EDR.pdf

PDF 60 KB Posted

Attached to
F-16 Power Supply
Solicitation number
SPRHA4-26-R-0482
Issued by

About this file

This is an Engineering Data Requirements document (Hill AFB Form 462) that establishes manufacturing instructions and specifications for a Power Supply, Data Entry Display component for the F-16 aircraft.

The document specifies the part number 16VE173002-7 and its corresponding National Stock Number (6130-21-914-2914WF). Prepared by Jonathan Tuchow from the 416 SCMS/GUEAA office at Hill Air Force Base on December 5, 2024, the document outlines that military specifications and standards will not be included in the bid set but will be referenced as controlling documents. Key requirements include: (1) adherence to all listed specifications, standards, and drawings with no deviations authorized without prior approval from the cognizant engineering activity; (2) use only approved sources and materials specified in the standards and drawings, with any substitutions requiring prior written approval; and (3) compliance with marking requirements per MIL-STD-130. This document serves as the engineering control and instruction set for contractors manufacturing the specified power supply component.

View the file

Other files

File Type Posted
SOW.pdf PDF
MQR.pdf PDF
SPRHA426R0482.pdf PDF
CDRL_CPP.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REV: ENGINEERING DATA REQUIREMENTS

(ENGINEERING INSTRUCTIONS)

NOTE: MILITARY SPECIFICATIONS / STANDARDS WILL NOT BE FURNISHED IN THE BID SET.

1. THE FOLLOWING INSTRUCTIONS ARE FURNISHED FOR THE MANUFACTURE OF:

POWER SUPPLY, DATA ENTRY DISPLAY F-16

2. PART NUMBER:

16VE173002-7

3. NATIONAL STOCK NUMBER:

6130-21-914-2914WF

PREPARED BY:

JONATHAN TUCHOW

OFFICE SYMBOL:

416 SCMS/GUEAA

DATE:

5 DECEMBER 2024

HILL AFB FORM 462 Page 1 of 1

4. THE FOLLOWING SPECIFICATIONS/STANDARDS, ETC., WILL BE USED IN LIEU OF THE DATA INDICATED. THE

SUPERSEDED DATA WILL NOT BE FURNISHED UNLESS SO INDICATED.

5. THE SOURCES/MATERIALS IF LISTED ON THE STANDARDS, SPECIFICATION AND DRAWINGS ARE THE ONLY SOURCES/MATERIALS FOR THOSE ITEMS. SUBSTITUTIONS SHALL HAVE PRIOR APPROVAL BY THE COGNIZANT

ENGINEERING ACTIVITY.

6. DEVIATIONS FROM SPECIFICATIONS IDENTIFIED IN CONTROL DRAWINGS ARE NOT AUTHORIZED WITHOUT PRIOR

APPROVAL BY THE COGNIZANT ENGINEERING ACTIVITY.

7. MARKING PER MIL-STD-130.

File details come from the government source that posted it. Updated .