About this file
This is a Justification for Other Than Full and Open Competition (J&A) document for the Defense Logistics Agency (DLA). The acquisition is for 50 each of a Vaneaxial Fan (NSN 4140-01-311-6901/14SDS518-6) with a total contract price increased to $1,277,950.00. The procurement is a one-time buy using 10 U.S.C. 3204(a)(1) authority for acquisition from a limited number of sources, specifically citing AMSC code IP (suitable for competitive acquisition for the second or subsequent time).
A sources sought notice was posted on 7 February 2025 with a closing date of 13 February 2025, which resulted in no responses. Potential sources identified include The Boeing Company and Meggitt Defense System, Inc. The technical data rights for the part cannot be purchased, developed, or obtained by the government. The acquisition will be synopsized around 21 February 2025, and firms are encouraged to seek approval to compete for future solicitations through the Standardized Aviation and Missiles Sources Approval Request (SAMSAR) process. The document has been approved by the Contracting Officer and the Competition Advocate, with approval level determined by the contract value being over $900,000 but not exceeding $20 million.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
FOR SOLE SOURCE AND LIMITED COMPETITION
I.Agency: Defense Logistics Agency Contracting Activity: _AH_ AB ________________ _
Documr✓1entifi;:~:~ber:_AX_s_c_04_2_7AX _____ I __ I _ ~:i::~:umber: _s_P_PRA_ 1_-2_s_-R_-_oo_,=2=,--F-AR--P-ru_t_ l 3 ___ 5 ___ _
2. The action being approved is the acquisition of supplies/services on other than a full and open competition basis.
□ New Action I✓ I Amendment: total contract price increased to $1,277,950.00
3. The supplies/services required to meet the using activity's needs ru·e described as follows:
BRIEF DESCRIPTION
FAN, VANEAXIAL
*If too numerous, attach list ofNSNs and AMSC codes.
This acquisition:
NSNIPN
4140-0l-311-6901/l4SDS518-6
4. Tlpe l f Contract (may include number of base years) ONE TIME BUY
✓ will not include an option.
QUANTITY
SO each
ESTIMATED VALUE --
D will include a _____ % option for increased quantity. Total estimated dollar value of option quantity is$ _____ _
□ will include an option to extend the tenn of the contract for a period of ____ .months, exercisable in increments of
___ months. Total estimated dollar value of all option periodsis $ _________ . The maximum dollar value of all option periods is $ ______ _
The total estimated dollar value of this acquisition is: (inclusive of any options) $~ The maximum dollar value ofthis acquisition is: (inclusive of any options)$
5. The statutory authoritype1mitting other than full and open competition is 10 U.S.C. 3204(a)(l) - Available from only one or limited number of sources.
6. Efforts to improve DoD Competition in accordance with DFARS 206.303-2:
I ✓ IA sow-ces sought notice or Request for Information (RFI) in accordance with DFARS PGI 206.302-l(d) was posted in Contract Oppo1tunities on 7 FEB 2025 . Results of the sources sought notice/RF! resulted in the following:
NO INTERESTED VENDERS
D A mass sow-ces sought notice which included NSN(s) _______________________ _ was posted to Contract Opportunities on. _______ . Date must be most cwTent Contract Opportw-uties posting (i.e., within a six month period). If too numerous, attach list ofNSNs.
D A waiver of sources sought notice/RF! was approved by the HCA or designee on _____________ and is hereby attached.
7. The acquisition is restricted to the only source(s) of supply known to have the capability of fum.ishing the required supplies/services.
Source(s) are:
AVNFonn S53, OCT 2025 CUI
CONTROLLED BY: DLA A VN HSV
CONTROLLED BY: AHAB
CUI CATEGORY: SSEL
DISTRIBUTION/DISSEMINATION CONTROL:FED ONLY
POC:
CAGE COMPANY NAME
77272 THE BOEING COMPANY
62228 MEGGITT DEFENSE SYSTEM, INC
The use of authority 10 U.S.C. 3204(a)(l) is based on:
[71 AMC 1.
□ AMC2.
□AMC3.
□ AMC4.
0 AMC5.
□AMSCA.
□ AMSCB.
□AMSCC.
□ AMSCD.
□AMSCH.
□AMSCK
□AMSCL.
□AMSCM
□AMSCN.
IZ] AMSCP.
□AMSCQ.
□ AMSCR.
□AMSCS.
□AMSCU.
□AMSCV
□AMSCY.
□AMSCZ.
□ Other:
Suitable for competitive acquisition for the second or subsequent time.
Suitable for competitive acquisition for the first time.
Acquire, for the second or subsequent time, directly from the manufacturer.
Acquire, for the first time, directly from the manufacturer.
Acquire directly from the sole source contractor, who is not the manufacturer.
The Govemment' s right to use data in its possession is questionable. This code is m1der review and will be updated when the review is complete.
This must be acquired from a manufacturing source(s) specified on a source control drawing.
This pa1t required engineering source approval by the design control activity in order to maintain the quality of the part.
The data needed to acquire this pa1t is not economically available.
The Govemment does not have sufficient, accurate, or legible data to purchase this patt from other tlian the cmTent som·ce. This code is under review and will be updated when the review iscomplete.
This part must be produced from class 1 castings Ullder MIL-STD-217 5.
The annual buy value of this pa1t falls below tlie screening threshold established by DoD.
Manufacture of this pa1t requires use of master or coordinated tooling.
Manufacture of this part requires special test and/or inspection facilities to maintain function or system integrity.
The rights to use the data needed to pm-chase tllis part from additional source(s) are not owned by the Government and cannot be purchased, developed, or othe1wise obtained.
The Govemment does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.
The Govemment does not own the data or rights to the data nee.ded to purchase this patt from another source. It is not economical to procme the data or rights to the data.
Acquisition of this item is restricted to Govemment approved source(s) because the item involves milita1y sensitive technology.
The cost to the Govemment to breakout this part and acquire it competitively has been detemrined to exceed the projected savings over the life span of the pa1t.
This patt has been designated a high reliability patt. Probability of failure would be unacceptable. The engineering activity has detenni.ned that data to define and control reliability limits caimot be obtained.
The design of this part is unstable. Engineering, manufacturing, or perfo1mance characteristics indicate that the required design objectives have not been achieved.
This part is a commercial/no-developmental/off-the-shelf item.
NOTE: A technical certification is requil'ed fo1· acquisitions over $15 million
AVNFonn S53, OCT 2025 CUI
8. Effo1is to ensme that offers are solicited from as many somces as practicable are:
I✓ I The acquisition will be synopsized onor about 21 FEB 2025 and any finn requesting a solicitation copy will be provided one. D A synopsis exception cited in FAR 5.202 applies:(Explain) _______________________ _
Manufactmers of similar products identified in the market survey will be solicited.
Dealers of the manufacturers will be solicited.
Other: (Explain) __________________________________ _
9. I hereby detennine that the anticipated cost to the Govemment will be fair and reasonable. (Explain) The overall cost of this acquisition will be fair and reasonable to the Govemmem. Toe contractor will be required to provide cost and pricing data pursuant to FAR Part 15.4 to support the Government's evaluation of its proposed cost and/or pricing.
The contract price will be negotiated in accordance with the procedures in FAR Part 15. Based on the furgoing, the Contracting Officer hereby, determines the anticipated oost to !he Go,'ellllDelll will be fair and reasooable.
10. A market survey as defined by FAR 10:
11.
I✓ I was conducted, and foms indicating an interest in the acquisition will be solicited. Market research efforts, include:
Contracting Officers are required to issue a Request for Information (RFI) or Sources Sought notice with the J&A when acquiring supplies and services from only one or a limited number of responsible sources. A sources sought was posted on 7 Feb 2025 with a closing date of 13 Feb 2025; no responses have been received. In the event a potential candidate identifies themselves within the appropriate time frame, DLA will provide approval instructio to the newly identified candidate. D was not conducted due to: --------------------------------------
Additional facts suppo1iing other than full and open competition are:
[l]
[l]
Based upon the technical certification on file, technical data is not available and cannot be developed to pennit full and open competition. The data presently available reflects the 1ninimum needs of the Govemment.
When FAR 6.302-1 is cited for substantial duplication of costs in the case of a follow-on acquisition as described in
6.302-l(a)(2)(ii)(A), an estimate if the cost to the Govemment that would be duplicated and how the estimate was derive.cl: ____________________________________________ _
When FAR 6.302-1 is cited for unacceptable delays in the case of a follow-on acquisition as described in 6.302-l (a)(2)(ii)(B), describe the tmacceptabledelays: ________________________ _
Other: The technical data for the part has undergone screening per DF ARS PGI 217 .7506, Spares Parts Breakout Program. The assigned
AMC/AMSC is IP. Suitable for competitive acquisition for the second or subsequent time. Tue rights to use the data needed to purchase this part from additional source(s) are not owned by the Government and cannot be purchased, developed, or otherwise obtained.
12. A listing of sources, if any, indicating an interest in writing in the acquisition are: (if none, state none)
CAGE COMPANY NAME
NONE
13. The actions, being taken to overcome ban-iers to competition before any subsequent acquisition are made: (Explain) Firms/suppliers are encouraged to seek approval in order to compete for future solicitations by accessing the website usa.rmy.redstone.ccdc-avmc.mbx.ame-sar@mail.mil and looking under Standardized Aviation and Missiles Sources Approval Request (SAMSAR). Currently there are no outstanding qualification requests for the item; however, this is a continuous method of identifying potential new sources of supply.
APPROVAL
APPROVAL LEVELS OF THE JUSTIFICATION - FAR 6.304
O not exceeding $900,000 ........... ... .... ............... ....... ............... .. Contracting Officer [Z] over $900,000 not exceeding $20,000,000 ..... ...... ........ .... .. .. Competition Advocate LJ over $20,000,000 not exceeding $150,000,000 ...... .. .... ........... Head of Contracting Activity
TECHNICAL/REQUIREMENTS PERSONNEL CERTIFICATION - FAR 6,303-2(c) Supporting data that is the responsibility of technical or requirements personnel and which form the basis for this justification have been certified as complete and accurate by the cognizant technical/requirements Personnel. Signature of technical/requirements personnel is not required.
CONTRACTING OFFICER-FAR 6.303-2(b )(12) I hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If not exceeding $900,000, this signature serves as the approval.
BAKER.JENNIFER.,._. o;gita11ys;gne00y
Jennifer Baker, Contracting Officer • • ~:~~~~~,~~:!££ &£ - Name and Title Signature Phone Date
COMPETITION ADVOCATE - FAR 6.304(a)(2) The Competition Advocate for the procuring activity designated pursuant to FAR 6.501 has reviewed and hereby certify that the information contained in this justification is accurate and complete to the best of my knowledge and belief. If over $900,000, but not exceeding $20 million this signature serves as the approval.
Nikki Hendrix, Deputy Director of Procurement Operations
~ 10/ 15/25 Name and Title Signature Phone Date
HEAD OF CONTRACTING ACTIVITY - FAR 6.304(a)(3) The Head of Contracting Activity has reviewed and approved this Justification for a proposed contract over $20 million, but not exceeding $150 million.
Name and Title Signature Phone Date
File details come from the government source that posted it. Updated .