This is a Standard Form 1447 (SF 1447), Solicitation/Contract Form, for a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by Defense Logistics Agency (DLA) Aviation for F-16 wing assemblies. The solicitation number is SPRHA4-26-R-0922, with an offer submission deadline of March 24, 2027 at 2:00 PM. The contracting officer is Kody R Quayle at DLA Aviation - Ogden, located at Hill Air Force Base, Utah. This acquisition is restricted to qualified sources only, with the following approved manufacturers: Lockheed Martin Corp. (CAGE 81755), Israel Aerospace Industries (CAGE 1909A), Aerospace & Commercial Technologies (CAGE 1XKR3), TATA Aerostructures (CAGE 2132Y), and Nordam Group (CAGE 29957). Contractors desiring qualified source status must submit a qualification package per FAR clause 52.209-1.
The contract covers four National Stock Numbers (NSNs): 1560-01-675-9943 WF, 1560-01-676-1366 WF, 1560-01-675-9945 WF, and 1560-01-675-9944 WF. The contract minimum is 10 units cumulatively, with a maximum of 45 units across all four NSNs. Year 1 ordering period is 10 units; Years 2-4 each require 9 units; and Year 5 requires 8 units. All line items are firm fixed-price. First Article Testing (FAT) is required for the initial four line items (0001AB, 0002AB, 0003AB, 0004AB), with testing to occur in two stages at the contractor's facility; DCMA will conduct preliminary inspections, and final FAT inspection will occur at Hill Air Force Base after manufacture. Wings must be delivered with primer only (unpainted) and marked with "FIRST ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY" in large red lettering. Delivery orders for Years 2-5 provide quantity ranges, allowing flexibility in ordering within specified parameters. All items require IUID markings per MIL-STD-130 and must comply with CMMC Level 2 requirements and AS9100 D quality standard. F.O.B. point varies by line item: FOB Origin for production articles (Ship To SW3210) and FOB Destination for first articles (Ship To FB2029). The acquisition is rated under the Defense Priorities and Allocations System (DPAS) Code A. Offered prices must be held firm for 120 days. Payment will be made via WAWF (Wide Area WorkFlow) system. This is an unrestricted acquisition with no small business set-aside identified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MQR.pdf | ||
| SPI.pdf | ||
| SOW.pdf | ||
| EDL-1366.pdf | ||
| EDR-9945.pdf | ||
| EDR-9944.pdf | ||
| EDL-9943.pdf | ||
| EDR-9943.pdf | ||
| CDRL_FATR.pdf | ||
| EDL-9945.pdf | ||
| EDR-1366.pdf | ||
| EDL-9944.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
9. (Agency Use)
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN
CALENDAR DAYS (60 CALENDAR DAYS UNLESS OFFEROR INSERTS A
DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9 ABOVE, THE
CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE
ITEMS SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT
SUBJECT TO THE TERMS AND CONDITIONS STATED HEREIN.
12. ADMINISTERED BY CODE
13. CONTRACTOR
OFFEROR
CODE FACILITY
CODE
14. PAYMENT WILL BE MADE BY CODE
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK:
15. PROMPT PAYMENT DISCOUNT
16. AUTHORITY FOR USING OTHER
THAN FULL AND OPEN COMPETITION
10 U.S.C. 3204(a) 41 U.S.C. 253
UNDER THE UNITED STATES CODE AT: ( ) ( )
17.
ITEM NUMBER
18.
SCHEDULE OF
SUPPLIES/SERVICES
19.
QUANTITY
20.
UNIT
21.
UNIT PRICE
22.
AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA 24. TOTAL AWARD AMOUNT
(For Government Use Only)
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO
ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET
FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION
NUMBER SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR
CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
27. SIGNATURE OF OFFEROR/CONTRACTOR 28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
NAME AND TITLE OF SIGNER (Type or Print) DATE SIGNED NAME OF CONTRACTING OFFICER
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION NOT USABLE
STANDARD FORM 1447 (REV. 12/2022)
DO: A1
X
SPRHA4-26-R-0922 25 NOV 2026
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
BUYER: Kody R Quayle/AUB kody.quayle@us.af.mil Phone: (385) 591- 0103 Fax: (000) 000-0000
X SPRHA4
CLASSIFICATION
336413
1,250
SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE
BLOCKS 11, 13, 15, 21, 22, and 27
1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at
15 CFR 700.
RATING PAGE OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. SOLICITATION NUMBER 5. SOLICITATION TYPE
SEALED BIDS
(IFB) INVITATION
FOR BID
NEGOTIATED
(RFP) REQUEST
FOR PROPOSAL
6. SOLICITATION
ISSUE DATE
7. ISSUED BY CODE 8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
NO COLLECT CALLS
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
HISTORICALLY ELIGIBLE UNDER THE WOSB PROGRAM
UNDERUTILIZED ECONOMICALLY DISADVANTAGED
BUSINESS ZONE WOMEN-OWNED SMALL BUSINESS (EDWOSB)
(HUBZone) SMALL BUSINESS NORTH AMERICAN INDUSTRY CLASSIFICATIO
SERVICE-DISABLED VETERAN- SYSTEM (NAICS):
OWNED SMALL BUSINESS
8(A) SIZE STANDARD:
Solicitation: Offers will be received at the Issuing office until * on * . Late offers are subject to late proposal provisions incorporated herein. All offers are subject to such provisions, representations certifications and specifications as are attached or incorporated by reference.*
24-MAR-2027 2:00PM
Other Aircraft Part and Auxiliary Equipment Manufacturing X
SCD:C
(SEE ESP CLAUSE 252.232-7003.)
EFT:T14
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
This acquisition is restricted to qualified sources: (Lockheed Martin Corp., CAGE:81755; Israel Aerospace Industries, CAGE:1909A; Aerospace & Commercial Technologies, CAGE:1XKR3; TATA Aerostructures, CAGE: 2132Y; Nordam Group, CAGE: 29957).
Contractors desiring to become a qualified source must submit a qualification package. Please see clause 52.209-1 and the attached Manufacturing Qualification Requirement for additional details.
SEE LINE ITEM SCHEDULE
Total
SEE SCHEDULE
X
DATE SIGNED
Prescribed by GSA - FAR (48 CFR) 53.214(d)
NO RESPONSE FOR REASONS CHECKED
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
UNABLE TO IDENTIFY THE ITEM(S)
DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
OTHER (Specify)
WE DO
WE DO NOT, DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE
OF ITEMS INVOLVED
NAME AND ADDRESS OF FIRM (Include ZIP Code) SIGNATURE
TYPE OR PRINT NAME AND TITLE OF SIGNER
FROM: AFFIX
STAMP
HERE
TO:
SOLICITATION NUMBER
DATE AND LOCAL TIME
ATTN: Kody R Quayle/AUB
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
24 MAR 2027 2:00 PM
SPRHA426R0922
STANDARD FORM 1447 (REV. 12/2022) BACK
SPRHA4-26-R-0922
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
This acquisition may require Cost and Software Data Reporting (CSDR). Upon receipt of all necessary information, if it is determined CSDR is required, the solicitation will be amended to include the appropriate CSDR requirements.
A. The purpose of this solicitation is to establish an IDIQ Contract for the purchase of Wing Assemblies used on the F-16. The subsequent IDIQ will have a five year ordering period beginning at contract award.
B. Failure of the Government to purchase such items in the amounts or quantities described in the schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price.
C. In accordance with FAR 52.216-22(b), “Indefinite Quantity”
1. Contract Minimum is defined as: 10 EA cumulative total of the following NSNs:
1560-01-675-9943 WF
1560-01-676-1366 WF
1560-01-675-9945 WF
1560-01-675-9944 WF
2. Contract Maximum is defined as: 45 EA cumulative total of the following NSNs:
1560-01-675-9943 WF
1560-01-676-1366 WF
1560-01-675-9945 WF
1560-01-675-9944 WF
D. This IDIQ will allow USAF orders
1. BEQ for Ordering Period (Year 1) is 10 EA
2. BEQ for Ordering Period (Year 2) is 9 EA
3. BEQ for Ordering Period (Year 3) is 9 EA
4. BEQ for Ordering Period (Year 4) is 9 EA
5. BEQ for Ordering Period (Year 5) is 8 EA
E. Periods of Contract Performance (to begin upon date of basic contract award announcement):
*Each year represents 365 days Ordering Period (Year 1) From dd/mm/yyyy through dd/mm/yyyy Ordering Period (Year 2) From dd/mm/yyyy through dd/mm/yyyy Ordering Period (Year 3) From dd/mm/yyyy through dd/mm/yyyy Ordering Period (Year 4) From dd/mm/yyyy through dd/mm/yyyy Ordering Period (Year 5) From dd/mm/yyyy through dd/mm/yyyy
F. Less than a truckload shipment is acceptable at no increase in cost to the Government. Early delivery acceptable at no increase in cost to the Government.
G. Please pay particular attention to Section L and M of this solicitation.
H. Should the Government only receive one offer, source selection will no longer be applicable and source selection procedures will no longer be followed.
I. If only one offer is received as a result of this solicitation, the contractor will be required to submit full certifiable cost and pricing within 30 days of the Government’s request.
K. In Accordance with FAR 52.216-22(d) "Indefinite Quantity"; the contractor shall not be required to make any deliveries under this contract after the delivery schedule cited in the last issued delivery order.
On Time Delivery Improvement
In accordance with the 448th Supply Chain Management Wing (448th SCMW), Air Force Sustainment Center Contracting Directorate (AFSC/OK) and Defense Logistics Agency (DLA) Aviation Contracting On-Time Delivery (OTD) Improvement Initiative. DLA Contracting has established the following OTD requirements with the intent to improve OTD.
As detailed in section B of the Solicitation, the government has developed a Required Delivery Schedule (RDS), which is reflective of the customer need date as well as projected Production Lead Time (PLT). The government RDS considered such factors as historical data and active contracts. In developing your response, the government requests your company review the RDS provided and propose an achievable delivery schedule based on your internal PLT review.
With input from suppliers, the Contracting Officer may negotiate an updated RDS representative of all factors stated above along with any new information that may become available.
Cybersecurity Maturity Model Certification (CMMC) Requirement: CMMC Level 2
Basic Line Item Item No.
NSN: 1560-01-675-9943 WF
Basic Line Item
WING ASSEMBLY,AIRCR
F-16 Manufacturer Part Number 1909A 16W1030-754
1XKR3 16W1030-754
2132Y 16W1030-754 29957 16W1030-754 81755 16W1030-754 Associated Document(s) Line Item(s)
FD20202600922 0001
Priority: R Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
Class I ODS Substance Application/Use Quantity
NONE NONE NONE
Contractor First Article Test Instructions for CDRL A001
It is the Government’s intent to travel to the contractor’s facility at the two stages of production listed below to participate in First Article Testing/Inspection. The Government’s participation will follow a preliminary inspection by DCMA to be conducted for both stages.
The Government would prefer for these site visits to occur simultaneously for all four First Article NSNs (1560-01-675-9943, 1560-01-676-1366, 1560-01-675-9945, and 1560-01-675-9944) to reduce the total visits to two rather than eight, unless this will cause significant delays.
The Contractor will provide the test time and location for the following stages at least 45 calendar days prior to the start of testing. Stage 1a and 1b should occur on the same visit. Stage 2 will occur on a separate visit.
DCMA will verify parts, materials and processes meet drawing and contract requirements before the stage 1 and stage 2 first article test events.
For stage 1 the following must be verified: Upper and lower skins, all spars and ribs, sealants, and fasteners
For stage 2 the following must be verified: All fasteners, sealants, Wing Attach Fittings, and Fixed trailing edge
Stage 1a: Final inspection of wing understructure
⦁ Ensure processes maintained proper installation/positioning of spars and ribs
⦁ The materials/specs for sealants, fasteners, and structures will be checked to ensure they match engineering data
⦁ Check that sealant is used appropriately in all areas specified in tech data
Stage 1b: Hardware check
⦁ Pressure testing of tubing IAW Technical Order
⦁ Visual inspection of installed non-structural components
Stage 2: Inspection of Wingbox:
⦁ Inspect Wing Attach Fittings before Mill and Drill procedures to verify that the Wing Attach Fittings have been positioned correctly
⦁ Inspect the Wingbox in other build fixtures to check for alignment and fitment
⦁ Inspect Root rib and Wing Attach Fittings after Mill and Drill procedures, ensure Milling did not remove excess material and Drilling of holes is well aligned
⦁ Check that Wing Attach Fittings and Root Rib Aft surfaces are coplanar after Milling
Contractor will deliver First Article Test (FAT) reports after each DCMA inspection event.
Final inspection of First Article part will occur at Hill AFB after manufacture is complete.
Bid A - First Article RequiredItem No.0001AA Not Separately PricedQuantity U/I Unit Price1 LO NSP FATRFirst Article Test ReportFIRST ARTICLE TEST REPORTCDRL (A001)Associated Document(s) Line Item(s)FD20202600922 0005 Inspection: DestinationAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: IAW 1423 (A001)Type / Ship To PACRN Mark For+ IAW1423 IAW 1423 (A001)Type / Ship To Quantity (U/I) To be determined _ Req No / PriRequired Delivery + IAW1423 1 LO TBD
Proposed Delivery + IAW1423 1 LO Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract administrator.
Bid A - First Article RequiredItem No.0001AB Firm Fixed PriceQuantity U/I Unit Price Amount
Bid A - First Article Required1 EA CLIN ACRN ACRN Total0001AB AAFAFirst ArticleFIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0001 Limitations of Liability: High Value Item Preliminary Inspection: Final Inspection: OriginAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Buy American Act/Balance of Payments Program Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
B FB2029 DESTINATIONType / Ship To PACRN Mark ForB FB2029 PAA First Article Do Not PostType / Ship To Quantity (U/I) *ARO Contract _ Req No / PriRequired Delivery B FB2029 1 EA *500 Calendar Days Proposed Delivery B FB2029 1 EA
Wings shall be delivered with PRIMER only and shall NOT be painted.
Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST
ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY.
Contractor shall notify the Government 45 days prior to shipment.
Bid A - First Article Required (Year 1 Ordering Period)Item No.0001AC Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 14 EA Quantity Range A1 EA 1 EA
Bid A - First Article Required (Year 1 Ordering Period)Quantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total0001AC AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0001 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA14 TBD Proposed Period of Performance A SW3210 1 EA14
Bid B - First Article NOT Required (Year 1 Ordering Period)Item No.0001AD Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 14 EA Quantity Range A
Bid B - First Article NOT Required (Year 1 Ordering Period)1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total0001AD AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0001 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA14 TBD Proposed Period of Performance A SW3210 1 EA14
Basic Line ItemItem No.0002
NSN: 1560-01-676-1366 WF
Basic Line ItemWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7531XKR3 16W1030-7532132Y 16W1030-75329957 16W1030-75381755 16W1030-753Associated Document(s) Line Item(s)FD20202600922 0002Priority: RApplicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130 Class I ODS Substance Application/Use QuantityNONE NONE NONE
Contractor First Article Test Instructions for CDRL A001
It is the Government’s intent to travel to the contractor’s facility at the two stages of production listed below to participate in First Article Testing/Inspection. The Government’s participation will follow a preliminary inspection by DCMA to be conducted for both stages.
The Government would prefer for these site visits to occur simultaneously for all four First Article NSNs (1560-01-675-9943, 1560-01-676-1366, 1560-01-675-9945, and 1560-01-675-9944) to reduce the total visits to two rather than eight, unless this will cause significant delays.
The Contractor will provide the test time and location for the following stages at least 45 calendar days prior to the start of testing. Stage 1a and 1b should occur on the same visit. Stage 2 will occur on a separate visit.
DCMA will verify parts, materials and processes meet drawing and contract requirements before the stage 1 and stage 2 first article test events.
For stage 1 the following must be verified: Upper and lower skins, all spars and ribs, sealants, and fasteners
For stage 2 the following must be verified: All fasteners, sealants, Wing Attach Fittings, and Fixed trailing edge
Stage 1a: Final inspection of wing understructure
⦁ Ensure processes maintained proper installation/positioning of spars and ribs
⦁ The materials/specs for sealants, fasteners, and structures will be checked to ensure they match engineering data
⦁ Check that sealant is used appropriately in all areas specified in tech data
Stage 1b: Hardware check
⦁ Pressure testing of tubing IAW Technical Order
⦁ Visual inspection of installed non-structural components
Stage 2: Inspection of Wingbox:
⦁ Inspect Wing Attach Fittings before Mill and Drill procedures to verify that the Wing Attach Fittings have been positioned correctly
⦁ Inspect the Wingbox in other build fixtures to check for alignment and fitment
⦁ Inspect Root rib and Wing Attach Fittings after Mill and Drill procedures, ensure Milling did not remove excess material and Drilling of holes is well aligned
⦁ Check that Wing Attach Fittings and Root Rib Aft surfaces are coplanar after Milling
Bid A - First Article RequiredItem No.0002AA Not Separately PricedQuantity U/I Unit Price1 LO NSP FATRFirst Article Test ReportFIRST ARTICLE TEST REPORTCDRL (A001)Associated Document(s) Line Item(s)FD20202600922 0005 Inspection: DestinationAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: IAW 1423 (A001)Type / Ship To PACRN Mark For+ IAW1423 IAW 1423 (A001)Type / Ship To Quantity (U/I) To be determined _ Req No / PriRequired Delivery + IAW1423 1 LO TBD
Proposed Delivery + IAW1423 1 LO Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract
Bid A - First Article RequiredItem No.0002AB
Bid A - First Article RequiredFirm Fixed PriceQuantity U/I Unit Price Amount1 EA CLIN ACRN ACRN Total0002AB AAFAFirst ArticleFIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0002 Limitations of Liability: High Value Item Preliminary Inspection: Final Inspection: OriginAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Buy American Act/Balance of Payments Program Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
B FB2029 DESTINATIONType / Ship To PACRN Mark ForB FB2029 PAA First Article Do Not PostType / Ship To Quantity (U/I) *ARO Contract _ Req No / PriRequired Delivery B FB2029 1 EA *500 Calendar Days Proposed Delivery B FB2029 1 EA
Wings shall be delivered with PRIMER only and shall NOT be painted.
Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST
Bid A - First Article Required (Year 1 Ordering Period)Item No.0002AC Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 13 EA
Bid A - First Article Required (Year 1 Ordering Period)Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total0002AC AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0002 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA13 TBD Proposed Period of Performance A SW3210 1 EA13
Bid B - First Article NOT Required (Year 1 Ordering Period)Item No.0002AD Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price
Bid B - First Article NOT Required (Year 1 Ordering Period)1 EA 13 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total0002AD AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0002 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA13 TBD Proposed Period of Performance A SW3210 1 EA13
Basic Line ItemItem No.0003
Basic Line Item
NSN: 1560-01-675-9945 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7921XKR3 16W1030-7922132Y 16W1030-79229957 16W1030-79281755 16W1030-792Associated Document(s) Line Item(s)FD20202600922 0003Priority: RApplicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130 Class I ODS Substance Application/Use QuantityNONE NONE NONE
Contractor First Article Test Instructions for CDRL A001
It is the Government’s intent to travel to the contractor’s facility at the two stages of production listed below to participate in First Article Testing/Inspection. The Government’s participation will follow a preliminary inspection by DCMA to be conducted for both stages.
The Government would prefer for these site visits to occur simultaneously for all four First Article NSNs (1560-01-675-9943, 1560-01-676-1366, 1560-01-675-9945, and 1560-01-675-9944) to reduce the total visits to two rather than eight, unless this will cause significant delays.
The Contractor will provide the test time and location for the following stages at least 45 calendar days prior to the start of testing. Stage 1a and 1b should occur on the same visit. Stage 2 will occur on a separate visit.
DCMA will verify parts, materials and processes meet drawing and contract requirements before the stage 1 and stage 2 first article test events.
For stage 1 the following must be verified: Upper and lower skins, all spars and ribs, sealants, and fasteners
For stage 2 the following must be verified: All fasteners, sealants, Wing Attach Fittings, and Fixed trailing edge
Stage 1a: Final inspection of wing understructure
⦁ Ensure processes maintained proper installation/positioning of spars and ribs
⦁ The materials/specs for sealants, fasteners, and structures will be checked to ensure they match engineering data
⦁ Check that sealant is used appropriately in all areas specified in tech data
Stage 1b: Hardware check
⦁ Pressure testing of tubing IAW Technical Order
⦁ Visual inspection of installed non-structural components
Stage 2: Inspection of Wingbox:
⦁ Inspect Wing Attach Fittings before Mill and Drill procedures to verify that the Wing Attach Fittings have been positioned correctly
⦁ Inspect the Wingbox in other build fixtures to check for alignment and fitment
⦁ Inspect Root rib and Wing Attach Fittings after Mill and Drill procedures, ensure Milling did not remove excess material and Drilling of holes is well aligned
⦁ Check that Wing Attach Fittings and Root Rib Aft surfaces are coplanar after Milling
Bid A - First Article RequiredItem No.0003AA Not Separately PricedQuantity U/I Unit Price1 LO NSP FATRFirst Article Test ReportFIRST ARTICLE TEST REPORTCDRL (A001)Associated Document(s) Line Item(s)FD20202600922 0005 Inspection: DestinationAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: IAW 1423 (A001)Type / Ship To PACRN Mark For+ IAW1423 IAW 1423 (A001)Type / Ship To Quantity (U/I) To be determined _ Req No / PriRequired Delivery + IAW1423 1 LO TBD
Proposed Delivery + IAW1423 1 LO Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract
Bid A - First Article RequiredItem No.0003AB Firm Fixed PriceQuantity U/I Unit Price Amount1 EA CLIN ACRN ACRN Total0003AB AAFAFirst ArticleFIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0003 Limitations of Liability: High Value Item Preliminary Inspection: Final Inspection: OriginAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Buy American Act/Balance of Payments Program Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
B FB2029 DESTINATIONType / Ship To PACRN Mark ForB FB2029 PAA First Article Do Not PostType / Ship To Quantity (U/I) *ARO Contract _ Req No / PriRequired Delivery B FB2029 1 EA *500 Calendar Days Proposed Delivery B FB2029 1 EA
Wings shall be delivered with PRIMER only and shall NOT be painted.
Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST
Bid A - First Article Required (Year 1 Ordering Period)Item No.0003AC Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price
Bid A - First Article Required (Year 1 Ordering Period)1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total0003AC AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0003 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD Proposed Period of Performance A SW3210 1 EA9
Bid B - First Article NOT Required (Year 1 Ordering Period)Item No.0003AD Firm Fixed Price
Bid B - First Article NOT Required (Year 1 Ordering Period)From QuantityU/I To Quantity U/I Unit Price1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total0003AD AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0003 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Basic Line ItemItem No.0004
Basic Line Item
NSN: 1560-01-675-9944 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7911XKR3 16W1030-7912132Y 16W1030-79129957 16W1030-79181755 16W1030-791Associated Document(s) Line Item(s)FD20202600922 0004Priority: RApplicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130 Class I ODS Substance Application/Use QuantityNONE NONE NONE
Contractor First Article Test Instructions for CDRL A001
It is the Government’s intent to travel to the contractor’s facility at the two stages of production listed below to participate in First Article Testing/Inspection. The Government’s participation will follow a preliminary inspection by DCMA to be conducted for both stages.
The Government would prefer for these site visits to occur simultaneously for all four First Article NSNs (1560-01-675-9943, 1560-01-676-1366, 1560-01-675-9945, and 1560-01-675-9944) to reduce the total visits to two rather than eight, unless this will cause significant delays.
The Contractor will provide the test time and location for the following stages at least 45 calendar days prior to the start of testing. Stage 1a and 1b should occur on the same visit. Stage 2 will occur on a separate visit.
DCMA will verify parts, materials and processes meet drawing and contract requirements before the stage 1 and stage 2 first article test events.
For stage 1 the following must be verified: Upper and lower skins, all spars and ribs, sealants, and fasteners
For stage 2 the following must be verified: All fasteners, sealants, Wing Attach Fittings, and Fixed trailing edge
Stage 1a: Final inspection of wing understructure
⦁ Ensure processes maintained proper installation/positioning of spars and ribs
⦁ The materials/specs for sealants, fasteners, and structures will be checked to ensure they match engineering data
⦁ Check that sealant is used appropriately in all areas specified in tech data
Stage 1b: Hardware check
⦁ Pressure testing of tubing IAW Technical Order
⦁ Visual inspection of installed non-structural components
Stage 2: Inspection of Wingbox:
⦁ Inspect Wing Attach Fittings before Mill and Drill procedures to verify that the Wing Attach Fittings have been positioned correctly
⦁ Inspect the Wingbox in other build fixtures to check for alignment and fitment
⦁ Inspect Root rib and Wing Attach Fittings after Mill and Drill procedures, ensure Milling did not remove excess material and Drilling of holes is well aligned
⦁ Check that Wing Attach Fittings and Root Rib Aft surfaces are coplanar after Milling
Bid A - First Article RequiredItem No.0004AA Not Separately PricedQuantity U/I Unit Price1 LO NSP FATRFirst Article Test ReportFIRST ARTICLE TEST REPORTCDRL (A001)Associated Document(s) Line Item(s)FD20202600922 0005 Inspection: DestinationAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: IAW 1423 (A001)Type / Ship To PACRN Mark For+ IAW1423 IAW 1423 (A001)Type / Ship To Quantity (U/I) To be determined _ Req No / PriRequired Delivery + IAW1423 1 LO TBD
Proposed Delivery + IAW1423 1 LO Although the Ship To code for this line item is +IAW1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report. Contractor will coordinate submission with contract
Bid A - First Article RequiredItem No.0004AB Firm Fixed PriceQuantity U/I Unit Price Amount1 EA CLIN ACRN ACRN Total0004AB AAFAFirst ArticleFIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0004 Limitations of Liability: High Value Item Preliminary Inspection: Final Inspection: OriginAcceptance: DestinationInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Buy American Act/Balance of Payments Program Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
B FB2029 DESTINATIONType / Ship To PACRN Mark ForB FB2029 PAA First Article Do Not PostType / Ship To Quantity (U/I) *ARO Contract _ Req No / PriRequired Delivery B FB2029 1 EA *500 Calendar Days Proposed Delivery B FB2029 1 EA
Wings shall be delivered with PRIMER only and shall NOT be painted.
Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering: FIRST
ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY.
Bid A - First Article Required (Year 1 Ordering Period)Item No.0004AC Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA
Bid A - First Article Required (Year 1 Ordering Period)Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total0004AC AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0004 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Bid B - First Article NOT Required (Year 1 Ordering Period)Item No.0004AD Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price
Bid B - First Article NOT Required (Year 1 Ordering Period)1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total0004AD AAPRODProduction ArticlePRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVEAssociated Document(s) Line Item(s)FD20202600922 0004 Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Year 2 Ordering PeriodItem No.1001 Firm Fixed Price
Year 2 Ordering PeriodFrom QuantityU/I To Quantity U/I Unit Price1 EA 14 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total1001 AANSN: 1560-01-675-9943 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7541XKR3 16W1030-7542312Y 16W1030-75429957 16W1030-75481755 16W1030-754Associated Document(s) Line Item(s)FD20202600922 0001Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Year 2 Ordering PeriodRequired Period of Performance A SW3210 1 EA14 TBD Proposed Period of Performance A SW3210 1 EA14
Year 2 Ordering PeriodItem No.1002 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 13 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total1002 AANSN: 1560-01-676-1366 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7531XKR3 16W1030-7532312Y 16W1030-75329957 16W1030-75381755 16W1030-753Associated Document(s) Line Item(s)FD20202600922 0002Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
Year 2 Ordering PeriodApplicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA13 TBD
Proposed Period of Performance A SW3210 1 EA13
Year 2 Ordering PeriodItem No.1003 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total1003 AANSN: 1560-01-675-9945 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7921XKR3 16W1030-7922312Y 16W1030-79229957 16W1030-792
Year 2 Ordering Period81755 16W1030-792Associated Document(s) Line Item(s)FD20202600922 0003Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Proposed Period of Performance A SW3210 1 EA9
Year 2 Ordering PeriodItem No.1004 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EA
Year 2 Ordering PeriodQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total1004 AANSN: 1560-01-675-9944 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7911XKR3 16W1030-7912312Y 16W1030-79129957 16W1030-79181755 16W1030-791Associated Document(s) Line Item(s)FD20202600922 0004Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Year 3 Ordering PeriodItem No.2001 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 14 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total2001 AANSN: 1560-01-675-9943 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7541XKR3 16W1030-7542312Y 16W1030-75429957 16W1030-75481755 16W1030-754Associated Document(s) Line Item(s)FD20202600922 0001Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONE
Year 3 Ordering PeriodType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA14 TBD Proposed Period of Performance A SW3210 1 EA14
Year 3 Ordering PeriodItem No.2002 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 13 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total2002 AANSN: 1560-01-676-1366 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7531XKR3 16W1030-7532312Y 16W1030-75329957 16W1030-75381755 16W1030-753Associated Document(s) Line Item(s)FD20202600922 0002Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date Tailoring
Year 3 Ordering PeriodAS9100 D _____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130 Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA13 TBD Proposed Period of Performance A SW3210 1 EA13
Year 3 Ordering PeriodItem No.2003 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total2003 AANSN: 1560-01-675-9945 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-792
Year 3 Ordering Period1XKR3 16W1030-7922312Y 16W1030-79229957 16W1030-79281755 16W1030-792Associated Document(s) Line Item(s)FD20202600922 0003Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Proposed Period of Performance A SW3210 1 EA9
Year 3 Ordering PeriodItem No.2004 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA
Year 3 Ordering PeriodQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 9 EACLIN ACRN ACRN Total2004 AANSN: 1560-01-675-9944 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7911XKR3 16W1030-7912312Y 16W1030-79129957 16W1030-79181755 16W1030-791Associated Document(s) Line Item(s)FD20202600922 0004Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA9 TBD
Year 3 Ordering PeriodProposed Period of Performance A SW3210 1 EA9
Year 4 Ordering PeriodItem No.3001 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 14 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total3001 AANSN: 1560-01-675-9943 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7541XKR3 16W1030-7542312Y 16W1030-75429957 16W1030-75481755 16W1030-754Associated Document(s) Line Item(s)FD20202600922 0001Priority: R ROUTINE Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings:
Year 4 Ordering PeriodIAW MIL-STD-130 Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA14 TBD Proposed Period of Performance A SW3210 1 EA14
Year 4 Ordering PeriodItem No.3002 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 13 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EAQuantity Range D4 EA 13 EACLIN ACRN ACRN Total3002 AANSN: 1560-01-676-1366 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7531XKR3 16W1030-7532312Y 16W1030-75329957 16W1030-75381755 16W1030-753Associated Document(s) Line Item(s)FD20202600922 0002Priority: R ROUTINE
Year 4 Ordering Period Limitations of Liability: High Value Item Inspection: OriginAcceptance: OriginInspection/Acceptance Report: Receiving Report RequiredQuality Assurance: Higher Level Contract Quality RequirementsThe Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)Title Number Date TailoringAS9100 D
_____________________________________________________________________________________________Applicability: None ;
Buy American Act/Balance of Payments ProgramIUID Required: YesPhysical Item Markings: IAW MIL-STD-130
Transportation From Continental United States CONUS (CONUS) SourcesTYPE / SHIP TO CODE F.O.B.
A SW3210 ORIGINClass I ODS Substance Application/Use QuantityNONE NONE NONEType / Ship To PACRN Mark ForA SW3210 PAA ACCOUNT 09Place of Perf Quantity (U/I) To be determined _ Req No / PriRequired Period of Performance A SW3210 1 EA13 TBD
Proposed Period of Performance A SW3210 1 EA13
Year 4 Ordering PeriodItem No.3003 Firm Fixed PriceFrom QuantityU/I To Quantity U/I Unit Price1 EA 9 EA Quantity Range A1 EA 1 EAQuantity Range B2 EA 2 EAQuantity Range C3 EA 3 EA
Year 4 Ordering PeriodQuantity Range D4 EA 9 EACLIN ACRN ACRN Total3003 AANSN: 1560-01-675-9945 WFWING ASSEMBLY,AIRCRF-16Manufacturer Part Number1909A 16W1030-7921XKR3 16W1030-7922312Y 16W1030-79229957 16W1030-79281755 16W1030-792Associated Document(s) Line Item(s)FD20202600922 0003Priority: R ROUTINE Limitations of Liability: High Value Item Inspection:…