This document is a solicitation amendment requesting proposals for power supplies. The Defense Logistics Agency Aviation requires offers for 11 each power supply units with national stock number 6130-01-105-1649 and part number 244-473806-000 from CMC Electronics cage code 90073. This is a one-time buy conducted as a firm fixed price solicitation. Offerors must acknowledge an ability to supply the full quantity. The solicitation due date is extended to April 8, 2024 to allow for the increased order quantity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRRA1-24-Q-0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2024MAR06
SPRRA1
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
CORNELIUS EDISON
EMAIL: CORNELIUS.EDISON@DLA.MIL
SPRRA1-24-Q-0002
2023NOV20
X
X 2024APR08 03:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 11
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: CORNELIUS EDISON
Buyer Office Symbol/Telephone Number: AHA/AHAA/(256)690-5438
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A-1. THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION SPRRA1-24-Q-0002 IS TO EXTEND SOLICITATION DUE DATE AND INCREASE QUANTITY OF CLIN
0001AA.
FROM: 29 DECEMBER 2023 TO OLD RFQ DUE DATE.
TO: 08 APRIL 2024.
A-2. 0001AA FOR A QUANTITY OF 3 EACH OF:
POWER SUPPLY
NSN: 6130-01-105-1649
Mfr CAGE: 90073
Mfr Part Number: 244-473806-000
TO: 0001A QUANTITY OF 11 EACH OF:
POWER SUPPLY
NSN: 6130-01-105-1649
Mfr CAGE: 90073
Mfr Part Number: 244-473806-000
A-3. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL EFFECT.
A-4. EXTEND PROPOSAL DUE DATE TO 04-08-2024.
*** END OF NARRATIVE A0002 ***
A-1. THIS REQUIREMENT IS RESTRICTED TO CMC ELECTRONICS CAGE 90073, IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1. "ONLY ONE RESPONSIBLE SOURCE
AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS."
A-2. THIS EFFORT IS IN SUPPORT OF THE UH-60 (BE) BLACKHAWK FOR THE FOLLOWING:
NSN: 6130-01-105-1649
PN: 244-473806-000
A-3. THIS IS A ONE TIME BUY, FIRM FIXED PRICE SOLICITATION.
BY REPLYING TO THIS SOLICITATION AND SUBMITTING A PROPOSAL, THE OFFEROR IS ACKNOWLEDGING ITS ABILITY TO SUPPORT THIS REQUIREMENT FOR THE
FULL SOLICITED QUANTITY.
A-4. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS REQUIRED.
A-5. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.
A-6. FIRST ARTICLE TEST (FAT) IS NOT REQUIRED.
A-7. SERIAL NUMBER REQUIREMENT REPORTING (SNRR) MARKINGS ARE NOT REQUIRED.
A-8. THE AVIATION MAINTENANCE MANAGEMENT SYSTEM-AVIATION (TAMMS-A) MARKINGS ARE NOT REQUIRED.
A-9. CONTRACTOR FURNISHED REUSABLE CONTAINER IS REQUIRED.
A-10. IUID MARKINGS ARE NOT REQUIRED.
2 11
SPRRA1-24-Q-0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
A-11. ARMS EXPORT CONTROL IS NOT APPLICABLE.
A-12. SERIAL NUMBERING IS NOT REQUIRED.
A-13. FIT CHECK IS NOT REQUIRED.
A-14. CONTRACTOR POINT OF CONTACT:
NAME: CLAUDIA AFANADOR
TELEPHONE NUMBER: (514) 748-3000
E-MAIL ADDRESS: CLAUDIA-MARIA.AFCLAUDIA-MARIA.ANADOR-LLACH@CMCELECTRONICS.CA
A-15. DCMA POINT OF CONTACT:
NAME: Bob Farrell
TELEPHONE NUMBER: (613) 996-1528
E-MAIL ADDRESS: ROBERT.H.FARRELL8.CIV@MAIL.MIL
A-16. CONTRACT SPECIALIST POINT OF CONTACT:
NAME: CORNELIUS EDISON
TELEPHONE NUMBER: (256) 690-5438
E-MAIL ADDRESS: CORNELIUS.EDISON@DLA.MIL
A-17. FACSIMILE PROPOSALS WILL NOT BE ACCEPTED. ALL PROPOSALS SHALL BE E-MAILED
A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A-19. PLEASE SUBMIT ALL FAT REPORTS, INQUIRIES, AND QUESTIONS TO:
DLA AVIATION HUNTSVILLE POST AWARD TEAM
5206 MARTIN ROAD
REDSTONE ARSENAL, ALABAMA 35898
OR
EMAIL TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
OTHER THAN COST AND PRICING DATA:_________________________________
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER
THAN CERTIFIED COST OR PRICING DATA. THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THEREFORE, YOU ARE REQUIRED TO SUBMIT OTHER
THAN COST AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST
ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING
DATA IF REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.
LONG LEAD TIME AND OR LONG-TERM CONTRACTS:__________________________________________
FOR LONG LEAD TIME ITEMS AND/OR LONG-TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR
PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTOR'S RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
PRODUCT QUALITY DEFICIENCY REPORTS (PQDRS)__________________________________________
THE PRODUCT QUALITY DEFICIENCY REPORT PROGRAM (ARMY REGULATION 702-7) WILL BE USED WHEN CONTRACTORS: 1) DELIVER DEFICIENT ITEMS OR 2)
RECEIVE DEFICIENT ITEMS FROM A DOD SUPPLY CHAIN IN SUPPORT OF ARMY REQUIREMENTS. WHEN REQUESTED, THE CONTRACTOR SHALL ASSIST THE
COGNIZANT CONTRACT ADMINISTRATION OFFICE IN EVALUATING PQDRS AND EXHIBITS FOR DEFECTS REPORTED ON ITEMS MANUFACTURED UNDER THIS CONTRACT
TO DETERMINE THE ROOT CAUSE FOR DEFICIENCIES. CORRECTIVE ACTION AND PREVENTATIVE ACTION TO PRECLUDE RECURRENCE OF DISCREPANCIES SHALL BE
AN INTEGRAL PART OF THE CONTRACTORS QUALITY PROGRAM. THESE DEFECTS MAY BE REPORTED FROM ANY DOD ACTIVITY THAT DISCOVERS A DEFECTIVE
ITEM.
*** END OF NARRATIVE A0001 ***
3 11
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0002 POWER SUPPLY
NSN: 6130-01-105-1649
Mfr CAGE: 90073
Mfr Part Number: 244-473806-000
0002AA Production Quantity 11 EA $ $ ___________________ ______________ __________________
PROGRAM YEAR: 1
COMMODITY NAME: POWER SUPPLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 244-473806
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(W562RM) SR W0MC ARMY GENERAL SUPPLY
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA,TX,75507-5000
4 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: MILITARY LEVEL PACKING: A
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND SIZE (INCHES)
WT [14] LB
LN [13] IN
WD [13] IN
DP [16] IN
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15 COMPLIANT
MIL-STD-2073-1 Codes, APPENDIX J
JI/A/MP [54] JII/CD [1] JIII/PM [00] JIV/WM [K3] JV/CD [NA]
JVI/CT [A] JVII/UC [NZ] JVII/IC [00] JIX/A/PK [F] JX/SM [19]
JVIIIA/OPI [M]
SUPPLEMENTAL INFORMATION:
8145-00-301-2987, 13414-017
REUSABLE CONTAINER WILL BE CONTRACTOR FURNISHED MATERIAL
*** END OF NARRATIVE D0001 ***
INSPECTION AND ACCEPTANCE
72;}{\f1The Government's Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):
The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:
Completeness of item
Material is new and unused
Absence of rust
Contamination, or deterioration
Correct identification/item marking
Correct packaging
Absence of any damage
Compliance with preparation for delivery
If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.
For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or
Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. Any deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.
*** END OF NARRATIVE E0001 ***
5 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
WOOD PACKING MATERIALS REQUIREMENTS___________________________________
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
Regulations (see http://www.alsc.org/ ).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes.
The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens: on two sides of the pallet.
Foreign manufacturers shall have the heat treatment of non-manufactured wood process verified in accordance with their National Plant
Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
SOURCES ELIGIBLE FOR AWARD CONSIDERATION________________________________________
(a) Competition under this solicitation is restricted to the following sources:
(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment.
(2) Sources that have been approved prior to award -- other than approved sources listed in Section B.
(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.
(b) Only offers submitted by the above sources will be considered for award under this solicitation.
(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the
Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.
(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source
6 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Approval Request (SAR) package, for review and approval, to the Systems Readiness Directorate (SRD), Aviation and Missile Center, DEVCOM. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). SAR instructions can be found at https://www/avmc.army.mil/Directorates/SRD/SAR/ .
Questions concerning SAR submissions can be directed to the SRD SAR Team at usarmy.redstone.devcom-avmc.mbx.amr-m-sar@army.mil.
(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised. AMCOM reserves the right to approve a contractor for award prior to completion of physical testing of the offered item. In such cases, the contractor shall perform any outstanding tests and provide all required documentation at no cost to the Government prior to entering upon full production. Lack of successful performance within the specified timeframe shall be grounds for a no cost termination.
(f) When a SAR is received, it will be processed for evaluation. If the evaluation and approval (including preparation or update of the requisite technical data package (TDP)) occurs before award, the requestor will be considered for award if a proposal was submitted per
(d) above. If the evaluation/TDP preparation has not been completed prior to award, AMCOM will continue the process until complete. If the requestors SAR becomes approved, the requestor will be eligible for consideration on all future solicitations for the item.
(g) All approval or disapproval notices shall be officially provided to the contractor by the appropriate technical official.
(h) Non-manufacturers (distributors) seeking to supply an item from a non-approved source must first ensure that the source becomes approved in accordance with (d) above prior to contract award.
NOTICE TO OFFERORS - CRITICAL SAFETY ITEMS REQUIRING ENGINEERING TESTING________________________________________________________________________
(a) The parts being procured under this solicitation are identified as Critical Safety Items requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources (1) who have been approved in accordance with AMCOM source approval procedures and (2) whose part has successfully completed all required engineering testing.
Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section
B are eligible for award.
(b) By submitting an offer/bid/quote, the contractor certifies that (1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and (2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.
REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT______________________________________________
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.:_______________________________________________________
Contractor:_________________________________________________________
Explanation of Data Rights:_________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled, " ENGINEERING CHG
PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE
7 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PREPARATION AND SUBMISSION INSTRUCTIONS
ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG_______________________________________________________________________________________________________________________________________
NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS______________________________________________
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below
2. Format.
a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared.
Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using DD Form
1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management Agency
(DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8
"Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract
Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the
Contractor and the Government.
k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration
8 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
documentation to the Government for approval.
m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled
"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative
Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the
Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution for unclassified is through the email or DOD safe site
(https://safe.apps.mil ) addressed to the PCO. Classified material shall be distributed via SIPERNET or by classified email as determined by the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the
E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website (http://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format
(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
CALIBRATION REQUIREMENTS________________________
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance Vocabulary.
FROZEN PLANNING/VERIFICATION OF CONTINUITY OF FROZEN PLANNING REQUIREMENTS__________________________________________________________________________
1. By submitting this proposal, the offeror verifies that the manufacturing planning relative to critical characteristics of the
Critical Safety Item (CSI) that was frozen in accordance with Quality Engineering Standard (QE-STD) 1:
a. Has not changed since approval by the Combat Capabilities Development Command (CCDC) Aviation Missile Center (AVMC) Systems
Readiness Directorate (SRD) or by predecessor U.S. Army Aviation Systems Engineering organizations.
OR
b. Has changed and all changes have been approved by the CCDC AvMC SRD.
OR
c. Has changed, all changes have been submitted to the CCDC AvMC SRD for approval, and changes will not be implemented until approval is obtained.
2. Within 30 days of contract award, the contractor shall submit through the Contracting Officer to the CCDC AvMC SRD a copy of the current version of its frozen manufacturing planning for the CSI being procured under the resulting contract.
3. In the event that it is determined by the Government that the offeror has never had its manufacturing plan reviewed and/or approved by the CCDC AvMC SRD or by predecessor U.S. Army Aviation Systems Engineering organizations, the offeror may be required to have its
9 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
manufacturing plan approved prior to First Article Test (FAT) or prior to the start of production if the FAT requirement was waived, in the event the offeror is awarded the contract resulting from this solicitation.
IDENTIFICATION MARKING REQUIREMENTS___________________________________
Item shall be marked per MIL-STD-130.
POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________
Preservation, packaging, packing and marking of supplies will be performed at the following location:
BAR CODE MARKINGS_________________
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE H0001 ***
CONTRACT CLAUSES
DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016)
(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.
(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.
(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.
*** END OF NARRATIVE I0001 ***
10 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L06 Agency Protests (DEC 2016)
Interested parties may file an agency level protest with the contracting officer or may request an independent review by the chief of the contracting office (CCO). Independent review by the CCO is an alternative to consideration by the contracting officer and is not available as an appellate review of a contracting officer decision on a protest previously filed with the contracting officer. Absent a clear indication of the intent to file an agency level protest with the CCO for independent review, protests will be presumed to be protests to the contracting officer.
*** END OF NARRATIVE L0001 ***
EVALUATION FACTORS FOR AWARD
Evaluation Criteria____________________
1. \*.Minimum technical requirements. To be technically acceptable and thus, eligible for award, a proposal must conform to ALL solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements provided within all sections of this solicitation and/or within its attached addenda. Proposals receiving a technical rating of Unacceptable will be ineligible for award.
2. Price. In addition to meeting the solicitations technical and quantity increment or range requirements above and cost and pricing requirements below, the Government will evaluate a proposals pricing for reasonableness. Evaluation of a proposal's pricing will not obligate the Government to order the estimated quantities or to distribute orders in the manner evaluated. The Government may reject a proposal as Unacceptable, if its pricing is determined to be materially unbalanced.
3. Cost and Pricing Data. Offerors must provide all cost or pricing information required by FAR 15.4. Failure of a proposal to provide cost or pricing information required by FAR 15.4 will result in said proposal being deemed
Unacceptable, and thus, ineligible for award.
*** END OF NARRATIVE M0001 ***
11 11
| SUPPLEMENTAL INFORMATION |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| PACKAGING AND MARKING |
| SPECIAL CONTRACT REQUIREMENTS |
| INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS |
File details come from the government source that posted it. Updated .