SPRRA2-20-D-0012 P00004 FULLY EXECUTED_24 SEP 2022.pdf

PDF 305 KB Posted

Attached to
Modification to add IBAS 2. 8 Kits, Installation, and Cables to SPRRA2-20-D-0012
Solicitation number
SPRRA2-20-D-0012
Issued by

About this file

This award notice modifies an existing contract to add Improved Bradley Acquisition Subsystem Block 2.8 Kits, installation services, and cables to the base contract between Defense Logistics Agency Aviation and DRS Network & Imaging Systems, LLC. The awarded contract value is $950 million over five years for 179 IBAS Block 2.8 Kits at a total price of $247 million, installation services, and cables including A3/A4 Tow Missile Launcher, A3 and A4 power and input/output cables. Delivery will occur over 24 months.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

P00004

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

JENNIFER TRIOLO

EMAIL: JENNIFER.TRIOLO@DLA.MIL

S1002A

DCMA ORLANDO

3555 MAGUIRE BLVD

ORLANDO, FL 32803-3726

32865

DRS NETWORK & IMAGING SYSTEMS, LLC

100 N BABCOCK ST

MELBOURNE, FL 32935-6715

SPRRA2-20-D-0012

2020MAY05

NO CHANGE TO OBLIGATION DATA

X 43.103(a)

X

SEE SECOND PAGE FOR DESCRIPTION

JUSTINE KIRK

JUSTINE.KIRK@DLA.MIL (256)690-5424

1 13

Tara Densler Director, Contracts & Compliance

9/23/22Densler, Tara

Digitally signed by Densler, Tara DN: cn=Densler, Tara ou=Employee Reason: I am the author of this document Location:

Date: 2022-09-23 18:32-04:00

KIRK.JUSTINE.R.1386257090 Digitally signed by KIRK.JUSTINE.R.1386257090 Date: 2022.09.24 08:41:50 -05'00'

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

P00004 2022SEP24

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

JENNIFER TRIOLO

EMAIL: JENNIFER.TRIOLO@DLA.MIL

S1002A

DCMA ORLANDO

3555 MAGUIRE BLVD

ORLANDO, FL 32803-3726

32865

DRS NETWORK & IMAGING SYSTEMS, LLC

100 N BABCOCK ST

MELBOURNE, FL 32935-6715

SPRRA2-20-D-0012

2020MAY05

NO CHANGE TO OBLIGATION DATA

X 43.103(a)

X

SEE SECOND PAGE FOR DESCRIPTION

/SIGNED/ 2022SEP24

JUSTINE KIRK

JUSTINE.KIRK@DLA.MIL (256)690-5424

1 13

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JENNIFER TRIOLO

Buyer Office Symbol/Telephone Number: DLA-AHA/(256)690-5245

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Kind of Modification: G

Type of Business: Large Business Performing in U.S.

Surveillance Criticality Designator: B

Contract Expiration Date: 2029MAR31

Paying Office: HQ0338

DFAS-COLUMBUS CENTER

SOUTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

*** End of Narrative A0000 ***

A-1. MODIFICATION P00004 IS BEING ISSUED TO ADD THREE-YEAR PRICING FOR IBAS BLOCK 2.8 KITS, INSTALLATION, AND IBAS 2.8 CABLES TO THE DLA

HUNTSVILLE SPARES SUBSUMABLE CONTRACT, SPRRA2-20-D-0012. IT IS ISSUED WITH FIRM FIXED PRICES AND FIRM DELIVERY SCHEDULES PURSUANT TO THE

SUBSUMABLE CONTRACT, SPRRA2-20-D-0012 AND IS SUBJECT TO AND INCORPORATES BY REFERENCE ALL TERMS AND CONDITIONS OF THE DRS ENTERPRISE

UMBRELLA CONTRACT, SPRRA2-20-D-0011.

A-2. THESE ADD-ON REQUIREMENTS ARE IN SUPPORT OF THE EH WEAPON SYSTEM, IMPROVED BRADLEY ACQUISITION SUBSYSTEM (IBAS).

A-3. THE FOLLOWING CLINs ARE HEREBY INCORPORATED INTO SECTION B OF THIS MODIFICATION AND WILL BE REFLECTED IN THEIR RESPECTIVE DELIVERY

ORDERS. CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/ ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE DETAILED WITHIN THE DELIVERY

ORDERS.

NOTE: THE FIRST DIGIT OF EACH CLIN WILL VARY WITHIN THE DELIVERY ORDERS DEPENDING ON THE FISCAL YEAR ORDERING PERIOD. FOR ADMINISTRATIVE

PURPOSES ONLY, DUE TO LIMITATIONS OF THE CONTRACT WRITING SYSTEM, ALL CLINS WITHIN THIS MOD START WITH "0", WITH THE EXCEPTION OF THE

INSTALLATION CLIN WHICH IS "2727". THE INSTALLATION CLIN WITHIN THE DELIVERY ORDERS WILL REFLECT "X027LX" DEPENDING ON THE ORDERING _ _

PERIOD.

CLIN: 2727

NOUN: IBAS BLOCK 2.8 KIT INSTALLATION

NSN: N/A- Labor

P/N: N/A- Labor

CLIN: 0027

NOUN: IBAS BLOCK 2.8 KIT

NSN: 9999-99-999-9999

P/N: 1035251-2

CLIN: 0028

NOUN: A3/A4 TOW MISSILE LAUNCHER (TML) CABLE

NSN: 9999-99-999-9999

P/N: 13762328

CLIN: 0029

NOUN: A3 POWER CABLE

NSN: 9999-99-999-9999

P/N: 13762327

CLIN: 0030

NOUN: A3 INPUT/OUTPUT CABLE

NSN: 9999-99-999-9999

P/N: 13762329

CLIN: 0031

NOUN: A4 POWER CABLE

NSN: 9999-99-999-9999

2 13

SPRRA2-20-D-0012

P00004

DRS NETWORK & IMAGING SYSTEMS, LLC

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

P/N: 13762332

CLIN: 0032

NOUN: A4 INPUT/OUTPUT CABLE

NSN: 9999-99-999-9999

P/N: 13762333

ADDITIONALLY, THE FOLLOWING CLIN NUMERIC SYSTEM AND SUFFIX CODES INDICATE THE APPROPRIATE ORDERING PERIOD:

NUMERIC SYSTEM______________ SUFFIX______ ORDERING PERIOD_______________

20XX AB YEAR 2 (OCTOBER 2021 - SEPTEMBER 2022)

30XX AC YEAR 3 (OCTOBER 2022 - SEPTEMBER 2023)

40XX AD YEAR 4 (OCTOBER 2023 - SEPTEMBER 2024)

THE SUFFIX LB/LC/LD WILL INDICATE AN INSTALLATION (LABOR) CLIN.

A-4. DLA HUNTSVILLE (SPRRA2)IS THE ORDERING AUTHORITY FOR THE SUBJECT ADD-ON REQUIREMENTS.

A-5. SECTION J ATTACHMENT, "SPREADSHEET FOR SPARES CLINS, PRICING AND DELIVERY SCHEDULE" WILL BE UPDATED TO REFLECT THE NEGOTIATED

PRICES AND WILL BE INCLUDED IN THE DELIVERY ORDERS AND ATTACHED HEREIN.

A-6. THE MAXIMUM QUANTITY/ CEILING OF $950,000,000 ($950M) REMAINS UNCHANGED. EXCEPT AS PROVIDED HEREIN, ALL OTHER TERMS AND CONDITIONS

REMAIN IN FULL FORCE AND EFFECT.

A-7. THE PROJECTED SPEND FOR THIS 3-YEAR ACTION IS AS FOLLOWS:

IBAS BLOCK 2.8 KITS AND INSTALLATION: $224,571,275.70

IBAS BLOCK 2.8 KIT CABLES: $5,648,889.33 _____________

TOTAL: $230,220,165.03

A-8. ACCELERATED DELIVERY IS ACCEPTABLE AT NO ADDITIONAL COST TO THE GOVERNMENT NOR TO THE CONTRACTOR.

A-9. IN ACCORDANCE WITH FAR 16.203-4(c)(5), FAR 52.216-4, ECONOMIC PRICE ADJUSTMENT - LABOR AND MATERIAL, WILL BE ADDED TO THIS

SUBSUMABLE CONTRACT TO COVER THE THREE-YEAR PRICING FOR PARTS ADDED UNDER MOD P00004 ONLY. BOTH PARTIES AGREE THAT THE ADDITION OF FAR

52.216-4 IS WITH THE UNDERSTANDING THAT ANY ADJUSTMENTS SHALL BE BASED ON THE BUREAU OF LABOR STATISTICS (BLS) INFLATION RATE INDEX FOR

UP TO 10%. THE CONTRACTOR MAY PROVIDE ECONOMIC PRICE ADJUSTMENT REQUESTS AS APPLICABLE IN DECEMBER 2022 AND BI-ANNUALLY THEREAFTER. THE

GOVERNMENT WILL THEN EVALUATE THE PRICE ADJUSTMENT REQUEST FOR APPLICABILITY TO THE TERMS SET FORTH IN FAR 52.216-4. THE GOVERNMENT

RESERVES THE RIGHT TO ADJUST UPWARD OR DOWNWARD, ALL OF WHICH ARE SUBJECT TO AVAILABILITY OF FUNDS. FURTHERMORE, CHANGES SHALL ONLY BE

MADE TO MATERIAL AND LABOR. NO ADJUSTMENTS WILL BE MADE ON THE APPLICABILITY TO RATES.

SEE ATTACHMENT 0005 - PRICED BILL OF MATERIALS (PBOM) FOR APPLICABLE PARTS ASSOCIATED WITH ANY REQUESTS FOR EQUITABLE ADJUSTMENTS FROM

DRS. NEGOTIATIONS OF THE PART NUMBERS LISTED ON THE ATTACHED PBOM WERE CONDUCTED ON A TOTAL MATERIAL COST BASIS. DLA IS CONSIDERING THE

DATA INCLUDED TO BE CURRENT, ACCURATE, AND COMPLETE AS OF JULY 1, 2022 BASED ON DRS'S CERTIFICATE OF CURRENT COST OR PRICING DATA.

*** END OF NARRATIVE A0005 ***

3 13

SPRRA2-20-D-0012

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0027 IBAS BLOCK 2.8 KIT $ ** NSP ** $ ** NSP ** __________________ ______________ __________________

COMMODITY NAME: IBAS BLOCK 2.8 KIT

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

0028 A3/A4 TOW MISSILE LAUNCHER CABLE $ ** NSP ** $ ** NSP ** ________________________________ ______________ __________________

COMMODITY NAME: A3/A4 TML CABLE

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

0029 A3 POWER CABLE $ ** NSP ** $ ** NSP ** ______________ ______________ __________________

COMMODITY NAME: A3 POWER CABLE

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

4 13

SPRRA2-20-D-0012

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

0030 A3 INPUT/OUTPUT CABLE $ ** NSP ** $ ** NSP ** _____________________ ______________ __________________

COMMODITY NAME: A3 I/O CABLE

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

0031 A4 POWER CABLE $ ** NSP ** $ ** NSP ** ______________ ______________ __________________

COMMODITY NAME: A4 POWER CABLE

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

5 13

SPRRA2-20-D-0012

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT:

0032 A4 INPUT/OUTPUT CABLE $ ** NSP ** $ ** NSP ** _____________________ ______________ __________________

COMMODITY NAME: A4 I/O CABLE

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

2727 INSTALLATION OF IBAS BLOCK 2.8 KIT $ ** NSP ** $ ** NSP ** __________________________________ ______________ __________________

COMMODITY NAME: INSTALLATION- IBAS BLOCK 2.8

PSC: 1095

CLIN CONTRACT TYPE:

Firm Fixed Price

CLIN DATA, PRICING, PACKAGING & MARKING, INSPECTION/

ACCEPTANCE, AND DELIVERY SCHEDULE WILL ALL BE

DETAILED WITHIN THE DELIVERY ORDER.

(End of narrative A001)

Packaging and Marking _____________________

FOB POINT:

6 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H-1. IN ACCORDANCE WITH FAR 16.203-4(c)(5), FAR 52.216-4, ECONOMIC PRICE ADJUSTMENT - LABOR AND MATERIAL, WILL BE ADDED TO THIS

SUBSUMABLE CONTRACT TO COVER THE THREE-YEAR PRICING FOR PARTS ADDED UNDER MOD P00004 ONLY. BOTH PARTIES AGREE THAT THE ADDITION OF FAR

52.216-4 IS WITH THE UNDERSTANDING THAT ANY ADJUSTMENTS SHALL BE BASED ON THE BUREAU OF LABOR STATISTICS (BLS) INFLATION RATE INDEX FOR

UP TO 10%. THE CONTRACTOR MAY PROVIDE ECONOMIC PRICE ADJUSTMENT REQUESTS AS APPLICABLE IN DECEMBER 2022 AND BI-ANNUALLY THEREAFTER. THE

GOVERNMENT WILL THEN EVALUATE THE PRICE ADJUSTMENT REQUEST FOR APPLICABILITY TO THE TERMS SET FORTH IN FAR 52.216-4. THE GOVERNMENT

RESERVES THE RIGHT TO ADJUST UPWARD OR DOWNWARD, ALL OF WHICH ARE SUBJECT TO AVAILABILITY OF FUNDS. FURTHERMORE, CHANGES SHALL ONLY BE

MADE TO MATERIAL AND LABOR. NO ADJUSTMENTS WILL BE MADE ON THE APPLICABILITY TO RATES.

SEE ATTACHMENT 0005 - PRICED BILL OF MATERIALS (PBOM) FOR APPLICABLE PARTS ASSOCIATED WITH ANY REQUESTS FOR EQUITABLE ADJUSTMENTS FROM

DRS. NEGOTIATIONS OF THE PART NUMBERS LISTED ON THE ATTACHED PBOM WERE CONDUCTED ON A TOTAL MATERIAL COST BASIS. DLA IS CONSIDERING THE

DATA INCLUDED TO BE CURRENT, ACCURATE, AND COMPLETE AS OF JULY 1, 2022 BASED ON DRS'S CERTIFICATE OF CURRENT COST OR PRICING DATA.

*** END OF NARRATIVE H0002 ***

7 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

I-1 ADDED 52.216-4 ECONOMIC PRICE ADJUSTMENT--LABOR AND MATERIAL JAN/2017

I-2 CHANGED 52.232-16 PROGRESS PAYMENTS (DEVIATION 2020-O0010) NOV/2021

The Government will make progress payments to the Contractor when requested as work progresses, but not more frequently than monthly, in amounts of $2,500 or more approved by the Contracting Officer, under the following conditions:

(a) Computation of amounts.

(1) Unless the Contractor requests a smaller amount, the Government will compute each progress payment as 90 percent of the

Contractor's total costs incurred under this contract whether or not actually paid, plus financing payments to subcontractors (see paragraph (j) of this clause), less the sum of all previous progress payments made by the Government under this contract. The

Contracting Officer will consider cost of money that would be allowable under Federal Acquisition Regulation (FAR) 31.205-10 as an incurred cost for progress payment purposes.

(2) The amount of financing and other payments for supplies and services purchased directly for the contract are limited to the amounts that have been paid by cash, check, or other forms of payment, or that are determined due and will be paid to subcontractors--

(i) In accordance with the terms and conditions of a subcontract or invoice; and

(ii) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government.

(3) The Government will exclude accrued costs of Contractor contributions under employee pension plans until actually paid unless-

(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and

(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's total costs for progress payments until paid).

(4) The Contractor shall not include the following in total costs for progress payment purposes in paragraph (a)(1) of this clause:

(i) Costs that are not reasonable, allocable to this contract, and consistent with sound and generally accepted accounting principles and practices.

(ii) Costs incurred by subcontractors or suppliers.

(iii) Costs ordinarily capitalized and subject to depreciation or amortization except for the properly depreciated or amortized portion of such costs.

(iv) Payments made or amounts payable to subcontractors or suppliers, except for--

(A) Completed work, including partial deliveries, to which the Contractor has acquired title; and

(B) Work under cost-reimbursement or time-and-material subcontracts to which the Contractor has acquired title.

(5) The amount of unliquidated progress payments may exceed neither (i) the progress payments made against incomplete work (including allowable unliquidated progress payments to subcontractors) nor (ii) the value, for progress payment purposes, of the incomplete work.

Incomplete work shall be considered to be the supplies and services required by this contract, for which delivery and invoicing by the

Contractor and acceptance by the Government are incomplete.

(6) The total amount of progress payments shall not exceed 90 percent of the total contract price.

(7) If a progress payment or the unliquidated progress payments exceed the amounts permitted by subparagraphs (a)(4) or (a)(5) above, the Contractor shall repay the amount of such excess to the Government on demand.

(8) Notwithstanding any other terms of the contract, the Contractor agrees not to request progress payments in dollar amounts of less than $2,500. The Contracting Officer may make exceptions.

(9) The costs applicable to items delivered, invoiced, and accepted shall not include costs in excess of the contract price of the items.

(b) Liquidation. Except as provided in the Termination for Convenience of the Government clause, all progress payments shall be liquidated by deducting from any payment under this contract, other than advance or progress payments, the unliquidated progress

8 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

payments, or 90 percent of the amount invoiced, whichever is less. The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated progress payments accordingly. The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.

(c) Reduction or suspension. The Contracting Officer may reduce or suspend progress payments, increase the rate of liquidation, or take a combination of these actions, after finding on substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (which includes paragraphs (f) and (g) below).

(2) Performance of this contract is endangered by the Contractor's (i) failure to make progress or (ii) unsatisfactory financial condition.

(3) Inventory allocated to this contract substantially exceeds reasonable requirements.

(4) The Contractor is delinquent in payment of the costs of performing this contract in the ordinary course of business.

(5) The fair value of the undelivered work is less than the amount of unliquidated progress payments for that work.

(6) The Contractor is realizing less profit than that reflected in the establishment of any alternate liquidation rate in paragraph

(b) above, and that rate is less than the progress payment rate stated in subparagraph (a)(1) above.

(d) Title.

(1) Title to the property described in this paragraph (d) shall vest in the Government. Vestiture shall be immediately upon the date of this contract, for property acquired or produced before that date. Otherwise, vestiture shall occur when the property is or should have been allocable or properly chargeable to this contract.

(2) Property, as used in this clause, includes all of the below-described items acquired or produced by the Contractor that are or should be allocable or properly chargeable to this contract under sound and generally accepted accounting principles and practices.

(i) Parts, materials, inventories, and work in process;

(ii) Special tooling and special test equipment to which the Government is to acquire title;

(iii) Nondurable (i.e., noncapital) tools, jigs, dies, fixtures, molds, patterns, taps, gauges, test equipment, and other similar manufacturing aids, title to which would not be obtained as special tooling under subparagraph (ii) above; and

(iv) Drawings and technical data, to the extent the Contractor or subcontractors are required to deliver them to the Government by other clauses of this contract.

(3) Although title to property is in the Government under this clause, other applicable clauses of this contract, e.g., the termination clauses, shall determine the handling and disposition of the property.

(4) The Contractor may sell any scrap resulting from production under this contract without requesting the Contracting Officer's approval, but the proceeds shall be credited against the costs of performance.

(5) To acquire for its own use or dispose of property to which title is vested in the Government under this clause, the Contractor must obtain the Contracting Officer's advance approval of the action and the terms. The Contractor shall (i) exclude the allocable costs of the property from the costs of contract performance, and (ii) repay to the Government any amount of unliquidated progress payments allocable to the property. Repayment may be by cash or credit memorandum.

(6) When the Contractor completes all of the obligations under this contract, including liquidation of all progress payments, title shall vest in the Contractor for all property (or the proceeds thereof) not--

(i) Delivered to, and accepted by, the Government under this contract; or

(ii) Incorporated in supplies delivered to, and accepted by, the Government under this contract and to which title is vested in the

Government under this clause.

(7) The terms of this contract concerning liability for Government-furnished property shall not apply to property to which the

Government acquired title solely under this clause.

(e) Risk of loss. Before delivery to and acceptance by the Government, the Contractor shall bear the risk of loss for property, the title to which vests in the Government under this clause, except to the extent the Government expressly assumes the risk. The Contractor

9 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

shall repay the Government an amount equal to the unliquidated progress payments that are based on costs allocable to property that is lost (see 45.101).

(f) Control of costs and property. The Contractor shall maintain an accounting system and controls adequate for the proper administration of this clause.

(g) Reports, forms, and access to records.

(1) The Contractor shall promptly furnish reports, certificates, financial statements, and other pertinent information (including estimates to complete) reasonably requested by the Contracting Officer for the administration of this clause. Also, the Contractor shall give the Government reasonable opportunity to examine and verify the Contractor's books, records, and accounts.

(2) The Contractor shall furnish estimates to complete that have been developed or updated within six months of the date of the progress payment request. The estimates to complete shall represent the Contractor's best estimate of total costs to complete all remaining contract work required under the contract. The estimates shall include sufficient detail to permit Government verification.

(3) Each Contractor request for progress payment shall:

(i) Be submitted on Standard Form 1443, Contractor's Request for Progress Payment, or the electronic equivalent as required by agency regulations, in accordance with the form instructions and the contract terms; and

(ii) Include any additional supporting documentation requested by the Contracting Officer.

(h) Special terms regarding default. If this contract is terminated under the Default clause, (i) the Contractor shall, on demand, repay to the Government the amount of unliquidated progress payments, and (ii) title shall vest in the Contractor, on full liquidation of progress payments, for all property for which the Government elects not to require delivery under the Default clause. The Government shall be liable for no payment except as provided by the Default clause.

(i) Reservations of rights.

(1) No payment or vesting of title under this clause shall (i) excuse the Contractor from performance of obligations under this contract or (ii) constitute a waiver of any of the rights or remedies of the parties under the contract.

(2) The Government's rights and remedies under this clause (i) shall not be exclusive but rather shall be in addition to any other rights and remedies provided by law or this contract and (ii) shall not be affected by delayed, partial, or omitted exercise of any right, remedy, power, or privilege, nor shall such exercise or any single exercise preclude or impair any further exercise under this clause or the exercise of any other right, power, or privilege of the Government.

(j) Financing payments to subcontractors. The financing payments to subcontractors mentioned in paragraphs (a)(1) and (a)(2) of this clause shall be all financing payments to subcontractors or divisions, if the following conditions are met:

(1) The amounts included are limited to--

(i) The unliquidated remainder of financing payments made; plus

(ii) Any unpaid subcontractor requests for financing payments.

(2) The subcontract or interdivisional order is expected to involve a minimum of approximately 6 months between the beginning of work and the first delivery; or, if the subcontractor is a small business concern, 4 months.

(3) If the financing payments are in the form of progress payments, the terms of the subcontract or interdivisional order concerning progress payments--

(i) Are substantially similar to the terms of this clause for any subcontractor that is a large business concern, or this clause with its Alternate I for any subcontractor that is a small business concern;

(ii) Are at least as favorable to the Government as the terms of this clause;

(iii) Are not more favorable to the subcontractor or division than the terms of this clause are to the Contractor;

(iv) Are in conformance with the requirements of FAR 32.504(e); and

(v) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the

Government's right to require delivery of the property to the Government if--

10 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(A) The Contractor defaults; or

(B) The subcontractor becomes bankrupt or insolvent.

(4) If the financing payments are in the form of performance-based payments, the terms of the subcontract or interdivisional order concerning payments--

(i) Are substantially similar to the Performance-Based Payments clause at FAR 52.232-32 and meet the criteria for, and definition of, performance-based payments in FAR Part 32;

(ii) Are in conformance with the requirements of FAR 32.504(f); and

(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the

Government's right to require delivery of the property to the Government if--

(A) The Contractor defaults; or

(B) The subcontractor becomes bankrupt or insolvent.

(5) If the financing payments are in the form of commercial product or commercial service financing payments, the terms of the subcontract or interdivisional order concerning payments--

(i) Are constructed in accordance with FAR 32.206(c) and included in a subcontract for a commercial product or commercial service purchase that meets the definition and standards for acquisition of commercial products and commercial services in FAR parts 2 and 12;

(ii) Are in conformance with the requirements of FAR 32.504(g); and

(iii) Subordinate all subcontractor rights concerning property to which the Government has title under the subcontract to the

Government's right to require delivery of the property to the Government if--

(A) The Contractor defaults; or

(B) The subcontractor becomes bankrupt or insolvent.

(6) If financing is in the form of progress payments, the progress payment rate in the subcontract is the customary rate used by the contracting agency, depending on whether the subcontractor is or is not a small business concern.

(7) Concerning any proceeds received by the Government for property to which title has vested in the Government under the subcontract terms, the parties agree that the proceeds shall be applied to reducing any unliquidated financing payments by the Government to the

Contractor under this contract.

(8) If no unliquidated financing payments to the Contractor remain, but there are unliquidated financing payments that the Contractor has made to any subcontractor, the Contractor shall be subrogated to all the rights the Government obtained through the terms required by this clause to be in any subcontract, as if all such rights had been assigned and transferred to the Contractor.

(9) To facilitate small business participation in subcontracting under this contract, the Contractor shall provide financing payments to small business concerns, in conformity with the standards for customary contract financing payments stated in FAR 32.113. The

Contractor shall not consider the need for such financing payments as a handicap or adverse factor in the award of subcontracts.

(k) Limitations on undefinitized contract actions. Notwithstanding any other progress payment provisions in this contract, progress payments may not exceed 80 percent of costs incurred on work accomplished under undefinitized contract actions. A contract action is any action resulting in a contract, as defined in subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes. This limitation shall apply to the costs incurred, as computed in accordance with paragraph (a) of this clause, and shall remain in effect until the contract action is definitized. Costs incurred which are subject to this limitation shall be segregated on Contractor progress payment requests and invoices from those costs eligible for higher progress payment rates. For purposes of progress payment liquidation, as described in paragraph (b) of this clause, progress payments for undefinitized contract actions shall be liquidated at 80 percent of the amount invoiced for work performed under the undefinitized contract action as long as the contract action remains undefinitized. The amount of unliquidated progress payments for undefinitized contract actions shall not exceed 80 percent of the maximum liability of the Government under the undefinitized contract action or such lower limit specified elsewhere in the contract. Separate limits may be specified for separate actions.

(l) Due date. The designated payment office will make progress payments on the 30th day after the designated billing office receives a proper progress payment request. In the event that the Government requires an audit or other review of a specific progress payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make

11 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

payment by the specified due date. Progress payments are considered contract financing and are not subject to the interest penalty provisions of the Prompt Payment Act.

(m) Progress payments under indefinite-delivery contracts. The Contractor shall account for and submit progress payment requests under individual orders as if the order constituted a separate contract, unless otherwise specified in this contract.

(End of clause)

12 13

SPRRA2-20-D-0012

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0001 SPREADSHEET FOR SPARES CLINS, PRICING AND DELIVERY SCHEDULE 12-JUL-2022 001 EMAIL

Attachment 0005 PRICED BILL OF MATERIALS 23-SEP-2022 001 EMAIL

13 13

SPRRA2-20-D-0012

YEAR 1 -- AA

CLIN CLIN ORDER YEAR CAGE NSN AMRC P/N NOMENCLATURE BEQ WITHOUT MOQ PRICE MOQ PRICE TOTAL UNIT PRICE TOTAL NUMBER PER MONTH TO BE DELIVERED DELIVERY (MONTHS AFTER DATE OF AWARD)

1001 AA 32865 6130-01-543-3461 13620091 POWER SUPPLY 50 $ 185.00 $ 4,422.00 $ 4,607.00 3 16 0001A1

1002 AA 18876 1240-01-581-5592 13622000 LASER SHUTTER ASSEMBLY 30 $ 55,868.00 $ 9,471.00 $ 65,339.00 2 15 0002A1

1003 AA 18876 5998-01-645-7357 13690050 CCA, LTAS PROCESSOR 20 $ 8,278.00 $ - 0 $ 8,278.00 3 12 0003B1

1004 AA 18876 5998-01-645-7359 13690052 CCA, P-HEAD SERVO PROCESS 10 $ 12,423.00 $ - 0 $ 12,423.00 2 14 0004B1

1005 AA 18876 5998-01-645-7361 13690053 CCA, P-HEAD INTERFACE 10 $ 10,676.00 $ - 0 $ 10,676.00 3 14 0005B1

1006 AA 18876 5998-01-645-7362 13690051 CCA, TAS INTERFACE 10 $ 7,094.00 $ - 0 $ 7,094.00 2 11 0006B1

1007 AA 32865 1430-01-571-5812 13620159 MISSILE CONTROL SUB UPGRADE 10 $ 86,300.00 $ 15,501.00 $ 101,801.00 1 22 0007A1

1008 AA 18876 5998-01-591-4243 13620160 CCA, CARRIER 10 $ 11,192.00 $ - 0 $ 11,192.00 1 11 0008B1

1009 AA 18876 5998-01-591-4248 13620162 CCA, CONFIGURATION MODULE 10 $ 11,286.00 $ - 0 $ 11,286.00 1 22 0009B1

1010 AA 18876 5998-01-591-4199 13620164 CCA, SINGLE BOARD COMPUTER 10 $ 35,108.00 $ - 0 $ 35,108.00 1 22 0010B1

1011 AA 18876 1290-01-461-9555 13588695 SLIDING BROWPAD ASSEMBLY 30 $ 890.00 $ - 0 $ 890.00 15 16 0011B1

1012 AA 18876 4935-01-607-1825 13680141 TOW SYSTEM EVALUATION 20 $ 2,400.00 $ - 0 $ 2,400.00 10 10 0012B1

1013 AA 18876 1240-01-537-0124 13620293 TARGET ACQUISITION SUB 10 $ 648,410.00 $ 127,825.00 $ 776,235.00 2 22 0013B1

1014 AA 18876 1240-01-537-0134 13620294 LOWER TARGET ACQ SUB 10 $ 479,029.00 $ 123,174.00 $ 602,203.00 2 22 0014B1

1015 AA 18876 1240-01-442-4825 13588710 PERISCOPE HEAD ASSEMBLY 20 $ 142,896.00 $ 4,659.00 $ 147,555.00 3 19 0015B1

1016 AA 18876 5998-01-462-8499 13588711 CCA, P-HEAD POWER SUPPLY 20 $ 10,310.00 $ - 0 $ 10,310.00 1 11 0016C1

1017 AA 18876 5855-01-462-9048 13588681 COLLIMATOR INFRARED 20 $ 44,883.00 $ 9,076.00 $ 53,959.00 2 15 0017C1

1018 AA 18876 7025-01-463-4586 13588679 DISPLAY UNIT 30 $ 19,639.00 $ 2,138.00 $ 21,777.00 2 11 0018C1

1019 AA 18876 5998-01-502-9342 13592574 CCA, VIDEO DEFLECTION 20 $ 6,687.00 $ - 0 $ 6,687.00 20 11 0019B1

1020 AA 18876 1240-01-617-7635 13677506 CCD DAY CAMERA 35 $ 8,546.00 $ 3,374.00 $ 11,920.00 10 14 0020B1

1021 AA 18876 6130-01-471-4569 13588757 POWER SUPPLY 10 $ 8,331.00 $ - 0 $ 8,331.00 10 13 0021C1

1022 AA 18876 5855-01-463-4579 13588715 INFRARED WINDOW ASSY 10 $ 29,446.00 $ - 0 $ 29,446.00 10 11 0022C1

1023 AA 18876 1240-01-497-2197 6445836 TAS/ISU CONTAINER 10 $ 4,305.00 $ - 0 $ 4,305.00 10 6 0023C1

1024 AA 18876 1240-01-497-2199 6445837 LTAS CONTAINER 10 $ 2,646.00 $ - 0 $ 2,646.00 10 5 0024C1

1025 AA 32865 5995-01-652-5148 6445002 WIRING HARNESS 10 $ 336.00 $ - 0 $ 336.00 10 8 0025C1

1026 AA 18876 5998-01-588-3343 13494806 CIRCUIT CARD ASSEMBLY 5 $ 2,403.00 $ - 0 $ 2,403.00 5* 11 0026B1

1027 32865 9999-99-999-9999 1035251-2 Block .8 Kit 179 $ 247,454.20 $ - 0 $ 247,454.20 5 24

1028 32865 9999-99-999-9999 13762328 A3/A4 TML 179 $ 2,088.00 $ - 0 $ 2,088.00 5 24

1029 32865 9999-99-999-9999 13762327 A3 Power 179 $ 845.00 $ - 0 $ 845.00 5 24

1030 32865 9999-99-999-9999 13762329 A3 I/O 179 $ 4,351.00 $ - 0 $ 4,351.00 5 24

1031 32865 9999-99-999-9999 13762332 A4 Power 179 $ 1,035.00 $ - 0 $ 1,035.00 5 24

1032 32865 9999-99-999-9999 13762333 A4 I/O 179 $ 3,762.00 $ - 0 $ 3,762.00 5 24

1033 32865 1240-01-462-8519 13588683 Field of View(FOV) Assy 0 $ - 0 $ - 0 $ - 0 0 0

* number of units delivered per mth will be ramped up to qty 30

YEAR 2 -- AB

CLIN CLIN ORDER YEAR CAGE NSN AMRC P/N NOMENCLATURE BEQ WITHOUT MOQ PRICE MOQ PRICE TOTAL UNIT PRICE TOTAL NUMBER PER MONTH TO BE DELIVERED DELIVERY (MONTHS AFTER DATE OF AWARD)

2001 AB 32865 6130-01-543-3461 13620091 POWER SUPPLY 10 $ 333.00 $ 4,422.00 $ 4,755.00 3 16 0001B2

2002 AB 18876 1240-01-581-5592 13622000 LASER SHUTTER ASSEMBLY 10 $ 91,129.00 $ 9,471.00 $ 100,600.00 2 15 0002A2

2003 AB 18876 5998-01-645-7357 13690050 CCA, LTAS PROCESSOR 10 $ 8,674.00 $ - 0 $ 8,674.00 3 12 0003B2

2004 AB 18876 5998-01-645-7359 13690052 CCA, P-HEAD SERVO PROCESS 10 $ 12,490.00 $ - 0 $ 12,490.00 2 14 0004B2

2005 AB 18876 5998-01-645-7361 13690053 CCA, P-HEAD INTERFACE 10 $ 11,269.00 $ - 0 $ 11,269.00 3 14 0005B2

2006 AB 18876 5998-01-645-7362 13690051 CCA, TAS INTERFACE 10 $ 7,128.00 $ - 0 $ 7,128.00 2 11 0006B2

2007 AB 32865 1430-01-571-5812 13620159 MISSILE CONTROL SUB UPGRADE 5 $ 117,813.00 $ 15,501.00 $ 133,314.00 1 22 0007A2

2008 AB 18876 5998-01-591-4243 13620160 CCA, CARRIER 5 $ 12,280.00 $ - 0 $ 12,280.00 1 11 0008B2

2009 AB 18876 5998-01-591-4248 13620162 CCA, CONFIGURATION MODULE 5 $ 22,680.00 $ - 0 $ 22,680.00 1 22 0009B2

2010 AB 18876 5998-01-591-4199 13620164 CCA, SINGLE BOARD COMPUTER 5 $ 41,300.00 $ - 0 $ 41,300.00 1 22 0010B2

2011 AB 18876 1290-01-461-9555 13588695 SLIDING BROWPAD ASSEMBLY 20 $ 1,038.00 $ - 0 $ 1,038.00 15 16 0011B2

2012 AB 18876 4935-01-607-1825 13680141 TOW SYSTEM EVALUATION 20 $ 2,417.00 $ - 0 $ 2,417.00 10 10 0012B2

2013 AB 18876 1240-01-537-0124 13620293 TARGET ACQUISITION SUB 10 $ 660,775.00 $ 127,826.00 $ 788,601.00 2 22 0013B2

2014 AB 18876 1240-01-537-0134 13620294 LOWER TARGET ACQ SUB 10 $ 492,178.00 $ 123,174.00 $ 615,352.00 2 22 0014B2

2015 AB 18876 1240-01-442-4825 13588710 PERISCOPE HEAD ASSEMBLY 10 $ 166,760.00 $ 4,659.00 $ 171,419.00 3 19 0015B2

2016 AB 18876 5998-01-462-8499 13588711 CCA, P-HEAD POWER SUPPLY 10 $ 10,822.00 $ - 0 $ 10,822.00 1 11 0016C2

2017 AB 18876 5855-01-462-9048 13588681 COLLIMATOR INFRARED 20 $ 45,512.00 $ 9,076.00 $ 54,588.00 2 15 0017C2

2018 AB 18876 7025-01-463-4586 13588679 DISPLAY UNIT 20 $ 27,610.00 $ 2,138.00 $ 29,748.00 2 11 0018C2

2019 AB 18876 5998-01-502-9342 13592574 CCA, VIDEO DEFLECTION 20 $ 6,842.00 $ - 0 $ 6,842.00 20 11 0019B2

2020 AB 18876 1240-01-617-7635 13677506 CCD DAY CAMERA 20 $ 14,768.00 $ 3,373.00 $ 18,141.00 10 14 0020B2

2021 AB 18876 6130-01-471-4569 13588757 POWER SUPPLY 10 $ 8,378.00 $ - 0 $ 8,378.00 10 13 0021C2

2022 AB 18876 5855-01-463-4579 13588715 INFRARED WINDOW ASSY 10 $ 29,822.00 $ - 0 $ 29,822.00 10 11 0022C2

2023 AB 18876 1240-01-497-2197 6445836 TAS/ISU CONTAINER 10 $ 4,392.00 $ - 0 $ 4,392.00 10 6 0023C2

2024 AB 18876 1240-01-497-2199 6445837 LTAS CONTAINER 10 $ 2,705.00 $ - 0 $ 2,705.00 10 5 0024C2

2025 AB 32865 5995-01-652-5148 6445002 WIRING HARNESS 10 $ 343.00 $ - 0 $ 343.00 10 8 0025C2

2026 AB 18876 5998-01-588-3343 13494806 CIRCUIT CARD ASSEMBLY 5 $ 2,410.00 $ - 0 $ 2,410.00 5 11 0026B2

2027 AB 32865 9999-99-999-9999 1035251-2 IBAS Block 2.8 Kit 143 N/A N/A $ 239,503.55 30 15

2027 LB 32865 Labor IBAS Block 2.8 Kit Installation 143 N/A N/A $ 3,526.78 30 15

2028 AB 32865 9999-99-999-9999 13762328 A3/A4 TML 143 N/A N/A $ 1,722.40 30 10

2029 AB 32865 9999-99-999-9999 13762327 A3 Power 143 N/A N/A $ 696.70 30 10

2030 AB 32865 9999-99-999-9999 13762329 A3 I/O 143 N/A N/A $ 3,588.85 30 10

2031 AB 32865 9999-99-999-9999 13762332 A4 Power N/A N/A N/A N/A N/A N/A

2032 AB 32865 9999-99-999-9999 13762333 A4 I/O N/A N/A N/A N/A N/A N/A

2033 AB 32865 1240-01-462-8519 13588683 Field of View(FOV) Assy 0 N/A N/A $ 15,926.75 5 12

YEAR 3 -- AC

CLIN CLIN ORDER YEAR CAGE NSN AMRC P/N NOMENCLATURE BEQ WITHOUT MOQ PRICE MOQ PRICE TOTAL UNIT PRICE TOTAL NUMBER PER MONTH TO BE DELIVERED DELIVERY (MONTHS AFTER DATE OF AWARD)

3001 AC 32865 6130-01-543-3461 13620091 POWER SUPPLY 50 $ 204.00 $ 4,422.00 $ 4,626.00 3 16 0001C3

3002 AC 18876 1240-01-581-5592 13622000 LASER SHUTTER ASSEMBLY 10 $ 92,700.00 $ 9,471.00 $ 102,171.00 2 15 0002A3

3003 AC 18876 5998-01-645-7357 13690050 CCA, LTAS PROCESSOR 30 $ 5,243.00 $ - 0 $ 5,243.00 3 12 0003C3

3004 AC 18876 5998-01-645-7359 13690052 CCA, P-HEAD SERVO PROCESS 30 $ 8,248.00 $ - 0 $ 8,248.00 2 14 0004C3

3005 AC 18876 5998-01-645-7361 13690053 CCA, P-HEAD INTERFACE 30 $ 8,546.00 $ - 0 $ 8,546.00 3 14 0005C3

3006 AC 18876 5998-01-645-7362 13690051 CCA, TAS INTERFACE 30 $ 4,518.00 $ - 0 $ 4,518.00 2 11 0006C3

3007 AC 32865 1430-01-571-5812 13620159 MISSILE CONTROL SUB UPGRADE 5 $ 119,188.00 $ 15,501.00 $ 134,689.00 1 22 0007A3

3008 AC 18876 5998-01-591-4243 13620160 CCA, CARRIER 5 $ 1,954.00 $ - 0 $ 1,954.00 1 11 0008B3

3009 AC 18876 5998-01-591-4248 13620162 CCA, CONFIGURATION MODULE 5 $ 1,889.00 $ - 0 $ 1,889.00 1 22 0009B3

3010 AC 18876 5998-01-591-4199 13620164 CCA, SINGLE BOARD COMPUTER 5 $ 41,773.00 $ - 0 $ 41,773.00 1 22 0010B3

3011 AC 18876 1290-01-461-9555 13588695 SLIDING BROWPAD ASSEMBLY 20 $ 1,059.00 $ - 0 $ 1,059.00 15 16 0011B3

3012 AC 18876 4935-01-607-1825 13680141 TOW SYSTEM EVALUATION 20 $ 2,461.00 $ - 0 $ 2,461.00 10 10 0012B3

3013 AC 18876 1240-01-537-0124 13620293 TARGET ACQUISITION SUB 10 $ 673,999.00 $ 127,826.00 $ 801,825.00 2 22 0013B3

3014 AC 18876 1240-01-537-0134 13620294 LOWER TARGET ACQ SUB 10 $ 500,814.00 $ 123,174.00 $ 623,988.00 2 22 0014B3

3015 AC 18876 1240-01-442-4825 13588710 PERISCOPE HEAD ASSEMBLY 30 $ 122,555.00 $ 4,659.00 $ 127,214.00 3 19 0015C3

3016 AC 18876 5998-01-462-8499 13588711 CCA, P-HEAD POWER SUPPLY 10 $ 10,933.00 $ - 0 $ 10,933.00 1 11 0016C3

3017 AC 18876 5855-01-462-9048 13588681 COLLIMATOR INFRARED 20 $ 46,353.00 $ 9,076.00 $ 55,429.00 2 15 0017C3

3018 AC 18876 7025-01-463-4586 13588679 DISPLAY UNIT 20 $ 28,292.00 $ 2,138.00 $ 30,430.00 2 11 0018C3

3019 AC 18876 5998-01-502-9342 13592574 CCA, VIDEO DEFLECTION 20 $ 6,944.00 $ - 0 $ 6,944.00 20 11 0019B3

3020 AC 18876 1240-01-617-7635 13677506 CCD DAY CAMERA 20 $ 14,967.00 $ 3,373.00 $ 18,340.00 10 14 0020B3

3021 AC 18876 6130-01-471-4569 13588757 POWER SUPPLY 10 $ 8,420.00 $ - 0 $ 8,420.00 10 13 0021C3

3022 AC 18876 5855-01-463-4579 13588715 INFRARED WINDOW ASSY 10 $ 30,264.00 $ - 0 $ 30,264.00 10 11 0022C3

3023 AC 18876 1240-01-497-2197 6445836 TAS/ISU CONTAINER 10 $ 4,455.00 $ - 0 $ 4,455.00 10 6 0023C3

3024 AC 18876 1240-01-497-2199 6445837 LTAS CONTAINER 10 $ 2,749.00 $ - 0 $ 2,749.00 10 5 0024C3

3025 AC 32865 5995-01-652-5148 6445002 WIRING HARNESS 10 $ 340.00 $ - 0 $ 340.00 10 8 0025C1

3026 AC 18876 5998-01-588-3343 13494806 CIRCUIT CARD ASSEMBLY 5 $ 2,430.00 $ - 0 $ 2,430.00 5 11 0026B3

3027 AC 32865 9999-99-999-9999 1035251-2 Block .8 Kit 414 N/A N/A $ 214,424.82 30 15

3027 LC 32865 Labor IBAS Block 2.8 Kit Installation 414 N/A N/A $ 3,566.59 30 15

3028 AC 32865 9999-99-999-9999 13762328 A3/A4 TML 414 N/A N/A $ 1,625.13 30 10

3029 AC 32865 9999-99-999-9999 13762327 A3 Power 414 N/A N/A $ 579.95 30 10

3030 AC 32865 9999-99-999-9999 13762329 A3 I/O 414 N/A N/A $ 3,452.58 30 10

3031 AC 32865 9999-99-999-9999 13762332 A4 Power N/A N/A N/A N/A N/A N/A

3032 AC 32865 9999-99-999-9999 13762333 A4 I/O N/A N/A N/A N/A N/A N/A

3033 AC 32865 1240-01-462-8519 13588683 Field of View(FOV) Assy 30 N/A N/A $ 15,926.75 10 12

* number of units delivered per mth will be ramped up to qty 30

YEAR 4 -- AD

CLIN CLIN ORDER YEAR CAGE NSN AMRC P/N NOMENCLATURE BEQ PRICE TOTAL NUMBER PER MONTH TO BE DELIVERED DELIVERY (MONTHS AFTER DATE OF AWARD)

4001 AD 32865 6130-01-543-3461 13620091 POWER SUPPLY 50 TBD TBD TBD

4002 AD 18876 1240-01-581-5592 13622000 LASER SHUTTER ASSEMBLY 30 TBD TBD TBD

4003 AD 18876 5998-01-645-7357 13690050 CCA, LTAS PROCESSOR 30 TBD TBD TBD

4004 AD 18876 5998-01-645-7359 13690052 CCA, P-HEAD SERVO PROCESS 30 TBD TBD TBD

4005 AD 18876 5998-01-645-7361 13690053 CCA, P-HEAD INTERFACE 30 TBD TBD TBD

4006 AD 18876 5998-01-645-7362 13690051 CCA, TAS INTERFACE 30 TBD TBD TBD

4007 AD 32865 1430-01-571-5812 13620159 MISSILE CONTROL SUB UPGRADE 5 TBD TBD TBD

4008 AD 18876 5998-01-591-4243 13620160 CCA, CARRIER 5 TBD TBD TBD

4009 AD 18876 5998-01-591-4248 13620162 CCA, CONFIGURATION MODULE 5 TBD TBD TBD

4010 AD 18876 5998-01-591-4199 13620164 CCA, SINGLE BOARD COMPUTER 5 TBD TBD TBD

4011 AD 18876 1290-01-461-9555 13588695 SLIDING BROWPAD ASSEMBLY 20 TBD TBD TBD

4012 AD 18876 4935-01-607-1825 13680141 TOW SYSTEM EVALUATION 20 TBD TBD TBD

4013 AD 18876 1240-01-537-0124 13620293 TARGET ACQUISITION SUB 10 TBD TBD TBD

4014 AD 18876 1240-01-537-0134 13620294 LOWER TARGET ACQ SUB 10 TBD TBD TBD

4015 AD 18876 1240-01-442-4825 13588710 PERISCOPE HEAD ASSEMBLY 30 TBD TBD TBD

4016 AD 18876 5998-01-462-8499 13588711 CCA, P-HEAD POWER SUPPLY 10 TBD TBD TBD

4017 AD 18876 5855-01-462-9048 13588681 COLLIMATOR INFRARED 20 TBD TBD TBD

4018 AD 18876 7025-01-463-4586 13588679 DISPLAY UNIT 20 TBD TBD TBD

4019 AD 18876 5998-01-502-9342 13592574 CCA, VIDEO DEFLECTION 20 TBD TBD TBD

4020 AD 18876 1240-01-617-7635 13677506 CCD DAY CAMERA 20 TBD TBD TBD

4021 AD 18876 6130-01-471-4569 13588757 POWER SUPPLY 10 TBD TBD TBD

4022 AD 18876 5855-01-463-4579 13588715 INFRARED WINDOW ASSY 10 TBD TBD TBD

4023 AD 18876 1240-01-497-2197 6445836 TAS/ISU CONTAINER 10 TBD TBD TBD

4024 AD 18876 1240-01-497-2199 6445837 LTAS CONTAINER 10 TBD TBD TBD

4025 AD 32865 5995-01-652-5148 6445002 WIRING HARNESS 10 TBD TBD TBD

4026 AD 18876 5998-01-588-3343 13494806 CIRCUIT CARD ASSEMBLY 5 TBD TBD TBD

4027 AD 32865 9999-99-999-9999 1035251-2 Block .8 Kit 414 $ 215,715.75 30 15

4027 LD 32865 Labor IBAS Block 2.8 Kit Installation 414 $ 3,657.20 30 15

4028 AD 32865 9999-99-999-9999 13762328 A3/A4 TML 414 $ 1,627.69 30 10

4029 AD 32865 9999-99-999-9999 13762327 A3 Power N/A N/A N/A N/A

4030 AD 32865 9999-99-999-9999 13762329 A3 I/O N/A N/A N/A N/A

4031 AD 32865 9999-99-999-9999 13762332 A4 Power 414 $ 778.29 30 10

4032 AD 32865 9999-99-999-9999 13762333 A4 I/O 414 $ 2,983.38 30 10

4033 AD 32865 1240-01-462-8519 13588683 Field of View(FOV) Assy 30 TBD TBD TBD

YEAR 5 -- AE

CLIN CLIN ORDER YEAR CAGE NSN AMRC P/N NOMENCLATURE BEQ PRICE TOTAL NUMBER PER MONTH TO BE DELIVERED DELIVERY (MONTHS AFTER DATE OF AWARD)

5001 AE 32865 6130-01-543-3461 13620091 POWER SUPPLY 50

5002 AE 18876 1240-01-581-5592 13622000 LASER SHUTTER ASSEMBLY 30

5003 AE 18876 5998-01-645-7357 13690050 CCA, LTAS PROCESSOR 30

5004 AE 18876 5998-01-645-7359 13690052 CCA, P-HEAD SERVO PROCESS 30

5005 AE 18876 5998-01-645-7361 13690053 CCA, P-HEAD INTERFACE 30

5006 AE 18876 5998-01-645-7362 13690051 CCA, TAS INTERFACE 30

5007 AE 32865 1430-01-571-5812…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .