SPRRA116R0138.pdf

PDF 188 KB Posted

Attached to
FITTING ASSEMBLY Federal contract opportunity
Solicitation number
SPRRA1-16-R-0138
Issued by
Defense Logistics Agency Aviation

About this file

RFP

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-16-R-0138

X

2016MAY31

2016JUN3004:00pm

DOA1

2016MAY31 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

LAKENDRA C. HOGG

(256)842-7394

DLA-AVN-AHAA

LAKENDRA.HOGG@DLA.MIL

X 1 25

1 77

X 1

X 5 X 15

X 18 X 19 X 21

X 25

X 27

X 34

X 52

X 53

X 66

X 77

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: LAKENDRA C. HOGG

Buyer Office Symbol/Telephone Number: DLA-AVN-AHAA/(256)842-7394

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

A-1 52.209-4008 NOTICE TO OFFERORS - FLIGHT SAFETY PARTS REQUIRING ENGINEERING FEB/1996

TESTING (USAAMCOM)

(a) The parts being procured under this solicitation are identified as flight safety parts requiring engineering testing. In accordance with the Army policy pertaining to such parts, this procurement is limited to only those sources (1) who have been approved in accordance with AMCOM (previously ATCOM) source approval procedures and (2) whose part has successfully completed all required engineering testing. Notwithstanding the fact that the technical data package may list sources who have not been tested, only those sources listed in Section B are eligible for award.

(b) By submitting an offer/bid/quote, the contractor certifies that (1) parts representative of the parts it will deliver have previously been subjected to and have passed all requisite engineering testing and (2) the critical manufacturing processes that will be used to produce the parts are either unchanged since the representative parts were tested or that changes in critical manufacturing processes have been approved by the Government in accordance with QE-STD-1 or other Government approved standard. The contractor agrees to provide any and all pertinent documentation which the Government deems necessary to show compliance with the foregoing requirements.

IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION (FAR) 6.302-1, THIS ACQUISITION IS LIMITED IN COMPETITION AS ONLY ONE RESPONSIBLE

SOURCE AND NO OTHER SUPPLIES WILL SATISFY AGENCY REQUIREMENTS.

FIRST ARTICLE TEST IS REQUIRED.

FIRST ARTICLE TEST ITEM(S) WILL NOT BE DESTROYED AS PART OF THE TESTING PROGRAM.

If the offeror has received a contract or purchase order for the same National Stock Numbered item sought under this solicitation subject to a First Article test, the offeror must identify the contract number under which the First Article is due and the date on which the First Article is due. The contracting officer will use this information in making a determination as to whether First Article can be waived for the offeror under the current solicitation, or alternately, whether a conditional award pending first article approval can be made under the current solicitation.

If the requested/required delivery for the FAT Report/FA ship time cannot be met, offeror(s) shall provide a proposed delivery schedule with details explaining why the requested/required delivery cannot be met.

The supplier shall notify in writing the testing lab, the Engineering Support Activity, and the contract administrator when testing reports and/or shipments are submitted IAW contract requirements to include tracking information.

THIS IS A FLIGHT SAFETY/CRITICAL SAFETY PART.

SNRR IS REQUIRED.

ENGINEERING TESTING REQUIRED

FATIQUE TEST REQUIRED

PART NUMBER BUY (70209-22103-071)

TAMMS-A IS NOT REQUIRED ___

ITEM IDENTIFICATION AND VALUATION IS NOT REQUIRED. ___

PRODUCTION LOT TESTING IS NOT REQUIRED ___

2 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

OFFER SHALL BE SUBMITTED IN ACCORDANCE WITH FAR CLAUSE 52.215-1 AND 15.208. FACSIMILE ARE NOT AUTHORIZED. ___

CONTRACTOR MAY EMAIL OFFER TO ALL OF THE FOLLOWING: LAKENDRA.HOGG@DLA.MIL, EFRAIN.ACEVEDO@DLA.MIL AND DLAHSVAPACHETEAM@DLA.MIL

OR MAIL TO:

DEFENSE LOGISTICS AGENCY

ATTN: LAKENDRA HOGG

DLA-AHA, BLDG 5201

REDSTONE ARSENAL, AL 35898-5280

COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ___________________________________________________

TELEPHONE NUMBER: _______________________________________

FAX NUMBER: ____________________________________________

E-MAIL ADDRESS: ________________________________________

THE GOVERNMENT INTENDS TO AWARD ONLY ONE CONTRACT AS A RESULT OF THIS ACQUISITION.

THE RESULTANT CONTRACT WILL BE AWARDED SUBJECT TO CERTIFICATION OF FUNDS.

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER

THAN CERTIFIED COST OR PRICING DATA. THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THERFORE, YOU ARE REQUIRED TO SUBMIT OTHER THAN

COST AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST ELEMENTS TO

INCLUDE PROFIT/FEE WHICH COMPRISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND PRICING DATA IF

REQUESTED WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIRMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE

PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF

ACTION AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT

WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN

WHOLE OR IN PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

CONTRACTOR FIRST ARTICLE TEST

Number of samples to be tested = ____1_____ _

Deliver FOB: Destination

Inspection: Origin

Acceptance: Destination (By the PCO)

BY: ________ (Delivery Date for First Article Test Report)

Ship To: Efrain Acevedo (PCO)

DLA Aviation Aviation Huntsville

Building 5201

Redstone Arsenal, Al 35898-7340

Delivery Schedule:

258 Days ARO: Contractor First Article completed and Report Submission

30 Days: Government Review and Notification to Contractor

405 DAFAA: Delivery of Production Units

405 DARO

*** END OF NARRATIVE A0002 ***

3 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

4 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

APPROVED SOURCE:

SIKORSKY AIRCRAFT CORPORATION (CAGE 78286)

*** END OF NARRATIVE B0001 ***

5 77

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

THIS IS A THREE YEAR INDEFINITE DELIVERY INDEFINITE

QUANTITY (IDIQ) SOLICITATION. FUNDS WILL BE

OBLIGATED/CITED UPON THE ISSUANCE OF EACH DELIVERY

ORDER. THE GOVERNMENT WILL ONLY BE OBLIGATED TO

ORDER THE STATED MINIMUM QUANTITY. THE GOVERNMENT IS

NOT OBLIGATED TO ISSUE ANY ADDITIONAL ORDERS AGAINST

THIS CONTRACT; HOWEVER, THE GOVERNMENT RESERVES THE

RIGHT TO ORDER UP TO THE MAXIMUM QUANTITY.

THE GOVERNMENT HAS SEGREGATED THE POTENTIAL

QUANTITIES INTO THREE YEARS. HOWEVER, THIS DOES NOT

PRECLUDE EXERCISING ITS RIGHTS UNDER FAR 52.216-19 BY

ORDERING THE MAXIMUM QUANTITY SPECIFIED IN FAR 52.216-

19(b)(1) AT ANY TIME DURING THE INDEFINITE QUANTITY

YEARS.

THE GOVERNMENT'S MINIMUM QUANTITY TO BE AWARDED

SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT

IS 100 EACH. THE GOVERNMENT'S MAXIMUM QUANTITY DURING

THE INDEFINITE QUANTITY PERIOD IS 300 EACH. THE

DELIVERY ORDER MINIMUM ORDER QUANTITY IS 40.

PRICES QUOTED FOR EACH YEAR WILL BE VALID FOR ALL

QUANTITIES ORDERED DURING THAT YEAR.

THE SOLICITATION IS FOR THE SUPPLIES AS DETAILED ON

THE FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO

INSURE THAT OFFERS ARE PROVIDED ON ALL QUANTITIES.

FAILURE TO PROPOSE ALL CLINS, WILL RESULT IN A

DETERMINATION OF NON RESPONSIVENESS.

YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365

DAYS AFTER CONTRACT AWARD (DACA).

YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.

YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.

THE CONTRACTOR SHALL PROVIDE UNIT PRICES FOR EACH

CLIN BELOW.

THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT

COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY

ABOVE THE MINIMUM QUANTITY.

THE GOVERNMENT INTENDS TO AWARD ONLY ONE BASIC

INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT AS A

RESULT OF THIS SOLICITATION.

(End of narrative A001)

0001 FITTING ASSEMBLY

NSN: 1560-01-411-5148

Mfr CAGE: 78286

Mfr Part Number: 70209-22103-071

6 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001AA PRODUCTION QTY W/ FIRST ARTICLE TEST 100 EA $ $ ____________________________________ ______________ __________________

COMMODITY NAME: FITTING ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

THE GOVERNMENT WILL EITHER AWARD CLIN 0001AA OR

0001AB IN ORDER 0001 FOR THE MINIMUM QUANTITY OF 100.

THIS IS A CRITICAL SAFETY ITEM. ATTACHED CRITICAL

CHARACTERISTICS APPLY.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [6.2]

LN [13.5]

WD [4]

DP [9.8]

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [EA]

JV/CD [NA] JVI/CT [B] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F]

JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W25G1U) SU W1A8 DLA DISTRIBUTION

7 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND,PA,17070-5002

DELIVERIES SHALL COMMENCE 338 DAYS AFTER THE DATE OF

DELIVERY ORDER AWARD AT A RATE OF 40 UNITS PER MONTH

UNTIL SHIPPED COMPLETE.

(End of narrative F001)

0001AB PRODUCTION QTY W/O FIRST ARTICLE TEST 100 EA $ $ ______________________________________ ______________ __________________

COMMODITY NAME: FITTING ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

THE GOVERNMENT WILL EITHER AWARD CLIN 0001AA OR

0001AB IN ORDER 0001 FOR THE MINIMUM QUANTITY OF 100.

THIS IS A CRITICAL SAFETY ITEM. ATTACHED CRITICAL

CHARACTERISTICS APPLY.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [6.2]

LN [13.5]

WD [4]

DP [9.8]

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [EA]

JV/CD [NA] JVI/CT [B] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F]

JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

8 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W52G1U) W1BG DLA DISTRIBUTION

DDSP NEW CUMBERLAND FACILITY

2001 NORMANDY DRIVE DOOR 113 TO 134

NEW CUMBERLAND, PA 17070-5002

DELIVERIES SHALL COMMENCE 270 DAYS AFTER THE DATE OF

DELIVERY ORDER AWARD AT A RATE OF 40 UNITS PER MONTH

UNTIL SHIPPED COMPLETE.

(End of narrative F001)

0002 FITTING ASSEMBLY

NSN: 1560-01-411-5148

Mfr CAGE: 78286

Mfr Part Number: 70209-22103-071

0002AA PRODUCTION QTY YEAR TWO 100 (E) EA $ $ _______________________ ______________ __________________

COMMODITY NAME: FITTING ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A CRITICAL SAFETY ITEM. ATTACHED CRITICAL

CHARACTERISTICS APPLY.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

9 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [6.2]

LN [13.5]

WD [4]

DP [9.8]

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [EA]

JV/CD [NA] JVI/CT [B] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F]

JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

DELIVERIES SHALL COMMENCE 270 DAYS AFTER THE DATE OF

DELIVERY ORDER AWARD AT A RATE OF 40 UNITS PER MONTH

UNTIL SHIPPED COMPLETE.

(End of narrative F001)

0003 FITTING ASSEMBLY

NSN: 1560-01-411-5148

Mfr CAGE: 78286

Mfr Part Number: 70209-22103-071

0003AA PRODUCTION QTY YEAR THREE 100 (E) EA $ $ _________________________ ______________ __________________

10 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: FITTING ASSEMBLY

CLIN CONTRACT TYPE:

Firm Fixed Price

THIS IS A CRITICAL SAFETY ITEM. ATTACHED CRITICAL

CHARACTERISTICS APPLY.

(End of narrative B001)

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALL APPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ADDITIONAL PACKAGING REQUIREMENTS

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [6.2]

LN [13.5]

WD [4]

DP [9.8]

MIL-STD-2073-1 CODES, APPENDIX J:

JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [EA]

JV/CD [NA] JVI/CT [B] JVII/UC [ED] JVII/IC [00]

JIX/A/PK [F]

JX/SM [00] JVIIIA/OPI [M]

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT.

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

11 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

DELIVERIES SHALL COMMENCE 270 DAYS AFTER THE DATE OF

DELIVERY ORDER AWARD AT A RATE OF 40 UNITS PER MONTH

UNTIL SHIPPED COMPLETE.

(End of narrative F001)

0004 FIRST ARTICLE TEST REPORT

0004AA FIRST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________

COMMODITY NAME: FIRST ARTICLE TEST REPORT

Description/Specs./Work Statement _________________________________

PROCUREMENT DOCUMENTATION TITLE:

ATTH 2 FAI ORIENTATION

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 AS REQUIRED

FOB POINT: Destination

SHIP TO:

(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-7340

0005 DATA ITEMS __________

A001 SERIAL NUMBER REPORT REQUIREMENT 1 EA $ ** NSP ** $ ** NSP ** ________________________________ ______________ __________________

COMMODITY NAME: DI-SESS-81759

12 77

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Description/Specs./Work Statement _________________________________

PROCUREMENT DOCUMENTATION TITLE:

EXHIBIT A ATTH 01

DELIVERY AS REQUIRED PER DD FORM 1423, CONTRACT DATA

REQUIREMENTS LIST (CDRL) AND STATEMENT OF WORK (SOW).

SEE EXHIBIT A AND ATTACHMENT 0001.

(End of narrative C001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 AS REQUIRED

FOB POINT: Destination

SHIP TO:

(W81D17) W0H9 US ARMY AVN & MISSILES CMD

MAINTENANCE INFO OP BRANCH MIO

SPARKMAN CIR BLDG 5301 2ND FLOOR

REDSTONE ARSENAL AL 35898-5230

13 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

B-1 52.209-4000 BID ["]A["] REQUIRED (USAAMCOM) OCT/1992

In order to insure being considered responsive all bidders are required to insert a price for "Bid "A" First Article Approval -

Contractor Testing Required", notwithstanding that they may furnish the information indicated in the provision in Section L entitled

"First Article Approval: Alternate Offers/Bids/Quotes".

(End of Clause)

B-2 52.209-4710 PRODUCTION QUANTITY WITH FIRST ARTICLE - CONTRACTOR TESTING JUN/1997

(USAAMCOM)

A first article is required but is not being procured as a separate CLIN. CLIN 0001 includes one (1) each first article and contractor testing of the first article, in accordance with FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, FAR 52.209-3 (ALTERNATE I). The first article, when accepted, will become part of the production quantity. See the first article approval clause for the first article test report delivery schedule.

Since the First Article, after acceptance, will be used as part of the production units, it shall not be subjected to environmental testing unless such testing is specifically identified on the documentation as acceptance testing that must be performed on all production units. First Article inspection, at a minimum, shall include evaluation of processes, material, any related certification, surface finish, dimensional and functional requirements of the contract, applicable specifications and drawings.

(End of Clause)

14 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

C-1 52.209-4011 FLIGHT SAFETY PARTS CRITICAL CHARACTERISTICS NEW MANUFACTURE QE-STD-1 JUL/2002

(USAAMCOM)

QE-STD-1

REVISION D

1 OCT 96

FLIGHT SAFETY PARTS

CRITICAL CHARACTERISTICS

NEW MANUFACTURE

QE-STD-1

Paragraph

Purpose------------------------------------- 1.0

Scope--------------------------------------- 2.0

References---------------------------------- 3.0

Definitions--------------------------------- 4.0

Policy-------------------------------------- 5.0

Requirements-------------------------------- 6.0

Manufacturing Planning---------------------- 6.1

Plan Content-------------------------------- 6.1.1

Frozen Planning Requirements---------------- 6.1.2

Changes to Frozen Planning------------------ 6.1.3

Audits-------------------------------------- 6.2

Critical Characteristics-------------------- 6.3

Inspection of Critical Characteristics------ 6.3.1

Variability Reduction Methods--------------- 6.3.2

NonConforming Critical Characteristics------ 6.3.3

Contradictory Critical Characteristics------ 6.3.4

Delivered Nonconformances------------------- 6.3.5

Records------------------------------------- 6.4

Traceability of Records--------------------- 6.4.1

Purchasing Records-------------------------- 6.4.2

Retention of Records------------------------ 6.4.3

Certification of Personnel------------------ 6.5

Tolerance of Measurement & Test Equipment--- 6.6

Serialization------------------------------- 6.7

1.0 PURPOSE: To establish the minimum level of activity that is required to manufacture Flight Safety Parts (FSPs) containing ________

Manufacturing Critical Characteristics (CCs). Requirements established herein are intended to establish and maintain the integrity of

CCs throughout the manufacturing process.

2.0 SCOPE: This document is to be used in conjunction with other contractually specified quality requirements. This document shall ______ apply to all FSPs.

3.0 REFERENCES: ___________

a. ANSI/ASQC B1,B2,B3-1996

b. ISO 10012-1

c. Competition Advocate's Shopping List (CASL)

d. AMCOM Regulation 702-7 Flight Safety Critical Aircraft Parts/New Source Testing Program Management

4.0 DEFINITIONS: ____________

a. FSP (Airframe): Any part, assembly, or installation containing a critical characteristic (CC) whose failure, malfunction, or _______________ absence could cause loss of or serious damage to the aircraft, and/or serious injury or death to the occupants.

15 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. FSP (Engine): Any part, assembly, or installation containing a critical characteristic whose failure, malfunction, or absence _____________ could cause an uncommanded engine shut down, and/or an uncontained engine failure resulting in loss of, or serious damage to the aircraft and/or serious injury or death to the occupants.

c. Critical Characteristic: Any feature throughout the life cycle of a FSP, such as dimension, finish, material or assembly, ________________________ manufacturing or inspection process, installation, operation, field maintenance, or depot overhaul requirement which if nonconforming, missing or degraded could cause the failure or malfunction of the FSP.

d. Approved Source: A manufacturer or vendor who has satisfied, prior to contract award, all AMCOM source approval requirements ________________ as set forth in the CASL to include, if applicable, engineering testing requirements (fatigue, endurance, and/or interchangeability).

5.0 POLICY: AMCOM will only procure Flight Safety Parts from approved sources. So as to maintain the integrity and quality of these _______ critical spare parts, manufacturers of FSPs, components, sub-assemblies, and assemblies are required to adhere to the requirements of this document in its entirety. If a contractor has difficulty in maintaining process control as evident through such things as internal management audits, customer audits, the receipt of quality deficiency reports for parts previously supplied to AMCOM et. al., this will require immediate corrective action for the current contract and could affect the award of future contracts to that contractor.

6.0 REQUIREMENTS: All requirements of this document (paras. 6.1 - 6.7) shall be complied with by a contractor receiving a contract to _____________ produce FSPs. If a process or processes that involve a CC is subcontracted, this document must be imposed, in its entirety, on the subcontractor performing the work.

6.1 MANUFACTURING PLANNING: _______________________

6.1.1 PLAN CONTENT: All manufacturing, assembly, and inspection points shall be controlled by detailed procedures outlining each step _____________ or parameter of the process along with any materials, tooling, equipment, environmental control, and operator certification required that leads to the specific production of an end item. Plans shall clearly identify all CCs and will include identification, in accordance with contractor procedures, as to its particular revision. All process plans shall clearly define sequence of operation, machine type, and accept/reject limits for the specific process or operation. Critical processes not easily verified by subsequent inspection shall clearly define process operating parameters with tolerances.

6.1.2 FROZEN PLANNING REQUIREMENTS: The contractor is responsible for developing manufacturing planning. Review and control of these ____________________________ plans will be the responsibility of the Contractor's Control Board (CCB) consisting of qualified personnel equipped with adequate resources to assure development of complete, reliable, and traceable documentation. Parts manufactured utilizing these plans shall meet all contractual requirements. Plans developed for FSPs shall be frozen when:

a. In the case of FSPs not requiring engineering testing, under the first production contract for the FSP at such time a successful First Article Test is completed, or at the start of production if FAT is not required.

b. In the case of FSPs requiring engineering test, at the time articles are manufactured which successfully meet the engineering test requirements.

Once frozen, plans shall remain frozen throughout the existing contract and all subsequent contracts for the item unless changes to the planning are made in accordance with this standard.

6.1.3 CHANGES TO FROZEN PLANNING: The portion of the frozen manufacturing plan pertaining to a CC shall not be changed without prior ___________________________

CCB recommendation, justification to AMCOM, and receipt of approval by the Procurement Contracting Officer (PCO). Changes not affecting critical characteristics or occurring as the result of an AMCOM approved Engineering Change Proposal (ECP), require CCB approval only.

All changes to frozen planning affecting CCs will be submitted to AMCOM. When the item, CC, or process is produced by a subcontractor, the planning shall be reviewed and approved by the contractor, and be subject to the same restrictions as above.

6.2 AUDITS: Contractors are to perform self-audits of their frozen planning when that planning applies to CCs produced or verified in _______ house. At a minimum, audits will be performed at the start of each production contract, annually, and when process changes occur. It is incumbent upon the prime contractor to assure that subcontractors accomplish self-audits, and the prime shall maintain records verifying that their vendors are in full compliance with the audit requirement. All audit findings will be recorded and corrective action will be documented.

6.3 CRITICAL CHARACTERISTICS: _________________________

6.3.1 INSPECTION OF CRITICAL CHARACTERISTICS: All CCs which can be nondestructively inspected/tested shall be subjected to 100 percent _______________________________________ inspection by the contractor or subcontractor. Critical characteristics which require destructive testing are to be tested on a lot or batch basis, with no skip lots allowed. All inspection records shall identify the FSP part number, serial or lot number, and characteristic inspected. Critical characteristics shall be identified on the inspection records in such a manner as to draw attention to them. Inspection records shall reflect the exact readings or dimensions, date of inspection, identity of inspector, and any required inspection certification. These requirements are in addition to other contractual requirements.

16 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6.3.2 VARIABILITY REDUCTION METHODS: Once the program demonstrates that the critical processes are statistically in control, stable, _______________________________ and capable, the contractor may submit to the PCO for approval its documentation with a request to implement a Statistical Process

Control (SPC) program in lieu of 100 percent inspection. This approval authority may be delegated to the Defense Contract Management

Agency (DCMA) by the PCO in which case AMCOM will be informed of any approval or suspension of SPC. At the Government's discretion, 100 percent inspection may be reinstated if the process controls prove inadequate.

6.3.3 NONCONFORMING CRITICAL CHARACTERISTICS: Nonconformances of CCs shall not be dispositioned "use as is" or "repair" through _______________________________________ contractor action, rework to print is acceptable. Waivers or deviations may be requested as specified in the contract. Request for waivers or deviations of CCs shall be classified as critical and will be forwarded to AMCOM for approval/disapproval.

6.3.4 CONTRADICTORY CRITICAL CHARACTERISTICS: Contradictions between the AMCOM FSP Spares Technical Data Package (STDP) list of _______________________________________ critical characteristics and the drawing/specifications shall not be resolved by the order of precedence paragraph in the STDP. The ___ contractor shall notify the PCO immediately and any work pertaining to the critical characteristic in question shall be stopped until a written resolution to the contradiction is issued to the contractor from the PCO.

6.3.5 DELIVERED NONCONFORMANCES: Contractors shall notify the PCO immediately of any discovered nonconformances that may exist in __________________________ previously delivered FSPs. Notification is required whether or not the characteristic in question has been classified as a critical characteristic. Notification shall include a description of the suspected nonconformance, contract number, part number, and affected serial numbers or lot numbers, when applicable.

6.4 RECORDS: ________

6.4.1 TRACEABILITY OF RECORDS: All records relating to FSPs shall be traceable to the date and place of production. Records shall ________________________ provide the degree of traceability required to enable subsequent verification of all aspects of material, manufacture, special process, personnel certification, variability control charts (if applicable), assembly, and inspection of CCs. Special processes include but are not limited to heat treat, shotpeening, and nondestructive testing.

6.4.2 PURCHASING RECORDS: All purchase orders for subcontracted products or processes that contain CCs must clearly identify the CC ___________________ and reference this document for compliance. All documents and referenced data for FSPs shall be available for review by the Government to determine compliance.

6.4.3 RETENTION OF RECORDS: The contractor shall retain copies of all records generated pursuant to this standard and make these _____________________ records available to the Government upon request. Records shall be retained for a period of at least five years after the contractor ceases to manufacture the part for which this standard applies. At the end of this period, or in the event of relocation or shutdown, all records shall be offered to the PCO prior to disposal.

6.5 CERTIFICATION OF PERSONNEL: Contractor personnel performing work or having inspection responsibilities pertaining to CCs, shall be ___________________________ certified to the appropriate professional level as outlined in the applicable national standards, best commercial practices, or as contractually required. A system for tracking personnel certification shall be an element in the contractor internal audit program to assure all certifications are maintained in a current status.

6.6 TOLERANCE OF MEASURING & TEST EQUIPMENT (M&TE): M&TE used to inspect FSPs must be discriminate to within ten percent of the total _______________________________________________ tolerance spread for the feature being inspected except as follows: for total tolerance spreads of less than .001, M&TE must be discriminate to twenty percent of the spread.

6.7 SERIALIZATION: All FSPs require individual serialization or identification by lot number for traceability. The contractor shall ______________ request either approval of or assignment of a block of serial numbers (S/Ns) by AMCOM. Serialization shall occur so that any individualized inspection/process that involves a critical characteristic is traceable to a specific S/N. All S/Ns approved for issue or provided by AMCOM shall be accounted for; this includes material scrapped during manufacturing. Serial numbers used in this program shall not be used on any other part manufactured by that contractor. Reporting of the S/Ns to the PCO shall be in accordance with contractual requirements.

17 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

D-1 52.208-4700 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD

HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(End of Clause)

D-2 52.247-4700 BAR CODE MARKINGS (USAAMCOM) MAY/2014

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

(End of Clause)

18 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ANSI/ISO/ASQ 9001:2008, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 7.3 (DESIGN AND DEVELOPMENT) DO NOT APPLY

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-4 52.209-4704 DUPLICATE FIRST ARTICLE (USAAMCOM) JUN/1997

a. The Government reserves the right to delete, within sixty (60) days from contract award and without cost to the Government, the contractual requirement for the first article(s) identified in the schedule from a contractor who has received a previous contract with a first article requirement for the same or similar item, provided that the contractor receiving the previous award has received approval and acceptance of the first article(s) from the Government.

In the event the Government elects to delete the first article(s) as herein permitted, the contract price shall be the price bid for production units without the first article and the delivery schedule shall be as set forth in the contract for delivery of units without the first article(s), extended on a day-to-day basis, from the date of award until notification of first article deletion is made.

b. To eliminate unnecessary additional costs, the contractor receiving an award which includes the requirement for an additional first article as discussed above, shall not incur any cost in connection with satisfaction of the requirement for the first article. Instead, he shall immediately notify the contracting officer and await written instructions to either delete the additional first article requirement or to proceed with manufacture of the additional first article(s).

E-5 52.246-4003 CALIBRATION (USAAMCOM) JAN/2012

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

E-6 52.246-4009 FLIGHT SAFETY PART SUPPLIER INTERFACE AND OVERSIGHT PROGRAM OCT/2002

REQUIREMENTS (USAAMCOM)

This contract is for a Flight Safety part (FSP) and requires special controls as identified in Quality Engineering Standard (QE-STD-1).

In addition to the QE-STD-1 requirements, the contractor shall comply with the following:

a. The Contractor shall prepare manufacturing planning documentation in accordance with paragraph 6.1 of QE-STD-1 and DI-MISC-

80508A. Any Contractor recommended changes to the manufacturing planning documentation which affect critical characteristics shall be approved by the Government. The Contractor shall not implement any process changes which affect critical characteristics without prior

Government approval.

b. Written notification shall be given to the Procurement Contracting Officer (PCO) as soon as possible but at least 30 days prior

19 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

to first delivery indicating the time frame when the parts being procured under this contract will be actively in production in order that a Supplier Interface and Oversight Program (SIOP) on-site review can be scheduled if such a review is determined by the Government to be necessary. The Contractor will cooperate with and allow the Government to conduct a SIOP on-site review (1-3 days typically) while the parts are actively in production. This review may also require site visits to critical process subcontractors. The purpose of the

SIOP on-site review is to thoroughly review manufacturing processes and documentation for FSP and provide feed-back and direction regarding the FSP program.

NOTE: Some of the personnel that support the SIOP program (e.g. evaluate manufacturing planning and participate in the SIOP on-site reviews) are employees of the U.S. Army Aviation and Missile Command (AMCOM) programmatic and technical services support contractors employed under the Omnibus 2000 contract. AMCOM's Directorate for Aviation Engineering (AMRDEC) will, within thirty days of contract award, identify the programmatic and technical services support contractors who may be involved with this contract and may require access to your company's proprietary data (e.g., frozen manufacturing planning) and facilities in performing their duties. Since these contractor personnel are not Federal employees, they will be allowed access only if a Non-Disclosure Agreement (NDA) between their employer and your company has been established. A standard NDA will accompany the AMRDEC notification. If a NDA with the identified support contractor has not been entered into by your company, sign and submit the NDA with the frozen manufacturing planning to the PCO within thirty days of contract award. If there are objections to the NDA or the terms or conditions thereof, contact, in writing, the

PCO within 10 days of receipt of the AMRDEC notification so as to allow sufficient time for a mutually acceptable arrangement be reached.

(End of Clause)

20 77

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-29 F.O.B. ORIGIN FEB/2006

F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-7 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

F-8 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012

F-9 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 100 338

0001AB 100 270

0002AA 100 270

0003AA 100 270

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .