835_075_NAVSUP_5.8m_Inflatable_Craft_Specifications_Transmittal-2.pdf
PDF 961 KB Posted
- Attached to
- 5. 8 Meter Inflatable Craft
- Solicitation number
- SPRMM1-16-R-YP84
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sources_Sought_Market_Survey.doc | DOC document | |
| 835_075_NAVSUP_5.8m_Inflatable_Craft_Specifications_Transmittal-2.pdf | ||
| Sources_Sought_Market_Survey.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL SUPPLY SYSTEMS COMMAND 5.8-METTER INFLATABLE CRAFT
SPECIFICATION
Attn: Roland Magar, Code N952 NAVSUP Weapon System Support - Mechanicsburg 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, PA 17055-0788 Tel: 717-605-4618
16 Mar 2016
Ser 835/075
(1) Purchase Description for 5.8-Meter Inflatable Craft
X
1. The technical content contained in enclosure (1) is provided for distribution.
2. For additional information, the point of contact is Thomas Apple, phone:
(757) 462-4517 and email:Thomas.Apple@navy.mil.
DAVID POGORZELSKI
By direction
Site Director, Carderock Division, Naval Surface Warfare Center, Detachment Norfolk, Virginia Beach, VA 23459-3239
PURCHASE DESCRIPTION FOR 5.8-METER INFLATABLE CRAFT
1.0 SCOPE. This specification describes the attributes for inflatable craft of approximately
5.8 meters in length. The craft will be used in fresh and saltwater environments and must withstand the rigors of military operational use. The minimum expected active service of the craft is five years with a storage life of ten years. Where possible the manufacturer shall construct the craft in a manner to minimize acoustic and magnetic signatures.
2.0 APPLICABLE DOCUMENTS
2.1 General. The documents listed in this section are referenced in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information, or as examples.
While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed.
2.2 Government Documents. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
2.2.1 Federal Standards:
FED-STD-191 Textile Test Methods
2.2.2 Military Standards:
MIL-STD-810 Environmental Engineering Considerations and Laboratory Tests
2.3 Non-Government Publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract.
2.3.1 ASTM International:
ASTM D413 - Standard Test Methods for Rubber Property-Adhesion to Flexible Substrate
ASTM D471- Standard Test Method for Rubber Property – Effect of Liquids ASTM D751 - Standard Test Methods for Coated Fabrics ASTM D2261- Standard Test Method for Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure (Constant-Rate-of-Extension Tensile Testing Machine) ASTM D412 - Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers—Tension
3.0 REQUIREMENTS
3.1 Physical Dimensions and Characteristics.
3.1.1 Overall Length. The overall length when inflated to working pressure shall be 6 meters (19 feet 8 inches) maximum and 5.8 meters (19 feet 0 inches) minimum.
3.1.2 Beam. The beam when inflated to working pressure shall be 2.6 meters (8 feet 6 inches) maximum.
3.1.3 Inside Length. The inside length when inflated to working pressure shall be a minimum of 4.15 meters (13 feet 7 inches).
3.1.4 Inside Width. The inside width when inflated to working pressure shall be a minimum of 1.22 meters (4 feet 0 inches).
3.1.5 Weight. The weight of the craft with standard accessories (rigid floor, pumps, tools, repair kit) shall not exceed 300 kilograms (661 pounds).
3.1.6 Deflated Width. When deflated, the craft shall not exceed a width of 2.08 meters (6 feet 10 inches).
3.1.7 Transom Strength.
3.1.7.1 The transom shall be strong enough to accommodate the weight and thrust of: a single 55-horsepower Multi-Fuel Engine (MFE) outboard weighing up to 123 kilograms (270 pounds).
3.1.7.2 The transom shall be strong enough to accommodate the weight and thrust of two 30-horsepower MFE outboards with a total weight of 140 kilograms (308 pounds).
3.1.8 Payload.
3.1.8.1 The craft shall be capable of transporting a maximum payload (exclusive of craft and standard accessories) of 2,000 kilograms (4,409 pounds).
3.1.8.2 The operational payload of the craft shall be 1,550 kilograms (3,417 pounds).
3.1.8.3 The hoisting payload of the craft shall be 910 kilograms (2,006 pounds).
3.2 Arrangement.
3.2.1 Main Buoyancy Tube.
3.2.1.1 The main buoyancy tube (MBT) shall have a minimum of five chambers of roughly equal volume.
3.2.1.2 The MBT shall be configured with valves that permit the air to flow from chamber to chamber as well isolating the air flow between chambers.
3.2.1.3 The MBT shall have a rub strake on its outboard periphery.
3.2.1.4 The craft shall maintain level flotation and be maneuverable and stable while underway including while driving the craft forward and executing turns to port and starboard if any one of the MBT air chambers is deflated while in operational payload.
3.2.2 Keel. The craft shall have a single, full-length inflatable keel that is secured to the craft to prevent shifting or dislodging and shall be removable without any special tools to facilitate repair or replacement.
The keel shall be outfitted with an inflation/deflation valve and be connectable to an adjacent chamber in the MBT for single-point inflation.
3.2.3 Speed/Stability Tubes. If the craft is equipped with speed/stability tubes below the main buoyancy tube, they shall be equipped with a valve or fitting that permits isolation of the air flow from the main buoyancy tube to the speed/stability tubes. The speed/stability tubes, if used, shall be removable to facilitate repair or replacement.
3.2.4 Tie-Down Fittings.
3.2.4.1 The craft shall have a minimum of 12 heavy-duty tie-down fittings with D-rings.
3.2.4.2 These shall be arranged along the inboard sides of the main buoyancy tube.
3.2.4.3 The D-rings shall be able to accommodate rope up to 19 millimeters (3/4 inch) diameter.
3.2.4.4 The D-rings shall be capable of holding loads up to 225 kilograms (496 pounds) for each.
3.2.5 Towing Points.
3.2.5.1 The craft shall be equipped with forward towing points allowing the craft to be towed at operational payload condition in Sea State 3 (Wilbur-Marks Wind and Wave Scales for Fully Risen Seas, Figure 1).
3.2.5.2 The craft shall be equipped with aft towing points capable of towing a similar craft at operational payload in Sea State 3 (Wilbur Marks scale, Figure 1).
3.2.6 Hoisting Fittings. The craft shall be equipped with four hoisting fittings that can support the weight of the craft and a hoisting payload of 910 kilograms (2,006 pounds) with a safety factor of 1.5 where the top of the sling ring is no greater than 1.1 meter (43 inches) above the rigid deck.
3.2.7 Safety Lines. The craft shall be equipped with grab and life lines for crew safety.
3.2.7.1 Safety lines shall be a minimum 14 millimeters (1/2 inch) diameter, double braided black nylon rope. Safety lines shall run the length of the boat and be anchored in multiple places.
3.2.7.2 A minimum of one grab line shall be on the inboard side (port and starboard) of the main buoyancy. The inboard grab line may be one continuous line provided it is along the inboard sides, port and starboard, of the main buoyancy tube. Inboard grab lines must be easily gripped by personnel seated in the boat.
3.2.7.3 There shall be one life line on the outboard side of the main buoyancy tube (port and starboard). Life line(s) must be easily gripped by personnel in the water.
3.2.8 Carry Handles.
3.2.8.1 The craft must have a minimum of six handles on each side (port and starboard) of the main buoyancy tube.
3.2.8.2 Handles shall be of sufficient size to accommodate a gloved hand.
3.2.8.3 Handles shall be arranged to facilitate carrying the craft with outboard engine mounted on the transom.
3.2.8.4 The handles shall not drag in the water when the craft is underway in operational payload condition on plane.
3.2.9 Rigid Deck. The craft shall be equipped with a removable rigid deck
3.2.9.1 The rigid deck shall be constructed from aluminum, composite, or other non-corrosion prone material panels.
3.2.9.2 The deck shall not require tools in install or remove.
3.2.9.3 The rigid deck shall have a minimum of six D-rings (three port, three starboard), with a 225 kilogram load capacity, sized to accept up to a 19 millimeter diameter rope, and able to hinge flat to the deck. The D-rings shall be placed along the outboard sides of the rigid deck. The deck shall be free of any other obstruction.
3.2.9.4 The deck shall not buckle or become dislodged or deflect more than 15 centimeters (6 inches) from flat between the forward hoisting fittings and the transom when operating the craft with an operational payload of 1,550 kilograms (3,417 pounds) in sea states up to 3 (Wilbur Marks scale, Figure 1).
3.2.10 Transom.
3.2.10.1 The transom shall be equipped with a plate on the inboard side with a lip to prevent the outboard engine mounts from slipping off. The plate shall be capable of accommodating one Evinrude 55-horsepower Multi-Fuel Engine (MFE) outboard engine or two Evinrude 30-horsepower MFE outboard engines.
3.2.10.2 There shall be a means to secure a lanyard from the outboard engine(s) to the transom and be of sufficient strength to support the weight of one 55-horsepower MFE outboard with a safety factor of 1.5.
3.2.10.3 The transom shall be outfitted with two self-bailing scuppers.
The scuppers shall drain water from the craft when moving forward and be able to be secured closed or by design able to prevent water entering the craft through them when the craft is sitting still or moving forward
3.2.10.4 The transom shall be equipped with anti-splash triangles, set in the unions of the main buoyancy tube and transom in such a manner to deflect wash and spray rising up the outboard transom face.
3.2.10.5 The transom shall conform to the strength requirements of Section 3.1.7.
3.2.10.6 The transom shall be of sufficient height to accommodate a long-shaft (20-inch) outboard engine without inducing ventilation of the propeller or pump-jet during operation of the craft, or causing undue spray (rooster tail) to emanate from the outboard engine during operation.
3.2.11 Spray Mitigation. The craft shall be equipped with rub strakes on the periphery of the main buoyancy tube with cupped lower edge or extruded spray rails to help deflect water rising up along the outer side of the main buoyancy tube which tends to strike the occupants of the craft.
3.2.12 Paddle Stowage. The craft shall be equipped with detachable bags with ties or straps to secure paddles on the inboard side of the main buoyancy tube in such a manner not to interfere with the operation of the craft. The bags shall be configured so they may be attached to the main buoyancy tube in a variety of locations at the users’ discretion.
3.2.13 Equipment Stowage. The craft shall be outfitted with storage bags to carry: Two manual inflation pumps, inflatable chamber repair kit, air pressure gauge, towing bridle, and hoisting slings. The location of the equipment bags shall not interfere with the operation of the craft. The bags shall be removable, attached to the MBT with ties or straps.
3.2.14 Hull. The hull of the craft shall be constructed from fabric coated on both sides. A rub strake shall extend the length of the hull on center, on the outside of the hull below the keel.
3.3 Inflation System.
3.3.1 Working Pressure. The maximum working pressure shall be no greater than 300 millibar (4.3 pounds/square-inch).
3.3.2 Single Point Inflation. The craft shall have the means to inflate all inflatable sections of the craft to working pressure from a single point using breathable air. This shall be accomplished by valves that permit air to flow from one chamber to the adjacent chamber and can be closed to stop the air flow between chambers.
3.3.3 Manual Inflation/Deflation. Each inflatable chamber on the craft shall be equipped with valves that permit the inflation or topping-off each inflatable section individually with a manual air pump or shop air and the deflation of that chamber. If equipped with speed/stability tubes, they may be inflated/deflated via a connection to an adjacent main buoyancy tube chamber.
3.3.4 Manual Deflation. The craft shall also be equipped with inflation/deflation valves (two total), one each located on top the aft ends of the main buoyancy tube (port and starboard). All air shall be able to be evacuated from all inflatable chambers via the two inflation/deflation valves.
3.3.5 Pressure Relief Valves.
3.3.5.1 Each inflatable air chamber, except the keel and stability tubes (if so equipped), shall have means to relieve pressure at no greater than 120% of working pressure and close at no less than 100% of working pressure. The differential between opening and closing pressures shall be 34.5 millibar (0.5 psi), -0.0 millibar, +6.9 millibar (-0.0 psi, +0.1 psi).
3.3.5.2 The pressure relief valves shall have means to seal or cap-off the valves to stop air flow.
3.4 Material Requirements.
3.4.1 Fabric. The inflatable chambers and hull of the craft shall be constructed of coated fabric using polyester or nylon as the base fabric. The fabric shall be coated on both sides. The fabric shall have an exterior coating of Hypalon/chlorosulfonated polyethylene (CSM), and an interior coating of neoprene, or coated with polyurethane on both sides. PVC or PVC alloy coated fabrics are not permitted. If a polyurethane overspray/encapsulation is used on the craft, it shall not be used to prevent or remedy air leakage. Latex or other leak preventatives shall not be used on the interior of inflatable chambers to prevent or repair leaks.
Craft made from polyurethane coated fabric shall use radio frequency (RF) welding to the greatest extent possible in its construction.
3.4.2 Color.
3.4.2.1 All visible surfaces of the fabric shall be non-reflective black or gray in color, except the main buoyancy tube.
3.4.2.2 The main buoyancy tube shall be non-reflective gray in color.
3.4.3 Stitching. There shall be no stitching penetrating any fabric used to retain air in the craft.
3.4.4 Fabric Coating. The coatings used on the fabric shall meet the performance requirements of Table 1 using the test method indicated.
Table 1. Characteristics of Coating Compounds
Property Requirements Test Method Tensile strength (initial) 10 megapascal (min) ASTM D412 Ultimate elongation 300% (min) ASTM D412 Tensile Strength after immersion in distilled water at 71 ± 1 °C for 14 days
7 megapascal of initial tensile strength (min) ASTM D471
ASTM D412
After immersion in Fuel A for 46 hours at 23 ± 1°C Tensile strength retained.
Volume change
5 megapascal 25% Max
ASTM D471
ASTM D412
ASTM D471
3.4.5 Breaking Strength. The breaking strength of the finished coated fabric shall be a minimum of 58 Newton/millimeter in warp and fill when tested in accordance with Method 5102 of FED-STD-191.
3.4.6 Tearing Strength. The tearing strength of the finished coated fabric shall be a minimum of 111 Newtons in warp and fill when tested in accordance with ASTM D 2261.
3.4.7 Coating Adhesion. The coating adhesion shall be determined by using a suitable air-cure adhesive to bond one face of the coated fabric to the other face. The minimum adhesion shall be 1.75 Newton/millimeter with the coating compound separating off the base fabric. Testing parameters shall be in accordance with Method 5970 of FED-STD-191.
3.4.8 Weld Strength of Thermoplastic Coated Fabrics. If the craft is fabricated from thermoplastic materials (e.g., polyurethane) and uses welding technology for seams and attachments, a Weld Test shall be conducted as follows. Two samples of fabric 300 millimeters x 200 millimeters, cut with a short side parallel to the warp direction, shall be superimposed face to back for double coated fabrics, or coated face to coated face for single coated fabrics. They shall be radio frequency welded with a tool to a 10 ±1 millimeters width and of convenient length. The test specimens, 25 millimeters wide, shall be cut transversely to the line of weld. The test samples shall be in accordance with Method 5970 of FED-STD-191. The maximum peel load shall be recorded. The minimum peel load shall be 7 Newton/millimeter for the initial break.
3.4.9 Coating Adhesion After Exposure to Water. Three test samples shall be made and tested per FED-STD-191 Test Method 5970 with the following modifications:
a. The adhesive system used for the samples shall be the same system used for production parts.
b. Test specimens for coating adhesion shall be immersed in 3 percent sodium chloride water solution at 60 ±1 °C for 96 hours ±1 hour.
c. The edges of the test specimens shall not be sealed.
d. The test specimens shall be removed from the warm water and immediately placed in water at room temperature.
e. Each determination shall be completed within three minutes of the time of removal from the water. Minimum adhesion results shall be 1.75 Newton/millimeter of width.
3.4.10 Puncture Resistance. The coated fabric shall have a puncture resistance of 360 N when tested in accordance with the following test procedure.
Method 5120 of FED-STD-191 will be used except that the ring clamp mechanism shall have an internal diameter of 76 millimeters, and the ball shall be replaced by a piercing instrument shaped like a flared, flat-tip screwdriver, having a width of 7.93 ±0.250 millimeters, and a thickness of 0.79 ±0.10 millimeters, at the extreme tip. The piercing tip edges shall be rounded to a 0.25 millimeter radius. The piercing instrument shall be oriented to intercept the warp and fill threads at an angle of approximately 45°. The average of three test specimens shall be reported. Non-conformance to 3.4.10 shall constitute failure of this test.
3.4.11 Fungus Resistance. The coated fabric shall be tested per MIL-STD-810, Method 508-6, except test specimen shall not be sterilized before being subjected to the fungus. The coated fabric shall maintain a minimum of 50 percent of original breaking strength.
3.4.12 Resistance to Low Temperatures. The coating shall be visually examined for signs of cracking or flaking when tested in accordance with the following method. The coated fabric shall be tested at -50°C per Method 5874 of FED-STD-191 with the exception that the hydrostatic resistance portion of the test is not required.
3.4.13 Laps and Seams. Seams shall be at least as strong as the weakest of the materials joined by the seam. Each seam shall be covered with tape where necessary to prevent lifting of and damage to fabric edges. Seams shall be capable of surviving a pressure of 200% of the working pressure for 30 minutes at a temperature of 38°C (100°F) without damage or any slippage of the seams.
3.4.14 Workmanship and Materials. The quality of work throughout the craft shall be high quality, reflecting the best marine practices. Inflatable tubes shall be free from twisting and warping. All joints are to be neatly and accurately made. Faying surfaces shall be free from gaps, hollows or warping. Shims, filling compounds, or layering of fabric shall not be used to correct improper fit. All sharp edges shall be dressed, ground or radiused to avoid injury to personnel. Internal corners shall be filleted and external comers shall be rounded-off. All metallic materials shall be non-ferrous or corrosion resistant steel (CRES) to minimize corrosion of the craft. All stainless steel shall be passivated and electropolished after welding. All exposed surfaces shall be matte finish. The interior and exterior of the craft shall be clean and free of foreign materials.
3.5 Performance.
3.5.1 Calm-water Performance.
3.5.1.1 The craft shall be able to attain a speed of 16 knots in operational payload condition (1,550 kilograms) with a 55-horsepower Multi- Fuel Engine (MFE) outboard using gasoline as fuel.
3.5.1.2 The outboard engine shall not exhibit any ventilation of the propeller or pump jet when performing maneuvers in calm water to include executing turns or crossing wakes.
3.5.1.3 The craft, in operational payload, shall maintain level flotation and be maneuverable and stable while underway with any one of the MBT chambers deflated.
3.5.1.4 The carry handle shall not drag in the water when the craft is underway, on plane, in operational payload condition.
3.5.1.5 The scuppers located on the transom shall be able to drain water from the craft during calm-water performance trials.
3.5.2 Rough-water Performance.
3.5.2.1 The craft shall be maneuverable, stable, and able to achieve planing speed in an operational payload condition in a Sea State 3 (Wilbur Marks scale, Figure 1) using a 55-horsepower MFE outboard engine using gasoline as fuel.
3.5.2.2 When operating in Sea State 3, there shall be no buckling, twisting, or distortion of the MBT.
3.5.2.3 The outboard engine shall exhibit minimal ventilation of the propeller or pump jet when performing maneuvers in rough water.
3.5.2.4 The craft shall be towed using the forward towing points and the towing bridle supplied with the craft with an operational payload in Sea State 3 (Wilbur-Marks Wind and Wave Scales for Fully Risen Seas, Figure 1).
3.5.2.5 The craft shall be able to tow a similar craft with an operational payload using its aft towing points in Sea State 3 (Wilbur-Marks Wind and Wave Scales for Fully Risen Seas, Figure 1).
3.5.2.6 The rigid deck shall not buckle or become dislodged or deflect more than 15 centimeters (6 inches) from flat between the forward hoisting fittings and the transom when the craft has an operational payload in Sea State 3 (Wilbur-Marks Wind and Wave Scales for Fully Risen Seas, Figure 1).
3.5.2.7 The scuppers located on the transom shall be able to drain water from the craft during rough-water performance trials.
3.5.3 Temperature Ranges.
3.5.3.1 The craft shall be capable of operating in temperatures ranging from -10°C to +50°C without damage or degradation of the craft.
3.5.3.2 The craft shall be able to endure storage temperatures ranging from -30°C to +65°C without damage or degradation of the craft.
3.5.4 Leakage Rate. When new, the craft shall not leak air at a rate in excess of 16% of working pressure over four hours. When testing for compliance, the temperature shall not change more than 2.8°C (5.0°F) during the course of the leakage rate test. Final pressure readings shall be corrected for change in temperature and barometric pressure using Table 3.
3.6 Accessories.
3.6.1 Paddles. The craft shall be equipped with six paddles of sufficient size and strength to propel the craft by crew seated in the craft with the craft at operational payload condition. There shall means to stow and secure the paddles where they will not interfere with the operation of the craft.
Stowage bags shall be used to meet this requirement. The paddles shall be able to float.
3.6.2 Carrying Cases.
3.6.2.1 The craft shall be equipped with a fabric carrying case that can contain the folded/rolled deflated craft, without the decking, and is equipped with a minimum of six carrying handles on the outside of the case. The case shall be black in color.
3.6.2.2 There shall be a fabric case for the rigid deck. The case shall be black in color and equipped with a minimum of six carrying handles on the outside of the case.
3.6.3 Inflatable Craft Repair Kit. A repair kit shall be provided with each craft.
The repair kit shall include all necessary repair material, adhesive, patches, emergency repair clamps, tools, and instructions necessary to make a minimum of five repairs in the hull of the craft and repair up to 2% of the surface area of the craft. The repair kit shall also include at least two field-expedient types of patches in the event the boat is damaged while on a mission or on the water. The repair material shall come in several different shapes in order to patch punctures and rips or tears. The onboard repair kit will be packaged in a hard non-metallic case.
3.6.4 Pressure Gauge. A minimum of one pressure gauge shall be provided with each craft, and compatible with all manual inflation system valves, with a range of 0 to 15 pounds/square-inch marked in 0.1 pound/square-inch increments. The gauge shall be enclosed in a water-proof storage container to prevent water damage.
3.6.5 Towing Bridle. The craft shall have a towing bridle of sufficient strength to tow a similar craft with operational payload in a Sea State 3 (Wilbur Marks scale, Figure 1).
3.6.6 Tool Kit. The craft shall be furnished with a kit containing tools required to perform maintenance and repair to the craft to include tools needed to remove valves or valve components.
3.6.7 Manual Inflation Pumps. The craft shall be equipped with two manual inflation pumps capable of inflating craft to working pressure in 15 minutes or less when both pumps are used.
3.6.8 User Manual. The craft shall be provided with commercial off the shelf (COTS) manuals, drawings and technical information essential for repairs and supply support. (i.e., operation and maintenance information and parts lists/ illustrations).
3.6.9 Hoisting Slings.
3.6.9.1 The craft shall be equipped with synthetic webbing or rope hoisting slings capable of hoisting the craft with standard accessories and an operational payload of 1,550 kilograms (3,417 pounds) with a safety factor of six.
3.6.9.2 The top of the ring on the hoisting slings shall be no higher than
1.1 meter (43 inches) above the rigid deck of the craft.
3.6.9.3 The craft shall not bend, buckle or deform when hoisted using manufacturer supplied slings with 1.5 times the hoisting payload (1,365 kilograms total).
3.6.10 Rigid Bow Cover The craft shall come equipped with an optional, removable rigid bow cover. The weight of the rigid bow cover will be considered part of the payload.
3.6.10.1 The bow cover shall secure to the top of the main buoyancy tube by lacing or straps and not require tools to install or remove.
3.6.10.2 The bow cover length shall be one fifth of the inside length of the craft.
3.6.10.3 The bow cover shall be constructed of aluminum, composite, or other non-corrosion prone material panels.
3.6.10.4 The portions of the rigid bow cover that make contact with the MBT shall be smooth, free of edges or protrusions which may abrade or puncture the MBT.
3.6.10.5 The bow cover shall have a total of six D-rings, (three port, three starboard) with a load capacity of 225 kilograms (496 pounds) each. The D-rings shall be able to accommodate rope up to 19 millimeters (3/4 inch) diameter and shall be able to hinge flat on to the bow cover surface.
3.6.10.6 The bow cover shall be able to support the weight of a person and equipment of 136 kilograms (300 pounds) total.
3.6.10.7 The weight of the rigid bow cover shall not exceed 14 kilograms (31 pounds).
3.6.10.8 The rigid bow cover shall not become disconnected or dislodged in Sea State 3 (Wilbur Marks scale, Figure 1).
4.0 VERIFICATION
4.1 Classification of Inspections. The inspection requirements specified herein are classified as follows and summarized in Table 2:
4.1.1 Bid Sample Testing. Bid sample craft shall be tested to meet specific requirements in Section 3 as identified in 4.2. Independent laboratory test documentation for Material Requirements specified in section 3.4 shall be acceptable demonstration of compliance for the requirements in that section.
4.1.2 First Article Inspections. When required by the contract, a sample craft produced under that contract shall be inspected to verify conformance to specific requirements in Section 3.0 as identified in 4.3.
4.1.3 Conformance Inspections. Periodic inspections by government personnel may be performed on craft produced under this contract to verify conformance with specific requirements in Section 3.0 as identified in 4.4.
4.2 Bid Sample Testing Requirements. The requirements of bid sample testing are as follows:
4.2.1 Physical Dimensions and Characteristics. The bid sample craft shall be examined to verify it meets the requirements of 3.1.1 through 3.1.6.
Compliance to 3.1.7.1 shall be observed during Calm- and Rough-water Performance testing. Paragraphs 3.1.7.2 and 3.1.8.1 shall be validated using manufacturer’s product literature or test affidavit.
4.2.2 Arrangement. The bid sample craft shall be examined to verify compliance to 3.2.1.1 through 3.2.1.3, 3.2.2 through 3.2.4.3, 3.2.7 through 3.2.9.3, 3.2.10.1, and 3.2.11 through 3.2.14. The bid sample shall be tested to verify compliance to 3.2.1.4, 3.2.4.4, 3.2.5, 3.2.6, 3.2.9.4. The craft shall be hoisted with the operational payload (1,550 kilograms) to verify compliance to the requirements of 3.2.6 and 3.6.9. During Calm-and Rough-water performance trials, the bid sample shall be observed to verify compliance to the requirements of 3.2.9.4 through 3.2.11.
4.2.3 Inflation System. The bid sample shall be tested to verify compliance to the requirements listed in 3.3.
4.2.4 Material Requirements. The bidder shall provide independent laboratory reports that confirm compliance to 3.4. Those reports shall be examined to verify compliance to the requirements of 3.4.
4.2.5 Performance. The bid sample shall undergo testing to verify compliance to the performance requirements of 3.5.1, 3.5.2, and 3.5.4. Tests performed to validate compliance to section 3.5.13, 3.5.2.4, and 3.5.2.5 of shall be conducted for a distance of 0.4 kilometers. If an inflatable chamber fails the air retention requirements of 3.5.4 it will be retested with the adjacent chambers deflated. If that chamber still does not meet the requirements of 3.5.4 it will be considered non-compliant to that requirement. The bidder shall provide test documentation that verifies compliance to the requirements of 3.5.3.
4.2.6 Accessories. The bid sample shall be examined to ensure compliance to the requirements of 3.6. The bid sample shall be tested to verify compliance to performance requirements of 3.6.7 and 3.6.10.5 through 3.6.10.8.
4.3 First Article Inspections. The requirements for First Article Inspections are as follows:
4.3.1 Physical Dimensions and Characteristics. The first article craft shall be examined to verify it meets the requirements of 3.1.1 through 3.1.6.
Compliance to 3.1.7.1 shall be observed during Calm- and Rough-water Performance testing. Paragraphs 3.1.7.2 and 3.1.8.1 shall be validated using manufacturer’s product literature or test affidavit.
4.3.2 Arrangement. The first article craft shall be examined to verify compliance to 3.2.1.1 through 3.2.1.3, 3.2.2 through 3.2.4.3, 3.2.7 through 3.2.9.3, 3.2.10.1, and 3.2.11 through 3.2.14. The bid sample shall be tested to verify compliance to 3.2.1.4, 3.2.4.4, 3.2.5, 3.2.6, 3.2.9.4. The craft shall be hoisted with the operational payload (1,550 kilograms) to verify compliance to the requirements of 3.2.6 and 3.6.9. During Calm-and Rough-water performance trials, the bid sample shall be observed to verify compliance to the requirements of 3.2.9.4 through 3.2.11.
4.3.3 Inflation System. The first article craft shall be tested to verify compliance to the requirements listed in 3.3.
4.3.4 Material Requirements. The manufacturer shall provide independent laboratory reports that confirm compliance to 3.4. Those reports shall be examined to verify compliance to the requirements of 3.4.
4.3.5 Performance. The first article craft shall undergo testing to verify compliance to the performance requirements of 3.5.1, 3.5.2, and 3.5.4.
Tests performed to validate compliance to section 3.5.13, 3.5.2.4, and
3.5.2.5 shall be conducted for a distance of 0.4 kilometers. If an inflatable chamber fails the air retention requirements of 3.5.4 it will be retested with the adjacent chambers deflated. If that chamber still does not meet the requirements of 3.5.4 it will be considered non-compliant to that requirement. The bidder shall provide test documentation that verifies compliance to the requirements of 3.5.3.
4.3.6 Accessories. The first article craft shall be examined to ensure compliance to the requirements of 3.6. The bid sample shall be tested to verify compliance to performance requirements of 3.6.7, 3.6.9, and 3.6.10.5 through 3.6.10.8
4.4 Conformance Inspections. Conformance inspections may be conducted periodically to verify that production lot craft are compliant with many of the requirements of 3.0. The requirements for Conformance Inspections are as follows:
4.4.1 Physical Dimensions and Characteristics. A production lot craft shall be examined to verify compliance to 3.1.1 through 3.1.6
4.4.2 Arrangement. A production lot craft shall be examined to verify presence of the items described in 3.2.1 through 3.2.14.
4.4.3 Inflation System. A production lot craft shall be examined to verify presence of components described in 3.3.3 through 3.3.5.
4.4.4 Performance. A production lot craft shall be tested to verify compliance to the leakage rate requirement of 3.5.4
4.4.5 Accessories. A production lot craft shall be examined to verify the presence of the accessories identified in 3.6.1 through 3.6.10.
Table 2. Summary of Requirements Verification
Para. Requirement Verification Method Verification Type
Visual Insp. Test MFR’s
Doc.
Bid
Sample FAT Quality Conform
3.1 Physical Dimensions and Characteristics
3.1.1 Overall Length X X X X
3.1.2 Beam X X X X
3.1.3 Inside Length X X X X
3.1.4 Inside Width X X X X
3.1.5 Weight X X X X
3.1.6 Deflated Width X X X
3.1.7.1 Transom Strength – 55-HP X X X
3.1.7.2 Transom Strength – 30-HP X X
3.1.8.1 Payload - Full X X
3.1.8.2 Payload - Operational X X X
3.1.8.3 Payload - Hoisting X X
3.2 Arrangement
3.2.1.1 MBT – 5 Chambers X X X X
3.2.1.2 MBT – air flow X X X X
3.2.1.3 MBT – Rub Strake X X X X
3.2.1.4 MBT – Level Flotation X X
3.2.2 Keel X X X X
3.2.3 Speed/Stability Tubes X X X X
3.2.4.1 Tie Down Fittings - Qty X X X X
3.2.4.2 Tie Down Fittings - Location X X X X
3.2.4.3 Tie Down Fittings - Rope X X X X
3.2.4.4 Tie Down Fittings - Load X X
3.2.5.1 Towing Points - Forward X X X X
3.2.5.2 Towing Points - Aft X X X X
3.2.6 Hoisting Fittings X X X X X
3.2.7.1 Safety Lines - Type X X X X
3.2.7.2 Safety Lines - Grab X X X X
3.2.7.3 Safety Lines - Life X X X X
3.2.8 Carry Handles X X X X
3.2.9.1 Rigid Deck - Material X X X X
3.2.9.2 Rigid Deck – No Tools X X X
3.2.9.3 Rigid Deck – D-Rings X X X X X
3.2.9.4 Rigid Deck -Rigidity X X X
3.2.10.1 Transom – Engine Plate X X X X
3.2.10.2 Transom – Lanyard Attachm. X X X X X
3.2.10.3 Transom - Scuppers X X X X X
3.2.10.4 Transom – Anti-splash X X X X
3.2.10.5 Transom - Strength X X X
3.2.10.6 Transom - Height X X X
Verification Method Verification Type
Visual Insp. Test MFR’s
Doc.
Bid
Sample FAT Quality Conform
3.2.11 Spray Mitigation X X X X
3.2.12 Paddle Stowage X X X X
3.2.13 Equipment Stowage X X X X
3.2.14 Hull X X X X
3.3 Inflation System
3.3.1 Working Pressure X X X
3.3.2 Single Point Inflation X X X X
3.3.3 Manual Inflation/Deflation X X X X
3.3.4 Manual Deflation X X X X
3.3.5.1 Pressure Relief Valves X X X X
3.3.5.2 Pressure Relief Valve Caps X X X X
3.4 Material Requirements
3.4.1 Fabric X X X X X
3.4.2.1 Color X X X X
3.4.2.2 Color - MBT X X X X
3.4.3 Stitching X X X X
3.4.4 Fabric Coating X X X
3.4.5 Breaking Strength X X X
3.4.6 Tearing Strength X X X
3.4.7 Coating Adhesion X X X
3.4.8 Weld Strength X X X
3.4.9 Coating Adhesion - Exposed X X X
3.4.10 Puncture Resistance X X X
3.4.11 Fungus Resistance X X X
3.4.12 Resistance to Low Temps X X X
3.4.13 Laps and Seams X X X
3.4.14 Workmanship and Materials X X X X
3.5 Performance
3.5.1.1 Calm Water - Speed X X X
3.5.1.2 Calm Water – No ventilation X X X
3.5.2.1 Rough Water - Planes X X X
3.5.2.2 Rough Water – No buckling X X X
3.5.2.3 Rough Water – Min. vent. X X X
3.5.3.1 Temp. Range - Operations X X X
3.5.3.2 Temp. Range - Storage X X X
3.5.4 Leakage Rate X X X X
3.6 Accessories
3.6.1 Paddles X X X X
3.6.2.1 Carrying Case - Craft X X X X
3.6.2.2 Carry Case – Rigid Deck X X X X
3.6.3 Inflatable Craft Repair Kit X X X X
3.6.4 Pressure Gauge X X X X
Verification Method Verification Type
Visual Insp. Test MFR’s
Doc.
Bid
Sample FAT Quality Conform
3.6.5 Towing Bridle X X X X
3.6.6 Tool Kit X X X X
3.6.7 Manual Inflation Pumps X X X X X
3.6.8 User Manual X X X X
3.6.9.1 Hoisting Slings - Capacity X X X X
3.6.9.2 Hoisting Slings - Height X X X X
3.6.10.1 Rigid Bow Cover – Install. X X X X
3.6.10.2 Rigid Bow Cover - Length X X X
3.6.10.3 Rigid Bow Cover - Material X X X X
3.6.10.4 Rigid Bow Cover - Interface X X X
3.6.10.5 Rigid Bow Cover – D-rings X X X X
3.6.10.6 Rigid Bow Cover - Load X X X
3.6.10.7 Rigid Bow Cover - Weight X X X
3.6.10.8 Rigid Bow Cover - Security X X X
Figure 1. Wind and Wave Scales for Fully Risen Seas (from Wilbur Marks, DTMB)
Table 3. Air Pressure Correction Chart
File details come from the government source that posted it. Updated .