This is a Request for Quotation (RFQ) issued by the Defense Logistics Agency (DLA) Aviation for a critical safety item component for the CH-47 Chinook helicopter. The solicitation number is SPRRA1-26-Q-0023, issued on April 28, 2026, with a quotation closing date of May 28, 2026.
The requirement is for a Plate Assembly, Drive (NSN 1615-01-567-7013, Part Number 114DS344-1) and includes a mandatory First Article Test (FAT). This is a one-time buy, firm fixed-price acquisition limited to three approved sources: Rexnord Industries LLC (CAGE 46HD1), Boeing Distribution Services Inc. (CAGE 2V484), and The Boeing Company (CAGE 77272), justified under 10 U.S.C. 2304(c)(1) for limited responsive sources. The contractor must acknowledge its ability to support the full solicited quantity by submitting a proposal. Quotations must be submitted via email to the contracting officer, Samary Rodriguez-Hernandez at DLA-AHA, 5201 Martin Road, Redstone Arsenal, Alabama 35898-7340.
Production deliveries shall commence 387 days after contract award at a rate of 100 units for the first two months and 31 units in the final month, totaling approximately 231 units, with FOB Destination to DLA Distribution Depot Oklahoma (Tinker AFB). The solicitation requires compliance with Critical Safety Item requirements per QE-STD-1, including manufacturing plan submission within 30 days post-award and FAT within 828 days. The FAT unit shall not be retained as a manufacturing standard and will be delivered as part of production quantity. The contractor must provide bar code markings per MIL-STD-129, accomplish production lot testing, submit serial number reporting, and comply with DPAS rating requirements. Packaging shall follow MIL-STD-2073-1, and all wood packaging material must be ISPM-15 compliant. The contract incorporates numerous FAR and DFARS clauses addressing inspection, quality assurance, payment procedures (WAWF), and other standard contract administration requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of
(This is NOT an Order)
1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating
See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)
See Schedule
7. Delivery
FOB Other Destination
5B. For Information Call: (Name and telephone no.) (No collect calls)
8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)
See Schedule
10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.
Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. Schedule (Include applicable Federal, State, and local taxes)
Item Number (a)
Supplies/Services (b)
Quantity (c)
Unit (d)
Unit Price (e)
Amount (f)
(See Schedule)
12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage
NOTE: Additional provisions and representations are are not attached.
13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation
16. Signer
a. Name (Type or Print) b. Telephone
Area Code
c. Title (Type or Print) Number
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)
X
SPRRA1-26-Q-0023 2026APR28 DOA1
SPRRA1DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
SAMARY RODRIGUEZ-HERNANDEZ(000)000-0000
DLA-AHA
EMAIL: SAMARY.RODRIGUEZ-HERNANDEZ@DLA.MIL
X
2026MAY28
1 49
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: SAMARY RODRIGUEZ-HERNANDEZ
Buyer Office Symbol/Telephone Number: DLA-AHA/(000)000-0000
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS FOR LIMITED SOURCES TO REXNORD INDUSTRIES, LLC CAGE 46HD1, BOEING DISTRIBUTION SERVICES, INC. CAGE 2V484 & THE
BOEING COMPANY CAGE 77272. IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1 (a)(2) "A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF
SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS, FULL AND OPEN COMPETITION NEED NOT BE ACCOUNTED FOR."
A-2. THIS EFFORT IS IN SUPPORT OF THE CH-47 CHINOOK FOR THE FOLLOWING:
NSN: 1615-01-567-7013
PN: 114DS344-1
A-3. THIS IS A ONE TIME BUY, FIRM FIXED PRICE SOLICITATION.
BY REPLYING TO THIS SOLICITATION AND SUBMITTING A PROPOSAL, THE OFFEROR IS ACKNOWLEDGING ITS ABILITY TO SUPPORT THIS REQUIREMENT FOR THE
FULL SOLICITED QUANTITY.
A-4. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS REQUIRED.
ATTENTION: IAW CRITICAL SAFETY ITEMS CRITICAL CHARACTERISTICS NEW MANUFACTURE QE-STD-1, SECTION 6.1 MANUFACTURING PLANNING
6.1.1 GENERAL REQUIREMENTS
6.1.2 PLAN CONTENT REQUIREMENTS
6.1.3 FROZEN PLANNING REQUIREMENTS
A COPY OF THE CONTRACTOR'S MANUFACTURING PLAN MUST BE SUBMITTED TO DLA AVIATION POST AWARD NO LATER THAN 30 DAYS AFTER AWARD. FIRST
ARTICLE TESTING (FAT) MAY NOT COMMENCE WITHOUT REVIEW AND APPROVAL OF THE MANUFACTURING PLAN.
WHEN PARTS ARE DESIGNATED AS CSI, THE GOVERNMENT RESERVES THE RIGHT TO CONDUCT ANNUAL AUDITS OF THE CONTRACTOR'S CSI SYSTEM.
A-5. PRODUCTION LOT TESTING (PLT) IS REQUIRED.
A-6. FIRST ARTICLE TEST (FAT) IS REQUIRED.
THE FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING. THE FAT REPORT MUST BE
SUBMITTED IN ENGLISH.
A-7. SERIAL NUMBER REQUIREMENT REPORTING (SNRR) MARKINGS ARE NOT REQUIRED.
A-8. THE AVIATION MAINTENANCE MANAGEMENT SYSTEM-AVIATION (TAMMS-A) MARKINGS ARE NOT REQUIRED.
A-9. ARMS EXPORT CONTROL IS NOT APPLICABLE.
A-10. SERIAL NUMBERING IS NOT REQUIRED.
A-11. FIT CHECK IS NOT REQUIRED.
A-12. CONTRACTOR POINT OF CONTACT:
NAME: TO BE DETERMINED AT TIME OF AWARD
TELEPHONE NUMBER: TO BE DETERMINED AT TIME OF AWARD
E-MAIL ADDRESS: TO BE DETERMINED AT TIME OF AWARD
A-13. DCMA POINT OF CONTACT:
NAME: TO BE DETERMINED AT TIME OF AWARD
TELEPHONE NUMBER: TO BE DETERMINED AT TIME OF AWARD
E-MAIL ADDRESS: TO BE DETERMINED AT TIME OF AWARD
A-14. CONTRACT SPECIALIST POINT OF CONTACT:
NAME: SAMARY RODRIGUEZ-HERNANDEZ
E-MAIL ADDRESS: SAMARY.RODRIGUEZ-HERNANDEZ@DLA.MIL
A-15. FACSIMILE PROPOSALS WILL NOT BE ACCEPTED. ALL PROPOSALS SHALL BE E-MAILED
2 49
SPRRA1-26-Q-0023
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-16. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A-17. PLEASE SUBMIT ALL FAT REPORTS, INQUIRIES, AND QUESTIONS TO:
DLA AVIATION HUNTSVILLE POST AWARD TEAM
5206 MARTIN ROAD
REDSTONE ARSENAL, ALABAMA 35898
OR
EMAIL TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
A-18. CONTRACTOR FIRST ARTICLE TEST:
NUMBER OF SAMPLES TO BE TESTED = 1
INSPECTION: ORIGIN (DCMA)
ACCEPTANCE: ORIGIN (DCMA)
DELIVER FOB: DESTINATION
BY: 828 DACA
FIRST ARTICLE TEST PEPORT:
THE FIRST ARTICLE TEST REPORT WILL BE SENT ELECTRONICALLY TO:
DLAHSVPOSTAWARDTEAM@DLA.MIL
IF THE FILE IS TOO LARGE OR ENCRYPTION IS NEEDED, A DOD SAFE LINK WILL BE SENT TO YOU FOR UPLOAD USING HTTPS://SAFE.APPS.MIL/ . PLEASE
USE THE DLAHSVPOSTAWARDTEAM@DLA.MIL EMAIL ADDRESS TO REQUEST THE LINK.
INSPECTION: ORIGIN (DCMA)
ACCEPTANCE: DESTINATION (SPRRA1) BY THE PCO
SHIP TO: SPRRA1 (DLAHSVPOSTAWARDTEAM@DLA.MIL)
WAWF SUBMITTAL WILL BE A COMBO
ACCEPTANCE OF THE FATR WILL TAKE PLACE FIRST AND THEN ACCEPTANCE OF THE FAT BY DCMA WILL COMMENCE.
DELIVERY SCHEDULE:
828 DACA: CONTRACTOR FIRST ARTICLE COMPLETED AND REPORT SUBMISSION
45 DAYS: GOVERNMENT REVIEW AND NOTIFICATION TO CONTRACTOR
387 DAFAA: DELIVERY OF PRODUCTION UNITS
1260 DACA
FIRST ARTICLE TEST (FAT) VERBIAGE:
FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN
THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 1260 DACA. THE
CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST
ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS EMAIL OR DOD SAFE LINK. THE GOVERNMENT HAS 45 DAYS
TO APPROVE/DISAPPROVE THE TEST REPORT.
A-19. OTHER THAN COST AND PRICING DATA:
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER
THAN CERTIFIED COST OR PRICING DATA. THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THEREFORE, YOU ARE REQUIRED TO SUBMIT OTHER
THAN COST AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST
ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING
DATA IF REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.
A-20. LONG LEAD TIME AND OR LONG-TERM CONTRACTS:
FOR LONG LEAD TIME ITEMS AND/OR LONG-TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR
PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTOR'S RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
A-21. PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS)
THE PRODUCT QUALITY DEFICIENCY REPORT PROGRAM (ARMY REGULATION 702-7) WILL BE USED WHEN CONTRACTORS: 1) DELIVER DEFICIENT ITEMS OR 2)
RECEIVE DEFICIENT ITEMS FROM A DOD SUPPLY CHAIN IN SUPPORT OF ARMY REQUIREMENTS. WHEN REQUESTED, THE CONTRACTOR SHALL ASSIST THE
3 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
COGNIZANT CONTRACT ADMINISTRATION OFFICE IN EVALUATING PQDRS AND EXHIBITS FOR DEFECTS REPORTED ON ITEMS MANUFACTURED UNDER THIS CONTRACT
TO DETERMINE THE ROOT CAUSE FOR DEFICIENCIES. CORRECTIVE ACTION AND PREVENTATIVE ACTION TO PRECLUDE RECURRENCE OF DISCREPANCIES SHALL BE
AN INTEGRAL PART OF THE CONTRACTOR'S QUALITY PROGRAM. THESE DEFECTS MAY BE REPORTED FROM ANY DOD ACTIVITY THAT DISCOVERS A DEFECTIVE
ITEM.
A-22. DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS)
THIS IS A DO DPAS RATED ORDER, AND YOU ARE REQUIRED TO NOTIFY DLA WITHIN 15 DAYS OF RECEIPT OF ORDER IF THE RATED ORDER CANNOT BE
FULFILLED AS WRITTEN. THIS INCLUDES CONFLICTING RATED ORDER SCHEDULES. IF NO RESPONSE IS RECEIVED DURING THE REQUIRED RESPONSE TIME, THE
CONTRACTOR SELF-ATTESTS ORDER ACCEPTANCE AS IS.
A-23. PROPOSAL SHALL BE VALID FOR NO LESS THAN 180 DAYS FROM SOLICITATION CLOSING DATE.
*** END OF NARRATIVE A0001 ***
4 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
APPROVED SOURCES:
THE BOEING COMPANY, CAGE 77272 RECEIVED NO BID
REXNORD INDUSTRIES, LLC, CAGE 46HD1
APPROVED DISTRIBUTORS: BOEING DISTRIBUTION SERVICES, INC. CAGE 2V484 RECEIVED NO BID
*** END OF NARRATIVE B0001 ***
5 49
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001 PLATE ASSEMBLY,DRIV
NSN: 1615-01-567-7013
Mfr CAGE: 77272
Mfr Part Number: 114DS344-1
0001AA Production Quantity $ $ ____________________ ______________ __________________
COMMODITY NAME: PLATE ASSEMBLY,DRIV
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 00
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT 3.3
LN 10
WD 10
DP 3
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP 31 JII/CD 1 JIII/PM 06 JIV/WM GB
JV/CD NA JVI/CT B JVII/UC ED JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15
COMPLIANT.
Supplemental Information: N/A
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
6 49
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT: Destination
SHIP TO:
(SW3211) DLA DISTRIBUTION DEPOT OKLAHOMA
3301 F AVE CEN REC BLDG 506 DR 22
TINKER AFB OK 73145-8000
TINKER AFB,OK,73145-8000
DELIVERIES SHALL COMMENCE 387 DAYS AFTER CONTRACT
AWARD AT A RATE OF: 100 EA FIRST TWO MONTHS AND 31
LAST MONTH.
(End of narrative F001)
0002 FIRST ARTICLE TEST NRE
0002AA FIRST ARTICLE TEST $ _______________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST NRE
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0002AA COST IS FOR FIRST ARTICLE TEST ONLY.
FIRST ARTICLE TEST UNIT TO BE TESTED IS A PART OF
THE TOTAL QUANTITY FOR CLIN 0001AA.
UNIT TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL
BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN THE
GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR
WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED
DELIVERIES. THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE
PROPOSED DATE OF FIRST ARTICLE TESTING.
THE FIRST ARTICLE TEST UNIT SHALL NOT BE RETAINED BY
THE CONTRACTOR AS A MANUFACTURING STANDARD.
FAR 52.209-3 ALTERNATE I IS INCLUDED UNDER WHICH THE
CONTRACTOR IS REQUIRED TO PRODUCE THE FIRST ARTICLE
AND THE PRODUCTION QUANTITY AT THE SAME FACILITY.
THIS IN NO WAY PRECLUDES THE CONTRACTORS RIGHT TO
SUBMIT A REQUEST FOR WAIVER OF THE FAT, ALTHOUGH A
WAIVER IS NOT GUARANTEED.
(End of narrative B001)
7 49
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0002AB FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** _________________________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST REPORT
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 AS REQUIRED
FOB POINT: Destination
SHIP TO:
(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL
DLR PROCUREMENT OPERATIONS (AH)
5201 MARTIN ROAD
REDSTONE ARSENAL,AL,35898-7340
8 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
2 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
3 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
4 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
5 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ANSI/ISO/ASQ 9001:2008, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
6 52.242-15 STOP-WORK ORDER AUG/1989
7 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
8 52.247-34 F.O.B. DESTINATION (JAN 1991) FEB/2006
9 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
10 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
9 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
11 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023) JAN/2023
(a) Definitions. As used in this clause
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBO
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
10 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Routing Data Table*
------------------------------------------------------------------------ar Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC SPRRA1
Admin DoDAAC** TBD
Inspect By DoDAAC TBD
Ship To Code SW3211
Ship From Code TBD
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or
"Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD AT TIME OF AWARD
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
11 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
H-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
H-2 CALIBRATION REQUIREMENTS
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance Vocabulary.
H-3 ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION
CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below
2. Format.
a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared.
Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using DD Form
1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management Agency
(DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8
"Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract
Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the
12 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the
Contractor and the Government.
k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled
"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative
Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the
Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution for unclassified is through the email or DOD safe site
(https://safe.apps.mil) addressed to the PCO. Classified material shall be distributed via SIPERNET or by classified email as determined by the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the
E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website (http://www.esd.whs.mil/DD/) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format
(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
H-4 CRITICAL SAFETY ITEM (CSI) SUPPLIER INTERFACE AND OVERSIGHT PROGRAM REQUIREMENTS
This contract is for a Critical Safety Item (CSI) and requires special controls as identified in Quality Engineering Standard 1 (QE-STD-
1). In addition to the QE-STD-1 requirements, the contractor shall comply with the following:
a. The Contractor shall prepare manufacturing planning documentation in accordance with paragraph 6.1 of QE-STD-1 and DI-MGMT-81117A.
Any Contractor recommended changes to the manufacturing planning documentation which affect critical characteristics shall be approved by the Government. The Contractor shall not implement any process changes which affect critical characteristics without prior Government approval.
b. Written notification shall be given to the Procuring Contracting Officer (PCO) as soon as possible but at least 30 days prior to first delivery indicating the time frame when the parts being procured under this contract will be actively in production in order that a Supplier Interface and Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The Contractor will cooperate with and allow the Government to conduct a SIOP on-site review (1-3 days typically) while the parts are actively in production. This review may also require site visits to critical process subcontractors. The purpose of the SIOP on-site review is to thoroughly review manufacturing processes and documentation for CSIs and provide feed-back and direction regarding
13 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the CSI program.
NOTE: Some of the personnel that support the SIOP program (e.g. evaluate manufacturing planning and participate in the SIOP on- site reviews) are support contractors of the Systems Readiness Directorate (SRD), Aviation and Missile Center (AvMC), DEVCOM providing programmatic and technical services under the AMCOM Express Program. The SRD will, within thirty days of contract award, identify the programmatic and technical services support contractors who may be involved with this contract and may require access to your company's proprietary data (e.g., frozen manufacturing planning) and facilities in performing their duties. Since these contractor personnel are not Federal employees, they will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been established. A standard NDA will accompany the SRD notification. If a NDA with the identified support contractor has not been entered into by your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within thirty days of contract award. If there are objections to the NDA or the terms or conditions thereof, contact, in writing, the PCO within 10 days of receipt of the SRD notification so as to allow sufficient time for a mutually acceptable arrangement be reached.
H-5 IDENTIFICATION MARKING REQUIREMENTS
Item shall be marked per MIL-STD-130.
H-6 REQUEST FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL
(a) The requirement for FIRST ARTICLE APPROVAL may be waived, in whole or in part, by the Government, provided that sufficient information is provided to determine whether the request is to be approved. A partial waiver is defined as a waiver of only a specific test(s) of the First Article Test requirement as required by the Technical Data Package (TDP) and/or the solicitation/contract, i.e.
vibration test, salt water spray test, or a test on a component or subassembly of the procured item. A full waiver is defined as a waiver of all First Article testing as required by the TDP and/or the solicitation/contract.
(b) All waiver requests require a First Article Waiver Worksheet to be completed and submitted to the Government along with all supporting documentation. The worksheet will be provided by the Buyer upon request. No requests will be considered if the worksheet and supporting documentation are not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable). To substantiate or clarify information provided, the Government may request additional information.
(c) Submission of the FAT waiver request (and supporting documentation) to the Government does not guarantee that the waiver will be granted.
(d) The First Article Waiver Worksheet and additional supporting documentation must be submitted on Company letterhead and signed by an authorized agent of the Company.
(e) Supporting documentation.
(1) The request for waiver must be accompanied by the First Article Waiver Worksheet, and documentation in support of the request. The documentation may include, but is not limited to:
(i) Copy of the Administrative Contracting Officer's (ACO's) or Procuring Contracting Officer's (PCO's) letter approving a
First Article Test report on a recent contract for the same or similar item;
(ii) Copy of a First Article Test report for the same or a similar item as that solicited herein;
(iii) Copy of an ACO or PCO letter approving a prior waiver request; or
(iv) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(2) If a copy of a First Article Test report is submitted in support of a request for waiver, the test report must have been approved and signed by an authorized representative of the United States Government.
(3) The First Article Waiver Worksheet and all supporting documentation should be submitted by email. If the First Article
Waiver Worksheet and supporting documentation cannot be transmitted by email, the PCO should be contacted for further instruction.
(f) Note: If a waiver is granted, an accelerated delivery schedule will apply.
(g) Note: Cost considerations shall apply for approving a waiver or a portion thereof of a First Article Test.
H-7 REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT
14 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.:_____TBD__________________________________________________
Contractor:________TBD_________________________________________________
Explanation of Data Rights:_________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled, " ENGINEERING CHG
PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE
PREPARATION AND SUBMISSION INSTRUCTIONS"
H-8 SOURCES ELIGIBLE FOR AWARD CONSIDERATION
(a) Competition under this solicitation is restricted to the following sources:
(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment.
(2) Sources that have been approved prior to award -- other than approved sources listed in Section B.
(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.
(b) Only offers submitted by the above sources will be considered for award under this solicitation.
(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the
Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.
(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source
Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRD), Aviation and Missile Center, DEVCOM. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). SAR instructions can be found at https://www/avmc.army.mil/Directorates/SRD/SAR/.
Questions concerning SAR submissions can be directed to the SRD SAR Team at usarmy.redstone.devcom-avmc.mbx.amr-m-sar@army.mil.
(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.
15 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per
(d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestor's SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.
(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.
(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.
H-9 FEDERAL AVIATION ADMINISTRATION (FAA) AIRWORTHINESS APPROVAL TAG
If any of the items that are the subject of this procurement are also currently being sold to commercial customers and an FAA Form 8130-
3, Airworthiness Approval Tag, is required to accompany these parts, the offeror shall:
(a) Identify, in its proposal, these parts; and
(b) If awarded the contract, provide FAA Form 8130-3 to the Government upon delivery of the parts.
H-10 FROZEN PLANNING/VERIFICATION OF CONTINUITY OF FROZEN PLANNING REQUIREMENTS
1. By submitting this proposal, the offeror verifies that the manufacturing planning relative to critical characteristics of the
Critical Safety Item (CSI) that was frozen in accordance with Quality Engineering Standard (QE-STD) 1:
a. Has not changed since approval by the Combat Capabilities Development Command (CCDC) Aviation Missile Center (AVMC) Systems
Readiness Directorate (SRD) or by predecessor U.S. Army Aviation Systems Engineering organizations.
OR
b. Has changed and all changes have been approved by the CCDC AvMC SRD.
OR
c. Has changed, all changes have been submitted to the CCDC AvMC SRD for approval, and changes will not be implemented until approval is obtained.
2. Within 30 days of contract award, the contractor shall submit through the Contracting Officer to the CCDC AvMC SRD a copy of the current version of its frozen manufacturing planning for the CSI being procured under the resulting contract.
3. In the event that it is determined by the Government that the offeror has never had its manufacturing plan reviewed and/or approved by the CCDC AvMC SRD or by predecessor U.S. Army Aviation Systems Engineering organizations, the offeror may be required to have its manufacturing plan approved prior to First Article Test (FAT) or prior to the start of production if the FAT requirement was waived, in the event the offeror is awarded the contract resulting from this solicitation.
H-11 CRITICAL SAFETY ITEMS NEW MANUFACTURE QE-STD-1
This contract is for a Critical Safety Item (CSI) as identified by the Government and shall comply with the requirements of Quality
Engineering Standard-1 (QE-STD-1). For any CSI parts required in the manufacture of this item, the contractor shall procure new CSIs only from sources of supply approved by the DEVCOM Aviation and Missile Center, Systems Readiness Directorate. The contractor must require purchase and acquisition of any new CSI parts to comply with QE-STD-1. Adherence to QE-STD-1 is necessary to maintain the integrity of the Critical Characteristics (CCs) of each CSI component. QE-STD-1 is provided as an attachment in Section J.
H-12 DEFENSE PRIORITY AND ALLOCATIONS SYSTEM (DPAS) RATED AWARDS
Defense Priorities and Allocations System (DPAS) Rated Awards (JUNE 2025)
A DPAS rated order indicates the priority the contractor must give to the performance of the award. There are two priority ratings: "DX" and "DO". All "DX" rated orders have equal priority with each other and take preference over "DO" rated orders and unrated orders. All
"DO" rated orders have equal priority with each other and take preference over unrated orders. (see 15 CFR 700.11 and DoDM 4400.1-M).
H-13 Mandatory Contractor Performance Scheduling
A contractor must schedule operations, including the acquisition of all needed production items, in a timely manner to satisfy the delivery requirements of each DPAS rated order. Additionally, contractors are required to use DPAS rated orders with their U.S.
suppliers to obtain items needed to fill rated orders (15 CFR 700.15). Contractors may also use DPAS rated orders to obtain replacements
16 49
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
of inventoried items used to fill rated orders (see 15 CFR 700.17(b)). Modifying production or delivery schedules is necessary only when required delivery dates for a rated order cannot otherwise be met. Since "DX" indicates the highest rated order, the manufacturer will schedule its production before processing other lower or unrated orders. "DX" rated orders must be given production preference over "DO" rated orders and unrated orders if necessary to meet required delivery dates, even if this requires the diversion of items being processed or ready for delivery against unrated orders. Similarly, "DO" rated orders must be given preference over unrated orders. If an accepted rated order of equal priority status conflicts with other accepted rated orders of equal priority status, the contractor must prioritize the rated orders in the sequence in which the rated orders are to be delivered or performed (see 15 CFR 700.14). Contractor
Acceptance of a DPAS rated order:[Contractors receiving an award that includes a DPAS rating shall advise DLA via the post award mailbox
(HYPERLINK "mailto:DLAHSVPostAwardTeam@dla.mil"DLAHSVPostAwardTeam@dla.mil), if they cannot perform in accordance with the requirements of the applied DPAS rating. When rejecting an order in full, communication to the contracting officer must include a detailed reason for rejection. If the order can be fulfilled at a later date, the contractor must provide, a) the earliest possible delivery date, b) a detailed reason why the awarded delivery date cannot be met (e.g. reason should not simply state a production delay) and, c) an offer to accept the order based on that date. Contractors must advise DLA within fifteen(15) working days after receipt of a "DO" rated order, and within ten (10) working days after receipt of a "DX" rated order if they cannot perform in accordance with the DPAS rating. Contractors that do not contact DLA are self-attesting that they acknowledge receipt of the award and will conform to the DPAS rating requirement. If the prescribed response time has passed and the contractor learns that shipment or performance will be delayed, the contractor is still required to notify DLA immediately. Special Priority Assistance:
Preferential scheduling is a must for DPAS rated orders (see 15 CFR 700.14). If a contractor learns that a shipment or performance will be delayed after the allotted response time has passed or any other issue arises that will affect deliveries during the duration of the contract, the contractor is required to notify DLA immediately through the use of Form BIS-999, Special Priorities Assistance (SPA).
Deviations from schedules cannot be approved without the completion and submission of this form. Once submitted, DLA and its customers will discuss the SPA for approval. The Department of Commerce requires an approved BIS-999 prior to reprioritizing DPAS rated orders and its schedules (See 15 CFR 700.50). Please contact DLA post award for any SPA questions or concerns.
*** END OF NARRATIVE H0001 ***
CONTRACT CLAUSES
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
12 52.202-1 DEFINITIONS JUN/2020
13 52.203-3 GRATUITIES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .