SPRRA127QA001.pdf
PDF 4 MB Posted
- Attached to
- SPRRA1-27-Q-A001
- Solicitation number
- SPRRA1-27-Q-A001
- Issued by
-
Defense Logistics Agency Aviation
About this file
Request for Quotation Summary
This is a Request for Quotation (RFQ) issued by DLA Aviation at Huntsville, Alabama, for transmission pumps supporting the Chinook CH-47 helicopter system. The solicitation number is SPRRA127QA001, issued on 15 October 2026, with quotations due by 16 November 2026. The contract is a five-year Indefinite Delivery Requirements (IDR) agreement with firm fixed pricing, structured across five one-year ordering periods beginning from the date of award. The government will obligate funds upon issuance of each delivery order and has established a guaranteed minimum quantity of 7 units to be awarded simultaneously with contract award. The requirement is limited source, restricted to The Boeing Company (CAGE 77272), Parker-Hannifin Corporation (CAGE 59211), and Boeing Distribution Services, Inc. (CAGE 2V484). The specific item required is part number 145DS211-2, National Stock Number 4320011153823, manufactured by Boeing. Estimated quantities across the five years total 20 units (Year 1: 7, Year 2: 4, Year 3: 3, Year 4: 3, Year 5: 3), though the government reserves the right to order any quantity above the guaranteed minimum. Delivery is required 420 calendar days from contract award to DLA Distribution Depot Oklahoma (Tinker AFB), with FOB Destination terms for the first delivery order and FOB Origin thereafter.
The solicitation requires contractors to provide DoD unique item identification markings per DFARS 252.211-7003, comply with ANSI/ISO/ASQ 9001:2015 and AS 9100 quality standards, submit other-than-certified cost or pricing data if requested, and support a DO-A7 Defense Priority and Allocations System (DPAS) rating with 15-day notification requirements if performance cannot be met. All proposals must remain valid for 180 days from submission. The contract includes comprehensive FAR and DFARS clauses covering payments, changes, disputes, cybersecurity, Buy American requirements, and various compliance certifications. Inspection and acceptance will occur at Tinker AFB, and contractors must comply with wood packaging material requirements per ISPM 15 standards. No First Article Testing, Production Lot Testing, or flight safety certifications are required. Offerors must be approved sources or obtain approval prior to award through the Systems Readiness Directorate Source Approval Request process.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Section A - Solicitation/Contract Form
Pump, TransmissionInstrument Name:
Product Service Code : 4320
A-1. THIS REQUIREMENT IS FOR LIMITED SOURCE TO THE BOEING COMPANY, CAGE
77272, PARKER-HANNIFIN CORPORATION, CAGE 59211, AND BOEING DISTRIBUTION
SERVICES, INC 2V484. IAW 10 U.S.C. 2304 (C)(1) FAR 6.302-1 (A)(2). "A LIMITED NUMBER
OF RESPONSIBLE SOURCES AND NO OTHER TYPE OF SUPPLIES OR SERVICES WILL
SATISFY AGENCY REQUIREMENTS, FULL AND OPEN COMPETITION NEED NOT BE
ACCOUNTED FOR.
A-2. THIS REQUIREMENT IS IN SUPPORT OF THE CHINOOK CH-47 SYSTEM.
A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED.
A-4. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.
A-5. FIRST ARTICLE (FAT) IS NOT REQUIRED.
A-6. SNRR MARKINGS ARE NOT REQUIRED.
A-7. TAMMS-A MARKINGS ARE NOT REQUIRED.
A-8. IUID MARKINGS ARE REQUIRED. "THE DFARS CLAUSE 252.211-7003 ITEM
IDENTIFICATION AND VALUATION IS INCLUDED IN SECTION F".
A-9. RFID MARKINGS ARE NOT REQUIRED "NOTE: REQUIRED FOR SHIPMENTS TO
CERTAIN DEPOTS"
A-10. ARMS EXPORT CONTROL NOT APPLICABLE.
A-11. SERIAL NUMBERING IS NOT REQUIRED.
A-12. FIT CHECK IS NOT REQUIRED.
A-13. THIS IS A FIVE (5) YEAR INDEFINITE DELIVERY REQUIREMENTS (IDR) FIRM FIXED
PRICE EFFORT.
A-14. CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ___________________________________
TELEPHONE NUMBER: ___________________________________
E-MAIL ADDRESS: ________________________________________
SPRRA127QA001
A-15. DCMA ACO POINT OF CONTACT INFORMATION:
NAME: ___________________________
TELEPHONE NUMBER: ______________________________
E-MAIL ADDRESS: _______________________________________________
A-16. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:
NAME: ____________JESSICA COLEMAN
OFFICE SYMBOL: DLA-AVN-AHAB
TELEPHONE NUMBER: __________________256-938-0651
E-MAIL ADDRESS: _ _______________________JESSICA.COLEMAN@DLA.MIL
A-17. PLEASE SUBMIT ALL INQUIRIES AND QUESTIONS TO:
DLA AVIATION HUNTSVILLE POST AWARD TEAM
5206 MARTIN ROAD
REDSTONE ARSENAL, ALABAMA 35898
OR EMAIL TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
A-18. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.
A-19. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL
COST TO THE GOVERNMENT
A-20. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) SELECT THE
APPROPRIATE RATING FROM BELOW:
THIS IS A DO DPAS RATED ORDER, AND YOU ARE REQUIRED TO NOTIFY DLA WITHIN 15
DAYS OF RECEIPT OF ORDER IF THE RATED ORDER CANNOT BE FULFILLED AS
WRITTEN. THIS INCLUDES CONFLICTING RATED ORDER SCHEDULES. IF NO RESPONSE
IS RECEIVED DURING THE REQUIRED RESPONSE TIME, THE CONTRACTOR SELF-
ATTESTS ORDER ACCEPTANCE AS IS.
A-21. OTHER THAN CERTIFIED COST OR PRICING DATA:
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR)
15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER THAN CERTIFIED
COST OR PRICING DATA. THIS IS NOT CONSIDERED TO BE A SOLE SOURCE
REQUIREMENT; THERFORE, YOU ARE REQUIRED TO SUBMIT OTHER THAN COST OR
PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE,
AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO INCLUDE PROFIT/FEE
WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO
PROVIDE OTHER THAN COST OR PRICING DATA IF REQUESTED WILL RESULT IN YOUR
OFFER BEING CONSIDERED NON-RESPONSIVE.
A-22. FOR CONTRACTORS USING THE PROPRICER SYSTEM:
THE ORIGINAL UNEDITED PROPRICER SYSTEM GENERATED EXCEL FILE IS HEREBY
REQUESTED. IN EXCEL WORKBOOK FORMAT (.XLSX) PROVIDE A PROPRICER SYSTEM
GENERATED "DETAIL COST BREAKDOWN" REPORT, WITH "EXPORT FULL PRICING" SET
TO "ANNUAL". THIS EXCEL FILE SHALL BE A FULL WORKING COST MODEL CONTAINING
THE ORIGINAL COLUMNS, FORMULAS, AND WORKSHEETS ONLY. DO NOT MODIFY THE
PROPRICER SYSTEM GENERATED EXCEL FILE IN ANY MANNER. EXCEL TABS TO
INCLUDE:
1) P-SHEET (NEEDED AT MINIMUM)
2) DIRECT RATES
3) INDIRECT RATES
4) CERS (IF APPLICABLE)
5) CER FACTORS (IF APPLICABLE)
A-23. LONG LEAD TIME AND OR LONG TERM CONTRACTS FOR LONG LEAD TIME ITEMS
AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT
PART(S) OR COMPONENT(S) REQUIRED FOR PERFORMANCE OF THE CONTRACT
/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON
RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF
PERFORMANCE CONTRACTOR BECOMES AWARE THAT IT IS UNABLE TO PROCURE A
PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE
CONTRACT, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING
WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS
RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH
ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL
DETERMINE THE APPROPRIATE COURSE OF ACTION AND PROVIDE DIRECTION TO THE
CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF
ITS RECOMMENDATION WITHOUT WRITTEN DIRECTION FROM THE CONTRACTING
OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT
MAY BE TERMINATED IN WHOLE OR IN PART, AS APPROPRIATE.
A-24. PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS)- NEW SPARES
PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS): THE ARMY UTILIZES THE PRODUCT
QUALITY DEFICIENCY REPORT (PQDR) PROGRAM AS REQUIRED BY THE DEFENSE
LOGISTICS MANUAL (DLM) 4000.25, VOLUME 2, JUNE 24,2025 CHANGE 21 AND AR 702-7-1
TO IDENTIFY, REPORT, AND RESOLVE POTENTIAL DEFICIENCIES FOUND BY THE END
USER IN PRODUCTS FROM THE DOD SUPPLY CHAIN. WHEN REQUESTED BY THE
GOVERNMENT, THE CONTRACTOR SHALL ASSIST THE AVMC SYSTEMS READINESS
DIRECTORATE (SRD) OR THE COGNIZANT CONTRACT ADMINISTRATION OFFICE IN
EVALUATING PQDRS AND EXHIBITS FOR DEFECTS REPORTED ON ITEMS
MANUFACTURED UNDER THIS CONTRACT TO DETERMINE THE ROOT CAUSE FOR
DEFICIENCIES. A FINAL REPORT SHOULD BE GIVEN NO LATER THAN 75 DAYS AFTER
RECEIPT OF PQDR EXHIBIT. CORRECTIVE ACTION AND PREVENTATIVE ACTION TO
PRECLUDE RECURRENCE OF DISCREPANCIES SHALL BE AN INTEGRAL PART OF THE
CONTRACTOR'S QUALITY PROGRAM. THE CONTRACTOR SHALL NOT BILL THE
GOVERNMENT AS A DIRECT CHARGE FOR COOPERATION WITH THE GOVERNMENT IN
THE RESOLUTION OF ANY PQDRS.
A-25. ALL PROPOSAL DOCUMENTATION MUST BE VALID FOR A MINIMUM OF 180 DAYS
FROM THE DATE OF SUBMISSION.
THIS IS A FIVE-YEAR REQUIREMENTS TYPE SOLICITIATON. FUNDS WILL BE OBLIGATED
/CITED UPON THE ISSUANCE OF EACH DELIVERY ORDER. THE ESTIMATED QUANTITIES
HEREIN ARE NOT A REPRESENTATION TO AN OFFEROR OR CONTRACTOR THAT THE
ESTIMATED QUANTITY WILL BE REQUIRED OR ORDERED, OR THAT CONDITIONS
AFFECTING REQUIREMENTS WILL BE STABLE OR NORMAL.
THE ESTIMATED QUANTITIES ANNOTATED WITHIN THIS SOLICITATION ARE BASED ON
THE MOST CURRENT REQUIREMENT INFORMATION AVAILABLE.
THE GOVERNMENT WILL ONLY BE OBLIGATED TO ORDER THE STATED GUARANTEED
MINIMUM QUANTITY OF 7 EACH.
THE GOVERNMENT IS NOT OBLIGATED TO ISSUE ANY ORDERS AGAINST THIS
CONTRACT OVER THE GUARANTEED CONTRACT MINIMUM AMOUNT; HOWEVER, THE
GOVERNMENT RESERVES THE RIGHT TO ORDER ANY QUANTITY ABOVE THE
GUARANTEED CONTACT MINIMUM QUANTITY FOR THE DURATION OF THIS CONTRACT.
BY REPLYING TO THIS SOLICITATION AND SUBMITTING A QUOTATION OR PROPOSAL,
THE OFFEROR IS ACKNOWLEDGING ITS ABILITY TO SUPPORT THIS REQUIREMENT FOR
THE FULL SOLICITED TIME PERIOD.
THE GOVERNMENT HAS SEGREGATED THE ESTIMATED QUANTITIES INTO FIVE, ONE
YEAR ORDERING PERIODS. HOWEVER, THIS DOES NOT PREVENT THE GOVERNMENT
FROM EXERCISING ITS RIGHTS UNDER FAR 52.216-21 AT ANY TIME DURING THE
REQUIRMENT PERIOD.
THE GUARANTEED MINIMUM QUANTITY TO BE AWARDED SIMULTANEOUSLY WITH THE
AWARD OF THE BASIC CONTRACT IS 7 EACH. DELIVERY ORDERS ISSUED UNDER THIS
CONTRACT SHALL NOT HAVE OVERLAPPING DELIVERY SCHEDULES.
PRICES QUOTED FOR EACH ORDERING YEAR WILL BE VALID FOR ALL QUANTITIES
ORDERED DURING THAT ORDERING PERIOD.
THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON THE FOLLOWING PAGES.
OFFERORS ARE CAUTIONED TO ENSURE THAT OFFERS ARE PROVIDED ON ALL
QUANTITIES. FAILURE TO PROPOSE ALL CLINS, MAY RESULT IN A DETERMINATION OF
NON-RESPONSIVENESS. AN OFFER MAY BE REJECTED IF THE GOVERNMENT
DETERMINES THAT THE OFFER IS MATERIALLY UNBALANCED OR IF THE OFFER
CONTAINS UNBALANCED PRICING.
YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365 DAYS AFTER CONTRACT
AWARD (DACA).
YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.
YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.
YEAR 4 WILL BEGIN 1,096 DACA AND END 1,460 DACA.
YEAR 5 WILL BEGIN 1,461 DACA AND END 1,825 DACA.
ALL REFERENCES TO F.O.B. ORIGIN THROUGHOUT THIS SOLICITATION APPLY TO ALL
QUANTITIES ORDERED AFTER THE FIRST DELIVERY ORDER.
THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT COMMIT THE GOVERNMENT
TO ORDER THAT OR ANY QUANTITY ABOVE THE MINIMUM QUANTITY.
THE GOVERNMENT INTENDS TO AWARD ONLY ONE REQUIREMENTS TYPE BASIC
CONTRACT AS A RESULT OF THIS SOLICITATION.
*** END OF NARRATIVE 1 ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
APPROVED SOURCES:
THE BOEING COMAPNY, CAGE: 77272 (P/N 145DS106-13)
PARKER-HANNIFIN CORPORATION, CAGE 59211 (P/N GD-974-2)
APPROVED DISTRIBUTOR:
BOEING DISTRIUTION SERVICES, INC., CAGE 2V484
*** END OF NARRATIVE 1 ***
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 YEAR ONE (1) PRODUCTION
QUANTITY
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
National Stock Number:
4320011153823
Manufacturer's Part Number:
145DS211-2
Manufacturer's CAGE: 77272
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z621000HL
7 Each
Product Service Code: 4320
North American Industry Classification System (NAICS):
336413
Weapon System Code: ABK
Bill to Party: W58H0Z
Pricing Arrangement: Firm Fixed Price
0002 YEAR TWO (2) PRODUCTION
QUANTITY
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
National Stock Number:
4320011153823
Manufacturer's Part Number:
145DS211-2
Manufacturer's CAGE: 77272
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z621000HL
Product Service Code: 4320
North American Industry Classification System (NAICS):
336413
4 Each
Weapon System Code: ABK
Bill to Party: W58H0Z
Pricing Arrangement: Firm Fixed Price
0003 YEAR THREE (3) PRODUCTION
QUANTITY
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
National Stock Number:
4320011153823
Manufacturer's Part Number:
145DS211-2
Manufacturer's CAGE: 77272
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z621000HL
Product Service Code: 4320
North American Industry Classification System (NAICS):
336413
Weapon System Code: ABK
Bill to Party: W58H0Z
Pricing Arrangement: Firm Fixed Price
3 Each
0004 YEAR FOUR (4) PRODUCTION
QUANTITY
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
National Stock Number:
4320011153823
Manufacturer's Part Number:
145DS211-2
Manufacturer's CAGE: 77272
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z621000HL
Product Service Code: 4320
North American Industry Classification System (NAICS):
336413
Weapon System Code: ABK
Bill to Party: W58H0Z
Pricing Arrangement: Firm Fixed Price
3 Each
0005 YEAR FIVE (5) PRODUCTION
QUANTITY
NOTE: The requirements in DFARS 252.211-7003, Item Identification
3 Each and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification, or a DoD recognized unique identification equivalent.
National Stock Number:
4320011153823
Manufacturer's Part Number:
145DS211-2
Manufacturer's CAGE: 77272
CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W58H0Z621000HL
Product Service Code: 4320
North American Industry Classification System (NAICS):
336413
Weapon System Code: ABK
Bill to Party: W58H0Z
Pricing Arrangement: Firm Fixed Price
Section C - Description/Specifications/Statement of Work
Requirements
PUMP,TRANSMISSION
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-11 Higher-Level Contract Quality Requirement.
2014-12
Higher-Level Contract Quality Requirement (Dec 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS
UNDER 8.3 (DESIGN AND DEVELOPMENT OF PRODUCTS AND SERVICES) DO NOT
APPLY[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Source Instructions: Please see sections A and H for further information.
DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000
TINKER AFB, OK 73145-8000
UNITED STATES
0002 Inspection and Acceptance Location
Both Source Instructions: Please see sections A and H for further information.
DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000
TINKER AFB, OK 73145-8000
UNITED STATES
0003 Inspection and Acceptance Location
Both Source Instructions: Please see sections A and H for further information.
DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000
TINKER AFB, OK 73145-8000
UNITED STATES
0004 Inspection and Acceptance Location
Both Source Instructions: Please see sections A and H for further information.
DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000
TINKER AFB, OK 73145-8000
UNITED STATES
0005 Inspection and Acceptance Location
Both Source Instructions: Please see sections A and H for further information.
DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000
TINKER AFB, OK 73145-8000
UNITED STATES
Section F - Deliveries or Performance
0001 From date of lead time event to delivery 420 Calendar Days
Date of Award DoDAAC: SW3211
7 EachQuantity
Address and POC Ship To DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000 TINKER AFB,
OK 73145-8000 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Contractor
Point Type: Destination
0002 From date of lead time event to delivery 420 Calendar Days
Date of Award DoDAAC: SW3211
4 EachQuantity
Address and POC Ship To DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000 TINKER AFB,
OK 73145-8000 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Government
Point Type: Origin (Shipping Point)
0003 From date of lead time event to delivery 420 Calendar Days
Date of Award DoDAAC: SW3211
3 EachQuantity
Address and POC Ship To DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000 TINKER AFB,
OK 73145-8000 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Government
Point Type: Origin (Shipping Point)
0004 From date of lead time event to delivery 420 Calendar Days
Date of Award DoDAAC: SW3211
3 EachQuantity
Address and POC Ship To DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000 TINKER AFB,
OK 73145-8000 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Government
Point Type: Origin (Shipping Point)
0005 From date of lead time event to delivery 420 Calendar Days
Date of Award DoDAAC: SW3211
3 EachQuantity
Address and POC Ship To DoDAAC: SW3211 CountryCode: USA
DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22, TINKER AFB OK 73145-8000 TINKER AFB,
OK 73145-8000 UNITED STATES
Special Handling/Notes FoB Details
Party to Pay Transportation Cost: Government
Point Type: Origin (Shipping Point)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.242-17 Government Delay of Work. 1984-04
52.247-29 F.o.b. Origin. 2006-02
52.247-30 F.o.b. Origin, Contractor's Facility. 2006-02
52.247-34 F.o.b. Destination. 1991-01
52.247-35 F.o.b. Destination, Within Consignee's Premises.
1984-04
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBO
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
INVOICE 2 IN 1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC TBD AT TIME OF AWARD Issue By DoDAAC SPRRA1 Admin DoDAAC TBD AT TIME OF AWARD Inspect By DoDAAC TBD AT TIME OF AWARD Ship To Code SW3211 Ship From Code TBD AT TIME OF AWARD Mark For Code N/A Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) SW3211 (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD AT TIME OF AWARD
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Section H - Special Contract Requirements
H-1. BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO /IEC 16388 - Information Technology - Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
H-2. CALIBRATION
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National Conference of Standards Laboratories (ANSI /NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment).
Terminology shall be as defined by International Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
H-3. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS
Defense Priorities and Allocations System (DPAS) Rated Awards (JUNE 2025)
A DPAS rated order indicates the priority the contractor must give to the performance of the award.
There are two priority ratings: "DX" and "DO". All "DX" rated orders have equal priority with each other and take preference over "DO" rated orders and unrated orders. All "DO" rated orders have equal priority with each other and take preference over unrated orders. (see 15 CFR 700.11 and DoDM 4400.1-M).
Mandatory Contractor Performance Scheduling
A contractor must schedule operations, including the acquisition of all needed production items, in a timely manner to satisfy the delivery requirements of each DPAS rated order. Additionally, contractors are required to use DPAS rated orders with their U.S. suppliers to obtain items needed to fill rated orders (15 CFR 700.15). Contractors may also use DPAS rated orders to obtain replacements of inventoried items used to fill rated orders (see 15 CFR 700.17(b)). Modifying production or delivery schedules is necessary only when required delivery dates for a rated order cannot otherwise be met. Since "DX" indicates the highest rated order, the manufacturer will schedule its production before processing other lower or unrated orders. "DX" rated orders must be given production preference over "DO" rated orders and unrated orders if necessary to meet required delivery dates, even if this requires the diversion of items being processed or ready for delivery against unrated orders. Similarly, "DO" rated orders must be given preference over unrated orders. If an accepted rated order of equal priority status conflicts with other accepted rated orders of equal priority status, the contractor must prioritize the rated orders in the sequence in which the rated orders are to be delivered or performed (see 15 CFR 700.14).
Contractor Acceptance of a DPAS rated order:
[Contractors receiving an award that includes a DPAS rating shall advise DLA via the post award mailbox (DLAHSVPostAwardTeam@dla.mil) , if they cannot perform in accordance with the requirements of the applied DPAS rating. When rejecting an order in full, communication to the contracting officer must include a detailed reason for rejection. If the order can be fulfilled at a later date, the contractor must provide, a) the earliest possible delivery date, b) a detailed reason why the awarded delivery date cannot be met (e.g. reason should not simply state a production delay) and, c) an offer to accept the order based on that date. Contractors must advise DLA within fifteen
(15) working days after receipt of a "DO" rated order, and within ten (10) working days after receipt of a "DX" rated order if they cannot perform in accordance with the DPAS rating. Contractors that do not contact DLA are self-attesting that they acknowledge receipt of the award and will conform to the DPAS rating requirement. If the prescribed response time has passed and the contractor learns that shipment or performance will be delayed, the contractor is still required to notify DLA immediately.
Special Priority Assistance:
Preferential scheduling is a must for DPAS rated orders (see 15 CFR 700.14). If a contractor learns that a shipment or performance will be delayed after the allotted response time has passed or any other issue arises that will affect deliveries during the duration of the contract, the contractor is required to notify DLA immediately through the use of Form BIS-999, Special Priorities Assistance (SPA). Deviations from schedules cannot be approved without the completion and submission of this form. Once submitted, DLA and its customers will discuss the SPA for approval.
The Department of Commerce requires an approved BIS-999 prior to reprioritizing DPAS rated orders and its schedules (See 15 CFR 700.50). Please contact DLA post award for any SPA questions or concerns.
H-4. ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR
VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG
NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format.
a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government.
Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II
ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD Form 1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management Agency (DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution for unclassified is through the email or DOD safe site (https://safe.apps.mil) addressed to the PCO. Classified material shall be distributed via SIPERNET or by classified email as determined by the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail.
All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website (http://www.esd.whs.mil/DD/) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format (PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
H-5. IDENTIFICATION MARKING REQUIREMENTS
Item shall be marked per MIL-STD-130.
H-6. NOTICE: ENVIRONMENTAL TEST
Item(s) or components thereof which are subjected to environmental tests of a destructive nature or which otherwise degrade the quality of the item(s) shall not be furnished to the Government in satisfaction of this contract.
H-7. POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES
Preservation, packaging, packing, and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):
TBD
H-8. REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.:
Contractor:
Explanation of Data Rights:
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing
(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled, " ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND
SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS"
H-9. SOURCES ELIGIBLE FOR AWARD CONSIDERATION
(a) Competition under this solicitation is restricted to the following sources:
(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment.
(2) Sources that have been approved prior to award -- other than approved sources listed in Section B.
(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.
(b) Only offers submitted by the above sources will be considered for award under this solicitation.
(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained.
Whether or not such delay will occur will be solely at the discretion of the Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.
(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRD), Aviation and Missile Center, DEVCOM.
Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). SAR instructions can be found at https://www/avmc.army.mil/Directorates/SRD/SAR/. Questions concerning SAR submissions can be directed to the SRD SAR Team at usarmy.redstone.
devcomavmc.mbx.amr-m-sar@army.mil.
(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests.
In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.
(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per (d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestor's SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.
(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.
(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.
H-10. WOOD PACKING MATERIALS REQUIREMENTS
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures (ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard.
Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited.
Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of nonmanufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box /pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood process verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
*** END OF NARRATIVE 1 ***
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.211-5 Material Requirements.
(Deviation 2026-O0038)
2026-02
52.211-15 Defense Priority and Allocation Requirements.
2008-04
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-1 Payments. 1984-04
52.232-8 Discounts for Prompt Payment. 2002-02
52.232-11 Extras. 1984-04
52.232-25 Prompt Payment. 2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-39 Unenforceability of Unauthorized Obligations.
2013-06
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-1 Disputes. (Deviation 2026- O0038) (Alternate I)
2026-02 Alternate I 2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.243-1 Changes-Fixed-Price. (Deviation 2026-O0038)
2026-02
52.244-6 Subcontracts for Commercial 2026-04
Products and Commercial Services. (Deviation 2026-O0038)
52.246-26 Reporting Nonconforming Items. 2024-08
52.247-15 Contractor Responsibility for Loading and Unloading.
1984-04
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).
1984-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7003 Control of Government Personnel Work Product.
1992-04
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7002 Qualifying Country Sources as Subcontractors.
2022-03
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .