Enclosure 1 Identification of Requirements (IOR)_ 25-R-0046.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- SPRRA2-25-R-0046
- Issued by
-
Defense Logistics Agency Aviation
About this file
The document is an Identification of Requirements (IOR) Excel file for a sole source solicitation by the Defense Logistics Agency (DLA) Aviation for the Avenger Air Defense System. The solicitation (SPRRA2-25-R-0046) is specifically limited to Raytheon Company and seeks to add one NSN (National Stock Number) for a Cooler Reservoir Assembly to the existing DLA-Raytheon Depot Level Repairable (DLR) contract SPRBL1-15-D-0017, which is set to expire in September 2025.
The specific NSN (D14F0095D1) for the Cooler Reservoir Assembly has detailed quantity specifications, including minimum, mid-range, and maximum quantity ranges from 1-10, 10-20, and 20+ units. The item requires specific technical attributes, including FAT waiver, IUID (Unique Item Identification), serial number tracking, and a 720-day production lead time. The solicitation specifies direct communication with David Bennett via email, with interested parties required to provide their name, company name, CAGE code, and telephone number.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UCA IOR
| SPRRA2-24-R0073 Enclosure 1 - Identification of Requirements | |||||||||||||||||||||
| NOTE*** Alpha V Contract (SPRBL1-15-D-0017) is set to expire in September 2025. | |||||||||||||||||||||
| # | PRON | NSN | NIIN | PART NUMBER | NOUN | BID | INC | APPROVED CAGE | NAICS | # OF EMPLOYEES | AMRC CODE | AMRC EXP DATE | FAT Waiver | IUID Required | Serial # Required | Ozone | Classified Docs | Export Controled | Reusable Container | Production Lot Test | Required Production Lead Time |
| 1 | D14F0095D1 | 144001-4515825-- | 000001-4515825-- | 481-200571 | COOLER RESERVOIR ASSEMBLEY | UCA | N/A | 15090 | 336415 | 1000 | 3D | 9/24/29 | Yes | Yes | Yes | No | No | No | No | No | 720 days |
Unit Price Points Year 2025
| RFP Identitifcation of Requirements 2025 | Unit Price Points | Raytheon Proposed | |||||||
| # | PRON | NSN | PART NUMBER | NOUN | BID | Minimum Quantity | BEQ Quantity | Minimum Quantity | BEQ Quantity |
| 1 | D14F0095D1 | 144001-4515825-- | 481-200571 | COOLER RESERVOIR ASSEMBLEY | BID | 1 | 1420 | ||
| 8 | |||||||||
| 9 | |||||||||
| 10 | |||||||||
| 11 | |||||||||
| 12 | |||||||||
| 13 |
Quantity Range 2025
| RFP Identitifcation of Requirements 2025 | Unit Price Points | Raytheon Proposed | ||||||||
| # | PRON | NSN | PART NUMBER | NOUN | Minimum Range | Mid Range | Maximum Range | Minimum Range | Mid Range | Maximum Range |
| 1 | D14F0095D1 | 144001-4515825-- | 481-200571 | COOLER RESERVOIR ASSEMBLEY | 1-10 | 10-20 | 20+ |
File details come from the government source that posted it. Updated .