This document is a Justification for Other Than Full and Open Competition for the acquisition of 78 DELAY LINE items (NSN 5999-01-618-5016) by the Defense Logistics Agency Aviation. The contracting activity is DLA-AH.
The acquisition is being conducted as a sole source on the basis that the required items are available from only one or a limited number of sources (10 U.S.C. 3204(a)(1)). A sources sought notice was posted on July 10, 2023 but did not result in any responses. The proposed acquisition is a firm-fixed price, one-time buy with an estimated total value of $. The acquisition will be synopsized on or about August 4, 2023. The contracting officer has determined the cost to the government will be fair and reasonable based on certified cost and pricing data from the contractor. No other sources have indicated an interest in this acquisition. Efforts are being made to identify potential new sources for future competitive procurements.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
FOR SOLE SOURCE AND LIMITED COMPETITION
1. Agency: Defense Logistics Agency Contracting Activity: _D_L_A_-AH_ C_A ______________ _
Documr✓1entif;:;:~ber:_D_1_3H_o2_4_50_1 ____ 1 __ I _ ~:i::~~;umber: _s_P_RRA2 __ -_23_-R_-_o_oj=6-i--F-AR--P-a-1t- l 3- .-5----
2. The action being approved is the acquisition of supplies/services on other than a full and open competition basis.
l✓ I New Action □ Amendment: ________________________ _
3. The supplies/services required to meet the using activity's needs are described as follows:
BRIEF DESCRIPTION
DELAY LINE
*If too numerous, attach list ofNSNs and AMSC codes.
This acquisition:
NSNIPN
5999-01-618-5016/13646142-7
4. Tlpe , fContract (may include numberofbase years)
✓ will not include an option.
Finn Fixed Price One time Buy
QUANTITY
78EACH
ESTIMATED VALUE
will include a _____ % option for increased quantity. Total estimated dollar value of option quantity is$ _____ _ will include an option to extend the tenn of the contract for a period of ____ .months, exercisable in increments of
___ months. Total estimated dollar value of all option periodsis $ . The maximum dollar value of all option periods is $ ______ _
The total estimated dollar value of this acquisition is: (inclusive of any options) $~ The maximum dollar value of this acquisition is : (inclusive of any options)$
5. The statutory authority pennitting other than full and open competition is 10 U.S. C. 3204( a)( 1) - Available from only one or limited number of sources.
6. Effo1ts to improve DoD Competition in accordance with DFARS 206.303-2:
I ✓ IA sources sought notice or Request for Infonnation (RFI) in accordance with DFARS PGI 206.302-l (d) was posted in Contract Oppo1tunities on l O July 2023 . Results of the sources sought notice/RPI resulted in the following:
NO RESPONSES.
D A mass sources sought notice which included NSN(s) _______________________ _ was posted to Contract Opportunities on. _______ . Date must be most cmTent Contract Oppo1tunities posting (i.e., within a six month period). If too numerous, attach list ofNSNs.
D A waiver of sources sought notice/RPI was approved by the HCA or designee on. __________ and is hereby attached.
7. The acquisition is restricted to the only source(s) of supply known to have the capability of furnishing the required supplies/services.
Source(s) are:
A VN Form S53, NOV 2023 CUI
CONTROLLED BY: DLA Aviation
CONTROLLED BY: AHCB
CUI CATEGORY: SSEL DISTRIBUTION
DISSEMINATION CONTROL: FED
ONLYPOC:
CAGE COMPANY NAME
6Y858 MlCROSEMl CORP
The use of authority 10 U.S.C. 3204(a)(l) is based on:
B AMCl .
AMC2.
IZ) AMC3.
□ AMC4.
0 AMC5.
□AMSCA.
l ✓ I AMSCB.
□AMSCC.
□ AMSCD.
□AMSCH.
□AMSCK
□AMSCL.
□AMSCM
□AMSCN.
□AMSCP.
□AMSCQ.
□ AMSCR.
□AMSCS.
□AMSCU.
□AMSCV
□AMSCY.
□AMSCZ.
Suitable for competitive acquisition for the second or subsequent time.
Suitable for competitive acquisition for the first time.
Acquire, for the second or subsequent time, directly from the manufacturer.
Acquire, for the first time, directly from the manufacturer.
Acquire directly from the sole source contractor, who is not the manufacturer.
The Government' s right to use data in its possession is questionable. This code is under review and will be updated when the review is complete.
This must be acquired from a manufacturing source( s) specified on a source control drawing.
This pa1t required engineering source approval by the design control activity in order to maintain the quality of the part.
The data needed to acquire this pa1t is not economically available.
The Government does not have sufficient, accurate, or legible data to purchase this pa1t from other than the cwTent source. This code is under review and will be updated when the review iscomplete.
This pa1t must be produced from class 1 castings under MIL-STD-2175.
The annual buy value of this pa1t falls below the screening threshold established by DoD.
Manufactw·e of this part requires use of master or coordinated tooling.
Manufactw·e of this pa1t requires special test and/or inspection facilities to maintain function or system integrity.
The rights to use the data needed to purchase this part from additional source(s) are not owned by the Government and cannot be pw·chased, developed, or othe1wise obtained.
The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.
The Government does not own the data or rights to the data needed to pw·chase this part from another source. It is not economical to procure the data or rights to the data.
Acquisition ofthis item is restricted to Government approved sow·ce(s) because the item involves military sensitive technology.
The cost to the Govemment to breakout this pa1t and acquire it competitively has been determined to exceed the projected savings over the life span of the part.
This part has been designated a high reliability part. Probability of failw·e would be unacceptable. The engineering activity has detennined that data to define and control reliability limits cannot be obtained.
The design of this pa1t is unstable. Engineering, manufacturing, or perfonnance characteristics indicate that the required design objectives have not been achieved.
This part is a commercial/no-developmental/off-the-shelf item.
l✓ I Other:
Sources Sought was published on 10 July 2023 with a response date of 12 July 2023; no responses were received.
NOTE: A technical certification is required for acquisitions over $15 million
A VN Form S53, NOV 2023 CUI
8. Effo11s to ensure that offers are solicited from as many sources as practicable are:
I✓ I The acquisition will be synopsized onor about 4 August 2023 and any fum requesting a solicitation copy will be provided one. D A synopsis exception cited in FAR 5.202 applies: (Explain) _______________________ _
IZ]
Manufacturers of similar products identified in the market survey will be solicited.
Dealers of the manufacturers will be solicited.
Other: (Explain) Sources Sought and Synopsis will be published on or about 10 July 2023 and
4 August 2023 with a response date of 12 July 2023 and 21 August 2023.
9. I hereby detennine that the anticipated cost to the Government will be fair and reasonable. (Explain) n. .. ·eraJJ c""0r dris acqumnon will bewrllldreasonabl• ••tbe
Govemmem !AW FAR 15.403-4. me contrac.tor •ill be required to provide wtified cost and pric:iD& dua to bt used in supponiug the Gwemmea.t',; e\1alua.ti.00 of the proposed cost The proposed skill mix of labor. labor houn &: quantities of maJ.eJW. other direa cost and direa .
aDd iDdirtct mes will be oegoria1ed bytheGO\•emmem based oo rec.oo:a::oeodat:iofrtm DCMA Cldei:pett leChnic.a) persumel S1.1W(fliDgcbt program. The coc:mcc p:ice •iD be oegotiared lAW 1be proctdures iD FARPart l Smsttringcbt u.bimattcosr to the Gowmmem n fair and rwooab1e.
10. A market survey as defuted by FAR 10:
11.
I✓ I was conducted, and fu1US indicating an interest in the acquisition will be solicited. Market research effo1ts, include:
Market research as defined by FAR I 0.00 I was conducted based on knowledge of individuals within the requirements community. This item
Competition Advocate Shopping List Date is 30 September 20 I 8. IA W DLA Broadcast Acquisition Memorandum (BAM) 2015-27 published
12 June 15, Contracting Officers are required to issue a Request for Information (RF]) for Sources Sought with the J&A when acquiring supplies from only or a limited number of responsible sources. D was not conducted due to: --------------------------------------
Additional facts supporting other than full and open competition are:
Based upon the technical certification on file, technical data is not available and cannot be developed to pennit full and open competition. The data presently available reflects the minimum needs of the Govemment.
When FAR 6.302-1 is cited for substantial duplication of costs in the case of a follow-on acquisition as described in
6.302-l (a)(2)(ii)(A), an estimate if the cost to the Govemment that would be duplicated and how the estimate was derived: -------------------------------------------
When FAR 6.302-1 is cited for unacceptable delays in the case of a follow-on acquisition as described in 6.302-l (a)(2)(ii)(B), describe the unacceptable delays: ________________________ _
Other: AMSC 3B, Acquire, for the second or subsequent time, directly from the manufacturer. 1bis must be acquired from a manufacturing source(s) specified on a source control drawing.
12. A listing of somces, if any, indicating an interest in v.•riting in the acquisition are: (if none, state none)
CAGE COMPANY NAME
13. The actions, being taken to overcome ban-iers to competition before any subsequent acquisition are made: (Explain) Firms are encouraged to seek source approval in order to compete for future solicitations by accessing the websitehttp://amcomdmz..redstone.army.mil/casl_ cmo/casl_ cmo _home and looking under Standardiz.ed Aviation and Missile Source Approval Request (SAMSAR). Cturently, there are no outstanding qualification requests on 1his item; however, 1his is a continuous method of identifying potential new sources of supply. It has been determined that the Government's need cannot be met by an item available in the commercial marketplace; therefore, FAR Part 12 will not be used.
This is a spare part procured to an approved part number and is a military unique requirement not available in the commercial market place. As a result of the Sources Sought, no response has been received.
APPROVAL
APPROVAL LEVELS OF THE JUSTIFICATION - FAR 6.304
O notexceeding $750,000 . ... ........ ...................... ...................... . Contracting Officer [ZJ over $750,000 not exceeding $15,000,000 .. . .. .................... .. Competition Advocate LJ over $15,000,000 not exceeding $100,000,000 ...... ...... ........... Head of Contracting Activity
TECHNICAL/REQUIREMENTS PERSONNEL CERTIFICATION - FAR 6.303-2(c) Supporting data that is the responsibility of technical or requirements personnel and which form the basis for this justification have been certified as complete and accurate by the cognizant technical/requirements Personnel. Signature of technical/requirements personnel is not required.
DLA COUNSEL AVIATION - DLAD 1.691(e)(3)(i) DLA Counsel A via ti on has reviewed this Form S53 and concluded it creates a legally sufficient justification for restricting competition pursuant to
10 U.S.C. 3204(a)(l) and FAR 6.302-1 for sole source tactical acquisitions for NSNs in the federal supply system at or below $15 million. For acquisitions above SI S million, signature of the Aviation Deputy Chief Counsel is required to document legal sufficiency:
Name and Title Signature Phone Date
CONTRACTING OFFICER- FAR 6.303-2(b)(12) I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief If not exceeding $750,000, this signature serves as the approval.
Jean Paul Bretz, Contracting Officer BRETZ.JEAN.PAUL■ ~~~p~u,lllllll
- Oate: 2024.06.11 1<1:<tv:.co~-uD' --- 11 June2024
Name and Title Signature Phone Date
COMPETITION ADVOCATE- FAR 6.304(a)(2) The Competition Advocate for the procuring activity designated pursuant to FAR 6.501 has reviewed and hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If over $750,000, but not exceeding $15 million this signature serves as the approval.
Nikki Hendrix, Competition Advocate
Name and Title
HEAD OF CONTRACTING ACTIVITY - FAR 6.304(a)(3)
Oigitaly signed by
HENOR0CNIKKI.M-
Oate: 2024.06.12 1~ 0' --- 12June2024
Phone Date
The Head of Contracting Activity has reviewed and approved this Justification for a proposed contract over $ 15 million, but not exceeding$ 100 million.
Name and Title Signature Phone Date
File details come from the government source that posted it. Updated .