SPRRA124D0001-P00001.pdf
PDF 37 KB Posted
- Attached to
- SPRRA124D0001-P00001
- Solicitation number
- SPRRA1
- Issued by
-
Defense Logistics Agency Aviation
About this file
This is an award notice and modification for a federal indefinite delivery indefinite quantity contract between the Defense Logistics Agency Aviation and Breeze-Eastern Corporation. The contract is for cargo hooks over three program years, with an estimated total value of $12,589,413.25. Delivery locations include a DLA distribution center in Tracy, California. Key contract requirements include IUID markings, serial number reporting, ISPM-15 compliant wood packaging, and a subcontracting plan from the contractor.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
P00001 2023DEC04
SPRRA1
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
EXAVIER MASSEY
EMAIL: EXAVIER.MASSEY@DLA.MIL
S3101A
DCMA MUNITIONS & SUPPORT SYSTEMS -
SPRINGFIELD
BLDG 93, ARDEC
PICATINNY NJ 07806-5000
08484
BREEZE-EASTERN CORPORATION
35 MELANIE LN
WHIPPANY, NJ 07981-1638
SPRRA1-24-D-0001
2023NOV06
NO CHANGE TO OBLIGATION DATA
X
X
SEE SECOND PAGE FOR DESCRIPTION
/SIGNED/ 2023DEC04
DANIELLE JEFFERSON
DANIELLE.JEFFERSON@DLA.MIL (256)924-7899
1 15
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: EXAVIER MASSEY
Buyer Office Symbol/Telephone Number: DLA-AHAA/(256)604-2760
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Kind of Modification: 8
Type of Business: Large Business Performing in U.S.
Surveillance Criticality Designator: C
Contract Expiration Date: 2026NOV06
Paying Office: HQ0337
DFAS-COLUMBUS CENTER
NORTH ENTITLEMENT OPERATIONS
P.O. BOX 182317
COLUMBUS OH 43218-2317
*** End of Narrative A0000 ***
A-1. THE PURPOSE OF THIS MODIFICATION P00001 TO CONTRACT SPRRA124D0001 FOR THE NOUN: HOOK,CARGO P/N: FE7590-173, NSN: 4030-01-456-4792
IS FOR THE FOLLOWING REASONS.
A-2. TO ADD SUBCONTRACTING PLAN BULLET:
LOCATED IN THE A-NARRATIVE UNDER A-14
BREEZE-EASTERN CORPORATION(CAGE: 08484), APPROVE SUBCONTRACTING PLAN IS HEREBY INCORPORATED BY REFERENCE AND MADE A PART OF THIS
CONTRACT. THE EFFECTIVE PERIOD OF THIS PLAN IS NOVEMBER 2, 2023 TO NOVEMBER 2, 2027.
A-3. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
*** END OF NARRATIVE A0002 ***
A-1. THIS CONTRACT IS AWARDED TO BREEZE-EASTERN CORPORATION, CAGE 08484, AS A RESULT OF SOLICITATION SPRRA1-23-R-0044. IAW U.S.C. 2304
(c) (1) FAR 6.302-1(a)(2). A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF SUPPLIES OR SERVICES WILL SATISFY AGENCY
REQUIREMENTS, FULL AND OPEN COMPETITION NEED NOT BE ACCOUNTED FOR.
A-2. THIS EFFORT IS IN SUPPORT OF THE UH-60 (BE) BLACKHAWK FOR THE FOLLOWING:
NSN: 4030-01-456-4792
PN: FE7590-173
NOUN: HOOK,CARGO
A-3. THIS IS A THREE-YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY FIRM FIXED PRICE AWARD.
A-4. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED.
A-5. PRODUCTION LOT TESTING (PLT) IS NOT REQUIRED.
A-6. FIRST ARTICLE TEST (FAT) IS NOT REQUIRED.
A-7. SERIAL NUMBER REQUIREMENT REPORTING (SNRR) MARKINGS ARE NOT REQUIRED.
A-8. THE AVIATION MAINTENANCE MANAGEMENT SYSTEM-AVIATION (TAMMS-A) MARKINGS ARE NOT REQUIRED.
A-9. CONTRACTOR FURNISHED REUSABLE CONTAINER IS REQUIRED.
A-10. IUID MARKINGS ARE REQUIRED. "THE DFARS CLAUSE 252.211-7003 ITEM IDENTIFICATION AND VALUATION IS INCLUDED IN SECTION F".
A-11. ARMS EXPORT CONTROL IS APPLICABLE.
"THE TECHNICAL DATA PACKAGE CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22 U.S.C., SEC 2751
2 15
SPRRA1-24-D-0001
P00001
BREEZE-EASTERN CORPORATION
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES."
Export Control requires the applicable certifications to be current for both the quoter and manufacturer. The oofferor and any source(s) of supply it will use for contract performance must have an active United States/Canada Joint Certification Program (JCP) certification to access export-controlled data. DLA does not intend to delay award in order for an ineligible offer or its source(s) supply to apply for and receive authority approval to access the export-controlled data.
A-12. SERIAL NUMBERING IS REQUIRED.
A-13. FIT CHECK IS NOT REQUIRED.
A-14. SUBCONTRACTING PLAN: BREEZE-EASTERN CORPORATION(CAGE: 08484), APPROVED SUBCONTRACTING PLAN IS HEREBY INCORPORATED BY REFERENCE AND
MADE A PART OF THIS CONTRACT. THE EFFECTIVE PERIOD OF THIS PLAN IS NOVEMBER 2, 2023 TO NOVEMBER 2, 2027.
A-15. CONTRACTOR POINT OF CONTACT:
NAME: KELLY CARNIVALE
TELEPHONE NUMBER: 973-602-1059
E-MAIL ADDRESS: KCARNIVALE@BREEZE-EASTERN.COM
A-16. DCMA POINT OF CONTACT:
NAME: VERONICA C. MATTHEWS
TELEPHONE NUMBER: 973-891-3924
E-MAIL ADDRESS: VERONICA.C.MATTHEWS.CIV@MAIL.MIL
A-17. CONTRACT SPECIALIST POINT OF CONTACT:
NAME: EXAVIER MASSEY
TELEPHONE NUMBER: (256) 274-2508
E-MAIL ADDRESS: EXAVIER.MASSEY@DLA.MIL
A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A-19. REUSABLE CONTAINER WILL BE CONTRACTOR FURNISHED MATERIAL
A-20. PLEASE SUBMIT ALL INQUIRIES, AND QUESTIONS TO:
DLA AVIATION HUNTSVILLE POST AWARD TEAM
5206 MARTIN ROAD
REDSTONE ARSENAL, ALABAMA 35898
OR
EMAIL TO: DLAHSVPOSTAWARDTEAM@DLA.MIL
LONG LEAD TIME AND OR LONG TERM CONTRACTS:__________________________________________
FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR
PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTOR'S RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
*** END OF NARRATIVE A0001 ***
3 15
SPRRA1-24-D-0001
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 HOOK,CARGO
NSN: 4030-01-456-4792
Mfr CAGE: 08484
Mfr Part Number: FE7590-173
0001AA Production Quantity 170 EA $ 17,934.62000 $ 3,048,885.14 ___________________ ______________ __________________
PROGRAM YEAR: 1
COMMODITY NAME: HOOK,CARGO
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 4030
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 000 INTERMEDIATE PACK: DELETED
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
0002 CARGO HOOK
NSN: 4030-01-456-4792
Mfr CAGE: 08484
Mfr Part Number: FE7590-173
0002AA Production Quantity 215 EA $ 19,190.04000 $ 4,125,858.98 ___________________ ______________ __________________
PROGRAM YEAR: 2
COMMODITY NAME: CARGO HOOK
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 4030
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 000 INTERMEDIATE PACK: DELETED
LEVEL PRESERVATION: Military
LEVEL PACKING: A
4 15
SPRRA1-24-D-0001
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
0003 CARGO HOOK
NSN: 4030-01-456-4792
Mfr CAGE: 08484
Mfr Part Number: FE7590-173
0003AA Production Quantity 215 EA $ 20,533.34000 $ 4,414,669.11 ___________________ ______________ __________________
PROGRAM YEAR: 3
COMMODITY NAME: CARGO HOOK
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 4030
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-2073-1 CODES, APPENDIX J
UNIT PACK: 000 INTERMEDIATE PACK: DELETED
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
5 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
MIL-STD-129 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: MILITARY LEVEL PACKING: A
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND SIZE (INCHES)
WT [67.2] LB
LN [37.0] IN
WD [21.0] IN
DP [17.0] IN
ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15 COMPLIANT
MIL-STD-2073-1 Codes, APPENDIX J
JI/A/MP [44] JII/CD [1] JIII/PM [00] JIV/WM [GB] JV/CD [NA]
JVI/CT [F] JVII/UC [NZ] JVII/IC [00] JIX/A/PK [F] JX/SM [17]
JVIIIA/OPI [M]
SUPPLEMENTAL INFORMATION:
NZ = 8145-00-536-4925, 13414-101
REUSABLE CONTAINER WILL BE CONTRACTOR FURNISHED MATERIAL
*** END OF NARRATIVE D0001 ***
6 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
The Government's Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):
The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:
Completeness of item
Material is new and unused
Absence of rust
Contamination, or deterioration
Correct identification/item marking
Correct packaging
Absence of any damage
Compliance with preparation for delivery
If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.
For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or
Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. Any deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.
*** END OF NARRATIVE E0001 ***
7 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
THE FIRST ORDER FOR CLIN 0001AA TO BE ISSUED IN CONJUNCTION WITH CONTRACT AWARD WILL BE DELIVERED TO:
W62G2T
XU W1A8 DLA DIST SAN JOAQUIN
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY, CA, 95304-5000
FOLLOW ON ORDERS FOR CLIN(s) 0002AA, AND 0003AA: SHIP TO INSTRUCTIONS FOR CONSIGNEE WILL BE FURNISHED PRIOR TO SCHEDULED DELIVERY
DATE FOR ITEMS REQUIRED UNDER THIS REQUISITION.
DELIVERIES SHALL COMMENCE 210 DAYS AFTER THE DATE OF AWARD AT A RATE OF 15 PER MONTH UNTIL SHIPMENT IS COMPLETE.
*** END OF NARRATIVE F0001 ***
8 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
WOOD PACKING MATERIALS REQUIREMENTS___________________________________
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
Regulations (see http://www.alsc.org/ ).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes.
The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens: on two sides of the pallet.
Foreign manufacturers shall have the heat treatment of non-manufactured wood process verified in accordance with their National Plant
Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
REVISIONS TO DRAWINGS/PART NUMBERS REQUIREMENT______________________________________________
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.:_______________________________________________________
Contractor:_________________________________________________________
Explanation of Data Rights:_________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors
9 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the requirement entitled, " ENGINEERING CHG
PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE
PREPARATION AND SUBMISSION INSTRUCTIONS
ENGINEERING CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG______________________________________________________________________________________________________________________________________
NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS______________________________________________
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Request for Variance
(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below
2. Format.
a. Class I ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications anddrawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared.
Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using DD Form
1692 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Defense Contract Management Agency
(DCMA) Contract Management Office (CMO) will validate data entries in Block 5 "Class of ECP", Block 6 "Priority", and Block 8
"Justification Codes."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.
e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract
Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.
f. Classification of RFVs.
(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability;
reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the
10 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Contractor and the Government.
k. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
l. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
m. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled
"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The preferred method of submittal is digitally as a single file in Adobe Acrobat Portable Document Format (PDF). Unless otherwise specified, alternate methods of submittal shall be proposed to and authorized by the PCO prior to submittal. If the hardcopy method is requested and approved, the Contractor shall submit two (2) copies of each proposal to the responsible Administrative
Contracting Officer (ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the
Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution for unclassified is through the email or DOD safe site
(https://safe.apps.mil ) addressed to the PCO. Classified material shall be distributed via SIPERNET or by classified email as determined by the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the
E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website (http://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document
Format
(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
CALIBRATION REQUIREMENTS________________________
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance Vocabulary.
POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________
Preservation, packaging, packing and marking of supplies will be performed at the following location:
BAR CODE MARKINGS_________________
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
11 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE H0001 ***
12 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
DISPUTES AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (DEC 2016)
(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.
(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.
(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.
*** END OF NARRATIVE I0001 ***
13 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
L06 AGENCY PROTESTS (DEC 2016)
INTERESTED PARTIES MAY FILE AN AGENCY LEVEL PROTEST WITH THE CONTRACTING OFFICER OR MAY REQUEST AN INDEPENDENT REVIEW BY THE CHIEF OF
THE CONTRACTING OFFICE (CCO). INDEPENDENT REVIEW BY THE CCO IS AN ALTERNATIVE TO CONSIDERATION BY THE CONTRACTING OFFICER AND IS NOT
AVAILABLE AS AN APPELLATE REVIEW OF A CONTRACTING OFFICER DECISION ON A PROTEST PREVIOUSLY FILED WITH THE CONTRACTING OFFICER. ABSENT A
CLEAR INDICATION OF THE INTENT TO FILE AN AGENCY LEVEL PROTEST WITH THE CCO FOR INDEPENDENT REVIEW, PROTESTS WILL BE PRESUMED TO BE
PROTESTS TO THE CONTRACTING OFFICER.
*** END OF NARRATIVE L0001 ***
14 15
SPRRA1-24-D-0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
This document incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a provision may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the provision requires additional or unique information, then that information is provided immediately after the provision title.
EVALUATION CRITERIA___________________
1. Minimum technical requirements. To be technically acceptable and thus, eligible for award, a proposal must conform to ALL solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements provided within all sections of this solicitation and/or within its attached addenda. Proposals receiving a technical rating of Unacceptable will be ineligible for award.
2. Price. In addition to meeting the solicitations technical and quantity increment or range requirements above and cost and pricing requirements below, the Government will evaluate a proposals pricing for reasonableness. Evaluation of a proposal's pricing will not obligate the Government to order the estimated quantities or to distribute orders in the manner evaluated. The Government may reject a proposal as Unacceptable, if its pricing is determined to be materially unbalanced.
3. Cost and Pricing Data. Offerors must provide all cost or pricing information required by FAR 15.4. Failure of a proposal to provide cost or pricing information required by FAR 15.4 will result in said proposal being deemed Unacceptable, and thus, ineligible for award.
*** END OF NARRATIVE M0001 ***
15 15
SPRRA1-24-D-0001
| SECTION A |
| SECTION B |
| SECTION D |
| SECTION E |
| SECTION F |
| SECTION H |
| SECTION I |
| SECTION L |
| SECTION M |
File details come from the government source that posted it. Updated .