SPRRA126Q0031.pdf
PDF 94 KB Posted
- Attached to
- COOLER ASSEMBLY, TRA / COOLER ASSEMBLY, TRA
- Solicitation number
- SPRRA1-26-Q-0031
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is a Request for Quotation (RFQ) issued by the Defense Logistics Agency (DLA) Aviation for thermal management cooler assemblies supporting the CH-47 Chinook helicopter weapon system. The solicitation is restricted to Triumph Thermal Systems, Inc. (CAGE 78943) as the sole source provider per 10 U.S.C. 2304(c)(1) and FAR 6.302-1, with Boeing (CAGE 77272) confirming non-participation via Request for Information.
The requirement includes two contract line items: CLIN 1001AA for 11 production units of Cooler Assy, Transmi (NSN 1615-01-113-0217, Part Number 145DS105-1) shipping to DLA Distribution San Joaquin, and CLIN 2001AA for 5 production units of Cooler Assembly, Tra (NSN 1615-01-112-5900, Part Number 145DS209-1) shipping to DLA Distribution Depot Oklahoma. Both items require First Article Test (FAT) completion with reports due 288 days after contract award (DACA) for CLIN 1001AA and 348 DACA for CLIN 2001AA, followed by 45-day government review periods. Production deliveries commence 117 DACA for CLIN 1001AA at 6 units monthly and 147 DACA for CLIN 2001AA at 5 units monthly. The contract type is Firm Fixed Price, single purchase, with FOB Destination delivery terms. Quote submission deadline and contract award date were not specified in the document. All items require IUID markings per DFARS 252.211-7003, MIL-STD-129 packaging compliance, and evaluation per technical acceptability and price reasonableness criteria.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
SPRRA1-26-Q-0031 DOA1
SPRRA1DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
KATRIN CAMP (256)690-5715
DLA-AHD
EMAIL: KATRIN.CAMP@DLA.MIL
X
1 46
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: KATRIN CAMP
Buyer Office Symbol/Telephone Number: DLA-AHD/(256)690-5715
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS RESTRICTED TO TRIUMPH THERMAL SYSTEMS, INC. CAGE 78943, IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1. "ONLY ONE
RESPONSIBLE SOURCE AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS."
A-2. THIS EFFORT IS IN SUPPORT OF THE CH-47 CHINOOK WEAPON SYSTEM FOR THE FOLLOWING:
NSN: 1615-01-112-5900
PN: 145DS209-1
NSN: 1615-01-113-0217
PN: 145DS105-1
A-3. THIS IS A SINGLE PURCHASE FIRM FIXED PRICE REQUIREMENT.
BY REPLYING TO THIS SOLICITATION AND SUBMITTING A QUOTATION OR PROPOSAL, THE OFFEROR IS ACKNOWLEDGING ITS ABILITY TO SUPPORT THIS
REQUIREMENT FOR THE FULL SOLICITED TIME PERIOD.
A-4. THIS IS NOT A FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI).
A-5. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.
A-6. FIRST ARTICLE TEST (FAT) IS REQUIRED.
THE FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING. THE FAT REPORT MUST BE
SUBMITTED IN ENGLISH.
A-7. SERIAL NUMBER REQUIREMENT REPORTING (SNRR) IS NOT REQUIRED.
A-8. THE AVIATION MAINTENANCE MANAGEMENT SYSTEM-AVIATION (TAMMS-A) MARKINGS ARE
NOT REQUIRED.
A-9. ARMS EXPORT CONTROL IS NOT APPLICABLE.
A-10. IUID MARKINGS ARE REQUIRED. "THE DFARS CLAUSE 252.211-7003 ITEM IDENTIFICATION AND VALUATION IS INCLUDED IN SECTION F".
A-11. SERIAL NUMBERING IS NOT REQUIRED.
A-12. FIT CHECK IS NOT REQUIRED.
A-13. CONTRACTOR POINT OF CONTACT:
NAME:TBD
TELEPHONE NUMBER:TBD
E-MAIL ADDRESS:TBD
A-14. DCMA POINT OF CONTACT:
NAME:DANIEL FUENTES
TELEPHONE NUMBER: TBD
E-MAIL ADDRESS: DANIEL.E.FUENTES2.CIV@MAIL.MIL
A-15. CONTRACT SPECIALIST POINT OF CONTACT:
NAME: KATRIN CAMP
TELEPHONE NUMBER: 256-690-5715
E-MAIL ADDRESS: KATRIN.CAMP@DLA.MIL
FACSIMILE PROPOSALS WILL NOT BE ACCEPTED. ALL PROPOSALS SHALL BE E-MAILED
A-16. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
2 46
SPRRA1-26-Q-0031
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-17. PLEASE SUBMIT ALL FAT REPORTS, INQUIRIES, AND QUESTIONS TO:
DLA AVIATION HUNTSVILLE POST AWARD TEAM
5206 MARTIN ROAD
REDSTONE ARSENAL, ALABAMA 35898
OR
EMAIL TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
A-18. CONTRACTOR FIRST ARTICLE TEST:
NUMBER OF SAMPLES TO BE TESTED = 1
INSPECTION: ORIGIN (DCMA)
ACCEPTANCE: ORIGIN (DCMA)
DELIVER FOB: DESTINATION
FIRST ARTICLE TEST PEPORT
THE FIRST ARTICLE TEST REPORT WILL BE SENT ELECTRONICALLY TO:
DLAHSVPOSTAWARDTEAM@DLA.MIL
IF THE FILE IS TOO LARGE OR ENCRYPTION IS NEEDED, A DOD SAFE LINK WILL BE SENT TO YOU FOR UPLOAD USING HTTPS://SAFE.APPS.MIL/ . PLEASE
USE THE DLAHSVPOSTAWARDTEAM@DLA.MIL EMAIL ADDRESS TO REQUEST THE LINK.
INSPECTION: ORIGIN (DCMA)
ACCEPTANCE: DESTINATION (SPRRA1) BY THE PCO
SHIP TO: SPRRA1 (DLAHSVPOSTAWARDTEAM@DLA.MIL)
WAWF SUBMITTAL WILL BE A COMBO
ACCEPTANCE OF THE FATR WILL TAKE PLACE FIRST AND THEN ACCEPTANCE OF THE FAT BY DCMA WILL COMMENCE.
DELIVERY SCHEDULE:
CLIN 1001AA/1001AB/1001AC
288 DACA: CONTRACTOR FIRST ARTICLE COMPLETED AND REPORT SUBMISSION
45 DAYS: GOVERNMENT REVIEW AND NOTIFICATION TO CONTRACTOR
117 DAFAA: DELIVERY OF PRODUCTION UNITS
CLIN 2001AA/2001AB/2001AC
348 DACA: CONTRACTOR FIRST ARTICLE COMPLETED AND REPORT SUBMISSION
45 DAYS: GOVERNMENT REVIEW AND NOTIFICATION TO CONTRACTOR
147 DAFAA: DELIVERY OF PRODUCTION UNITS
A-19. FIRST ARTICLE TEST (FAT) VERBIAGE:
FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN
THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES CLIN 1001AA 117 DACA /
CLIN 2001AA 147 DACA. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE
TESTING. THE FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS EMAIL OR DOD SAFE LINK. THE
GOVERNMENT HAS 45 DAYS TO APPROVE/DISAPPROVE THE TEST REPORT.
A-20. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.
A-21. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS)
THIS IS A DO DPAS RATED ORDER, AND YOU ARE REQUIRED TO NOTIFY DLA WITHIN 15 DAYS OF RECEIPT OF ORDER IF THE RATED ORDER CANNOT BE
FULFILLED AS WRITTEN. THIS INCLUDES CONFLICTING RATED ORDER SCHEDULES. IF NO RESPONSE IS RECEIVED DURING THE REQUIRED RESPONSE TIME, THE
CONTRACTOR SELF-ATTESTS ORDER ACCEPTANCE AS IS.
A-22. CERTIFIED COST OR PRICING DATA
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER
THAN CERTIFIED COST OR PRICING DATA. THIS IS NOT CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THERFORE, YOU ARE REQUIRED TO SUBMIT OTHER
THAN COST OR PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS
TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST OR PRICING DATA IF
REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.
A-23. PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS)
THE PRODUCT QUALITY DEFICIENCY REPORT PROGRAM (ARMY REGULATION 702-7) WILL BE USED WHEN CONTRACTORS: 1) DELIVER DEFICIENT ITEMS OR 2)
RECEIVE DEFICIENT ITEMS FROM A DOD SUPPLY CHAIN IN SUPPORT OF ARMY REQUIREMENTS. WHEN REQUESTED, THE CONTRACTOR SHALL ASSIST THE
COGNIZANT CONTRACT ADMINISTRATION OFFICE IN EVALUATING PQDRS AND EXHIBITS FOR DEFECTS REPORTED ON ITEMS MANUFACTURED UNDER THIS CONTRACT
TO DETERMINE THE ROOT CAUSE FOR DEFICIENCIES. CORRECTIVE ACTION AND PREVENTATIVE ACTION TO PRECLUDE RECURRENCE OF DISCREPANCIES SHALL BE
AN INTEGRAL PART OF THE CONTRACTOR'S QUALITY PROGRAM. THESE DEFECTS MAY BE REPORTED FROM ANY DOD ACTIVITY THAT DISCOVERS A DEFECTIVE
3 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ITEM.
*** END OF NARRATIVE A0001 ***
4 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
APPROVED SOURCES:
BOEING, CAGE CODE 77272, HAS INDICATED VIA RFI, THEY WILL NOT BE PROVIDING A BID IN SUPPORT OF THIS EFFORT.
TRIUMPH THERMAL SYSTEMS, INC., CAGE CODE 78943
*** END OF NARRATIVE B0001 ***
5 46
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1001 COOLER ASSY,TRANSMI
NSN: 1615-01-113-0217
Mfr CAGE: 78943
Mfr Part Number: UA537558-1
1001AA PRODUCTION QUANTITY 11 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: COOLER ASSY,TRANSMI
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 1 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [ 60]
LN [ 31]
WD [ 31]
DP [ 14]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
MIL-STD-2073-1 CODES, APPENDIX J:
JI/A/MP [45] JII/CD [1] JIII/PM [00] JIV/WM [GH]
JV/CD [FL] JVI/CT [A] JVII/UC [KE]
JVII/IC [00] JIX/A/PK [F] JX/SM [17] JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W62G2T) SR W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY,CA,95304-5000
6 46
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DELIVERIES SHALL COMMENCE 117 DAYS AFTER CONTRACT
AWARD (DACA)AT A RATE OF 6(EA) PER MONTH UNTIL ALL
DELIVERIES ARE COMPLETE.
(End of narrative F001)
1001AB COST OF CONTRACTOR FIRST ARTICLE TEST 1 LO $ _____________________________________ __________________
SERVICE REQUESTED: COOLER ASSY,TRANSMI
THIS IS THE COST OF THE KTR FIRST ARTICLE ONLY. THIS
COST DOES NOT INCLUDE UNIT COST.
FIRST ARTICLE TEST IS 3 DAYS. UNITS TO BE TESTED IS 1
EACH. BEGIN TESTING 270 DAYS AFTER CONTRACT AWARD
(DACA). END TESTING 273 DAYS. FIRST ARTICLE TEST
REPORT DUE 288 DACA. THE GOVERNMENT HAS 45 DAYS TO
APPROVE/DISAPPROVE THE TEST REPORT. THE FIRST ARTICLE
TEST UNIT SHALL NOT BE RETAINED BY THE CONTRACTOR AS
A MANUFACTURING STANDARD. FAR 52.209-3 ALTERNATE I IS
INCLUDED UNDER WHICH THE CONTRACTOR IS REQUIRED TO
PRODUCE THE FIRST ARTICLE AND THE PRODUCTION QUANTITY
AT THE SAME FACILITY.
THE FIRST ARTICLE TEST REPORT WILL BE SENT
ELECTRONICALLY TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
1001AC FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: COOLER ASSY,TRANSMI
THE FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER
FAT. FAT REPORT SHALL BE SUBMITTED IN ENGLISH.
CONTACT DLA AVN POST AWARD TO CONFIRM THE PREFERRED
METHOD OF TRANSMITTAL. EMAIL:
DLAHSVPOSTAWARDTEAM@DLA.MIL
THE GOVERNMENT HAS 45 DAYS TO APPROVE / DISAPPROVE
THE TEST REPORT.
7 46
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL
DLR PROCUREMENT OPERATIONS (AH)
5201 MARTIN ROAD
REDSTONE ARSENAL,AL,35898-7340
2001 COOLER ASSEMBLY,TRA
NSN: 1615-01-112-5900
Mfr CAGE: 78943
Mfr Part Number: UA537559-1
2001AA PRODUCTION QUANTITY 5 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: COOLER ASSEMBLY,TRA
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
Packaging and Marking
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 1 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [ 91]
LN [ 27]
WD [ 27]
DP [26.5]
8 46
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT
MIL-STD-2073-1 CODES, APPENDIX J:
JI/A/MP [55] JII/CD [1] JIII/PM [00] JIV/WM [GH]
JV/CD [FL] JVI/CT [M] JVII/UC [KE]
JVII/IC [00] JIX/A/PK [A] JX/SM [19] JVIIIA/OPI [M]
SUPPLEMENTAL PACKAGING INSTRUCTIONS: V KE = 8110-00-
433-1074, MS27683-16; CAP OPENINGS
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(SW3211) DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
TINKER AFB,OK,73145-8000
DELIVERIES SHALL COMMENCE 147 DAYS AFTER CONTRACT
AWARD (DACA)AT A RATE OF 5(EA) PER MONTH UNTIL ALL
DELIVERIES ARE COMPLETE.
(End of narrative F001)
2001AB COST OF CONTRACTOR FIRST ARTICLE TEST 1 LO $ _____________________________________ __________________
SERVICE REQUESTED: COOLER ASSEMBLY,TRA
THIS IS THE COST OF THE KTR FIRST ARTICLE ONLY. THIS
COST DOES NOT INCLUDE UNIT COST.
FIRST ARTICLE TEST IS 3 DAYS. UNITS TO BE TESTED IS 1
EACH. BEGIN TESTING 330 DAYS AFTER CONTRACT AWARD
(DACA). END TESTING 333 DAYS. FIRST ARTICLE TEST
REPORT DUE 348 DACA. THE GOVERNMENT HAS 45 DAYS TO
APPROVE/DISAPPROVE THE TEST REPORT. THE FIRST ARTICLE
TEST UNIT SHALL NOT BE RETAINED BY THE CONTRACTOR AS
A MANUFACTURING STANDARD. FAR 52.209-3 ALTERNATE I IS
INCLUDED UNDER WHICH THE CONTRACTOR IS REQUIRED TO
PRODUCE THE FIRST ARTICLE AND THE PRODUCTION QUANTITY
9 46
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
AT THE SAME FACILITY.
THE FIRST ARTICLE TEST REPORT WILL BE SENT
ELECTRONICALLY TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
2001AC FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: COOLER ASSEMBLY,TRA
THE FIRST ARTICLE TEST REPORT IS DUE 15 DAYS AFTER
FAT. FAT REPORT SHALL BE SUBMITTED IN ENGLISH.
CONTACT DLA AVN POST AWARD TO CONFIRM THE PREFERRED
METHOD OF TRANSMITTAL. EMAIL:
DLAHSVPOSTAWARDTEAM@DLA.MIL
THE GOVERNMENT HAS 45 DAYS TO APPROVE / DISAPPROVE
THE TEST REPORT.
(End of narrative C001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL
DLR PROCUREMENT OPERATIONS (AH)
5201 MARTIN ROAD
REDSTONE ARSENAL,AL,35898-7340
10 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 8.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
6 52.242-15 STOP-WORK ORDER AUG/1989
7 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
8 52.247-34 F.O.B. DESTINATION (JAN 1991) FEB/2006
9 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
10 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
11 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010
12 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023) JAN/2023
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
11 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .
"DoD item unique identification" means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
"Enterprise" means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
"Enterprise identifier" means a code that is uniquely assigned to an enterprise by an issuing agency.
"Government's unit acquisition cost" means
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor's estimated fully burdened unit cost to the
Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery.
"Issuing agency" means an organization responsible for assigning a globally unique identifier to an enterprise, as indicated in the
Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.aimglobal.org/?Reg_Authority15459 .
"Issuing agency code" means a code that designates the registration (or controlling) authority for the enterprise identifier.
"Item" means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
"Lot or batch number" means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
"Machine-readable" means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
"Original part number" means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
"Parent item" means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
"Serial number within the enterprise identifier" means a combination of numbers, letters, or symbols assigned by the enterprise to an item that provides for the differentiation of that item from any other like and unlike item and is never used again within the enterprise.
"Serial number within the part, lot, or batch number" means a combination of numbers or letters assigned by the enterprise to an item that provides for the differentiation of that item from any other like item within a part, lot, or batch number assignment.
12 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
"Serialization within the enterprise identifier" means each item produced is assigned a serial number that is unique among all the tangible items produced by the enterprise and is never used again. The enterprise is responsible for ensuring unique serialization within the enterprise identifier.
"Serialization within the part, lot, or batch number" means each item of a particular part, lot, or batch number is assigned a unique serial number within that part, lot, or batch number assignment. The enterprise is responsible for ensuring unique serialization within the part, lot, or batch number within the enterprise identifier.
"Type designation" means a combination of letters and numerals assigned by the Government to a major end item, assembly or subassembly, as appropriate, to provide a convenient means of differentiating between items having the same basic name and to indicate modifications and changes thereto.
"Unique item identifier" means a set of data elements marked on items that is globally unique and unambiguous. The term includes a concatenated unique item identifier or a DoD recognized unique identification equivalent.
"Unique item identifier type" means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html .
(b) The Contractor shall deliver all items under a contract line, subline, or exhibit line item.
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government's unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or
Exhibit Line Item Number Item Description
__N/A______________ N/A___________________________________
__N/A______________ N/A___________________________________
__N/A______________ N/A___________________________________
(ii) Items for which the Government's unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or
Exhibit Line Item Number Item Description
__N/A______________ N/A___________________________________
__N/A______________ N/A___________________________________
__N/A______________ N/A___________________________________
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in
Attachment Number N/A.
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in
Attachment Number N/A.
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(2) The unique item identifier assignment and its component data element combination shall not be duplicated on any other item marked or registered in the DoD Item Unique Identification Registry by the contractor.
13 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) The unique item identifier component data elements shall be marked on an item using two dimensional data matrix symbology that complies with ISO/IEC International Standard 16022, Information technology--International symbology specification--Data matrix; ECC200 data matrix specification.
(4) Data syntax and semantics of unique item identifiers. The Contractor shall ensure that--
(i) The data elements (except issuing agency code) of the unique item identifier are encoded within the data matrix symbol that is marked on the item using one of the following three types of data qualifiers, as determined by the Contractor:
(A) Application Identifiers (AIs) (Format Indicator 05 of ISO/IEC International Standard 15434), in accordance with ISO/IEC
International Standard 15418, Information Technology--EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI
MH 10.8.2 Data Identifier and Application Identifier Standard.
(B) Data Identifiers (DIs) (Format Indicator 06 of ISO/IEC International Standard 15434), in accordance with ISO/IEC International
Standard 15418, Information Technology--EAN/UCC Application Identifiers and Fact Data Identifiers and Maintenance and ANSI MH 10.8.2
Data Identifier and Application Identifier Standard.
(C) Text Element Identifiers (TEIs) (Format Indicator 12 of ISO/IEC International Standard 15434), in accordance with the Air
Transport Association Common Support Data Dictionary; and
(ii) The encoded data elements of the unique item identifier conform to the transfer structure, syntax, and coding of messages and data formats specified for Format Indicators 05, 06, and 12 in ISO/IEC International Standard 15434, Information Technology-Transfer
Syntax for High Capacity Automatic Data Capture Media.
(5) Unique item identifier.
(i) The Contractor shall--
(A) Determine whether to--
(1) Serialize within the enterprise identifier;
(2) Serialize within the part, lot, or batch number; or
(3) Use a DoD recognized unique identification equivalent (e.g. Vehicle Identification Number); and
(B) Place the data elements of the unique item identifier (enterprise identifier; serial number; DoD recognized unique identification equivalent; and for serialization within the part, lot, or batch number only: Original part, lot, or batch number) on items requiring marking by paragraph (c)(1) of this clause, based on the criteria provided in MIL-STD-130, Identification Marking of
U.S. Military Property, latest version;
(C) Label shipments, storage containers and packages that contain uniquely identified items in accordance with the requirements of
MIL-STD-129, Military Marking for Shipment and Storage, latest version; and
(D) Verify that the marks on items and labels on shipments, storage containers, and packages are machine readable and conform to the applicable standards. The contractor shall use an automatic identification technology device for this verification that has been programmed to the requirements of Appendix A, MIL-STD-130, latest version.
(ii) The issuing agency code--
(A) Shall not be placed on the item; and
(B) Shall be derived from the data qualifier for the enterprise identifier.
(d) For each item that requires item unique identification under paragraph (c)(1)(i), (ii), or (iv) of this clause or when item unique identification is provided under paragraph (c)(1)(v), in addition to the information provided as part of the Material Inspection and
Receiving Report specified elsewhere in this contract, the Contractor shall report at the time of delivery, as part of the Material
Inspection and Receiving Report, the following information:
(1) Unique item identifier.
(2) Unique item identifier type.
(3) Issuing agency code (if concatenated unique item identifier is used).
14 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(4) Enterprise identifier (if concatenated unique item identifier is used).
(5) Original part number (if there is serialization within the original part number).
(6) Lot or batch number (if there is serialization within the lot or batch number).
(7) Current part number (optional and only if not the same as the original part number).
(8) Current part number effective date (optional and only if current part number is used).
(9) Serial number (if concatenated unique item identifier is used).
(10) Government's unit acquisition cost.
(11) Unit of measure.
(12) Type designation of the item as specified in the contract schedule, if any.
(13) Whether the item is an item of Special Tooling or Special Test Equipment.
(14) Whether the item is covered by a warranty.
(e) For embedded subassemblies, components, and parts that require DoD item unique identification under paragraph (c)(1)(iii) of this clause or when item unique identification is provided under paragraph (c)(1)(v), the Contractor shall report as part of the Material
Inspection and Receiving Report specified elsewhere in this contract, the following information:
(1) Unique item identifier of the parent item under paragraph (c)(1) of this clause that contains the embedded subassembly, component, or part.
(2) Unique item identifier of the embedded subassembly, component, or part.
(3) Unique item identifier type.**
(4) Issuing agency code (if concatenated unique item identifier is used).**
(5) Enterprise identifier (if concatenated unique item identifier is used).**
(6) Original part number (if there is serialization within the original part number).**
(7) Lot or batch number (if there is serialization within the lot or batch number).**
(8) Current part number (optional and only if not the same as the original part number).**
(9) Current part number effective date (optional and only if current part number is used).**
(10) Serial number (if concatenated unique item identifier is used).**
(11) Description.
** Once per item.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at
252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods--
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/ ; or
15 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(iii) Via WAWF as a deliverable attachment for exhibit line item number -7-, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
(g) Subcontracts. If the Contractor acquires by subcontract any item(s) for which item unique identification is required in accordance with paragraph (c)(1) of this clause, the Contractor shall include this clause, including this paragraph (g), in the applicable subcontract(s), including subcontracts for commercial products or commercial services.
(End of clause)
Time of Delivery Accelerated Delivery
Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the
Government for accelerated delivery.
*** END OF NARRATIVE F0001 ***
16 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
13 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023
(a) Definitions. As used in this clause
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1)Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
THE CONTRACTOR IS ENCOURAGED TO USE THE COMBINATION INVOICE AND RECEIVING REPORT (COMBO) FOR SUBMITTING INVOICES FOR SUPPLIES. THIS
ELIMINATES THE NEED TO SEPERATELY PROCESS A RECEIVING REPORT AND INVOICE.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
2in1 INVOICE
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv)For performance based payments, submit a performance based payment request.
(v) For commercial financing submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3)Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
17 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD AFTER CONTRACT AWARD
Issue By DoDAAC SPRRA1
Admin DoDAAC TBD AFTER CONTRACT AWARD
Inspect By DoDAAC TBD AFTER CONTRACT AWARD
Ship To Code CLIN 1001AA W62G2T
CLIN 2001AA SW3211
Ship From Code TBD AFTER CONTRACT AWARD
Mark For Code TBD AFTER CONTRACT AWARD
Service Approver (DoDAAC) TBD AFTER CONTRACT AWARD
Service Acceptor (DoDAAC) TBD AFTER CONTRACT AWARD
Accept at Other DoDAAC TBD AFTER CONTRACT AWARD
LPO DoDAAC TBD AFTER CONTRACT AWARD
DCAA Auditor DoDAAC TBD AFTER CONTRACT AWARD
Other DoDAAC(s) TBD AFTER CONTRACT AWARD
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or
"Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4)Payment request.The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5)Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g)WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Daniel Fuentes (ACO) mail to:daniel.e.fuentes2.civ@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
18 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
BAR CODE MARKING REQUIREMENTS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39
CALIBRATION REQUIREMENTS
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance Vocabulary.
ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES
1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 3000 Lakeside Drive, 105N, Bannockburn, IL, 60015, https://www.ipc.org .
2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.
3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a
Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.
4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application.
Include, when applicable:
a. Part Number and Source
b. Size and weight data.
c. Electrical and mechanical characteristics
d. Reliability (with data if requested)
e. Availability of the standard part (delivery schedules, still available etc.)
f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards (DoDISS) or Standardized Military Drawings (SMD).
5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-
Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-
2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.
6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request.
The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the
Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-PRO-
010.
ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG
NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
19 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format
a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished
Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for
Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using DD
Form 1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management
Agency (DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8
"Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense
Contract Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using subsections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal
The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative
Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the
Contractor concerning ECPs, VECPs, or RFVs will be…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .