SPRTA1-20-R-0100 LETTER RFP.pdf

PDF 799 KB Posted

Attached to
PIPE, EXHAUST Federal contract opportunity
Solicitation number
SPRTA1-20-R-0100
Issued by
Defense Logistics Agency Aviation

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DDEFENSE LOGISTICS AGENCY

AVIATION AT OKLAHOMA CITY

3001 STAFF DRIVE SUITE 2B95

TINKER AIR FORCE BASE, OKLAHOMA 73145-3015

February 14, 2020

IN REPLY

REFER TO: DLA Aviation-AOBB

William Stephenson Phone: (405)-855-3543

Mr. Tim Jungman Northrop-Grumman Systems Corporation 6401 S. Air Depot Blvd.

Oklahoma City, OK 73135-5911

SUBJECT: Letter Solicitation SPRTA1-20-R-0100 to add items to the existing Northrop Grumman subsumable contract SPRTA1-19-D-0001. This solicitation replaces the now-canceled solicitations SPRTA1-18-R-0188 and 0189.

This Solicitation is issued to provide notice that the attached items will be added to the existing Northrop Grumman subsumable contract, SPRTA1-19-D-0001. These items are sole sourced to Northrop-Grumman Systems Corporation (CAGE 78JW8).

SOLE SOURCE: All subject items are Acquisition Method Code (AMC) Code 4R. Acquisition is limited to the single responsible source and no other supplies will satisfy agency requirements. Northrop-Grumman is currently the only source who can manufacture these parts. AMSC Code 4R - The Government does not own the data or the rights to the data needed to purchase this part from additional sources. It has been determined to be uneconomical to buy the data or rights to the data. It is uneconomical to reverse engineer the part.

Please provide pricing and delivery for addition of these NSNs to the existing Northrop Grumman subsumable contract, SPRTA1-19-D-0001. We request Northrop-Grumman provide range pricing for each year. Quantities may vary plus or minus 50%. For example, in FY20, the quantity may be as few as 7, but as many as 21. This will provide us the flexibility to scale each order to match budget availability. We also request Northrop provide capacity, lead time, and range pricing using the best estimated quantities as a guide.

If the quantity ranges provided in this solicitation do not provide the best pricing option then the contractor shall submit quantity ranges that yield the best prices to the Government based on the stated range. See clause 52.207-4.

The final quantity of this solicitation will be re-evaluated upon receipt of the contractor's proposal and closing of the solicitation.

NSN P/N Noun AMSC FY20

BEQ

FY21

BEQ

FY22

BEQ

1560014645559 DAA3213A301-035 Tailpipe Assembly, Right Hand

4R 14 18 17

1560014650736 DAA3213A301-036 Tailpipe Assembly, Left Hand

4R 14 18 17

Specific delivery dates and locations to be cited (TBC) on each order.

In addition to the BEQs above, the following is also required and will be executed with the first order of the NSNs above:

NSN P/N Noun FY20

QTY

SHIP TO

DODAAC

1560014645559 DAA3213A301-035 Tailpipe Assembly, Right Hand

– First Article Inspection Unit *

1 EA SW3211

First Article Test Report 1 LO FA8111 Certificate of Compliance 1 LO FA8111 Material Certification 1 LO FA8111

1560014650736 DAA3213A301-036 Tailpipe Assembly, Left Hand – First Article Inspection Unit *

1 EA SW3211

First Article Test Report 1 LO FA8111 Certificate of Compliance 1 LO FA8111 Material Certification 1 LO FA8111

* First Article Inspection Units will not be expended during testing and will count towards production quantity.

THIS PROCUREMENT IS RATED DX IN THE DPAS SYSTEM & IS IN DIRECT SUPPORT OF THE B-2 AIRCRAFT

Future orders and Ship To location are To Be Determined (TBD).

It is known that Northrop Grumman proposes a Systems Engineering and Program Management (SEPM) CLIN with most proposals. If that is to be the case, Northrop Grumman must present these charges on a per unit basis, so it can be appropriately applied to the final quantity for each FY order.

This solicitation is for New Manufactured Material only.

UID marking IAW DFARS 252.211-7003 is applicable

The terms and conditions of the Northrop Grumman Umbrella contract SPE4AX-18-D-9443, and subsumable contract SPRTA1-19-D-0001 will apply to the addition of these NSNs to the Long Term Contract.

Clause 52.207-4, Economic Purchase Quantity-Supplies, is applicable

Please respond with your pricing and delivery for the item by the solicitation closing date of 11 March 2020. If you have any further questions, please contact Bill Stephenson at 405-855-3543 or by email to william.stephenson.4@us.af.mil.

Qualification Requirements: Do not exist.

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required.

Quality Assurance: To be cited on each order Buy American Act/balance of Payments Program applies

Submit proposals electronically to: William Stephenson, E-mail: william.stephenson.4@us.af.mil or Fax to: (405) 739-4237

Proposal is due by: 16 March, 2020 3:00PM CST

Kind Regards, William J. Stephenson Lead Procurement Contracing Officer Defense Logistics Agency Procurement Operations B-1, B-2, ATCALS, and Instrumentation Branch 3001 Staff Drive, Suite 2B95 Tinker AFB OK 73145 Office : 405-855-3543 Fax: 405-739-4237

STEPHENSON.WILLIAM.JAMES.1122015080 Digitally signed by STEPHENSON.WILLIAM.JAMES.1122015080 Date: 2020.02.14 07:15:11 -06'00'

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Pipe, Exhaust

E. CONTRACT / PR NO.

FD20301800202

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

First Article Inspection Test Report

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LZPED

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

Test Day

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2017DATE:

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION UTILIZING WAWF. A

COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL BE SUBMITTED THROUGH WAWF IN

ORDER TO RECEIVE PAYMENT FOR DATA REPORTS.

BLOCK 8: GOVERNMENT WRITTEN NOTICE OF APPROVAL/DISAPPROVAL IS DUE 90 DAYS AFTER

RECEIPT OF CONTRACTOR'S REPORT.

BLOCK 12: 180 DAYS AFTER CONTRACT AWARD.

SEE ATTACHED DD FORM 1664, DATA ITEM DESCRIPTION.

BLOCK 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

A. THE PURPOSE OF THE FIRST ARTICLE INSPECTION IS TO GIVE OBJECTIVE EVIDENCE THAT ALL

ENGINEERING, DESIGN AND SPECIFICATION REQUIREMENTS ARE CORRECTLY UNDERSTOOD,

ACCOUNTED FOR, VERIFIED AND RECORDED.

B. SHOW COMPLETION OF INSPECTION AND RESULTS OF INSPECTION PERFORMED TO

DEMONSTRATE THAT THE FIRST ARTICLE UNIT(S) CONFORM TO THE APPLICABLE CONTRACT

TECHNICAL REQUIREMENTS.

C. REPORT SHALL DELINEATE THE SPECIFIC RESULTS OBTAINED, THE WITNESSES, AND ANY

OTHER PERTINENT OBSERVATIONS.

D. INSPECTION RESULTS SHALL BE THE APPLICABLE VARIABLE & ATTRIBUTE DATA IN THE FORM

OF RECORDINGS, INSTRUMENT READINGS AND RELATED DATA.

E. AS APPLICABLE, THE FIRST ARTICLE INSPECTION TEST REPORT SHOULD IDENTIFY ANY

DEVIATIONS OR LIMITATIONS IN THE FIRST ARTICLE UNIT(S) INVOLVED.

DELETE PARAS: 10.2.4(a), 10.2.5, 10.2.6.2, 10.2.6.3, 10.2.6.4.2(b-d), 10.2.6.5, 10.2.6.6, 10.2.7.2 & 10.2.8

AS 9102 FORMAT OR EQUIVALENT IS ACCEPTABLE.

REMARK APPLICABLE TO HAZARDOUS ITEMS ONLY: THE TESTS REQUIRED ARE AS

SPECIFIED IN CHAPTER 9 OF THE UNITED NATIONS TRANSPORT OF DANGEROUS GOODS (ORANGE

BOOK) RECOMMENDATIONS.

COORDINATORS:

424 SCMS/GUEA

3001 Staff Drive Tinker AFB OK 73145-3033

0 1 0

AFLCMC/LZPED

ATTN: FA Monitor DoDAAC

FA8111

3001 Staff Drive, Suite

1AB85A

Tinker AFB, OK 73145-3041

0 1 0

0 2 015. TOTAL

Page 1 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Feb 2020

PREVIOUS EDITION MAY BE USED.

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

07 NOV 2017

I. APPROVED BY

//DIGITALLY SIGNED//

COCHRAN.RAYANN.HASLAM.1464677093

424 SCMS / GUEAA 405-736-2780 / 886-2780

J. DATE

06 NOV 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Pipe, Exhaust

E. CONTRACT / PR NO.

FD20301800202

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Certification Data for Material

3. SUBTITLE

N/A

4. AUTHORITY

DI-MISC-81020/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LZPED

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 19 MAY 2016DATE:

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION UTILIZING WAWF. A

COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL BE SUBMITTED THROUGH WAWF IN

ORDER TO RECEIVE PAYMENT FOR DATA REPORTS.

BLOCKS 10 & 12: WITH FIRST ARTICLE SUBMITTAL.

BLOCK 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

1. CONTRACTOR FORMAT AUTHORIZED, MATERIAL CERTIFICATION SHALL BE SUPPLIED WITH ALL FIRST ARTICLES. COPIES OF ORIGINAL CERTIFICATION SHALL BE PROVIDED IF THE CONTRACT IS

AWARDED TO THE ORIGINAL MANUFACTURER, AND THE ITEM SHALL BE MADE FROM THE SAME

LOT OF MATERIAL. IF A NEW LOT OF MATERIAL IS USED TO PRODUCE THE ITEM, A NEW MATERIAL

CERTIFICATION SHALL BE REQUIRED. IF THE FIRST ARTICLE IS WAIVED, THE MATERIAL

CERTIFICATION IS ALSO WAIVED.

2. CHANGES TO THE DATA ITEM DESCRIPTION:

2.1 CHANGE TITLE (BLOCK 3) TO READ CERTIFICATION DATA FOR MATERIAL.

2.2 PARAGRAPH 3.1 (FIRST LINE) DELETE THE WORDS "FOR NON-NUCLEAR LEVEL 1" AND (FOURTH

LINE) DELETE THE WORDS "LEVEL 1".

COORDINATORS:

424 SCMS/GUEA

3001 Staff Dr.

Tinker AFB, OK 73145

0 1 0

AFLCMC/LZPED

FA MONITOR, DODAAC

FA8111

3001 STAFF DR., STE 1AB

85A

TINKER AFB, OK 73145-

0 1 0

0 2 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

07 NOV 2017

I. APPROVED BY

//DIGITALLY SIGNED//

COCHRAN.RAYANN.HASLAM.1464677093

424 SCMS / GUEAA 405-736-2780 / 886-2780

J. DATE

06 NOV 2017

Page 2 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Feb 2020

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Pipe, Exhaust

E. CONTRACT / PR NO.

FD20301800202

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Certificate of Compliance

3. SUBTITLE

N/A

4. AUTHORITY

DI-MISC-81356A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

424 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 19 MAY 2016DATE:

BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION UTILIZING WAWF. A

COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL BE SUBMITTED THROUGH WAWF IN

ORDER TO RECEIVE PAYMENT FOR DATA REPORTS.

BLOCKS 10 & 12: WITH FIRST ARTICLE SUBMITTAL.

BLOCK 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

1. CONTRACTOR FORMAT AUTHORIZED, CERTIFICATE OF COMPLIANCE SHALL BE SUPPLIED WITH ALL FIRST ARTICLES. COPIES OF ORIGINAL CERTIFICATION SHALL BE PROVIDED IF THE CONTRACT IS AWARDED TO THE ORIGINAL MANUFACTURER, AND THE ITEM SHALL BE MADE FROM THE SAME LOT OF MATERIAL. IF A NEW LOT OF MATERIAL IS USED TO PRODUCE THE ITEM, A NEW MATERIAL CERTIFICATION SHALL BE REQUIRED. IF THE FIRST ARTICLE IS WAIVED, THE CERTIFICATE OF

COMPLIANCE IS ALSO WAIVED.

COORDINATORS:

424 SCMS/GUEA

3001 Staff Dr.

Tinker AFB, OK 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

07 NOV 2017

I. APPROVED BY

//DIGITALLY SIGNED//

COCHRAN.RAYANN.HASLAM.1464677093

424 SCMS / GUEAA 405-736-2780 / 886-2780

J. DATE

06 NOV 2017

Page 3 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 12 Feb 2020

DATA ITEM DESCRIPTION

Title: Certificate of Compliance Number DI-MISC-81356A Approval Date: 20071218 AMSC Number: N9036 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NAVICP Code 8741 Applicable Forms: N/A

Use/Relationship: The Certificate of Compliance provides certification from the contractor that the materiel supplied is in full compliance with all contract requirements. This DID contains the format, content, and intended use information for the data deliverable required by the contract.

This DID supersedes DI-MISC-81356.

Requirements:

1. Format. The Certificate of Compliance shall be presented in a format similar to that of Figure 1.

2. Content. The Certificate of Compliance shall contain:

a. Contractor’s name.

b. Contractor’s address.

c. Contractor’s phone number.

d. Date.

e. Contracting Agency’s name.

f. Contract Number.

g. National Stock Number (NSN).

h. Item nomenclature.

i. A statement certifying that all items furnished on the contract are in full compliance with all specification and contract requirements.

j. Authorized personnel’s signature.

k. Authorized personnel’s printed name and title.

DI-MISC-81356A

From: ______________________ (Contractor’s name)

Address: ______________________ (Contractor’s address)

Phone Number: ________________ (Contractor’s phone number)

Date: ________________

To: _______________ (Contracting Agency)

Contract Number: _______________

National Stock Number: _______________

Item Nomenclature: ___________________

“All items furnished on this contract are in full compliance with all specification and contract requirements.”

(Signature of Authorized Personnel

(Printed Name and Title of Authorized Personnel)

Note: The recording of false, fictitious, or fraudulent statements or entries on this document may be punished as a felony under Federal Statutes.

3. End of DI-MISC-81356A

Figure 1 – Sample format for a Certificate of Compliance

DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188

1.nTLE 2.IOENTIFICATIONNUMBER

TEST/ INSPECTION REPORT DI-NM’I-80809B

L OESCRIPTlOtVPURPOSE

3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.

1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable

(YVMMOD)

F/AFMC-DCJP

970124

,.APPLlCAT\0NflNTER7iElAT10NSH1P

7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement

I as delineated in the contract.

I

7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.

7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653

1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER

F7231

10,PREPARATIONlNSTRUCnONS

10.1 Format. Contractor format is acceptable.

paragraph 10.2 and its subparagraphs in a manner understanding

10.2 CQnL!aL. The test/inspection report shall

applicable.

Organize the information required by that facilitates presentation and contain the following information, as

10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:

a. Report date.

b. Report number (contractor or government)

Contractor’ s name, address, and commercia 1 and government entity code.

Contract number and contract line item number or sequence number (if applicable)

e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.

9. Date or period of test/inspection.

h. Name and address of requiring government activity.

i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.

(Continued on page 2 )

1.DIS77UBUTIONSTATEMEW

DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.

ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123

DI-NDTI-80809B

Block 10, Preparation Instructions (continued)

10.2.2 ~. The table of contents shall identify the following:

a. The title and starting page of each major section, paragraph, and apPendix of the report.

b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)

10 .2.3 -ductim. The introduction shall include the following information:

10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.

10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:

a. Nomenclature.

b. National stock number.

Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )

e. Serial or lot number.

f. Applicable engineering changes

9. Production item specification, if applicable.

h. Date of manufacture.

10.2 .3.3 Complete inspection requirements correlated to contractual following:

Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.

10.2.4 ~. Complete test/inspection report following:

identification of the testl requirements including the compliance limits, and summary including the

a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.

b. Proposed corrective actions and schedules for failures or problems encountered.

c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.

d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.

10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:

a. Prior testf inspection reports on the same item.

b. Test /inspection plans and procedure documents

c. Prior certifications of compliance.

d. Contractor’ s file designation where test/ inspection records are maintained.

e. Input parameters used.

The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Page 2 of 4 Pages

10.2.6 ~. The body of the testlinspection report shall be as follows :

10 .2.6.1 KzZL_ + de.tlflca~.

Complete identification of each item of test equipment used in the testlinspection including the following:

a.

b.

c.

d.

e.

f.

9.

10. 2.6.2

Nomenclature.

Model number.

Serial number.

Manufacturer.

Calibration status.

Accuracy data.

Comments, if applicable.

Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:

a. Location or orientation of the item.

b. Location. orientation, or settinm of test equipment and instrumentation.

c. Location, orientation, or settings of sensors and probes

d. Location or orientation of interconnections, cables, and hoop-ups.

e. Electrical power, pneumatic, fluidic, and hydraulic requirements.

Drawings, illustrations, and photographs maY be used for clarification.

10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:

a. Item selection and inspection that verified suitability for test/ inspection.

b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.

10 .2.6.4 A copy of all testlinspection results and analysis to include the following:

10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.

10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:

a. Matrices comparing results achieved against test/inspection objectives or requirements

b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.

Calculation examples.

;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.

10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:

a. The effectiveness of the testlinspection procedures in measuring item performance.

Page 3 of 4 Pages

b. The success or failure of the item to meet required test/inspection objectives.

c. The need for repeat, additional, or alternative tests linspections.

d. The need for item redesign or further development.

e. The need for improved test/inspection procedures, techniques, or facilities.

f. The adequacy and completeness of the test/inspection requirements.

10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:

a b.

c.

d.

e.

f.

9.

h.

Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.

Redesign required.

Problem resolution.

Test/inspection procedure or facility improvements Disposition of items tested/inspected.

Documentation changes required.

Testing/ inspection improvements

10.2.7 The following certifications shall be included, .as

applicable:

10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses

10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.

Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.

10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness

10.2.8 Appendices shall be used to append detailed

test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.

Page 4 of 4 Pages

SPRTA1-20-R-0100 LETTER RFP
01-406-7368 SPI
2359384_CDRL1_REPORT
DI-MISC-81020
DI-MISC-81356A
DI-NDTI-80809B

File details come from the government source that posted it. Updated .