Letter RFP_SPRRA225R0078_AMD 01.pdf

PDF 530 KB Posted

Attached to
Alpha 6 - INC 2 add Sole Source Raytheon
Solicitation number
SPRRA2-25-R-0078
Issued by

About this file

This is a Draft Request for Proposal (RFP) from the Defense Logistics Agency (DLA) Aviation/Missiles, sole-sourced to Raytheon Company for a subsumable contract amendment. The solicitation (SPRRA2-25-R-0078) seeks to add fourteen (14) National Stock Numbers/Part Numbers to an existing Long-Term Contract (LTC) Umbrella Contract, specifically supporting Patriot Missile and other weapon systems. The RFP requests Raytheon to provide a comprehensive proposal including range pricing (minimum/best estimated/maximum quantities), delivery schedules, and supporting cost documentation by August 1, 2025.

Key proposal requirements include submitting pricing information in Microsoft Excel, providing full cost data substantiation, proposing evidence-based delivery schedules, and including documentation of indirect expense rates. The contract will use Firm-Fixed-Pricing for a 5-year period, with potential progress payments. Raytheon must only propose sole-source items, identify any potential organizational conflicts of interest, and comply with specific federal acquisition regulations. The government reserves the right to award the parts either on the same contract modification or through separate delivery orders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

AVIATION / MISSILES

5201 MARTIN ROAD

REDSTONE ARSENAL, ALABAMA 35898

DLA AHCA

June 26, 2025

Raytheon Company 350 Lowell Street Andover, MA 01810

Subject: Letter DRAFT Request for Proposal (RFP) – SPRRA2-25-R-0078_AMD 1

Dear Raytheon Company, The Defense Logistics Agency (DLA) issued solicitation SPRRA2-25-R-0078 on May 29, 2025, to add parts to a Subsumable Contract under the negotiated (Alpha 6) Long-Term Contract (LTC) Umbrella Contract SPRBL1-25- D-0006 currently under negotiation that will succeed the DLA-Raytheon Depot Level Repairable (DLR) SPRBL1-15-D-0017 (Alpha 5) LTC. This amendment clarifies the above solicitation.

The associated parts are listed in Enclosure 1 of this document. The parts will support the Patriot Missile and other systems. This add-on will include a total of fourteen (14) NSN/Part Numbers (Enclosure 1) Identification of Requirements (IOR) and Proposal Information.

The basic terms and conditions of the umbrella contract shall govern the contractors and Governments’ rights and obligations. This solicitation is sole sourced to Raytheon Company, CAGE 05716. IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1. “…Only one responsible source, and no other type of supplies or services will satisfy agency requirements…”

DLA Contracting Team Identification:

Siyeicea Jackson, DLA Aviation – Branch Chief / KO E-mail: siyeicea.jackson@dla.mil; (256) 690-5737

Adam Henson, DLA Aviation - Team Lead E-Mail: jeffrey.henson@dla.mil; Phone: (256) 924-7897

Kereen Johnston, DLA Aviation - Contract Specialist E-mail: kereen.johnston@dla.mil; Phone: (256) 280-6784

A. The following timelines are proposed in this RFP:

1. Indicate your intention to provide a responsive proposal to this letter RFP in writing within five (5) business days. It is requested that a negative response be accompanied by an explanation. Responses shall be provided to the contracting team identified above.

2. Your response is requested as soon as possible. If you choose to submit a proposal in response to this RFP it shall be submitted on/or before 5:00 P.M. Central Standard Time (CST) August 01, 2025.

The added clarifications do not extend the proposal submission date.

B. Instructions for the proposal:

1. Please ensure that you read the entire RFP, including all of the enclosures, prior to submitting a proposal. The proposal shall be in full compliance with the instructions of this RFP.

2. This RFP is not an authorization to start work.

3. The basic terms and conditions of the Umbrella Contract SPRBL1-25-D-0006 shall govern the Contractors’ and Governments’ rights and obligations.

4. Contract Clauses are governed by the Umbrella Contract unless otherwise indicated, (excluding classified clauses; notices, clauses, and provisions) shall apply to all add-ons, delivery orders and shall govern the contractor’s and Governments’ rights and obligations. No alternative or additional clauses shall be submitted with this proposal. Raytheon can submit previously coordinated alternates of term and conditions as assumptions to their proposal to assure maximum timeliness of proposal, the list of NSN/PNs numbers may be separated into mor than one proposal with the understanding that the data requirements are not lessened by doing so.

5. Your proposal shall remain valid for a minimum of one hundred and eighty (180) days from receipt by the Government.

6. The offeror may propose alternative sole source parts for the requested items provided the alternative parts(s) have the same form, fit and function and is accompanied by a complete obsolescence notification letter detailing the reasons the contractor is unable to propose the requested part.

7. In the interest of supporting obsolete items and pursuant to communication with the Contracting

Officer, an additional proposal for a live-buy of the Next Higher Assembly (NHA) may be accepted to support the function of a requested part.

8. Nothing in this RFP shall be construed to preclude the contracting officer from requiring the offeror to supply sufficient information to determine the reasonableness of price, regardless of whether the offeror was required to provide such information in connection with any earlier procurement. If the contracting officer determines that the pricing information submitted is not sufficient (see Section C of this RFP) to determine the reasonableness of price, the contracting officer may request other relevant information prior to accepting the proposal as adequate and consistent with the solicitation.

9. The proposal should include proposed order sizes, evidence-based delivery schedules and ranges-

Minium Order Quantities (MOQ), Best Estimated Quantities (BEQ). The Government expects the Offeror to propose only the quantities or ranges that can be supported and is open to negotiating any items (s) related to quantity or price ranges. The quantities requested are based on a government estimate and the offeror proposal shall support the quantities provided.

10. Raytheon shall only propose sole source items under this contract. Raytheon shall notify the Government immediately if the items or services being solicited are not sole source to Raytheon.

11. First Article (FAT) / Production Lot (PLT) MAY BE required. FAT unit MAY BE retained as a material standard. Test Item MAY BE destroyed as part of testing. First Article Test (FAT) and Production Lot Test (PLT) requirements for items listed in Enclosure 1 - Identification of Requirements, as applicable, MAY BE waived. Raytheon company may submit a first article test waiver worksheet. FAT/PLT units SHALL BE proposed until the waiver is approved.

C. Proposal Content/Cost/Price Supporting documentation. At a minimum your proposal shall be addressed with the following:

1. The Government contemplates Firm-Fixed-Pricing for the NSN/Parts listed in Enclosure 1 in accordance with the umbrella contract, and request pricing for 5 years. This is an RFP for NSN/Parts support requirements generated by the AMCOM Army Logistics Center (ALC). The add-on Identification of Requirements (IOR) and Packaging Sheets are provided in Enclosure 1.

2. The offeror must prepare pricing information as provided in Enclosure 1, Identification of Requirements (IOR) and proposal information in a Microsoft Excel file utilizing the specific headers provided within. The offeror’s summary schedule must provide the Contract Line-Item Numbers (CLINs), National Stock Numbers (NSNs), Part Numbers (PNs) reconcile with the total overall price offered and applicable data within the proposal. Along with the enclosure schedule, the offeror shall provide full supportable cost data substantiating the offeror’s summary schedule for all CLINS and all ranges proposed.

3. The Government did not provide subcontract Line-Item Numbers (SLINs) to accommodate items that may require reusable shipping containers. However, if an item requires a reusable shipping container, a SLIN may be added to allow the offeror to price the item with a shipping container.

The offeror shall propose the most expeditious delivery schedule for each item.

4. The submission of cost data must include working cost model with excel formulas. Submission shall be in accordance with FAR 15.408, Table 15-2, Instructions for Submitting Cost/Price Proposals when Certified Cost or Pricing Data are required. Back up documentation shall detail the labor categories to be used, labor hours proposed by category, material and equipment cost, and a total cost breakdown. The offeror must also provide supporting cost/price documentation for all proposed subcontractors, to include the proposed type of subcontract.

5. Should the proposal not require certification of cost and pricing data, the Offeror’s attention is directed at the Federal Acquisition Regulation FAR 15.403-3, relative to the requirements for obtaining Other Than Certified Cost or Pricing Data. The Offeror is required to submit Other Than Certified Cost or Pricing Data with the submission of the proposal. If additional supporting documentation is requested, the government is seeking a timely response (5-10 business days).

Failure to provide Other Than Certified Cost or Pricing Data will result in the offeror being deemed as inadequate and/or deficient.

6. Per FAR 15.408, Table 15-2, cost analysis must be performed by the offeror for subcontracts identified in the Consolidated Bill of Materials (CBOMs) as having total proposed pricing that exceeds the regulatory threshold indicated in FAR Part 15.403-4 for the BEQ only. Fair and reasonable subcontractor analysis in accordance with FAR 15.404-3(b) Subcontract Pricing Considerations must be provided for the BEQ only.

7. In support of the proposed Indirect Expense Rates, Raytheon business units performing or as an internal work transfer, and any other subordinates shall provide documentation of the most recent Indirect Expense Rates, to include at least one of the following (by order of acceptability):

i. Forward Pricing Rate Agreements (FPRAs) with DCMA.

Note: the rates reflected in any existing FPRA shall directly match the proposed rates as detailed in the proposal.

ii. Forward Pricing Rate Recommendations (FPRR)from DCMA.

Note: if proposed rates do not match an existing FPRR, the offeror shall provide sufficient detail explaining how the cost realism of the rates proposed.

iii. Forward Pricing Rate Proposals (FPRP) previously accepted by the DACO at DCMA pursuant to the establishment of a new FPRR.

iv. OR Approved provisional Rates or other statement of current rates including three

(3) years of Incurred Cost Submissions to DCAA detailing historical (actual) Pools and bases (by expense accounts), and any information which validates tha calculations.

Note: the rates reflected in the FPRA shall directly match the proposed rates as detailed in the proposal. If the rates do not match, the offeror shall provide sufficient detail explaining how the proposed rates are realistic.

8. A sanitized cost break-down (no cost information, no rates/dollars) shall also be provided in a Microsoft excel file in addition to the other information required by the RFP.

9. The proposal will identify key business unit personnel related to contracting, technical and pricing questions and known DCMA or DCAA business unit point of contract (POC) to expedite the question/review process.

D. Additional Terms, Conditions, Clauses, and Provisions specific to this procurement needs and/or agency requirement:

1. In accordance with FAR clause 52.215-22, Limitation on Pass-Through charges, if Raytheon intends to subcontract more than 70 percent of the total cost of work to be performed under the resulting contract, Raytheon shall identify in its proposal a description of the value-added provided by Raytheon as related to the work to be performed by the subcontractor(s) as defined by FAR Clause 52.215-23.

2. DFARS Claues 252.211-7003, Item Unique Identification and Valuation may be applicable to items in this Letter RFP.

3. Raytheon shall assert restrictions on technical data or software as required; when Raytheon shall deliver with less than Unlimited Rights IAW DFARS 252.227-7017, Enclosure 3.

i. Raytheon shall identify and address in its proposal all actual or potential Organizational

Conflicts of Interest (OCI), per FAR 9.5, or state that there are no known potential OCIs. If any actual or potential OCIs are identified, then Raytheon shall submit a mitigation plan.

4. The Government reserves the right to award the NSNs / Parts of this letter RFP either on the same contract modification or separate contract modification, increment add-on, or delivery order.

5. All communications SHALL be submitted in writing ONLY and directly to the contract team(s) email addresses identified on the first page of this RFP. Raytheon shall not contact any other Government personnel other than the person(s) identified. Contracting any Government personnel other than the individual(s) identified above could result in an organizational conflict of interest

(COI).

6. Small Business Subcontracting Plan: the contractor shall continue participation in the Department of Defense (DoD) Test Program for a Comprehensive Subcontracting Plan with the Defense Contract Management Agency (DCMA). A small business subcontracting plan will not be required by the Government for this subsumable, increment add-on, or delivery order contracts unless the contractor fails to meet the goals outlined in the comprehensive subcontracting plan agreement with DCMA.

7. Progress Payments FAR 52.232-16 may be included in the resulting subsumable contract SPRRA2-TBD under the negotiated (Alpha 6) Umbrella Contract SPRBL1-25-D-0006. If progress payments are desired, they shall be expressly requested in the proposal. Progress Payments will be agreed to during negotiations and added to each applicable delivery order.

8. Prohibition on the acquisition of covered defense telecommunications equipment of service clause 252.204-7018 will be added to each applicable delivery order or increment add-on.

If you have any questions, feel free to contact the undersigned, Kereen Johnston at kereen.johnston@dla.mil.

Sincerely, Kereen Johnston

Kereen Johnston Contract Specialist, Missile Division DLA Aviation HSV

Enclosures listed below:

Enclosure 1: Identification of Requirements (IOR) and Proposal Information Enclosure 2: Required Reps and Certs (FAR 52.204-8) Enclosure 3: Data Rights and Assertions DFARS 252.227-7017 mailto:kereen.johnston@dla.mil

CUI_SSI

THIS IS A PROTECTED DOCUMENT; AS SUCH SSI CAN ONLY BE

FOUND ON THIS TAB BUT IS APPLICABLE TO THE ENTIRE WORKBOOK

DLA:

CONTROLLED UNCLASSIFIED INFORMATION (CUI)

THE INFORMATION IN THIS EXCEL WORK SHEET IS SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104. THIS HEADER SHEET IS APPLICABLE TO ALL SHEETS IN THIS EXCEL DOCUMENT.

IOR & Packaging

CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104 CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104

NOTES:*RFP CLIN Number will change to a new series in the corporate contract
Ordering Periods are Calendar YearPACKAGING REQURIEMENTSMIL-STD-2073-1 Codes, Appendix J

SOL #: SPRRA2-25-R-0078 Alpha 6 SPRBL1-25-D-0006 Estimated Max Unit Pkg Weight and Size Pkg J. J J J J J J J J J J

Subsumable SPRRA2-TBD Weigh Length Width Depth Reqmt I./A II. III. IV. V. VI. VII. VII. IX./A X VIIIA. Transportation

RFP CLIN#1st Year Suffix2nd Year Suffix3rd Year Suffix4th Year Suffix5th Year SuffixPRONNSNPART NUMBERNOUN
(Part Name)APPROVED CAGENAICS# OF EMPLOYEESAMRC CODEAMRC EXP DATEFAT Req / WaiverIUID RequiredSerial # RequiredEXPORT CONTROLOzoneClassified DocsReusable/Furnished ContainerProduction Lot TestRequired Production Lead Time (Months)Level of Preservation (Military or Commercial)PKG-REF or SPIPoundsInchesInchesInchesLevel of PackQty Unit PackQty Intermediate ContainerWood Packing Material (WPM)Codes(MP)(CD)(PM)(WM)(CD)(CT)(UC)(IC)(PK)(SM)(OPI)Special MarkingsSupplemental InfoF.O.B.InspectionAcceptance

0001 AA AB AC AD AE D15H0834D1 5998-01-713-9303 13657825-109 Circuit Card Assemb 5716 334412 750 4N 4/14/30 Req Yes Y Y N N CTR N 24 Military MIL-STD-129 / MIL-STD-2073-1 5.0 14.0 14.0 4.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT B ED 00 F 39 M N/A N/A Destination Origin Origin

0002 AA AB AC AD AE n/a 4140-01-596-3780 13657975 FAN, Centrigugal 05716 334412 750 3C 12/12/26 Req Yes N Y N Y TBD N 18 Military MIL-STD-129 / MIL-STD-2073-1 5.0 17.7 9.1 3.6 B 001 000 ISPM-15 Appendix J 41 1 00 EA NA A ED 00 F 00 M N/A N/A

0003 AA AB AC AD AE n/a 5975-01-703-2324 13741377-1 Cabinet, Electrical Equipment 05716 332710 500 4D 10/4/27 Req Yes N Y YES Y TBD N 24 Military MIL-STD-129 / MIL-STD-2073-1 67.0 30.0 28.0 12.0 A 001 000 ISPM-15 Appendix J 52 1 00 K3 NB H F2 00 F ZZ M Y ZZ=MARK WITH 14, 19, & 39 SM'S; WPM MUST BE ISPM-15 COMPLIANT Destination Origin Origin

0004 AA AB AC AD AE n/a 5998-01-411-3031 11472033 Circuit Card Assemb 05716 334412 750 3N 7/7/26 Req Yes Y Y N N TBD N 26 Military MIL-STD-129 / MIL-STD-2073-1 2.0 9.3 6.3 3.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M N/A N/A Destination Origin Origin

0005 AA AB AC AD AE n/a 5998-01-411-3043 11472079 Circuit Card Assemb 05716 334412 750 3N 7/21/26 Req Yes Y Y N N TBD N 26 Military MIL-STD-129 / MIL-STD-2073-1 2.7 10.5 10.5 4.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M Y NS=FASTPACK (XC9) 8115-01-057-1244 Destination Origin Origin

0006 AA AB AC AD AE n/a 5998-01-411-3046 11472117 Circuit Card Assemb 05716 334412 750 3N 6/23/25 Req Yes Y Y N N TBD N 25 Military MIL-STD-129 / MIL-STD-2073-1 1.6 9.3 6.3 3.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M N/A N/A Destination Origin Origin

0007 AA AB AC AD AE n/a 5998-01-478-0910 11479784 Circuit Card Assembly Regulator 05716 334412 750 3N 6/23/25 Req Yes Y Y N N TBD N 30 Military MIL-STD-129 / MIL-STD-2073-1 3.3 13.5 13.5 4.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M N/A N/A Destination Origin Origin

0008 AA AB AC AD AE n/a 5998-01-609-1550 13647113 CCA - IOCU Interface 05716 334412 750 3N 6/6/27 Req Yes Y Y N N TBD N 34 Military MIL-STD-129 / MIL-STD-2073-1 1.2 9.3 6.3 3.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT D ED 00 Q 39 M N/A N/A Destination Origin Origin

0009 AA AB AC AD AE n/a 5998-01-618-4897 13658669 Circuit Card Assemb 05716 334412 750 3C 9/14/25 Req Yes Y Y N Y TBD N 39 Military MIL-STD-129 / MIL-STD-2073-1 2.5 9.5 6.7 4 B 001 000 N/A Appendix J GX 1 00 K3 LT A NS 00 Q 39 M N/A N/A Destination Origin Origin

0010 AA AB AC AD AE n/a 5998-01-632-9177 13657827-101 Circuit Card Assemb 05716 334412 750 3C 2/12/22 Req Yes N Y N Y TBD N 45 Military MIL-STD-129 / MIL-STD-2073-1 1.9 9.3 6.3 4.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M N/A N/A Destination Origin Origin

0011 AA AB AC AD AE n/a 5998-01-677-9236 13661199-1 CCA 05716 334412 750 3C 1/9/26 Req Yes Y Y N Y TBD N 33 Military MIL-STD-129 / MIL-STD-2073-1 1.7 10.5 10.5 4.0 B 001 000 ISPM-15 Appendix J GX 1 00 K3 LT A NS 00 F 39 M N/A N/A Destination Origin Origin

0012 AA AB AC AD AE D15H0824D1 6130-01-450-3535 11477045 Inverter, Power, Static 05716 335931 600 3N 7/21/26 Req Yes Y Y YES N TBD N 36 Destination Origin Origin

0013 AA AB AC AD AE n/a 6150-01-475-7993 13492518-1 Cable Assembly Spec 05716 335311 800 1G 4/7/27 Req Yes Y Y YES N TBD N 8 Military MIL-STD-129 / MIS-STD-2073-1 1.7 11.0 11.0 6.0 B 001 000 ISPM-15 Appendix J 41 1 00 00 LC A ED 00 Q 00 M Y COILCABLETO 10'DIA, CUSHION CAP CONNECTORS Destination Origin Origin

0014 AA AB AC AD AE n/a 6625-01-525-7028 11481078 Test Set, Electrical 3B150 334412 750 3B 7/7/26 Req Yes N Y N N TBD N 12 Military MIL-STD-129 / MIL-STD-2073-1 95.0 46.5 30.5 30.0 B 001 000 ISPM-15 Appendix J 10 1 00 EA ZZ H DP 00 F 00 M Y ZZ=NS USE BOTH POLYURETHANE DIE CUTS AND TRIPLEWALL FIBORBOA RD SLEEVES. ITEM PARTS LIST WILL BE INCLUDED. Origin Origin Origin

Offered Inspection Point

CUI & SOURCE SELECTION INFORMATION – SEE FAR 2.101 & 3.104

Offered Inspection Point for Supplies

RFP CLIN# NSN Description Plant CAGE Street City State Zip

0001 5998-01-713-9303 Circuit Card Assemb

0002 4140-01-596-3780 FAN, Centrigugal

0003 5975-01-703-2324 Cabinet, Electrical Equipment

0004 5998-01-411-3031 Circuit Card Assemb

0005 5998-01-411-3043 Circuit Card Assemb

0006 5998-01-411-3046 Circuit Card Assemb

0007 5998-01-478-0910 Circuit Card Assembly Regulator

0008 5998-01-609-1550 CCA - IOCU Interface

0009 5998-01-618-4897 Circuit Card Assemb

0010 5998-01-632-9177 Circuit Card Assemb

0011 5998-01-677-9236 CCA

0012 6130-01-450-3535 Inverter, Power, Static

0013 6150-01-475-7993 Cable Assembly Spec

0014 6625-01-525-7028 Test Set, Electrical

DFARS 252.217-7026 FILL IN

CUI & SOURCE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .