SPRRA2-20-D-0012 DLA HSV SPARES (Unpriced) with attachments- FULLY EXECUTED 05 MAY 2020.pdf

PDF 2 MB Posted

Attached to
DRS/ DLA Enterprise Subsumable Contract - Huntsville Spares Contract
Solicitation number
SPRRA2-20-D-0012
Issued by

About this file

This is an award notice for a subsumable contract between the Defense Logistics Agency Aviation and DRS Network & Imaging Systems, LLC. The contract is for various national stock numbers to support the IBAS Weapon System and was awarded on December 23, 2020 for $69 million. Key details include that DRS will provide spare parts and components for the IBAS system under delivery orders issued against the subsumable contract, which relies upon terms and conditions from a related umbrella contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)

Rating Page Of Pages

2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.

5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:

7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery

FOB Origin Other (See Below)

9. Discount For Prompt Payment

10. Submit Invoices Item (4 Copies Unless Otherwise Specified)

Code Facility Code To The Address Shown In:

11. Ship To/Mark For Code 12. Payment Will Be Made By Code

13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount

15G. Total Amount Of Contract

16. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments

C Description/Specs./Work Statement J List of Attachments

D Packaging and Marking Part IV - Representations And Instructions

E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors

H Special Contract Requirements M Evaluation Factors for Award Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable

17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)

19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer

19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed

By By

(Signature of person authorized to sign) (Signature of Contracting Officer)

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)

DOA2

SPRRA2-20-D-0012 2020MAY05 SEE SCHEDULE

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

JENNIFER TRIOLO

JENNIFER.TRIOLO@DLA.MIL

S1002A

DCMA ORLANDO

3555 MAGUIRE BLVD

ORLANDO, FL 32803-3726

32865

DRS NETWORK & IMAGING SYSTEMS, LLC

100 N BABCOCK ST

MELBOURNE, FL 32935-6715

X

SEE SCHEDULE

HQ0338

DFAS-COLUMBUS CENTER

SOUTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

X 1

SEE SCHEDULE

$0.00

X

2 signed

JUSTINE KIRK

JUSTINE.KIRK@DLA.MIL (256)690-5424

/SIGNED/ 2020MAY05

1 27

X 1

X 4

X 6

X 7

X 8

X 22

X 27

AWARD/CONTRACT 1. This Contract Is A Rated Order Under DPAS (15 CFR 700)

Rating Page Of Pages

2. Contract (Proc. Inst. Ident.) No. 3. Effective Date 4. Requisition/Purchase Request/Project No.

5. Issued By Code 6. Administered By (If Other Than Item 5) Code e-mail address:

7. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 8. Delivery

FOB Origin Other (See Below)

9. Discount For Prompt Payment

10. Submit Invoices Item (4 Copies Unless Otherwise Specified)

Code Facility Code To The Address Shown In:

11. Ship To/Mark For Code 12. Payment Will Be Made By Code

13. Authority For Using Other Than Full And Open Competition: 14. Accounting And Appropriation Data

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

15A. Item No. 15B. Supplies/Services 15C. Quantity 15D. Unit 15E. Unit Price 15F. Amount

15G. Total Amount Of Contract

16. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s) Part I - The Schedule Part II - Contract Clauses

A Solicitation/Contract Form I Contract Clauses B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attachments C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

Contracting Officer Will Complete Item 17 (Sealed-Bid or Negotiated Procurement) Or 18 (Sealed-Bid Procurement) As Applicable

17. Contractor’s Negotiated Agreement (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all the services set forth or otherwise identified above and on any continuation sheets for the consideration stated herein. The rights and obligations of the parties to this contract shall be subject to and governed by the following documents: (a) this award/contract, (b) the solicitation, if any, and (c) such provisions, representations, certifications, and specifications, as are attached or incorporated by reference herein. (Attachments are listed herein.)

18. Sealed-Bid Award (Contractor is not required to sign this document.) Your bid on Solicitation Number , including the additions or changes made by you which additions or changes are set forth in full above, is hereby accepted as to the items listed above and on any continuation sheets. This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your bid, and (b) this award/contract. No further contractual document is necessary. (Block 18 should be checked only when awarding a sealed-bid contract.)

19A. Name And Title Of Signer (Type Or Print) 20A. Name Of Contracting Officer

19B. Name of Contractor 19c. Date Signed 20B. United States Of America 20C. Date Signed

By By (Signature of person authorized to sign) (Signature of Contracting Officer) AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 26 (Rev. 5/2011) Previous edition is NOT usable Prescribed By GSA - FAR (48 CFR) 53.214(a)

DOA2

SPRRA2-20-D-0012 SEE SCHEDULE

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

JENNIFER TRIOLO

JENNIFER.TRIOLO@DLA.MIL

S1002A

DCMA ORLANDO

3555 MAGUIRE BLVD

ORLANDO, FL 32803-3726

32865

DRS NETWORK & IMAGING SYSTEMS, LLC

100 N BABCOCK ST

MELBOURNE, FL 32935-6715

X

SEE SCHEDULE

HQ0338

DFAS-COLUMBUS CENTER

SOUTH ENTITLEMENT OPERATIONS

P O BOX 182317

COLUMBUS OH 43218-2317

X 1

SEE SCHEDULE

$0.00

X

2 signed

JUSTINE KIRK

JUSTINE.KIRK@DLA.MIL (256)690-5424

1 27

X 1

X 4

X 6

X 7

X 8

X 22

X 27

Tara Densler Director, Contracts & Compliance

5/4/2020tara.densler @drs.com

Digitally signed by tara.densler@drs.com DN: cn=tara.densler@drs.com Reason: I am the author of this document Location:

Date: 2020-05-04 20:33-04:00

KIRK.JUSTINE.R.1386257090 Digitally signed by KIRK.JUSTINE.R.1386257090 Date: 2020.05.05 14:21:39 -05'00'

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JENNIFER TRIOLO

Buyer Office Symbol/Telephone Number: DLA-AHA/(256)690-5245

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Large Business Performing in U.S.

Surveillance Criticality Designator: B

Contract Expiration Date: 2029MAR31

*** End of Narrative A0000 ***

THIS SUBSUMABLE CONTRACT (SPRRA2-20-D-0012) FULLY RELIES UPON THE TERMS AND CONDITIONS UNDER UMBRELLA CONTRACT SPRRA2-20-D-0011. THIS

SUBSUMABLE CONTRACT ALSO RELIES UPON THE DLA AVIATION HUNTSVILLE LOCAL TERMS AND CONDITIONS PROVIDED IN SECTION H OF SPRRA2-20-D-0012.

*** WARNING EXPORT CONTROL***

THIS ACQUISITION CONTAINER TECHINCAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ)

OR THE EXPORT ADMINISTRATION ACT (TITLE 50, U.S.C., APP 2401-2402) EXECUTIVE ORDER 124170. THIS INFORMATION CANNOT BE RELEASED OUTSIDE

THE UNITED STATES WITHOUT PRIOR APPROVAL OF THE GOVERNMENT.

THIS REQUIREMENT IS ISSUED AS A DRAFT TO DRS NETWORK & IMAGING SYSTEMS, LLC, CAGE CODE: 32865 IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1

(a)(2) A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS, FULL AND

OPEN COMPETITION.

THIS REQUIREMENT IS IN SUPPORT OF DLA AVIATION HUNTSVILLE DEPOT LEVEL REPARABLE (SPARE) PARTS.

FIRST ARTICLE TEST MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

THE FIRST ARTICLE TEST UNIT SHALL NOT BE RETAINED BY THE CONTRACTOR AS A MANUFACTURING STANDARD. FAR 52.209-3 ALTERNATE I IS INCLUDED

UNDER WHICH THE CONTRACTOR IS REQUIRED TO PRODUCE THE FIRST ARTICLE AND THE PRODUCTION QUANTITY AT THE SAME FACILITY.

THIS MAY BE A FLIGHT SAFETY/CRITICAL SAFETY PART. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

SNRR AND/OR TAMMS-A MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

SERIAL NUMBERING MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

BAR CODE MARKING MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

FIT CHECK MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE DELIVERY ORDERS.

DFARS 252.211-7003 ITEM IDENTIFICATION AND VALUATION MAY BE REQUIRED. THE REQUIREMENT WILL BE INCLUDED ON THE APPLICABLE SUBSUMABLE

DELIVERY ORDERS.

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIRMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE

PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF

ACTION AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT

WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN

WHOLE OR IN PART, AS APPROPRIATE.

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-4, RELATIVE TO THE REQUIREMENT FOR OBTAINING CERTIFIED

COST AND PRICING DATA. THIS REQUIREMENT IS SOLE SOURCE, THEREFORE THE OFFEROR IS REQUIRED TO SUBMIT CERTIFIED COST AND PRICING DATA WITH _____

THE PROPOSAL. FAILURE TO PROVIDE CERTIFIED COST AND PRICING DATA WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.____________

PROPOSALS SHALL BE SUBMITTED IN ACCORDANCE WITH FAR PART 15.208 AND FAR CLAUSE 52.215-1. FACSIMILE SUBMISSIONS ARE NOT AUTHORIZED. ___

CONTRACTOR MAY E-MAIL OFFER TO JUSTINE.KIRK@DLA.MIL OR MAIL TO: _____________________

DEFENSE LOGISTICS AGENCY

ATTN: JUSTINE R KIRK

DLA AVIATION, BLDG 5202

2 27

SPRRA2-20-D-0012

DRS NETWORK & IMAGING SYSTEMS, LLC

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

REDSTONE ARSENAL, AL 35898-5280

CONTRACTOR POINT OF CONTACT INFORMATION:

NAME :

TELEPHONE NUMBER:

FAX NUMBER:

E-MAIL ADDRESS:

DCMA ACO POINT OF CONTACT INFORMATION:

NAME :

TELEPHONE NUMBER:

FAX NUMBER:

E-MAIL ADDRESS:

FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.

______________ APPROVED SUBCONTRACTING PLAN IS HEREBY INCORPORATED BY REFERENCE AND MADE A PART OF THIS CONTRACT. THE EFFECTIVE PERIOD

OF THIS PLAN IS _____________ TO ______________.

POST AWARD INFORMATION

PLEASE SUBMIT ALL POSTAWARD INQUIRIES, AND QUESTIONS TO:

DLA HSV STRATEGIC MISSILE TEAM

BUILDING 5202 MARTIN ROAD, REDSTONE ARSENAL, AL 35898

JUSTINE.KIRK@DLA.MIL

*** END OF NARRATIVE A0001 ***

3 27

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CLINS WILL BE PROVIDED ON EACH DELIVERY ORDER _____________________________________________

X001 REFERENCE EXCEL SPREADSHEET DLA SPARES $ ** NSP ** $ ** NSP ** ______________________________________ ______________ __________________

COMMODITY NAME: REFERENCE ATTACHMENT 0001

CLIN CONTRACT TYPE:

Firm Fixed Price

PSC: 1095

Packaging and Marking _____________________

FOB POINT:

0002 CONTRACTOR ACQUIRED PROPERTY (CAP) __________________________________

X002 REFERENCE EXCEL SPREADSHEET SPARES LAY-IN $ ** NSP ** $ ** NSP ** _________________________________________ ______________ __________________

COMMODITY NAME: REFERENCE ATTACHMENT 0002

CLIN CONTRACT TYPE:

Cost No Fee

PSC: 1095

Packaging and Marking _____________________

FOB POINT:

4 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

REFERENCE ATTACHMENT 0001 FOR SPARE CLIN STRUCTURE, PRICING AND DELIVERY SCHEDULE. CLINS WILL BE BUILT AS THE REQUIREMENTS ARE SUBMITTED

ON EACH DELIVERY ORDER.

REFERENCE ATTACHMENT 0002 FOR LIST OF CONTRACTOR ACQUIRED PROPERTY (CAP) ITEMS THAT MAY BE ORDERED UNDER A CAP CLIN. THE CAP IS COST

REIMBURSABLE. APPROVAL FOR CAP WILL BE AUTHROIZED BY THE CONTRACTING OFFICER.

*** END OF NARRATIVE B0001 ***

5 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

PRODUCTION LOT ACCEPTANCE SHALL BE PER MIL-STD-1916 FOR ALL SUBASSEMBLIES WITH THE EXCEPTION OF THE TARGET ACQUISITION SUBSYSTEM (TAS), LOWER TARGET ACQUISITION SUBSYSTEM (LTAS), AND PERISCOPE HEAD (PH). THE NORMAL VERIFICATION LEVEL SHALL BE II AND THE SAMPLING TYPE IS

ATTRIBUTES. THE ACCEPTANCE METHODS SHALL BE INCORPORTATED INTO THE CONTRACTOR'S QUALITY PROGRAM PLAN.

*** END OF NARRATIVE E0001 ***

6 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

TIME OF DELIVERY ACCELERATED DELIVERY_____________________________________

UNLESS OTHERWISE AUTHORIZED IN THE AWARD, ACCELERATED DELIVERY IS ACCEPTABLE ONLY IF THERE IS NO ADDITIONAL COST OR OBLIGATION TO THE

GOVERNMENT FOR ACCELERATED DELIVERY.

DELIVERY INFORMATION WILL BE PROVIDED ON EACH DELIVERY ORDER.

*** END OF NARRATIVE F0001 ***

7 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

CALIBRATION___________

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES______________________________________________________________________________

1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-

6135, telephone number (847) 509-9700, fax number (847) 509-9798.

2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.

3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a

Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.

4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:

a. Part Number and Source

b. Size and weight data.

c. Electrical and mechanical characteristics

d. Reliability (with data if requested)

e. Availability of the standard part (delivery schedules, still available etc.)

f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards

(DoDISS) or Standardized Military Drawings (SMD).

5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-

Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-

2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.

6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-

PRO- 010.

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE______________________________________________________________________________________________________________________________________

PREPARATION AND SUBMISSION INSTRUCTIONS_______________________________________

8 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Requests for Variance

(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format. _______

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished

Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for

Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD Form 1692 (page

1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.

e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management

Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.

f. Classification of RFVs.

(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability;

survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

k. The Contractor shall submit, concurrent with the ECP, a separate DD Form 1696, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

l. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

m. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

9 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

n. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). __________

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution. ____________

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word _______________________ is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website

(http://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format

(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.

b. Hard Copy Distribution of Class I or II ECPs and RFVs, For each Class I or II ECP, or each RFV that the ACO determines to be in ______________________________________________________ compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor _______________________________ shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the

PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the

VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal, or Distribution Process. Proposals may be prepared in a different format, submitted using a different ____________________________________________________ submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution _____________________ of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The

Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

(End of Clause)

*FIRST ARTICLE INSPECTION AND TEST - CONTRACTOR TESTED - ADDITIONAL REQUIREMENTS________________________________________________________________________________

a. The first article shall be inspected and tested by the contractor in accordance with the requirements of the contract. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the

Contractor (including subcontractors) using the technical data package applicable to this procurement. If applicable, the Contractor or its subcontractor shall produce or demonstrate proof that any fixtures, tool masters, jigs, or similar devices used in the inspection and/or testing of the first article have been subjected to an initial inspection, or other suitable means supporting their accuracy, before being used in the manufacturing/production process.

b. At a minimum, first article inspection and test shall include:

10 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) A 100% inspection (or as set forth in relevant specifications) of all physical and functional characteristics, to include but not limited to, any drawings, as well as any other requirements which may be set forth by other applicable specifications, or in any technical data packages, and/or any other special/functional testing as set forth in this contract;

(2) A review of parts, components and/or assemblies for compliance to identification markings;

(3) A review of packaging for compliance to preservation, packaging, packing, and marking requirements;

(4) A review for compliance within the Technical Data Package or as otherwise stated in this contract that approved manufacturing sources have been used for special processes, controlled parts, components, and/or assemblies;

(5) The verification through documented evidence that all inspection, testing, measuring and diagnostic equipment used in the inspection/test of the first article piece(s) have been subjected to an initial inspection, or other means supporting their accuracy, and are maintained in accordance with contractual calibration standards.

c. Unless otherwise specified in the contract, the contractor shall NOT retain the first article provided under this contract to serve as the manufacturing standard of acceptance.

d. A First Article Test Report (FATR) shall be prepared and submitted in accordance with FAR 52.209-3. The report will include all necessary documentation to demonstrate and support full compliance with the first article inspection and test requirements as set forth in this contract (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specifications and/or Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article test was successfully completed.

e. Additional first article testing may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 3 years, or (iii) whenever a change occurs in place of performance, manufacturing locations or processes, material used, drawing, specification or source of supply. When conditions

(i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Should the Government require additional first article testing the Contractor may be entitled to an equitable adjustment.

*FIRST ARTICLE INSPECTION AND TEST - GOVERNMENT TESTED - ADDITIONAL REQUIREMENTS________________________________________________________________________________

a. The first article shall conform to the requirements of the contract and the Technical Data Package drawing(s), the Quality Assurance

Provisions (QAPs), and specification(s) referenced thereon. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

b. Unless otherwise specified in the contract, the contractor shall NOT retain the first article provided under this contract to serve as the manufacturing standard of acceptance.

c. Additional first article testing may be ordered by the Contracting Officer in writing whenever (i) a major change is made to the technical data, (ii) there is a lapse in production for a period in excess of 18 months, or (iii) a change occurs in place of performance, manufacturing locations or processes, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Should the Government require additional first article testing the Contractor may be entitled to an equitable adjustment.

d. Rejected first articles or portions thereof not destroyed during inspection and testing will be held at the government first article test site for a period of 3 years following the date of notification of rejection, pending receipt of instructions from the Contractor for the disposition of the rejected material. The Contractor agrees that failure to furnish such instructions within said time period shall constitute abandonment of said material by the Contractor and shall confer upon the Government the right to destroy or otherwise dispose of the rejected items at the discretion of the Government without liability to the Contractor by reason of such destruction or disposition.

*STATEMENT OF WORK - FIT CHECK REQUIREMENTS___________________________________________

(a) The parts being procured under this solicitation/contract are identified as items requiring fit check verification before any

11 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

production lots under this solicitation/contract can be shipped and entered into the Government supply system. In accordance with the

Army policy pertaining to such parts, the Government shall test 1 unit of Lot/Item -1- as specified in this solicitation/contract. This shall be the first production unit tendered to the Government for acceptance (or the First Article unit if a First Article Test is required by contract) and will be shipped to a location identified by the Procuring Contracting Officer.

(b) At least 20 calendar days prior to tendering the first production unit to the Government, the Contractor shall notify the

Contracting Officer, in writing, of the date the unit will be ready for shipment so that the Government may arrange the location of the tests. In the case that the solicitation/contract includes a First Article requirement, in conjunction with the submission of the First

Article Test Report, a notification letter shall be included stating that the unit is ready for shipment so that the Government may arrange the location of the tests.

(c) The Procuring Contracting Officer will notify the contractor of the Fit Check time, location, and marking instructions. The

Contractor, in conjunction with the shipment of the Fit Check, will be required to:

(1) have Contract Quality Assurance performed at origin by the Government Quality Assurance Representative,

(2) provide their Point of Contact/phone number and the DD250 or notification of the DD250 being loaded in Wide Area Work Flow along with the part when it is shipped, and

(3) confirm item shipment, date and tracking information, to the Procuring Contracting Officer.

(d) The fit check shall be in accordance with the description found in the technical data package. All fit checks, which are to be performed by the Government, shall be a factor in the successful completion of any first article inspection and test requirement.

(e) The Contractor shall not retain the fit check unit provided under this contract, throughout production, to serve as the manufacturing standard of acceptance.

(f) Unless otherwise specified in this solicitation/contract, any item destroyed or consumed during the fit check process is not to be considered as part of the contract quantity. The full quantity of acceptable and serviceable items must be delivered.

(g) Unless otherwise specified in this contract, and if the approved fit check unit is not destroyed or consumed during the fit check process, the contractor shall have delivered the fit check unit as part of the contract quantity.

(h) Within thirty (30) calendar days after the Government receives the fit check unit, the Contracting Officer shall notify the

Contractor, in writing, of the conditional approval, approval or disapproval of the fit check. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(i) If the fit check is disapproved, the Procuring Contracting Officer will make a determination whether to allow additional Fit Check submittal. If approval to resubmit is granted, the Contractor shall make any necessary changes, modifications, or repairs to the fit check unit, or produce another fit check unit for testing. All costs related to these additional tests are to be borne by the

Contractor, including any and all shipping costs for return of the fit check unit and cost for additional tests following a disapproval.

The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.

(j) If the Contractor fails to deliver any fit check unit in accordance with the contract, or the Contracting Officer disapproves any fit check, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(k) If the Government does not act within the time specified in the First Article clause and/or paragraph (h) of this statement of work, the Contracting Officer may, upon timely written request from the Contractor, adjust the delivery dates and/or any other contractual term affected by the delay.

(l) The Government may waive the requirement for fit check where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver in writing to the Procuring Contracting Officer.

*FLIGHT SAFETY PART SUPPLIER INTERFACE AND OVERSIGHT PROGRAM REQUIREMENTS_________________________________________________________________________

This contract is for a Flight Safety part (FSP) and requires special controls as identified in Quality Engineering Standard (QE-STD-1).

In addition to the QE-STD-1 requirements, the contractor shall comply with the following:

a. The Contractor shall prepare manufacturing planning documentation in accordance with paragraph 6.1 of QE-STD-1 and DI-MISC- 80508A.

Any Contractor recommended changes to the manufacturing planning documentation which affect critical characteristics shall be approved by the Government. The Contractor shall not implement any process changes which affect critical characteristics without prior Government approval.

12 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. Written notification shall be given to the Procuring Contracting Officer (PCO) as soon as possible but at least 30 days prior to first delivery indicating the time frame when the parts being procured under this contract will be actively in production in order that a Supplier Interface and Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The Contractor will cooperate with and allow the Government to conduct a SIOP on-site review (1-3 days typically) while the parts are actively in production. This review may also require site visits to critical process subcontractors. The purpose of the SIOP on-site review is to thoroughly review manufacturing processes and documentation for FSP and provide feed-back and direction regarding the FSP program.

NOTE: Some of the personnel that support the SIOP program (e.g. evaluate manufacturing planning and participate in the SIOP on- site reviews) are employees of the U.S. Army Aviation and Missile Command (AMCOM) programmatic and technical services support contractors employed under the AMCOM Express Program. AMCOM's Directorate for Aviation Engineering (AMRDEC) will, within thirty days of contract award, identify the programmatic and technical services support contractors who may be involved with this contract and may require access to your company's proprietary data (e.g., frozen manufacturing planning) and facilities in performing their duties. Since these contractor personnel are not Federal employees, they will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been established. A standard NDA will accompany the AMRDEC notification. If a NDA with the identified support contractor has not been entered into by your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within thirty days of contract award. If there are objections to the NDA or the terms or conditions thereof, contact, in writing, the

PCO within 10 days of receipt of the AMRDEC notification so as to allow sufficient time for a mutually acceptable arrangement be reached.

*NOTICE TO OFFERORS - FLIGHT SAFETY PARTS REQUIRING ENGINEERING TESTING_______________________________________________________________________

(a) The parts being procured under this solicitation are identified as flight safety parts requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources:

(1) who have been approved in accordance with AMCOM (previously ATCOM) source approval procedures and

(2) whose part has successfully completed all required engineering testing. Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section B are eligible for award.

(b) By submitting an offer/bid/quote, the contractor certifies that

(1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and

(2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.

IDENTIFICATION MARKING______________________

Item shall be marked per MIL-STD-130.

NOTICE: ENVIRONMENTAL TEST

Item(s) or components thereof which are subjected to environmental tests of a destructive nature or which otherwise degrade the quality of the item(s) shall not be furnished to the Government in satisfaction of this contract.

NOTICE TO OFFERORS - USE OF CLASS I OZONE-DEPLETING SUBSTANCES (ASSISTANT SECRETARY OF THE ARMY RDA)

(a) In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone-depleting substance (ODS) identified in Section 602(a) of the Clean

Air Act, (42 U.S.C. 767a(1), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisition official who determines that there is no suitable substitute available.

(b) To comply with this statute, the Government has conducted a best efforts screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements. To the extent that ODS requirements were revealed by this review they are identified below with the disposition determined in each case.

(c) If offerors possess any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information was surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, offerors should provide any information as soon as possible after release of the solicitation and prior to the submission of offers to the extent practicable. It should be understood that there is no obligation on offerors to comply

13 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

with this request and that no compensation can be provided for doing so.

ODS Identified Specification /Standard Disposition

-1- -2- -3-

POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________

Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):

SU W1A8 DLA DISTRIBUTION DDSP

NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND, PA, 17070-5002

*PRODUCTION LOT TEST - GOVERNMENT TESTED________________________________________

(a) The Contractor shall deliver 1 units of Lot/Item TBD within TBD calendar days from the date of this contract to the Government at

(W31P0W) PR W0H9 US ARMY AVIATION AND MISSILE COMMAND, REDSTONE TECHNICAL TEST CENTER, COTTONWOOD ROAD BLDG 8022 MF4500, REDSTONE

ARSENAL, AL 35898-8052 for Production Lot Test (PLT). If the quantity required for PLT is less than the actual production quantity, the sample(s) to be shipped shall be selected at random during manufacture by the DCMA QAR. The shipping documentation shall contain this contract number and the Lot/Item identification. Copies of all available in-process documentation to include copies of Instruction

Letters, Inspection Sheets/records, Material Test Results, and Certificates of Compliance shall be included with the sample(s) shipment.

(b) PLT sample(s) must meet all the requirements of the Technical Data Package (TDP) and all other contractual requirements. If the entire lot is required for testing, delivery of the total quantity required herein shall be accomplished in no more than two (2) shipments. Delivery in one (1) shipment is desirable; however, when two (2) shipments are necessary, fifty percent (50%) or more of the total quantity shall be included in the first shipment, and the remaining quantity shall be included in the second shipment.

(c) The Contracting Officer…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .