SPRPA119RZ078_N0038318X3323_PKU05482531566_PKU05482951797_REDACTED.pdf
PDF 176 KB Posted
- Attached to
- J and A NOTICE
- Solicitation number
- SPRPA119RZ078
About this file
SPRPA119RZ078_N0038318X3323_PKU05482531566_PKU05482951797_REDACTED.pdf
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Contracting Activity
2. Description of the Action Being Approved
3. Description of Supplies/Servies
DEPARTMENT OF THE NAVY
DLA Aviation
700 ROBBINS AVENUE PHILADELPHIA PA 19111-5098
Justification for Other Than Full & Open Competition
Contracting Activity
DLA Aviation - Philadelphia Type C1
Folder # 18256-0019 PD # N0038319X1273 (187 ea.)
PKU05482951797 (70 ea.)
PKU05482531566 (10 ea.)
Item Manager's Name
Ext Code
Technician's Name
Ext Code
Buyer's Name
Ext Code
Description Negotiation and award of a contract through other than full and open competition.
This J&A covers the acquisition of the following
Spares Repair/Overhaul Modification Management Piece Parts
Data Report
Nomenclature Nitrogen Receiver Assembly Quantity 267
NSN 1440-01-140-7620 Cage Code 1CR65 & 32067
P/N 58A164D863 Unit Price
Page 1 of 4ContractsPro https://my.navsup.navy.mil/apps/ops$contracts_pro.j_and_a_edit?p_id=263
4. Statutory Authority Permitting Other Than Full & Open Competition
5. Rationale Justifying Use of Cited Authority
Estimated Value
Ship To N0038319X1273 (187 ea.) W62G2T, PKU05482951797 (70 ea.) & PKU05482531566 (10 ea.) DKU005
Line of Accounting
97 00 XX XX 4930 NC1A 000 85004 0 050120 7R
000000 7PPN00000000, 97-
11X824228780007478200659162DPKU054829517970JVF,
This J&A is based upon the authority of 10 USC 2304(C) (1), only one or a limited number of responsible sources will satisfy agency requirements, as implemented by FAR 6.302-1
A/RMC 2
Suitable for competitive acquisition for the first time.
A/RMSC C
This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing/repair knowledge by the qualified source(s) require acquisition/repair of the part from the approved source(s). The approved source(s) retain data rights, manufacturing/repair knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. If one source is approved, A/RMCs 3, 4, or 5 are valid. If at least two sources are approved or if data is adequate for an alternate source to qualify in accordance with the design control activity's procedures, A/RMCs 1 or 2 are valid.
This acquisition will be solicited to
LCF SYSTEMS, INC (1CR65) and MARVIN ENGINEERING CO, INC (32067) because This part requires engineering source approval by the design control activity in order to maintain the quality of the part. LCF SYSTEMS, INC (1CR65) and MARVIN ENGINEERING CO, INC (32067) have existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). The approved source(s)LCF SYSTEMS, INC (1CR65) and MARVIN ENGINEERING CO, INC (32067) retain data rights, manufacturing knowledge, or technical data that are not economically available to the Government, and the data or knowledge is essential to maintaining the quality of
Page 2 of 4ContractsPro
6. Description of Efforts Made To Solicit Offers From as Many Offerors as Practicable
7. Determination of Fair And Reasonable Cost
8. Actions to Remove Barriers to Future Competition
9. Reference To The Approved Acquisition Plan the part. An alternate source must qualify in accordance with the design control activity's procedures, as approved by the cognizant Government engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application.
A Request for Information / Sources Sought Notice was entered on the FedBizOpps website for government-wide point of entry on
05/08/2019 and as a result
No other sources have expressed an interest in this acquisition.
The proposed contract action was synopsized on the FedBizOpps website for government-wide point of entry on
12/14/2018 and as a result
No other sources have expressed an interest in this acquisition.
Market research was conducted in accordance with far part 10. The results of the market research conducted (or the reason(s) market research was not conducted) are as follows
No additional market research was conducted because it is not practicable, for the reasons discussed in paragraph 5 above, for any other source to provide the required supplies and services.
The contracting officer determines that the anticipated cost to the Government of the supplies covered by this J&A will be fair and reasonable.
To promote competition the NAVSUP WSS will continue to encourage vendors with the expertise to manufacture/repair the subject item to submit a complete technical data package for review and source approval by the appropriate engineering source approval authority per the (WSS) guidelines. Also future requirements will be advertised in the FedBizOps website (www.fedbizops.gov) in order to encourage potential vendors to submit Source Approval Requests. For reasons set forth in Paragraph (5 & 6), NAVSUP WSS has no plans at this time to compete future contracts for the subject item covered by this document. If another potential manufacturing source emerges, NAVSUP WSS will assess whether competition for future requirements is feasible.
Previous J&A
An acquisition plan is not required for this acquisition
Page 3 of 4ContractsPro
10. Documentation For Spare/Repair Parts Acquisitions
History
The specifications for the above articles have been reviewed and reflect the minimum needs of the government of
An acquisition plan is not required for this acquisition
Created By Created Date 2019-05-08
08-MAY-19
Modified By Modified Date 2019-06-05
Requirements Cognizance Signature
Requirements Cognizance Signature Date
2019-05-08
Technical Cognizance Signature
Technical Cognizance Signature Date
2019-05-17
Source Development Cognizance Signature
Source Development Cognizance Signature Date
2019-05-22
Contracting Officer Certification Signature
John Mccarry Contracting Officer Certification Signature Date
2019-05-28
Competition Advocacy Review And Concurrence Signature
John Sweeney Competition Advocacy Review And Concurrence Signature Date
2019-06-05
Legal Sufficiency Review Signature
Sharif Dawson Legal Sufficiency Review Signature Date
2019-06-06
Approval Required By Far 6.304 Signature
William Cosenza
Approval Required By Far 6.304 Signature Date
2019-06-10
Page 4 of 4ContractsPro
File details come from the government source that posted it.