ / Delivery Date:
“FY26 funds apply to this acquisition. Availability of funds clause (FAR 52.232-18) applies. No obligation may be incurred by the government until FY26 funds availability has been certified.”
Qualification requirements may be found under clause 52.209-1.
IUID APPLIES: DFARS 252.211.7003
Critical Safety Item (CSI): YES
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required.
Quality Assurance: Higher Level Contract Quality Requirements, ISO 9001:2000.
Buy American Act/balance of Payments Program
Requested Delivery: 1 each “On or Before” 11 AUG 2027.
Ship to: Mark For: Supplemental Address: TAC Code:
DTH003 DTH100 DA3RBO DFMS
The terms and conditions of BOA # :( fill-in: ) will apply to this NSN. Please respond with your pricing and delivery for the item by the solicitation closing date of 26 AUG 2026. If you have any further questions, please contact Dillon Endecott at 392-737-3194 or dillon.endecott.1@us.af.mil.
Sincerely, //SIGNED//
Dillon J. Endecott Contract Specialist
DEFENSE LOGISTICS AGENCY
AVIATION AT OKLAHOMA CITY
3001 STAFF DRIVE POST 2B95
TINKER AIR FORCE BASE, OKLAHOMA 73145-3015
21 JUL 2026
mailto:dillon.endecott.1@us.af.mil
ATTACHMENTS:
NOTE 1 – Packaging to be accomplished IAW the Packaging Requirements document attached.
NOTE 2 – Special Packaging NOTE 3 – Transportation to be accomplished IAW the applicable Transportation document attached.
NOTE 4 – IUID Checklist
NOTE 5 – MQR-PSD-1 R2
PACKAGING REQUIREMENTS
PURCHASE INSTRUMENT NUMBER: FD20302600799-00 VERSION: 1
MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN
PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAA MIL Long Line Packaging MIL B
ITEM(S):
2915001436107OK
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
1 AAA 41 1 00 GB NA A NS EC B ZZ 1.30 6.3 5.3 4.0 0.077 M
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
ITEMS W/RESIDUAL FUEL USE SPI F WF-117-2012; ZZ MARKINGS=IAW DAFI 24-602 VOL2, 2.16.6.3 -- IF APPLICABLE
VENDOR PACKAGING INSTRUCTIONS:
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
ORGANIZATION / OFFICE SYMBOL:
406 SCMS / GULAA
PACKAGING SPECIALIST:
Real, Billy S
PHONE NUMBER:
405-582-9721 / 852-9721
SIGNATURE:
//SIGNED//Real, Billy S
DATE:
26005 - 05 JAN 2026
Page 1 of 1AFMC 158 Version 1Generated by PRPS using Jasper Reports on 07 Apr 2026
OKLAHOMA
U.S. AIR
FORCECITY
PACKAGINGALCAPPROVED
AutoCAD SHX Text
WF-117-2012
AutoCAD SHX Text
P. BROWNING
AutoCAD SHX Text
C. TROTTER
AutoCAD SHX Text
H. HOLINSWORTH
AutoCAD SHX Text
ITEM WT LBS
AutoCAD SHX Text
ITEM DIM
AutoCAD SHX Text
DESIGN FRAGILITY G
AutoCAD SHX Text
GROSS WT LBS
AutoCAD SHX Text
GROSS CU FT
AutoCAD SHX Text B
AutoCAD SHX Text
AS SPECIFIED BELOW AND BILL OF MATERIALS
AutoCAD SHX Text
PACKING
AutoCAD SHX Text
CLOSURE
AutoCAD SHX Text
DO NOT DESTROY.
AutoCAD SHX Text
REUSABLE CONTAINER AND DUNNAGE
AutoCAD SHX Text
IAW MIL-STD-129
AutoCAD SHX Text
IAW MIL-STD-2073
AutoCAD SHX Text
ICQ
AutoCAD SHX Text
QUP
AutoCAD SHX Text
IAW MIL-STD-2073
AutoCAD SHX Text
SERVICEABLE METHOD:
AutoCAD SHX Text
CODE ID
AutoCAD SHX Text
SPI NO (TPO)
AutoCAD SHX Text
NATIONAL STOCK NO.
AutoCAD SHX Text
PART OR DRAWING NO.
AutoCAD SHX Text
CURR REV
AutoCAD SHX Text
ORIG DATE
AutoCAD SHX Text
ITEM NOMENCLATURE
AutoCAD SHX Text
SPECIAL PACKAGING INSTRUCTION
AutoCAD SHX Text
CLEANING & DRYING
AutoCAD SHX Text
MARKING
AutoCAD SHX Text
PRESERVATION
AutoCAD SHX Text
PRESERVATIVE
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text N/A
AutoCAD SHX Text
F WF-117-2012
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
AutoCAD SHX Text
LEVEL A:
AutoCAD SHX Text
FUEL DEVICE W/RESIDUAL FUEL
AutoCAD SHX Text
AutoCAD SHX Text 12042
AutoCAD SHX Text
NEW
AutoCAD SHX Text
NOT FOR OUTSIDE STORAGE.
AutoCAD SHX Text
CNTNR O.D.
AutoCAD SHX Text
CNTNR I.D.
AutoCAD SHX Text
F WF-117-2012
AutoCAD SHX Text
SPI N0.
AutoCAD SHX Text 98748
AutoCAD SHX Text N/A
AutoCAD SHX Text
CONTAINER SPEC IAW SPIRES (SEE NOTE 1)
AutoCAD SHX Text N/A
AutoCAD SHX Text
ILL
AutoCAD SHX Text
AUTH
AutoCAD SHX Text
CHK
AutoCAD SHX Text
PS
AutoCAD SHX Text
LEVEL
AutoCAD SHX Text
SPEC
AutoCAD SHX Text
STYLE
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
CL
AutoCAD SHX Text
VRTY
AutoCAD SHX Text
GR
AutoCAD SHX Text
TR
AutoCAD SHX Text
LEVEL A
AutoCAD SHX Text
LEVEL B
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
WIDTH
AutoCAD SHX Text
DEPTH
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
UNSERVICEABLE METHOD:
AutoCAD SHX Text
LEVEL B:
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
LEVEL A:
AutoCAD SHX Text
LEVEL B:
AutoCAD SHX Text
LEVEL A:
AutoCAD SHX Text
LEVEL B:
AutoCAD SHX Text
M. O'NEAL
AutoCAD SHX Text
AutoCAD SHX Text N/A
AutoCAD SHX Text
IAW APPLICABLE CONTAINER SPECIFICATION
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
SEE LEVEL OF PACK
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
LTR
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DANGEROUS GOODS IN APPARATUS,
AutoCAD SHX Text
UN3363, CLASS 9.
AutoCAD SHX Text
SEE LEVEL OF PACK
AutoCAD SHX Text
ITEMS CONTAINING RESIDUAL FUEL ARE CONSIDERED
AutoCAD SHX Text
CAUTION
AutoCAD SHX Text
HAZARDOUS MATERIALS AND MUST BE
AutoCAD SHX Text
MATERIAL REGULATION AND CERTIFIED BY
AutoCAD SHX Text
PACKED IAW THE APPROPRIATE HAZARDOUS
AutoCAD SHX Text
AUTHORIZED HAZARDOUS MATERIAL PERSONNEL.
AutoCAD SHX Text
(NOTES 1 & 2)
AutoCAD SHX Text
AutoCAD SHX Text
(NOTES 1 & 2)
AutoCAD SHX Text
TYPE OF RESIDUAL FUEL.
AutoCAD SHX Text B)
AutoCAD SHX Text A)
AutoCAD SHX Text C)
AutoCAD SHX Text D)
AutoCAD SHX Text E)
AutoCAD SHX Text
SPECIAL MARKINGS:
AutoCAD SHX Text
(NOTE 3)
AutoCAD SHX Text
FLASH POINT.
AutoCAD SHX Text F)
AutoCAD SHX Text
COMPUTER GENERATED
AutoCAD SHX Text
AutoCAD SHX Text
VARIOUS
AutoCAD SHX Text
VARIOUS
AutoCAD SHX Text
COMPUTER GENERATED
AutoCAD SHX Text
ITEM NOMENCLATURE
AutoCAD SHX Text
SPECIAL PACKAGING INSTRUCTION
AutoCAD SHX Text
CODE ID
AutoCAD SHX Text
SPI NO (TPO)
AutoCAD SHX Text 98748
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
WF-117-2012
AutoCAD SHX Text
FUEL DEVICE W/RESIDUAL FUEL
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
PART
AutoCAD SHX Text
NO.
AutoCAD SHX Text
QTY.
AutoCAD SHX Text
AutoCAD SHX Text
MATERIAL SPECIFICATION
AutoCAD SHX Text
SIZE (INCHES UNLESS SPECIFIED)
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NOMENCLATURE OR
AutoCAD SHX Text
TOLERANCES ON FRAC. 1/8,
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DECIMAL .10, ANGLES 1 .
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A/R
AutoCAD SHX Text
BARRIER BAG
AutoCAD SHX Text
ABSORBENT MATERIAL
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
MIL-PRF-131, CL. 1
AutoCAD SHX Text
A-A-59759 TY. II OR EQUIVALENT
AutoCAD SHX Text THE PURPOSE OF THIS SPI IS TO AMEND THE PACKAGING & MARKING REQUIREMENTS OF FUEL DEVICES WHICH HAVE
AutoCAD SHX Text ITEMS CONTAINING RESIDUAL FUEL MUST BE PACKED IN A LEAK PROOF LINER, ABSORBENT MATERIALS IN A STRONG
AutoCAD SHX Text OUTER CONTAINER. MARK, LABEL AND DOCUMENT THE PACKAGE AS UN3363, DANGEROUS GOODS IN APPARATUS, AutoCAD SHX Text SUBSTITUTE SORBENT MATERIAL (3) IN PLACE OF WRAP INDICATED IN THE EXISTING ITEM PACKAGING REQUIREMENTS.
AutoCAD SHX Text
AS SPECIFIED IN THE SHALL
AutoCAD SHX Text 1)
AutoCAD SHX Text 2)
AutoCAD SHX Text 4)
AutoCAD SHX Text
BE SUPPLEMENTED WITH THE ADDITIONAL REQUIREMENTS OF THIS SPI.
AutoCAD SHX Text 3)
AutoCAD SHX Text I.D. TAGS MUST BE STAMPED BY RESPONSIBLE PARTY SIGNIFYING ITEM HAS BEEN PREPARED FOR
AutoCAD SHX Text
STORAGE/SHIPMENT IAW APPLICABLE TECHINCAL DATA.
AutoCAD SHX Text
CLASS 9.
AutoCAD SHX Text
AS REQUIRED
AutoCAD SHX Text
SEE LEVEL OF PACK
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONTAINER I.D.
AutoCAD SHX Text
AutoCAD SHX Text BEEN DRAINED, CAPPED AND PLUGGED BUT MAY CONTAIN RESIDUAL FUEL. THE ITEM IN ITS PRESCRIBED CONTAINER, AutoCAD SHX Text
SPECIAL PACKAGING INSTRUCTIONS RETRIEVAL & EXCHANGE SYSTEM (SPIRES),
TRANSPORTATION DATA FOR SOLICITATIONS
COMMODITY: See Continuation
PURCHASE INSTRUMENT NUMBER:
FD20302600799-00
DATE INITIATED:
18 FEB 2026
STOCK NUMBER: See Continuation
X ORIGIN DESTINATION OTHER X DATA / FIRST ARTICLE F.O.B. DESTINATION(Specify)
F.O.B. TERMS RECOMMENDED AS BEST SUITED FOR THIS PROCUREMENT
TRANSPORTATION PROVISIONS / CLAUSES FAR CITATION
F.O.B. Origin 52.247-29 Clearance and Documentation Requirements 52.247-52 Freight Classification Description 52.247-53 Marking of Shipments 47.305-10 Evidence of Shipment FMS 352.225-U037U Contact DCMA Transportation Contact DCMA Transportation on ALL "DCMA Administered" contracts prior to shipment for shipping instructions using the DCMA Shipment Instruction Request (SIR) eTool System, at http://www.dcma.mil <http://www.dcma.mil/> for ALL FOB:
Origin, Foreign Military Sales (FMS), and FOB: Destination OCONUS/Export movements to obtain the appropriate DOD regulatory clearances, shipping documentation and instructions from your cognizant DCMA Transportation Office. If you are new to DCMA, and do not already have a SIR eTool account, you will first need to request an account via DCMA External Web Access Management (EWAM) application which can be accessed at http://www.dcma.mil. If you need additional assistance, email DCMA Transportation Group at: Transportation.Division@dcma.mil. Do not move any freight to a water or aerial port prior to contacting DCMA or it will become frustrated. Failure to contact the responsible DCMA may result in vendor incurring additional expenditures.
Vendor Transportation Instructions
TACRN:
AAA
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 9711X8242.0002 4FX LC5W CRBOTH 000000 00000 002000 503000 F03000 FSR: 026796 PSR: 414898
First Destination Transportation Account Code: DFMS
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code:
FMS LOA: 9711X8242.0002 4FX LC5W CRBOTH 000000 00000
Additional Funding Information:
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 2915001436107OK
Purchase Instrument Line Item Number: 0001
Ship to (DoDAAC / MAPAC): DTH003
Mark For: DTH100
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number: DTH15453450303
Supplemental Address: DA3RBO
FMS Case: RBO
Ship To (Remarks): TAC - DFMS
Page 1 of 2DD FORM 1653 Version 2Generated by PRPS using Jasper Reports on 07 Apr 2026
NSN / Pseudo NSN: 2915001436107OK
Purchase Instrument Line Item Number: 0002
Ship to (DoDAAC / MAPAC): DTH003
Mark For: DTH100
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number: DTH15453450303
Supplemental Address: DA3RBO
FMS Case: RBO
Ship To (Remarks): TAC - DFMS
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
OTHER TRANSPORTATION DATA:
TACRN:
AAB
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 9711X8242.0002 4FX LC5W CRBOTH 000000 00000 002000 503000 F03000 FSR: 026796 PSR: 414898
First Destination Transportation Account Code:
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code:
FMS LOA:
Additional Funding Information:
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 2915001436107OK
Purchase Instrument Line Item Number: 0003
Ship to (DoDAAC / MAPAC): TBDTBD
Mark For: FA Monitor
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number: DTH15453450303
Supplemental Address: TBDTBD
FMS Case: RBO
Ship To (Remarks): TAC - DFMS
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
OTHER TRANSPORTATION DATA:
NAME
Langford, Dorothy A
ORGANIZATION / OFFICE
SYMBOL
406 SCMS / GULAA
COMMERCIAL / DSN
PHONE
478-327-6593 / 497-6593
SIGNATURE
//SIGNED//Langford, Dorothy A
DATE
18 FEB 2026
Page 2 of 2DD FORM 1653 Version 2Generated by PRPS using Jasper Reports on 07 Apr 2026
ITEM UNIQUE IDENTIFICATION (IUID) CHECKLIST
I. IUID DETAILS: DFARS 252.211.7003
SECTION (c) (1) (ii) APPLIES TO THE FOLLOWING:
ITEM REQUIRING IUID MARKING
NSN
2915001436107OK
VERSION NUMBER
NOUN
VALVE,FUEL PRESSURI
INITIATOR
Bowen, John R
ORGANIZATION CODE / OFFICE SYMBOL
AFLCMC / LPSEC2
COMMERCIAL PHONE
405-734-9199
DSN PHONE
884-9199
CAGE / REFERENCE NUMBER
MARKING IS TO BE PERFORMED IN ACCORDANCE WITH THE LATEST VERSION OF MIL-STD-130
MARKING GUIDANCE
Recommended Marking Instruction
ENGINEERING DRAWING / ECP / ECO NUMBER
MARKING TYPE
Bag/Tag
MARKING METHOD
BAG/TAG
DESCRIPTION / LOCATION
Mark CAGE code, part number, and serial number on outside container (box)
REMARKS
ATTACHMENT(S)
II. EMBEDDED ITEMS
SECTION (c) (1) (iii) APPLIES TO THE FOLLOWING:
NSN NOUN
CAGE / REFERENCE NUMBER
ITEM IS AN EMBEDDED ITEM FOR NSN / PSEUDO NSN: 2915001436107OK
MARKING GUIDANCE ENGINEERING DRAWING / ECP / ECO NUMBER
MARKING TYPE MARKING METHOD
DESCRIPTION / LOCATION
REMARKS
ATTACHMENT(S)
Page 1 of 1IUID Version 1Generated by PRPS using Jasper Reports on 07 Apr 2026
29 October 2019 MQR-PSD-1
Revision 2
Page | 1
MANUFACTURE QUALIFICATION REQUIREMENTS (MQR) FOR
PROPULSION CRITICAL SAFETY ITEMS (CSI) & CRITICAL
APPLICATION ITEMS (CAI)
1. APPLICATION
2. SCOPE
3. SUBMITTAL CONSIDERATION
4. TECHNICAL DATA REQUEST
5. FORMAT FOR ALL SUBMITTED DOCUMENTATION
6. USE OF PROPRIETARY DATA
7. COMPANY PROFILE
8. SOURCE APPROVAL REQUEST (SAR)
9. DOCUMENT SUBMITTAL
10. EVALUATION METHODS
11. APPROVAL DURATION
12. SOURCE RESUBSTANTIATION REQUEST (SRR)
13. PROCESS CHANGE REQUEST (PCR)
APPENDIX A: SELF-ASSESMENT CHECKLIST (SAC)
APPENDIX B: SIGNIFICANT INDUSTRIAL PROCESS FORM
APPENDIX C: COVER LETTER REQUIREMENTS
APPENDIX D: SOURCE OF SUPPLY MATRIX FOR MODULES/ASSEMBLIES
APPENDIX E: TECHNICAL DATA RIGHTS CERTIFICATION LETTER
APPENDIX F: SIMILAR ITEM COMPARISON MATRIX
APPENDIX G: PROCESS CHANGE REQUEST (PCR) / SOURCE RESUBSTANTIATION REQUEST (SRR)
APPENDIX H: DEFINITIONS
Page | 2
1. APPLICATION
1.1. This MQR applies to CSI and CAI with an Acquisition Method Suffix Code (AMSC) of C, D, K, M, N, P, Q, R, S, V, and Z within the Propulsion Sustainment Division. This MQR does not apply to items with an AMSC of G, A, B, H, L, U, and Y.
1.2. This MQR establishes technical requirements, which Potential Sources (PS) must satisfy in order to obtain Engineering Support Activity (ESA) approval to manufacture propulsion items.
2. SCOPE
2.1. The PS must have a valid Company Profile on record with the ESA in order to gain source approval status. If one does not exist the PS must submit one. Company Profile requirements are described in section 7.
2.2. In order to gain source approval status, the PS must submit a SAR. The SAR requirements are described in section 8.
2.3. The Company Profile and SAR will be reviewed by the ESA and the PS will either be made an approved source, or denied source approval. See section 10.
2.4. Source approval status expires after 3 years for CSI, and 7 years for CAI. Sources that deliver parts on government contract, maintain source approval status. See section 11.
2.5. Approved sources shall submit a Source Resubstantiation Request (SRR) prior to expiration of the current approval period (recommended 60 days) in order to renew the approval status duration. See section 12.
2.6. Any time a change to the SAR documentation occurs, the approved source must submit a Process Change Request (PCR) for review by the ESA. See section 13.
2.7. The ESA may revoke the approval status of a PS at any time per FAR 9.207.
3. SUBMITTAL CONSIDERATION
3.1. The PS should consider submitting a SAR for evaluation after determining that the USAF is in need of the subject item. This can be done by considering the following:
3.1.1. Has the United States Air Force (USAF) listed a requirement in the System for
Award Management (SAM) at https://beta.sam.gov or DLA Bid Board System
(DIBBS) at https://www.dibbs.bsm.mil?
https://beta.sam.gov/ https://www.dibbs.bsm.mil/
Page | 3
3.1.2. Has the procurement history for the item been researched and determined to be active?
3.1.3. Is the subject item listed in the Requirement Projection on the Web (RPOW)?
3.1.3.1. The RPOW can be found on the Strategic Alternative Sourcing Program
Office (SASPO) website: www.tinker.af.mil/Home/429SCMSSASPO/.
3.1.3.2. The forecasts contained on the RPOW may or may not generate due to variability in customer demands and priorities. The forecast data is for planning purposes only and does not constitute an invitation for bid or request for proposal and is not a commitment by the government to purchase the described items.
3.2. Any questions regarding SAR submission or the RPOW should be directed to either the
Air Force Small Business Office (SBO) or SASPO.
4. TECHNICAL DATA REQUEST
4.1. Requests related to any procurement announcement should be submitted to the announcing Contracting Officer.
4.2. If no procurement announcement exists, requests should be submitted to the Tinker
Engineering Drawing Public Sales Office at the following address/email:
AFLCMC/LZPEF
Tinker Engineering Drawing Public Sales
3001 Staff Drive, Suite 1AB82A
Tinker AFB, OK 73145-3041
Phone: 405-736-4676
Email: OCALC.LGLDO.PUBLIC@US.AF.MIL
4.3. Requests should identify the specific drawing(s) and specification(s) being requested, along with the solicitation information (if a procurement announcement exists).
4.4. Requests should be made on company letterhead along with an approved DD Form
2345 or Export Control License.
http://www.tinker.af.mil/Home/429SCMSSASPO/ mailto:OCALC.LGLDO.PUBLIC@US.AF.MIL
Page | 4
5. FORMAT FOR ALL SUBMITTED DOCUMENTATION
5.1. All financial data must be redacted from submitted documentation.
5.2. Packages should be submitted on a Compact Disk-Recordable (CD-R), Digital Versatile
Disc Recordable (DVD-R), or through an approved government file transfer system, in a
.pdf file format.
5.2.1. The package can be a single .pdf file with indexes linked to each element, or a series of files/folders for each element.
5.2.2. If the PS is submitting Company Profile documents at the same time as a SAR package, the Company Profile documents should be provided in a separate .pdf file and/or in a separate and clearly identified folder.
5.2.3. All documents should be scanned for viruses prior to submission.
5.2.4. If the CD-R is encrypted or password protected, provide a point of contact that can give access to the documentation. Zip files cannot be encrypted.
5.3. Packages submitted on a Compact Disk-Rewritable (CD-RW), Digital Versatile Disc
Rewritable (DVD-RW), or flash drive will not be accepted.
5.4. Company Profile and SAR packages must follow the order called out in Tables 1 and 2.
5.5. For all Company Profile and SAR submissions, a table of contents is expected.
5.6. Certain elements may not be required depending on the circumstances of the submittal. If an element is not applicable, the PS must provide a statement explaining why this is the case. Do not leave any element blank.
6. USE OF PROPRIETARY DATA
6.1. The PS is not to utilize intellectual property (IP) of any third parties without appropriate authorization of the IP owner. The PS is cautioned that no part of the government MQR is intended to endorse or encourage the improper use of IP developed by the Original
Equipment Manufacturer (OEM) or any other third party.
Page | 5
7. COMPANY PROFILE
Note: Any PS seeking source approval must have a valid Company Profile on record with the ESA.
Initial submission of a Company Profile should include all of the requirements listed in Table 1 and described in Elements 1-9. Company Profiles can be submitted at any time, standalone or in conjunction with a SAR. All information provided in the Company Profile may be kept by the ESA for use in future SAR reviews. A Company Profile is required for each unique CAGE code.
Company Profile Requirements
ELEMENT 1. Company Brochure/Website
ELEMENT 2. Quality Assurance Certificate (QAC)
ELEMENT 3. Self-Assessment Checklist (SAC)
ELEMENT 4. Quality Assurance System (QAS) Manual
ELEMENT 5. Equipment List
ELEMENT 6. DD Form 2345 or Export Control License
ELEMENT 7. Quality History
ELEMENT 8. Significant Industrial Process (SIP) Certifications
ELEMENT 9. Sub-Tier Supplier Info.
1. List of all Sub-Tier Suppliers (STS)
2. All STS Quality Assurance Certifications
3. Any STS Significant Industrial Process Certifications
Table 1. Company Profile Requirements
7.1. Element 1, COMPANY BROCHURE/WEBSITE
7.1.1. Provide a company brochure and/or website.
7.2. Element 2, QUALITY ASSURANCE CERTIFICATE (QAC)
7.2.1. Provide one of the following QAC with a valid expiration date: ISO 9001, AS9100, or NATO AQAP-2070.
7.3. Element 3, SELF-ASSESMENT CHECKLIST (SAC)
7.3.1. The PS must complete and submit a SAC (Appendix A).
7.3.2. The SAC must be signed by an authorized binding company official (i.e. President, Owner, or Facility General Manager).
7.3.3. If artifacts are used to support any of the items on the checklist, they can be attached to the checklist. However, not all items require artifacts.
Page | 6
7.4. Element 4, QUALITY ASSURANCE SYSTEM (QAS) MANUAL
7.4.1. Provide a copy of the PS’s QAS manual and all supporting/referenced documentation.
7.5. Element 5, EQUIPMENT LIST
7.5.1. Provide a complete list of all equipment owned and used for the manufacturing and repair of parts by the PS.
7.6. Element 6, DD FORM 2345 OR EXPORT CONTROL LICENSE
7.6.1. If located within the United States or Canada, provide a copy of the PS’s DD Form
2345 with a valid expiration date.
7.6.2. If not located within the United States or Canada, provide a copy of the PS’s
Export Control License with a valid expiration date.
7.7. Element 7, QUALITY HISTORY
Note: Nonconformance is not necessarily perceived as an increase in risk when considering source approval. Identification of nonconformance can illustrate a successful quality assurance program.
7.7.1. Provide a PS quality history summary of Deficiency Reports (DR) experienced for the last 36 months including but not limited to: internal deficiencies, commercial deficiencies, FAA Service Bulletins, Maintenance Review Board (MRB) actions, Quality Deficiency Reports (QDR), Laboratory Quality Review Orders (LQRO), Offeror Report of Nonconformance (ORON), Supplier Reports of Non-conformance (SRON), Material Deficiency Reports (MDR), statistical reports of nonconformance and nonconforming material rejection reports. If the PS facilities have not experienced any quality deficiencies within the last 36 months, provide a document stating as such.
7.7.1.1. If government source inspections were conducted, the Government Quality
Assurance Representative will coordinate on the summary. Otherwise, an authorized binding company official (i.e. President, Facility General
Manager, or Quality Assurance Manager) must coordinate on the summary.
7.7.1.2. The summary will include the following data: part number, nomenclature, feature, deficiency, quantity, date, and corrective action.
Page | 7
7.7.2. Provide an example corrective action request and corrective action plan or resolution for an identified deficiency, if one exists.
Note: Elements 8 and 9 may be reviewed during the SAR, SRR, and PCR evaluation processes. If the PS claims the use of a SIP or STS in any of these requests, the referenced SIP or STS must be included in, or added to the Company Profile at that time.
7.8. Element 8, SIGNIFICANT INDUSTRIAL PROCESS (SIP) CERTIFICATIONS
7.8.1. Provide any SIP certifications possessed by the PS with a valid expiration date.
7.8.2. SIP certification is required for those processes denoted by grey highlight in
Appendix B. Methods of certification include:
7.8.2.1. National Aerospace & Defense Contractors Accreditation Program
(NADCAP) certification.
7.8.2.2. OEM Certification and/or audit.
7.8.2.3. Department of Defense (Air Force, DCMA, Navy, or Army) certification and/or audit.
7.8.2.4. Other external audit and/or certification.
7.8.2.4.1. Requires the submission of documents showing the process and procedure used for certification to be reviewed by the ESA in order to determine acceptability of alternative certification.
7.9. Element 9, SUB-TIER SUPPLIER (STS) INFORMATION
7.9.1. Provide a complete list of all STS that the PS is currently using for government contracts, or may use in future source approval requests. List must include the
STS company name and CAGE code.
7.9.2. For each STS, provide one of the following QAC with a valid expiration date: ISO
9001, AS9100, NATO AQAP-2070, or Aerospace Quality System (AQS) NADCAP.
7.9.3. Provide any SIP certifications possessed by each STS listed, with a valid expiration date. See Section 7.8.2 for requirements.
Page | 8
7.10. COMPANY PROFILE EVALUATION
Note: The Company Profile does not have an inherent expiration date. However, elements within the profile do expire and must be updated to maintain a valid Company Profile.
7.10.1. The initial review of the Company Profile includes the examination of all elements described in sections 7.1-7.7.
7.10.2. During the review of any future SAR, SRR, or PCR submitted by the PS, the
Company Profile will be reviewed in order to determine if the following requirements are met:
7.10.2.1. All certificates must not be expired.
7.10.2.1.1. Elements 2 and 6 have inherent expiration dates that, if expired, must be renewed before source approval status can be granted.
7.10.2.1.2. If a SIP requiring certification is identified in the request, a valid certificate must be included in either Elements 8 or 9.
7.10.2.2. Any STS identified in the request must be included in Element 9 with a valid
QAC provided.
7.10.3. If any deficiency in the Company Profile is identified at the time of review, the PS may be issued a conditional approval letter pending resolution of these issues.
See section 10 for details on corrective actions.
7.11. COMPANY PROFILE AMENDMENTS
Note: It is encouraged for the PS to maintain a valid and up to date Company Profile at all times in order to expedite the SAR evaluation process.
7.11.1. At any time, the PS may submit amendments or updates to the Company Profile.
7.11.1.1. Common updates include: Replacing expired certificates (QAC, SIP, DD
Form 2345), adding a new STS, or notification of a significant change to any element of the Company Profile.
7.11.2. Company Profile amendments can be submitted per section 9.
7.11.3. If the PS is bought or sold by a third party the PS must submit a novation letter detailing the specifics of this change in company makeup/structure.
Page | 9
8. SOURCE APPROVAL REQUEST (SAR)
Note: Any PS seeking source approval must have a valid Company Profile on record with the ESA.
If one does not exist, the PS cannot be awarded source approval. See section 7 for details.
8.1. SAR Categories Determination
8.1.1. CATEGORY I (Actual Item)
8.1.1.1. This category covers PS who manufacture the exact subject item, using
OEM technical data, for the prime contractor, OEM, DOD, civil agency, foreign government, or the civil sector under Federal Aviation
Administration (FAA).
8.1.2. CATEGORY II (Similar Item)
8.1.2.1. This category covers PS who have not previously manufactured the exact subject item, but have manufactured other items similar in material, coatings, design features, industrial processes, etc. for the prime contractor, OEM, DOD, civil agency, foreign government, or the civil sector under FAA. Multiple similar items may be used to demonstrate relevant experience. Similarity is not limited to aerospace applications.
Note: Category III (No Experience) and IV (Reverse Engineering) SARs as defined by the AFMCI
23-113 are not covered by this QR document. The ESA will direct sources when a need arises for reverse engineered components and will provide relevant requirements at that time. Category
III and IV SARs submitted under this QR will not be evaluated.
8.2. A SAR consists of two (2) packages of information:
8.2.1. SUBJECT ITEM PACKAGE (Elements A-I)
8.2.1.1. Includes all of the required engineering data, proposed manufacturing plan, and other legal documents required to manufacture the subject item.
8.2.2. DEMONSTRATION PACKAGE (Elements J-M)
8.2.2.1. Demonstrates that the PS has recently manufactured and delivered either the subject item, or part(s) of similar complexity compared to the subject item.
Page | 10
8.2.2.1.1. For Category II SARs, if more than one similar item is required to demonstrate relevant experience, the PS must submit a demonstration package for each unique similar item.
8.3. ASSEMBLY SAR REQUIREMENTS
8.3.1. Any SAR package submitted for an assembly, module, or whole engine must meet all of the additional requirements called out in Appendix D. Submit the source of supply matrix in Element A along with the cover letter.
8.4. SAR WAIVERS
8.4.1. The ESA may decide to waive certain requirements in special circumstances. If the
PS has a letter from the ESA waiving them of certain SAR requirements, provide this letter in place of said requirements.
Section Element Title
Subject Item Package
A Cover Letter
Engineering Data B Subject Item Technical Data
Manufacturing
Plan
C Proposed Production Documents
D Sub-Tier Supplier (STS) List
E Significant Industrial Processes (SIP)
F Calibrated Equipment List
Licensing/Legal
Documents
G Technical Data Rights Certification Statement
H License Agreements
I Government Quality Assurance Compliance
Demonstration Package
J Similarities/Differences Summary*
K Similar Item Technical Data*
L Demonstration Production Documents
M Purchase Orders and Shipping Documents
Table 2. SAR Requirements Outline *N/A for Category I SARs
8.5. Element A, COVER LETTER
8.5.1. Provide a cover letter (Appendix C).
8.5.2. For assemblies, modules or whole engine SAR packages provide the Source of
Supply Matrix (Appendix D).
Page | 11
8.6. Element B, SUBJECT ITEM TECHNICAL DATA
8.6.1. Provide the subject item Engineering Data List (EDL).
8.6.1.1. The EDL is the complete list of all technical data required to manufacture an item. This may include drawings (casting, forging, source control, master, assembly, detail, schematic, airfoil data, etc.), specifications, parts lists, etc.
8.6.2. Provide the latest legible revision of all technical data listed on the EDL.
8.6.2.1. For specifications, only the title page is required.
8.6.2.2. Proprietary technical data may be redacted to only reveal the drawing/ specification number, title, revision, and proprietary statement.
8.7. Element C, PROPOSED PRODUCTION DOCUMENTS
Note: Proposed Production Documents consist of Travelers, Process Operation Sheets (POS) and
Inspection Method Sheets (IMS). Together, these documents must demonstrate that the PS has an adequate manufacturing plan and that traceability of the work being performed is achieved.
8.7.1. All Proposed Production Documents must meet the following requirements:
8.7.1.1. Must be created and owned by the PS.
8.7.1.2. Must include any and all proprietary production documents.
8.7.1.2.1. The process description may be redacted for proprietary processes.
8.7.1.3. Must establish traceability.
8.7.1.3.1. Proper traceability connects the work being performed to the facility, performing operator, specific part, and the date that the work is being performed.
8.7.1.3.2. An example of adequate traceability is the use of page numbers along with a unique document number that is present on each page. On the first page of the document, the date, company name, cage code is present, and the travelers have stamp blocks that allow the operator to indicate the work that is accomplished by the specific operator.
Page | 12
8.7.1.4. Any sub-vended process listed must identify the STS by name and CAGE at each applicable operational step with clearly identified process or procedure.
8.7.1.4.1. Any STS referenced in the production documents must be included in
Element D, and the PS Company Profile.
8.7.2. TRAVELERS
8.7.2.1. Travelers are a detailed step-by-step account of the proper sequenced procedures necessary to manufacture the subject item.
8.7.2.2. Must include the following:
8.7.2.2.1. The operation number, process description, location, software data file name, etc. necessary to control the manufacture operations.
8.7.2.2.2. Signature blocks for in-process operator and/or inspector signing or stamping.
8.7.2.2.3. Tracked disposition of all parts during the entire manufacturing operation to include rejects and laboratory samples.
8.7.2.2.4. References to specific IMS or POS in applicable steps.
Note: Travelers enclosed in this section are not to be considered a replacement for detailed
Process Operation Sheets (POS). Lack of detailed POS pertaining to manufacture may be cause for disapproval of the PS’s SAR.
8.7.3. PROCESS OPERATION SHEETS (POS)
8.7.3.1. POS are a detailed description of the process being performed.
8.7.3.2. POS should include an identification of the equipment/tooling used in the process, material handling procedures, set-up procedures, necessary safety precautions, any process specific drawings/graphics and a description of the in-process parameters used (i.e. speed and feed rates).
8.7.4. INSPECTION METHOD SHEETS (IMS)
8.7.4.1. IMS are a detailed step-by-step account of the proper sequenced procedures necessary to inspect the subject item.
Page | 13
8.7.4.2. Must include part number(s), exact dimensions and proper units.
8.7.4.3. Pass/Fail dimensions are not acceptable, except when using a part specific
“go-no-go” gage. This type of gage must be included in Element F.
8.7.4.4. If a sampling plan is used, provide the sampling plan to be reviewed.
8.8. Element D, SUB-TIER SUPPLIER (STS) LIST
Note: All STS identified in this section must be included in the PS Company Profile, or the SAR will not be approved until the issue is resolved. If a new STS must be added to the PS Company Profile, submit a Company Profile amendment per sections 7.9 and 7.11 of this document.
8.8.1. Provide a matrix, Table 3, with the CAGE, Company Name, and a short description of any work being performed by STS.
Sub-Tier Suppliers Used to Manufacture Subject Item
CAGE: Company Name: Description of support:
XXXXX Example Company #1 Provides raw material
YYYYY Example Company #2 Performs SIP for the PS (See Element E)
Table 3. Example of Sub-Tier Supplier Matrix
8.9. Element E, SIGNIFICANT INDUSTRIAL PROCESSES (SIP)
Note: Any SIP that requires quality certification, identified in this section, must be included in the
PS Company Profile or the SAR will not be approved until the issue is resolved. If a new SIP certification must be added to the PS Company Profile, submit a Company Profile amendment per sections 7.8 and 7.11 of this document.
8.9.1. Provide a matrix (Appendix B) indicating the performing cage code (PS or STS) for any and all SIP performed during the manufacturing of the subject item.
8.10. Element F, CALIBRATED EQUIPMENT LIST
8.10.1. Provide a matrix listing all equipment/tooling requiring calibration to include:
part number, serial number, location, and date of calibration and expiration for each item used in the manufacturing of the subject item.
8.10.1.1. This includes any “go-no-go” gages referenced in section 8.7.4.
Page | 14
8.11. Element G, TECHNICAL DATA RIGHTS CERTIFICATION STATEMENT
8.11.1. The PS must provide a certification of rights to use technical data in the format and wording provided in Appendix E, signed on company letterhead by an authorized binding company official (i.e. President, Owner, or Facility General
Manager).
8.11.2. This Certificate states that the technical data was obtained by legal means and the company has the rights to use the data supplied in the SAR for manufacture purposes.
8.11.3. It is acceptable for the certificate to address multiple PN/NSN on a single certificate.
8.12. Element H, LICENSE AGREEMENTS
8.12.1. For an item where proprietary data is used, or with an AMSC code of V, provide an ownership statement or a copy of the licensee agreement between the PS and the data owner.
8.12.2. If a STS owns a proprietary process, the PS will provide a letter of support from the STS. The letter should state the duration of the proprietary process support, availability and capacity.
8.12.3. MASTER TOOLING CERTIFICATION
8.12.3.1. Provide certification of the right to use, and access the following, as applicable to the latest item technical data and/or drawing(s) required for manufacture: any required master tooling, special tooling/test equipment, mylars (stable base drawings), glass layout, loft data, and contour data.
8.13. Element I, GOVERNMENT QUALITY ASSURANCE COMPLIANCE
8.13.1. Provide a statement that the PS will comply with all government imposed quality assurance provisions, testing requirements, etc. as identified in the solicitation or contract for the subject item.
Note: For Category I SAR submittals, Elements J and K are not required.
Note: For Category II SAR submittals, if more than one similar item is required to demonstrate relevant experience, multiple demonstration packages consisting of elements J-M must be submitted.
Page | 15
8.14. Element J, SIMILARITIES AND DIFFERENCES BETWEEN SUBJECT AND SIMILAR ITEM(S)
8.14.1. Provide a comparison matrix (Appendix F) identifying the specific similarities and differences in materials, coatings, design features, industrial processes, etc.
between the subject and similar item(s).
8.14.1.1. If more than one similar item is being used to demonstrate relevant experience, the comparison matrix should include a column for each item being compared in a single matrix. Provide a copy of this matrix in each demonstration package submitted.
8.15. Element K, SIMILAR ITEM TECHNICAL DATA
8.15.1. Provide all technical data used in the manufacturing of the similar item.
8.16. Element L, DEMONSTRATION PRODUCTION DOCUMENTS
8.16.1. Provide copies of all demonstration travelers, POS, and IMS used in the manufacturing of the demonstration item. Blank documents do not meet this requirement.
8.17. Element M, PURCHASE ORDERS AND SHIPPING DOCUMENTS
8.17.1. Provide copies of the purchase orders and shipping documents that demonstrate that the PS manufactured and delivered the demonstration item.
8.17.1.1. These documents must be from the same contract as the demonstration production documents provided in Element L.
8.17.1.2. Contracts must be with the Prime/OEM, DOD, foreign government, or other commercial customers.
8.17.1.3. These documents must be from a date within three (3) years for CSI, and seven (7) years for CAI, as evidenced by the latest shipping document provided. The threshold will be evaluated against the date that the SBO receives the SAR.
8.17.1.3.1. Highlight the date on all documents in this section.
8.17.1.4. All financial information must be removed, else the SAR may be returned.
8.17.1.5. If a contract was terminated, state the reason for the termination.
Page | 16
9. DOCUMENT SUBMITTAL
9.1. If the part is AF managed, documents should be submitted to:
AFSC/SB
Solicitation Number: (If known)
3001 Staff Drive, Suite 1AG85A
Tinker AFB, OK 73145-3009
Email: afsc.sb.workflow@us.af.mil
9.2. If the part is DLA managed, documents should be submitted to:
DLA Aviation Richmond
ATTN: Small Business Office/DU
SAR Program Manager
Solicitation Number: (If known)
8000 Jefferson Davis Highway
Richmond, VA 23297
9.3. All Company Profile documents should be submitted to the SBO per section 9.1.
10. EVALUATION METHODS
10.1. The ESA will evaluate the submitted SAR package using the criteria specified within this requirements document.
10.1.1. If the ESA identifies any issues, missing data, or discrepancies during the evaluation of the submitted package, the ESA will provide the PS with a list of issues that need to be resolved.
10.1.1.1. The PS will be given a Data Submission Date (DSD) of 5 working days to provide the requested data. A longer DSD may be provided upon the PS request, if determined acceptable by the ESA.
10.1.1.1.1. If the DSD is met and the PS provides all missing/required data then the ESA will approve the package per section 10.1.2.
10.1.1.1.2. If the DSD is not met, or the PS cannot provide the required missing data, then the ESA will complete the evaluation and forward a disapproval letter with a list of issues that need to be resolved. The
PS will be encouraged to resubmit the request once all identified issues have been resolved.
mailto:afsc.sb.workflow@us.af.mil
Page | 17
10.1.2. If the PS provides all of the specified data in the required format, the ESA will issue an approval letter with an expiration date in accordance with section 11 and update the approved source list accordingly.
10.2. All transactions required to evaluate the approval request will be documented. All necessary artifacts will be recorded and retained in an ESA designated information system.
10.3. The PS is responsible for retaining all disposition letters received from the government.
10.4. The ESA retains the right to request an on-site audit of the vendor’s facility during
Company Profile, SAR, SRR, or PCR evaluation, or at any time during the vendor’s approval period.
11. APPROVAL DURATION
11.1. ESA source approval expiration is three (3) years for CSI and seven (7) years for CAI. The expiration date will be based off of the date printed on the ESA approval letter.
11.2. Prior to source approval expiration, the approved source must submit an SRR in accordance with section 12 in order to renew their approval status.
11.3. Sources that are delivering the subject item on a government contract maintain their approval status and do not require source resubstantiation until there is a lapse in delivery/contract award of greater than three (3) years for CSI and seven (7) years for
CAI.
11.4. The ESA may decide to revoke source approval status at any time per FAR 9.207.
12. SOURCE RESUBSTANTIATION REQUEST (SRR)
Note: Only sources that are currently approved to manufacture the subject item (must have been approved through the USAF SAR process and be listed on the AFMC Form 761) may submit an
SRR. Sources that are delivering the subject item on government contract maintain their approval status and do not require source resubstantiation until there is a lapse in delivery/contract award of greater than three (3) years for CSI and seven (7) years for CAI (this does not include sources who were awarded government contracts without going through the USAF SAR process).
12.1. The SRR provides an approved source the opportunity to renew the approval status of a previously approved SAR through the review of any and all changes to the contents of the referenced SAR since the time of approval.
Page | 18
12.2. Provide the SRR (Appendix G).
12.2.1. Describe any and all changes made to the contents of the referenced SAR package since the time of approval.
12.2.2. The original SAR approval letter should be attached to the SRR.
12.2.3. The SRR must be in the format provided in Appendix G and signed on company letterhead by an authorized binding company official (i.e. President, Owner, or
Facility General Manager).
12.2.4. Any SAR element identified as “Updated” must be submitted for review.
12.2.4.1. All changes within the submitted documents should be highlighted.
12.3. For sources that previously delivered the subject item on a government contract, submit the quality history, any DRs, and the latest purchase orders and shipping documents from the referenced contract.
12.4. Upon review of the SRR, the ESA may request additional information and documentation for review.
12.5. If the changes are determined to be acceptable, the ESA will issue a new approval letter.
13. PROCESS CHANGE REQUEST (PCR)
13.1. The approved source is responsible for submitting a PCR any time a change to the contents of the Subject Item Package occurs.
13.1.1. This may include, but is not limited to: changes to the STS list, using different equipment/tooling, and/or changing the sequence of operations on the travelers.
13.1.2. Failure to provide a formal PCR when a significant change occurs could result in a revocation of the source’s approval status.
13.2. Provide the PCR (Appendix G) in accordance with section 12.2.
13.3. Upon review of the PCR, the ESA may request additional information and documentation for review.
13.4. If the changes are determined to be acceptable, the ESA will issue a new approval letter.
29 October 2019
This document reviewed and signed by:
Competition Advocate AFSC/PZCAB Competition Advocate DLA Aviation/AOCA
Head of Contracting DLA Aviation /AO Head of Contracting AFSC/PZA
Chief Engineer Fighter Engines AFLCMC/LPE Chief Engineer Tanker/Bomber Engines AFLCMC/LPE
Small Business Office AFSC/SB SASPO Office AFSC/429 SCMS
Signatures kept on file by AFLCMC/LPE
For a copy of the signatures, please contact AFLCMC.LPE.SourceEvalTeam@us.af.mil.
MQR-PSD-1
Revision 2
Page | 19
The authority granted by the signatures for qualification requirement shall not exceed seven (7) years past the signed date. Qualification requirements shall be examined and revalidated if the last signed date is over seven (7) years old per FAR 9 .202(f).
Page | 20
APPENDIX A:
SELF-ASSESMENT CHECKLIST (SAC)
1. Complete the SAC using the checklist below.
1.1. In the references and artifacts column, identify the location within the PS QAM, or other documentation, where the requirement is met.
1.2. If other documentation is used to cover items on this list, provide the specified document.
Item No. Review Item References and Artifacts Pass
1. Production Engineering and Planning
1.1. Government furnished data
1.1.1.
Are contractor’s procedures adequate to verify currency of depot/Naval Air Systems Command
(NAVAIR)/Army Aviation and Missile Command
(AMCOM)/Air Force Material Command (AFMC) technical publications, Local Engineering
Specifications (LES)/Local Process Specifications
(LPS)/Engineering Change Proposals (ECP), Maintenance Engineering Orders (MEO), Manual
Change Revisions (MCR), and Engineering
Drawings
2. Production Control
2.1. Delivered non-conforming CSIs
2.1.1.
Is there a procedure for notification to the Administrative and Procuring Contract Officers (ACO & PCO) of any delivered non-conforming as soon as practicable, but no later than 72 hours
2.1.2.
Do procedures require that the contract, part, and serial numbers be identified if non-conforming parts are delivered
2.2. Purchasing Records
2.2.1.
Do vendor purchase orders (POs) reference QE- STD-1 and/or other applicable Critical Item program documents
2.2.2.
Are POs available for review by the appropriate Government Official ☐
2.3.
Government Furnished Material (GFM)
2.3.1.
Do the contractor’s procedures include the following
☐ Yes ☐ No
2.3.1.1.
Examination upon receipt to detect transit damage
2.3.1.2. Inspection for completeness and proper type ☐
2.3.1.3.
Periodic inspection and precautions to assure adequate storage conditions are maintained, to guard against damage from handling and deterioration during storage, and to segregate it in a secure, controlled area
Page | 21
2.3.1.4.
Functional testing, as required by contract, to determine satisfactory operation
2.3.1.5.
Identification and protection from improper use or disposition
2.3.1.6. Verification of Quantity ☐
2.3.1.7.
Procedures to report damaged/non-conforming GFM and to segregate it in a secure, controlled area pending disposition instructions
3. Production Methods and Processes:
3.1.
List of in-house processes (e.g. MPI, LPI, x-ray, brazing, welding, heat treat, shot peen, metallurgical lab, chemical lab, plating processes (identify), other coating capabilities (identify), etc.)
3.2. Material Review Board Actions
3.2.1.
Do you have separate secured MRB storage areas (Gov/Civ)
4. Facility Test Equipment and Tooling
4.1. Tooling
4.1.1.
Who manufactures your special tools and fixtures?
4.1.2.
Is any tooling within the facility owned by the Government
4.1.2.1.
If yes, how is the tooling stored and segregated?
5. Configuration Management
5.1.
Do government and commercial products require segregation?
5.2.
If yes,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .