SPRRA226R0079 RFP_Redacted.pdf

PDF 128 KB Posted

Attached to
Kuwait Deferred OPTEMPO Spares, Sole Source to Raytheon
Solicitation number
SPRRA226R0079_RFP
Issued by

About this file

This is a Request for Proposal (RFP) issued by the Defense Logistics Agency (DLA) Weapons Support for pricing spare parts to support the PATRIOT Weapon System Ground Support Equipment. The RFP SPRRA2-26-R-0079 is directed to Raytheon Company (CAGE 05716, Large Business) for pricing part numbers listed in "Attachment 0001_Kuwait Deferred Spares List." The priced parts will be added to Raytheon's existing Indefinite Delivery Requirements (IDR) type contract SPRRA2-25-D0016 under Firm-Fixed-Pricing (FFP) terms to support Kuwait Foreign Military Sales (FMS) for the Portfolio Acquisition Executive (PAE) Fires Integrated Fires Mission Command (IFMC) Project Office.

Raytheon must indicate its intention to provide a proposal within five business days of the RFP issuance, with a firm proposal submission deadline of 4:00 p.m. Central Standard Time on July 6th, 2026. Proposals must remain valid for a minimum of 180 days from government receipt. The proposal must include a summary schedule with fully supportable cost data, working Excel formulas, and detailed backup documentation addressing labor categories, hours, materials, equipment costs, and total cost breakdowns. For subcontracts exceeding regulatory thresholds under FAR Part 15.403-4, offerors must provide fair and reasonable pricing analyses and submit an un-sanitized cost breakdown in Microsoft Excel format. Documentation of current Indirect Expense Rates is required, such as Forward Pricing Rate Agreements (FPRAs), Forward Pricing Rate Recommendations (FPRRs), or Forward Pricing Rate Proposals (FPRPs) with DCAA or DCMA. If using the ProPricer system, the original unedited Excel file is required with specific tabs including P-Sheet, Direct Rates, Indirect Rates, CERS, and CER Factors. Additional requirements include identification of Organizational Conflicts of Interest with mitigation plans if applicable, JCP Certification for export-controlled items, compliance representations regarding covered telecommunications equipment per FAR and DFARS clauses, and completion of the Proposal Adequacy Checklist for offers exceeding the TINA threshold. All communications must be submitted in writing exclusively to the identified contracting team: Anna Phillips (Contracting Officer) and Ava Lowman (Contract Specialist).

View the file

Other files

File Type Posted
Attachment 0001_Kuwait Deferred Spares List.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

WEAPONS SUPPORT

5202 MARTIN ROAD

REDSTONE ARSENAL, ALABAMA 35898-7340

IN REPLY REFER: DLA AHC1

May 27th, 2026

Raytheon Company 350 Lowell St Andover, MA 01810

CAGE: 05716

Large Business

RE: Request for Proposal (RFP) SPRRA2-26-R-0079

Raytheon Company, The Government wishes to price the part numbers found in “Attachment 0001_Kuwait Deferred Spares List” in support of the Phased Array Tracking Radar to Intercept on Target (PATRIOT) Weapon System Ground Support Equipment (GSE). The part numbers in the attachment referenced above will be placed on the Raytheon Company subsumable Indefinite Delivery Requirements (IDR) type contract (SPRRA2- 25-D0016) with Firm-Fixed-Pricing (FFP) to support Kuwait Foreign Military Sales (FMS) for the Portfolio Acquisition Executive (PAE) Fires Integrated Fires Mission Command (IFMC) Project Office.

DLA Contracting Team Identification:

Anna Phillips, DLA Weapons Support - Huntsville, Contracting Officer/Branch Chief Email: anna.phillips@dla.mil Phone: (256) 214-9734

Ava Lowman, DLA Weapons Support - Huntsville, Contract Specialist Email: ava.lowman@dla.mil Phone: (256) 556-1758

A. Please adhere to the following timelines:

Indicate your intention to provide a responsive proposal to this RFP in writing within five (5) business days. It is requested that a negative response be accompanied by an explanation.

Responses shall be provided to the contracting team identified above.

Your response is requested as soon as possible. If you choose to submit a proposal, it shall be submitted before 4:00 p.m. Central Standard Time (CST), July 6th, 2026.

B. Instructions:

1. The negotiated contract (SPRRA2-25-D-0016) shall govern the Contractor’s and Government’s rights and obligations.

2. This RFP is not an authorization to start work.

3. Please ensure that you read the entire RFP, prior to submitting your proposal. Your proposal shall be in full compliance with the instructions of this RFP.

4. The Proposal must be certified to the quantities found in “Attachment 0001_Kuwait Deferred Spares List.”

5. Your proposal shall remain valid for a minimum of one hundred and eighty (180) days from receipt by the government.

C. Proposal Content/Cost/Price Supporting Documentation:

At a minimum, your proposal shall include the following:

1. The offeror shall prepare one summary schedule. Along with the summary schedule, the offeror shall provide fully supportable cost data which substantiates the offeror’s summary schedule for the part numbers. Submission must include working excel formulas, if applicable. Submission shall be in accordance with FAR 15.408, Table 15-2, Instructions for Submitting Cost/Price Proposals When Certified Cost or Pricing Data are required. Back up documentation shall detail the labor categories to be used, labor hours proposed by category, material and equipment cost, and a total cost breakdown. The offeror shall also provide supporting cost/price documentation for all proposed subcontractors, to include the proposed type of subcontract.

a. Per FAR 15.408 Table 15-2, cost analyses must be performed by the offeror for subcontracts identified in the Consolidated Bill of Materials as having total proposed pricing that exceeds the regulatory threshold indicated in FAR Part 15.403-4. Fair and reasonable subcontractor analysis in accordance with FAR 15.404-3(b) Subcontract Pricing Considerations shall be provided.

b. An un-sanitized cost break-down (all cost information, rates/dollars) shall also be provided in a Microsoft Excel File.

c. In support of the proposed Indirect Expense Rates, IOTs and its subcontractor(s) shall provide documentation of the most recent Indirect Expense Rates, to include, at least one of the following (A, B, or C):

A. Forward Pricing Rate Agreements (FPRAs) with DCAA or DCMA B. Forward Pricing Rate Recommendations (FPRR) from DCAA or DCMA C. Forward Pricing Rate Proposal (FPRP), Approved Provisional Rates Proposal or other statement of current rates including three (3) years of Incurred Cost Submissions to DCAA detailing pools and bases (by expense accounts) information which validates the calculations or Three (3) years historical actual detailing pools and bases (by expense accounts) information which validates the calculations.

Note: The rates reflected in the FPRA, FPRR, FPRP, Approved Provisional Rates Proposal or other statement of current rates shall directly match the proposed rates as detailed in the proposal.

If the rates do not match, the offeror shall provide sufficient detail explaining how the proposed rates are realistic.

d. Identify key business unit personnel related to contracting, technical and pricing questions and known DCMA or DCAA business unit points of contact (POC’s) to expedite the question/review process.

e. In accordance with FAR clause 52.215-22, Limitation on Pass-Through Charges, if Raytheon intends to subcontract more than 70 percent of the total cost of work to be performed under the resulting add-on, Raytheon shall identify in its proposal a description of the value-added provided by Raytheon as related to the work to be performed by the subcontractor(s) as defined by FAR clause 52.215-22.

f. Raytheon shall identify and address in its proposal all actual or potential Organizational Conflicts of Interests (OCIs), per FAR 9.5, or state that there are no known potential OCIs. If any actual or potential OCIs are identified, then Raytheon shall submit a mitigation plan.

g. All communications SHALL be submitted in writing only AND directly to the individual(s)’s email address identified on the first page of this RFP. Raytheon shall not contact any other Government personnel other than the person(s) identified above. Contacting any Government personnel other than the individual(s) identified above could result in an organizational conflict of interest (OCI).

h. No assumptions, terms, conditions, caveats, or exceptions submitted within your proposal, in response to this RFP, will be accepted or incorporated into the basic contract. All assumptions shall be addressed and/or resolved through the use of the question-and-answer period.

i. This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., SEC 2751 ET SEQ.) or Executive Order 12470. Violation of these export laws are subject to severe criminal penalties. JCP Certification is required for Export Controlled Items.

j. Effective August 13, 2020, the offeror, by submission of its quotation, represents it:

1) will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation in accordance with FAR 52.204-24(d)(1);

2) does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services IAW FAR 52.204-24(d)(2)

3) does not provide covered defense telecommunications equipment or services as part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument IAW DFARS 252.204-7016(c).

2. Complete the Proposal Adequacy Checklist located in DFARS 252.215-7009 for offers over the TINA threshold.

FOR CONTRACTORS USING THE PROPRICER SYTEM:

The original unedited ProPricer system generated Excel file is hereby requested. In Excel Workbook format (.xlsx) provide a ProPricer system generated “Detail Cost Breakdown” report, with “Export Full Pricing” set to “Annual”. This Excel file shall be a full working cost model containing the original columns, formulas, and worksheets only. Do not modify the ProPricer system generated Excel file in any manner. Excel tabs to include:

1. P-Sheet (needed at minimum)

File details come from the government source that posted it. Updated .