SPRHA526R1141_______0001.pdf

PDF 124 KB Posted

Attached to
AEWS Electronic Component
Solicitation number
SPRHA5-26-R-1141
Issued by

About this file

This is a federal solicitation (Request for Proposal) SPRHA5-26-R-1141-0001 issued by DLA Aviation at Hill Air Force Base for an electronic component procurement. The solicitation is for 10 electronic components with CAGE code 26269, seeking range pricing across different quantity brackets (1-2 EA, 3-4 EA, 5-10 EA, 11-15 EA, 16+ EA). A first article testing requirement is included, with one first article test to be completed within 360 calendar days and subsequent production deliveries expected by August 17, 2027.

The procurement is a Foreign Military Sales (FMS) case with a priority rating of R, involving multiple part numbers from manufacturers including 03538, 0WEC9, and 1D8S5. Specific requirements include higher-level contract quality requirements (AS9100), IUID marking, Buy American Act compliance, and supply chain traceability documentation. The evaluation will be primarily cost-based, with the government reserving the right to adjust quantities, and pricing will be assessed across different quantity ranges to determine the most advantageous offer.

View the file

Other files

File Type Posted
SPRHA526R1141_______0003.pdf PDF
SPRHA526R1141_______0002.pdf PDF
CDRLFATR.pdf PDF
SPRHA526R1141.pdf PDF
CDRLFATP.pdf PDF
EDL.pdf PDF
MQR.pdf PDF
CDRLCPP.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

SPRHA5-26-R-1141-0001

3. EFFECTIVE DATE

1 DEC 2025

4. REQUISITION/PURCHASE REQ. NO.

FD20202501141

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

BUYER: Travis R Bodily/AUBA travis.bodily@us.af.mil Phone: (385) 591- 0001 Fax: (000) 000-0000 No Collect Calls

7. ADMINISTERED BY (If other than item 6) CODESPRHA5

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

SPRHA526R1141

9B. DATED (SEE ITEM 11)

24-NOV-2025

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FMS REQUIREMENT

ROUTINE

SEE PAGE 2 FOR THE PURPOSE OF THIS AMENDMENT

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SPRHA5-26-R-1141-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpost of this amendment is to update the Part Number for CAGE 26269 as follows:

From: 7344944G1

To: 583190

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

On Time Delivery Improvement

In accordance with the 448th Supply Chain Management Wing (448th SCMW), Air Force Sustainment Center Contracting Directorate (AFSC/OK) and Defense Logistics Agency (DLA) Aviation Contracting On-Time Delivery (OTD) Improvement Initiative.

DLA Contracting has established the following OTD requirements with the intent to improve OTD.

As detailed in section B of the Solicitation, the government has developed a Required Delivery Schedule (RDS), which is reflective of the customer need date as well as projected Production Lead Time (PLT). The government RDS considered such factors as historical data and active contracts. In developing your response, the government requests your company review the RDS provided and propose an achievable delivery schedule based on your internal PLT review.

With input from suppliers, the Contracting Officer may negotiate an updated RDS representative of all factors stated above along with any new information that may become available.

Quantity Range Pricing

The Government intends to purchase a total of 10EA Electronic Component. These requirements are FMS customers which are typically more volatile and could impact the quantity on the potential award (higher or lower quantities). Therefore, the Government is requesting range pricing for the following ranges. Please provide range pricing below.

1 to 2 EA $____________________ 3 to 4 EA $____________________ 5 to 10 EA $____________________ 11 to 15 EA $____________________

16 EA + $____________________

This solicitation includes a First Article requirement of 1 EA on Item No.0001AC. Please provide your price for the First Article in the space designated for 0001AC. All other pricing for the production items will be completed using the table above.

The Item No.’s (starting on page 4) list best estimated quantities. These Item No.’s will be unpriced (except for the First Article as explained above) as all other pricing should be completed in the table above.

In the event of competition, the Government will be awarding based on the total quantities needed at the time of award. The Government will evaluate competitive proposals based on the needed quantity price range. If a First Article is required, then that price will be added to the quantity range pricing to determine total evaluated price for Bid A.

*In the event the ranges listed above do not reflect appropriate range pricing, the contractor is able to provide alternate quantity ranges.

Item No.

NSN: 5998-01-176-5358 QX

ELECTRONIC COMPONENT

AEWS

Manufacturer Part Number 03538 7344944G001

0WEC9 7344944G1

1D8S5 7344944G1 26269 583190 Priority: R Applicability: None ;

Foreign Military Sales :FMS Case:

Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Bid A - First Article Required Item No.

0001AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

FATP

First Article Test Plan First Article Test Plan

CDRL A001

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW 1423 (CDRL A001) Type / Ship To PACRN Mark For

+ IAW1423 IAW 1423

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *360 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

The Contractor shall deliver the First Article Test Plan a minimum of 30 days prior to first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.

Bid A - First Article Required

0001AB

Bid A - First Article Required Not Separately Priced Quantity U/I Unit Price

1 LO NSP

FATR

First Article Test Report

FIRST ARTICLE TEST REPORT

CDRL A002

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW 1423 (CDRL A002) Type / Ship To PACRN Mark For

+ IAW1423 IAW 1423 (CDRL A002)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *480 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

The Contractor shall deliver the First Article Test Report NLT 15 days after first article test. The contractor shall make any re-submittal NLT 15 days after receipt of government comments.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AC AA

FA

First Article

FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

AS9100 9100

Buy American Act/Balance of Payments Program

Bid A - First Article Required

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2027 ORIGIN

Type / Ship To PACRN Mark For B FB2027 PAB First Article Do Not Post Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B FB2027 1 EA *390 Calendar Days DSRJ5443660003 / PRI: 2

Proposed Delivery

B FB2027 1 EA

Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST ARTICLE, DO NOT

PLACE IN AIR FORCE SUPPLY.

Contractor shall notify the Government 30 days prior to shipment.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

9 EA

CLIN ACRN ACRN Total

0001AD AA

PROD

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DSR004 ORIGIN

Type / Ship To PACRN Mark For

* DSR004 PAB DSRJ00

Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Bid A - First Article Required Required Delivery

* DSR004 9 EA 17 AUG 2027 DSRJ5443660003 / PRI: 2

Proposed Delivery

* DSR004 9 EA

Bid B - First Article NOT Required Item No.

0001AE

Firm Fixed Price Quantity U/I Unit Price Amount

10 EA

CLIN ACRN ACRN Total

0001AE AA

PROD

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

* DSR004 ORIGIN

Type / Ship To PACRN Mark For

* DSR004 PAB DSRJ00

Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Required Delivery

* DSR004 10 EA 17 AUG 2027 DSRJ5443660003 / PRI: 2

Proposed Delivery

* DSR004 10 EA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Counterfeit Prevention Plan

CDRL A005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW 1423 (CDRL A005) Type / Ship To PACRN Mark For

+ IAW1423 IAW 1423

Type / Ship To Quantity (U/I) IAW DD 1423-1 Req No / Pri

Required Delivery

+ IAW1423 1 LO IAW DD 1423-1

Proposed Delivery

+ IAW1423 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B FB2027

DDHU HILL SBSS RECEIVING

8019401545

7538 5TH STREET

BLDG 850 BAY B

HILL AFB UT 84056

UNITED STATES

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

SHIP TO (FOREIGN MILITARY SALES)

TYPE/CODE: * DSR004

SUPPLEMENTAL ADDRESS CODE: DA4RAG

FMS CASE CODE/LOA: SR-D-RAG/001

MAPAC SHIP TO CODE: DSR004

MAPAC MARK FOR: DSRJ00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C01 Superseded Part Numbered Items (FEB 2025)

When the award identifies supplies by manufacturer's name, Commercial and Government Entity (CAGE) code, and part number, the specified item(s) are the only item(s) acceptable under this contract. If an item part number is superseded during the term of this contract, the contractor shall advise the contracting officer immediately upon determination. The notice shall include complete information on the superseding item form, fit, function, configuration, application, or physical nature. The contracting officer will determine whether the item is acceptable to the Government, advise the contractor within seven days, and modify the contract accordingly.

C02 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components

(DEC 2016)

The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.

C03 Contractor Retention of Supply Chain Traceability Documentation (JUN 2023)

(1) By submitting a quotation or offer, the contractor is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) of this procurement note, demonstrating the item conforms to the technical requirements, and, for part numbered items, is from an approved manufacturer.

(2) Supply Chain Traceability Documentation

(i) Supply chain traceability documentation shall include basic item description; part number; drawing or specification;

national stock number; manufacturing source; manufacturing sources Commercial and Government Entity (CAGE) code; and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance.

(ii) Supply chain traceability documentation shall also include, when available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website (http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection- AvoidanceProgram/).

(iii) In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers’ parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

(3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer’s request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.

2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.

MIL-STD-129/ASTM-D-3951:

a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.

(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4-2), identifying number, and serial number, when applicable, shall be included in the identification marking.

(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.

b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers. Items requiring technical order (T.O.)

certification shall be annotated on inner and outer container tags or label with T.O. compliance.

c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.

d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P

4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item;

flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.

e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.

f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of

MIL-STD-129.

g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS FOOD

CONTAINERS."

h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:

(1) Foreign Military Sales.

(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.

(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).

(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.

i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.

3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:

a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.

b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.

SHIPPING CONTAINER MARKING

All shipping containers shall be marked meeting the following criteria:

(a) MIL-STD-129 R, Standard Practice for Military Marking.

(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.

(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:

PACRN(s) Applicable

Additional Bar Coding or Marking Requirements (if applicable)

PAB Not Applicable

MILITARY PACKAGING AND MARKING

Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.

PACRN QUP ICQ PS

MT

C D

PS

ML

WP

ML

CU

DU

C T

U C

I C

U C L

SM

PAB 001 000 GX 1 00 K3 P6 A NV 00 B 39

WGT LGTH WDTH DPTH CUBE O

P I

25.00 25.0 19.0 16.5 4.535 M

PACRN PACK

LVL

PRES

LVL

SUPPLEMENTAL PACKAGING

PAA B MIL <37> ESD PROTECTION REQUIRED F000009XE7

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)

(IAW FAR 9.308-2)

Test criteria are as follows:

Lot/Item Government Test/Inspection Requirements 0001AC Performance or other characteristics which the First Articles must meet are

The First Article must meet the requirements in drawing 77A103448 (03538) and successfully complete government in-system testing at the AN/FPS-117 Engineering Facility at Hill Air Force Base, Utah. In system testing will require up to 90 days of operation in the AN/FPS-117 at government discretion. The detailed technical requirements for First Article approval tests are contained in The First Article must meet the requirements in 77A103448 (03538) and the internal switch module (77C718003P2) must meet the requirements of drawing 77C718003 (03538).

Disposition of the First Article shall be as follows:

Lot/Item Approved 0001AC Approved First Articles will be forwarded to Government Supply.

Lot/Item Disapproved 0001AC Disapproved First Articles will be returned to the contractor.

(The above Clause/Provision has been modified.)

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(IAW FAR 46.302)

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(IAW FAR 46.311, DFARS 246.202-4(1))

(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*

*See Individual Line Item Schedule

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at (Final):

[CONTRACTOR FILL-IN]

Item No(s): See schedule for items with the following code(s) listed below :

Inspection Code and Address:

Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0001AA, 0001AB, 0002

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b)) Any supply item applicable to this document shall be delivered F.O.B. at:

F.O.B. Address:

[CONTRACTOR FILL-IN]

COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES

The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government. Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing. Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.

UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN

(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item. Multiple ASIs for multiple contract line items may be issued under one document.

(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.

(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b.

point, shall be subject to the negotiation of an equitable adjustment under the contract.

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003 , Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

_____________Combination__________________________________________

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer. ______Not Applicable

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See block 14 Issue By DoDAAC See block 7 Admin DoDAAC See block 12 Inspect By DoDAAC See Section B Ship To Code See Section B Ship From Code See Section B Mark For Code See Section B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact. ______________ Not Applicable ______________________________

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 9711X8242 .0002 4F X LC SH CRAGSR 000000 00000 001000 503000 F03000 $0.00

PSR: 575248 FSR: 091440 DSR: 209861 CIN: F2DCCW5308A1040000AA

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

ACRN TOTAL $ 0.00

TRANSPORTATION APPROPRIATION CHARGEABLE

The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".

FMS TRANSPORTATION ALLOTMENT SHALL BE USED ONLY WHEN SHIPMENT ON GOVERNMENT BILL OF LADING IS AUTHORIZED

TAI ATAC FMS ALLOTMENT

TAA DFMS 9711X8242.0002 4FX LCSH CRAGSR 000000 00000 0

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern.

The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Tyler Ouellette at 385 519 -8206 , FAX 000 000 -0000 , email tyler.ouellette@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements.

Such inquiries shall be directed to the contracting officer.

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)

(IAW DFARS 204.7109(a))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.

(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.

Item No Agency Name/Address

0001 DLA AVIATION OGDEN

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE, UT 84056-5820

travis.bodily@us.af.mil

(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.

Offeror's Name ______________________________

Manufacturer's Name _________________________

Source's Name ______________________________

Item Name _________________________________

Service Identification _________________________

Test Number _______________________________ (to the extent known)

(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.

(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.

(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))

(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

First Article Item **Quantity ***Calendar Days ****Type/Location

0001AC 1 360 FB2027

(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

*Lot/Item **Approval Days ELIN No.

0001AC 300

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor—

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR

VOLUNTARILY (JAN 2025)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY

MATTERS (OCT 2018)

(IAW FAR 9.104-7(c))

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b)) This is a rated order certified for national defense, emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

(IAW FAR 19.1309(b))

(b) Waiver of evaluation preference.

__ Offeror elects to waive the evaluation preference.

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (JAN 2025)

(IAW FAR 19.708(a))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (JAN 2025)

(IAW FAR 19.708(b))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN -- ALTERNATE II (NOV 2016)

(IAW FAR 19.708(b)(1)(ii))

52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (SEP 2021)

(IAW FAR 19.708(b)(2))

52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)

(IAW FAR 19.309(c)(1))

(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.

(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]

(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .