This is a solicitation from the Defense Logistics Agency Aviation for the manufacture of a gearbox assembly for the KC-135 aircraft. The solicitation seeks fixed price bids for the production of gearbox assemblies over a three year period, with a best estimated quantity of 45 units and minimum and maximum order quantities provided. Responses are due by August 5, 2020, and the solicitation contemplates a three year requirements contract. The solicitation includes line items for the gearbox assembly itself as well as data related to updated drawings or modeling, and provides shipping, inspection, and acceptance terms.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
SPRTA1-20-R-0181
6.SOLICITATION ISSUE DATE
6 JUL 2020
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 336413
8(A) SIZE STANDARD: 1,250
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
THIS IS A JPO ITEM. PROPOSE IN ACCORDANCE WITH JPO PROPOSAL SUBMISSION REQUIREMENTS.
3 YEAR REQUIREMENTS CONTRACT CONTEMPLATED
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
SPRTA1
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing7
9. (Agency Use)
LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.
SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL
5-AUG-2020 3:00PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DLA AVIATION AT OKLAHOMA CITY, OK
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
BUYER: Dana Craun/DLA-AOBA dana.craun@us.af.mil Phone: (405) 734- 8237 Fax: (000) 000-0000
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 5 AUG 2020 3:00 PM
SOLICITATION NUMBER SPRTA120R0181
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Dana Craun/DLA-AOBA
DLA AVIATION AT OKLAHOMA CITY, OK
DLR PROCUREMENT OPERATIONS (AO)
3001 STAFF DRIVE
TINKER AFB OK 73145-3070
SPRTA1-20-R-0181
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
3 Year (36 Months) Requirements Contract Contemplated
Requirements Contract 36 Month Ordering Period New Manufacture of Gearbox Assy
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price
45 EA
Minimum Quantity
9 EA
Maximum Quantity
68 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 1680-00-314-9112 FL
GEARBOX ASSEMBLY,AI
Flap Drive Offset Gearbox: Transfers rotary motion from the torque tube drive system to linear motion through the ball screw to raise and lower the trailing edge flaps. OEM: Boeing, Kent, WA Staineless Steel,Aluminum,Bronz Manufacturer Part Number 65506 5-84048 81205 5-84048 Associated Document(s) Line Item(s)
FD20302001268PLN 0001
Priority: R
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For A SW3211 PAA Acct:09 Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
Requirements Contract 36 Month Ordering Period New Manufacture of Gearbox Assy
A SW3211 9 EA 5 JUN 2020
Proposed Delivery
A SW3211 9 EA
For further clarification, quantities and descriptive application for this anticipated Requirements contract are as follows:
Best Estimated Quantity (for the entire 36-month Ordering Period): 45 EA Minimum Contractual Order Quantity: 9 Maximum Contractual Order Quantity: 68
N/A JPO Data- See Notes **
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
CLIN ACRN ACRN Total
0002 AA
Data JPO Line Item Associated Document(s) Line Item(s)
FD20302001268PLN 0002
Priority: R
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
+ IAW1423 ORIGIN
Type / Ship To Quantity (U/I) On or Before Req No / Pri
Required Delivery
+ IAW1423 1 LO 5 JUN 2020
Proposed Delivery
+ IAW1423 1 LO
**Note: Only provide a bid for this item if Updated drawings/modeling are necessary in order for the Contractor to manufacture this item.
If NRE is quoted for updated drawings/modeling necessary for the manufacture of this item, the attached CDRL lists the requirements for delivery of this Data to the Government. Include price for this deliverable IAW with the attached CDRL.
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3211
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
TINKER AFB OK 73145-8000
USA
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
(Applicable for supplies, services furnishing of supplies, fixed-price and exceeds the simplified acquisition threshold)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
Title Number Date Tailoring *See Individual Line Item Schedule
(Applicable only if specified in the individual order/call issued hereunder)
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixed-price contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
(Applicable to all orders issued hereunder)
Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b)) (Applicable when fixed-price supplies are furnished)
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1)) (Applicable for supplies, services, or research and development)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c)) (Applicable to fixed-price for supplies other than commercial or modified-commercial items)
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c)) (Applicable when specifying f.o.b. origin)
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c)) (Applicable to f.o.b. origin at contractor's facility)
52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)
(IAW FAR 47.303-17(f)) (Applicable when specifying f.o.b. origin)
F.O.B. ORIGIN (OCT 1993)
(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:
F.O.B. Address
[CONTRACTOR FILL-IN]
(Applicable when delivery term is f.o.b. origin)
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(Applicable in solicitations and contracts or task or delivery orders, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items, when 252.232-7003 is used and none of the exceptions at 232.7002(b)(1) apply. See PGI 232.7004 for instructions on completing the clause)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 97 X4930 FC04 64 0 47 GT 15119Z 01N000 00000 GGGTTT 503000 F03000 $0.00
PSR: K22624 FSR: 013352
ACRN TOTAL $ 0.00
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (OCT 2019)
(IAW AFFARS 5301.9103)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.
The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) The Competition Advocate (CA) at each contracting activity/office (as defined in DLAD 2.101) shall act as the ombudsman and attempt to resolve contractor complaints. DLA AVIATION – AOCA’s CA/ombudsman can be reached at (405) 734-8241, facsimile (405) 734-8129. Complaints which cannot be so resolved shall be forwarded to the HQ through J-72 for resolution by the DLA competition advocate. Each activity is responsible for developing procedures for executing the duties and responsibilities of its local ombudsman. .
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.
Such inquiries shall be directed to the contracting officer.
(The above Clause/Provision has been modified.)
(Applicable to all solicitations and contracts)
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
(Applicable when the simplified acquisition threshold is exceeded)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
(Applicable when simplified acquisition threshold is exceeded, except for personal services and those between military departments or defense agencies and foreign governments that do not obligate any funds appropriated to the Department of Defense)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
(Applicable when simplified acquisition threshold is exceeded other than those for commercial items (see Parts 2 and 12))
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
(Applicable when noncommercial and the simplified acquisition threshold is exceeded)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
(Applicable over $150,000)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
(Applicable in all solicitations and resultant contracts other than personal services contracts with individuals)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
(Applicable when exceeding the simplified acquisition threshold (except for commercial items))
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
(IAW DFARS 203.970)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
(Applicable over $30,000, unless not required to be reported in FPDS)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b)) (Applicable to solicitations that contain the provision at 52.204-7, and resulting contracts)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(IAW FAR 4.1804(c), FAR 12.301(d)) (Applicable when there is a requirement to be registered in SAM or to have a DUNS Number)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(IAW FAR 4.1903)
(Applicable to all solicitations and contracts, except COTs, when a contractor’s system may contain Federal contract information)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
(IAW FAR 4.2004)
(Applicable on all contracts and solicitations.)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)
(IAW 4.2105(b))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b)) (Applicable to all orders issued hereunder)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (DEC 2019)
(IAW DFARS 204.7304(c))
(Applicable to all solicitations and contracts, including commercial except when solely for commercial-off-the-shelf items)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
(Applicable to solicitations and contracts that involve litigation support services when 252.204-7014 is not included)
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (DEC 2019)
(IAW DFARS 204.2105(c))
(Applicable to all soliciations.)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(JUN 2020)
(IAW FAR 9.409)
(Applicable when exceeding $35,000)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
(Applicable to solicitations and contracts over $550,000 and contracts where the offeror has checked “has” in paragraph (b) clause 52.209-7)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
(Applicable to all solicitations and contracts for the acquisition of products and services (including construction) unless waived
IAW FAR 9.108-4)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
(Applicable to solicitations and contracts with a value of $150,000 or more)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
(Applicable to supplies that are not commercial items)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(Applicable to all rated orders)
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
(Applicable when delivery of one or more “items” as defined at 252.211-7003(c) is required)
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
(IAW FAR 15.209(b)(1)) (Applicable if negotiated and above the simplified acquisition threshold, except commercial items and utility services at public prices plus reasonable connection charge)
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h), AFFARS 53.15.209(h)) (Applicable when using uniform contract format that is not commercial or for construction)
52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA
(AUG 2011)
(IAW FAR 15.408(b))
(Applicable if negotiated and exceeding $750,000, when certified cost or pricing data is required)
52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (DEVIATION 2018-O0015)
(MAY 2018) (MAY 2018)
(IAW DARS Tracking Number: 2018-O0015)
52.215-14 INTEGRITY OF UNIT PRICES (JUN 2020)
(IAW FAR 15.408(f)(1)) (Applicable when negotiated and exceeding the simplified acquisition threshold)
52.215-14 INTEGRITY OF UNIT PRICES -- ALTERNATE I (OCT 1997)
(IAW FAR 15.408(f)(2)) (Alternate I is applicable when negotiated and exceeding the simplified acquisition threshold and contracting was without full and open competition)
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
(IAW FAR 15.408(g)) (Applicable exceeding $750,000, when certified cost or pricing data is required, or for which any preaward or postaward cost determinations are subject to Part 31)
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JUL 2005)
(IAW FAR 15.408(j))
(Applicable exceeding $750,000 when cost or pricing data is required, or for which any preaward or postaward cost
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
(IAW FAR 15.408(k)) (Applicable exceeding $750,000 when certified cost or pricing data is required, or for which any preaward or postaward cost
252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)
(IAW DFARS 215.408(1))
(Applicable to any order awarded on the basis of certified cost or pricing data)
252.215-7014 EXCEPTION FROM CERTIFIED COST OR PRICING DATA REQUIREMENTS FOR
FOREIGN MILITARY SALES INDIRECT OFFSETS (JUL 2018)
(IAW DFARS 215.408 (8))
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 9, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of 45
(2) Any order for a combination of items in excess of 68 ; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(The above Clause/Provision has been modified.)
52.216-21 REQUIREMENTS (OCT 1995)
(IAW FAR 16.506(d)(1))
(f) the Contractor shall not be required to make any deliveries under this contract after 29-DEC-2023
252.216-7006 ORDERING (SEP 2019)
(IAW DFARS 216.506(a))
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from 31-DEC-2020 through 29-DEC-2023.
(Applicable to solicitations and contracts when a definite-quantity contract, a requirements contract, or an indefinite-quantity contract is contemplated)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
(IAW FAR 19.708(a)) (Applicable when exceeding the simplified acquisition threshold, except for personal service contracts or when performance is entirely outside of the United States and its outlying areas)
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (DEVIATION 2018-O0018)
(AUG 2018)
(IAW DARS TRCKING # 2018-O0018)
(Applicable over $700,000)
52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)
(IAW FAR 19.708(b)(2)) (Applicable when FAR 52.219-9, Small Business Subcontracting Plan, or its Alternate I or Alternate II applies. IAW DFARS 219.708(b)(2), does not apply to DoD in contracts with contractors that have comprehensive subcontracting plans approved under the test program described in DFARS 219.702)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAY 2020)
(IAW FAR 19.309(c))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.
[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.
[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern.
[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.
[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
(Applicable in solicitations and contracts exceeding the micro-purchase threshold when the contract will be performed in the United States or its outlying areas)
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019)
(IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1)) (Applicable over $700,000)
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I
(DEC 2019)
(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))
(Applicable over $700,000 and when FAR clause 52.219-9 and its Alternate III are used)
252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (MAY 2019)
(IAW DFARS 219.708(b)(1)(B)) (Applicable when the contract includes a Comprehensive Subcontracting Plan)
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2020)
(IAW FAR 22.1505(b)) (Applicable for supplies that exceed the micro-purchase threshold)
52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT (JUN 2020)
(IAW FAR 22.610)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1)) (Applicable when exceeding $10,000, except those exempted by FAR 22.807 (b) which includes those for work to be performed outside the U.S. by employees who were not recruited within the U.S.)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e))
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(Applicable when the expected value is $150,000 or more except when work is performed outside the United States by employees recruited outside the United States or the Director, Office of Federal Contract Compliance Programs, has waived, in accordance with 22.1305(b), all of the terms of the clause)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
(IAW FAR 22.1408(a)) (Applicable over $15,000 except when performance of work and recruitment of workers will occur outside the United States, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island, or the agency head has waived, in accordance with 22.1403(a) or 22.1403(b) all the terms of the clause)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
(IAW FAR 22.1310(b)) (Applicable when the expected value is $150,000 or more and workers were recruited within the United States)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
(IAW FAR 22.1605)
(Applicable to all solicitations and contracts except under the simplified acquisition threshold, for work performed exclusively outside the U.S., or covered in their entirety by an exemption granted by the Secretary)
52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)
(IAW FAR 22.1705(a)(1))
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(IAW FAR 23.505)
(Applicable when the simplified acquisition threshold is exceeded except if performance is entirely outside the U.S. and its outlying areas)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
(IAW FAR 23.1105)
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
(IAW DFARS 223.7306, DFARS 212.301(f)(xxi)) (Applicable to solicitations and contracts for supplies, maintenance and repair services, or construction)
52.224-3 PRIVACY TRAINING (JAN 2017)
(IAW FAR 24.302(a)) (Applicable to all solicitations and contracts where contractor employees will have access to a system of records or personally identifiable information)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
(IAW FAR 25.1103(a)) (Applicable to supplies or services involving the furnishing of supplies unless an exception applies)
252.225-7001 BUY AMERICAN AND BALANCE OF PAYMENTS PROGRAM--BASIC (DEC 2017)
(IAW DFARS 225.1101(2)(i) and (2)(ii))
(Applicable except when an exception to the Buy American statute or Balance of Payments Program is known to apply, or if using the clause at 252.225-7021, Trade Agreements; or 252.225-7036, Buy American —Free Trade Agreements—Balance of Payments Program)
252.225-7002 QUALIFYING COUNTRY SOURCES AS SUBCONTRACTORS (DEC 2017)
(IAW DFARS 225.1101(3))
(Applicable if one of the following clauses are included: DFARS 252.225-7001, 252.225-7021 or 252.225-7036)
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
(IAW DFARS 225.7002-3(a)) (Applicable when exceeding the simplified acquisition threshold for food; clothing; tents, tarpaulins or covers; cotton and other natural fiber products; woven silk or woven silk blends; spun silk yarn for cartridge cloth; synthetic fabric, coated synthetic fabric; canvas products; wool; or any item of individual equipment (FSC 8465) manufactured from or containing such fibers, yarns, fabrics, or materials; to waste and byproducts of cotton or wool used in the production of propellants and explosives)
252.225-7013 DUTY-FREE ENTRY (MAR 2020)
(IAW DFARS 225.1101(4))
(Applicable to contracts requiring duty free entry of goods into the United States)
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)
(IAW DFARS 225.7901-4)
(Applicable to all solicitations and contracts)
(Unless acquiring items outside the United States for use outside the United States or a nonavailability determination has been made in accordance with 225.7018, applicable in solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items, that exceed the simplified acquisition threshold.)
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND
TUNGSTEN (DEVIATION 2020-O0006) (FEB 2020)
(IAW DEVIATION 2020-O0006)
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
(APR 2019)
(IAW DFARS 226.104)
(Applicable to supplies or services exceeding $500,000)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
(IAW FAR 27.201-2(a)(1)) (Applicable except when both complete performance and delivery are outside the United States)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (JUN 2020)
(IAW FAR 27.201-2(b))
(Applicable when the simplified acquisition threshold is exceeded except when both complete performance and delivery are outside the United States unless supplies are ultimately to be shipped into one of those areas)
52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)
(FEB 2013)
(IAW FAR 29.401-3(b))
(Applicable when the simplified acquisition threshold is exceeded and fixed-price noncompetitive, and performed wholly or partly within the United States, its possessions or territories, Puerto Rico or the Northern Mariana Islands)
52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (JUN 2020)
(IAW 29.402-3(b)) (Applicable in solicitations that contain the provision at 52.229–11, Tax on Certain Foreign Procurements—Notice and
Representation and resultant contracts in which the contractor has indicated that it was a foreign person in solicitation provision 52.229–11, Tax on Certain Foreign Procurements—Notice and Representation.)
252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
(IAW DFARS 231.100-70)
(Applicable over $500,000)
52.232-1 PAYMENTS (APR 1984)
(IAW FAR 32.111(a)(1)) (Applicable to fixed-price supply or services and non-regulated communication services).
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(IAW FAR 32.111(b)(1)) (Applicable to fixed-price supply or fixed-price service)
52.232-11 EXTRAS (APR 1984)
(IAW FAR 32.111(c)(2)) (Applicable to fixed-price supply, fixed-price service, or transportation)
52.232-17 INTEREST (MAY 2014)
(IAW FAR 32.611(a), FAR 32.611(b)) (Applicable when exceeding the simplified acquisition threshold)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
(IAW FAR 32.706-1(a))
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(IAW FAR 32.806(a)(1)) (Applicable when the micro-purchase threshold is exceeded, unless the contract will prohibit the assignment of claims (see 32.803(b))
52.232-25 PROMPT PAYMENT (JAN 2017)
(IAW FAR 32.908(c))
(a) Invoice payments—
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(Applicable except when the clause at 52.212-4, Contract Terms and Conditions--Commercial Items is included)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
(IAW FAR 32.1110(a)(1))
(Applicable for solicitations and contracts that include the provision at 52.204-7 or an agency clause that requires a contractor to be registered in the SAM database and maintain registration until final payment, unless (i) Payment will be made through a third party arrangement; or (ii) An exception listed in 32.1103(a) through (i) applies.)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
(IAW FAR 32.706-3)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
(IAW FAR 32.009-2)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(DEC 2018)
(IAW DFARS 232.7004(a))
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ .
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—
(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;
(2) DoD is unable to receive a payment request or provide acceptance in electronic form;
(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment; or
(4) DoD makes a payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
252.232-7009 MANDATORY PAYMENT BY GOVERNMENTWIDE COMMERCIAL PURCHASE CARD
(MAY 2018)
(IAW DFARS 232.1110)
(Applicable at or below the micro-purchase threshold and Governmentwide commercial purchase card is required)
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(IAW DFARS 232.7102)
(Applicable to all solicitations and contracts over the micro-purchase threshold issued hereunder)
252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS -
PROHIBITION ON FEES AND CONSIDERATION (APR 2020)
(IAW DFARS 232.009-2)
(Applicable in solicitations and contracts, including those using FAR part 12 procedures for the acquisition of commercial items, that include the clause at FAR 52.232–40, Providing Accelerated Payments to Small Business Subcontractors.)
52.233-1 DISPUTES (MAY 2014)
(IAW FAR 33.215)
(Applicable except to foreign governments or their agencies, or to international organizations or a subsidiary body of that organization, if the agency head determines that the application of 41 U.S.C. chapter 71 to the contract would not be in the public interest)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
(IAW FAR 33.106(b))
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(IAW FAR 33.215(b))
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
(IAW FAR 42.1504)
(Applicable to all solicitations and contracts containing the clause 52.219-9, Small Business Subcontracting Plan.)
52.242-13 BANKRUPTCY (JUL 1995)
(IAW FAR 42.903)
52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
(IAW FAR 43.205(a)(1)) (Applicable to fixed-price supplies)
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
(IAW DFARS 243.205-70)
(Applicable to fixed-price efforts)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
(IAW DFARS 243.205-71)
52.244-2 SUBCONTRACTS (JUN 2020)
(IAW FAR 44.204(a)(1), FAR 44.204(a)(3))
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts:
Subcontracts
(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:
Subcontracts
(Applicable to cost-reimbursement, letter contract exceeding the simplified acquisition threshold, fixed-price exceeding the simplified acquisition threshold under which unpriced actions are anticipated, time-and-materials exceeding the simplified acquisition threshold, or labor-hour contracts exceeding the simplified acquisition threshold)
52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
(IAW FAR 44.204(c)) (Applicable exceeding the simplified acquisition threshold when the order/contract results from noncompetitive procedures)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2020)
(IAW FAR 44.403)
(Applicable to supplies or services other than commercial items)
252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(DOD CONTRACTS) (JUN 2013)
(IAW DFARS 244.403)
(Applicable to solicitations and contracts for commercial items)
252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION--BASIC (MAY 2014)
(IAW DFARS 244.305-71)
(Applicable to solicitations and contracts containing the clause at FAR 52.244-2, Subcontracts)
52.246-23 LIMITATION OF LIABILITY (FEB 1997)
(IAW FAR 46.805(a)(1)) (Applicable to items that are not high-value items (at or below $100,000 per unit))
52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)
(IAW FAR 47.104-4(a), FAR 47.104-4(b)) (Applicable when fixed-price f.o.b. origin or Cost-reimbursement are specified)
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC (FEB 2019)
(IAW DFARS 247.574(b)) (Applicable when procedures other than for direct purchase of ocean transportation services are utilized)
252.247-7028 APPLICATION FOR U.S. GOVERNMENT SHIPPING
DOCUMENTATION/INSTRUCTIONS (JUN 2012)
(IAW DFARS 247.207)
(Applicable when shipping under Bills of Lading and Domestic Route Order under FOB origin contracts, Export Traffic Release regardless of FOB terms, or foreign military sales shipments)
52.248-1 VALUE ENGINEERING (JUN 2020)
(IAW FAR 48.201(b), FAR 48.201(f)) (Applicable over the simplified acquisition threshold, except as specified in FAR 48.201(a) and (f))
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012)
(IAW FAR 49.502(b)(1)(i))
(Applicable over the simplified acquisition threshold, except as specified in FAR 49.502(b)(1)(i)(A), (B) or (C))
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
(IAW FAR 49.504(a)(1)) (Applicable when fixed-price is contemplated and exceeds the simplified acquisition threshold)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(b)) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Regulations URLs: (Click on the appropriate regulation.)
https://acquisition.gov/browse/index/far…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .