SPRHA222R0139_______0002.pdf

PDF 23 KB Posted

Attached to
LGM-30 Cable Assembly Federal contract opportunity
Solicitation number
SPRHA2-22-R-0139
Issued by
Defense Logistics Agency Aviation

View the file

Other files for this federal contract opportunity

Other files attached to LGM-30 Cable Assembly, newest first.
File Type Posted
SPRHA222R0139_______0001.pdf PDF
EDL.pdf PDF
SPRHA222R0139.pdf PDF
pkgSOW.pdf PDF
FATR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1

2. AMENDMENT/MODIFICATION NO.

SPRHA2-22-R-0139-0002

3. EFFECTIVE DATE

18 APR 2022

4. REQUISITION/PURCHASE REQ. NO.

FD20202200139

5. PROJECT NO (If applicable)

6150-00-442-7866

6. ISSUED BY CODE

DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB

6051 GUM LANE BLDG 1225

HILL AIR FORCE BASE UT 84056-5820

BUYER: Michelle L Mihu/DLA michelle.mihu@us.af.mil Phone: (385) 519- 8013

7. ADMINISTERED BY (If other than item 6) CODESPRHA2

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

SPRHA222R0139

9B. DATED (SEE ITEM 11)

31-JAN-2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 29-APR-2022 :00

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

PURPOSE OF AMD 0001: See page 2

THIS ACQUISITION IS 100% SET ASIDE FOR SMALL BUSINESSES ONLY

Less than a truckload shipment is acceptable and authorized.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SPRHA2-22-R-0139-0002

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

PURPOSE OF AMD 0001:

1. Change Quality Assurance (QA) requirements for CLINs 0001AB, 0001AC and 0001AD from "Standard Inspection" to "Higher Level Contract Quality Requirements" (see individual line items).

2. Change delivery dates on CLINs:

0001AA and 0001AB: from 120 days ARO to 255 days ARO

0001AC: from 60 days AFAA to 90 days AFAA

0001AD: from 04 NOV, 22 to 01 AUG 23

3. Extend closing date to 29 APR 22.

4. All other terms and conditions remain unchanged.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Item No.

NSN: 6150-00-442-7866 AH

CABLE ASSEMBLY, POWER

W6A cable used in the Separation Clamp Kit, KMU-364/E, P/N: 69A48340G3 Rubber, electrical wiring, white and black insulation sleeving, potting, solder, 2 connectors Manufacturer Part Number 98747 69D49222G1 Priority: R Applicability: None ;

IUID Required: Yes Physical Item Markings:

IAW MIL-STD-130

Bid A - First Article Required Item No.

0001AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

First Article Test Report

FIRST ARTICLE TEST REPORT

IAW DD 1423-1 ATTACHED HERETO

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: IAW DD FORM 1423-1 Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ IAW1423 1 LO *255 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

The First Article Test Report is to be submitted concurrently with the First Article.

For WAWF purposes only, the contractor will use Ship To FB2029 for this line item.

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AB AA

First Article

FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Buy American Act/Balance of Payments Program

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

B FB2029 DESTINATION

Type / Ship To PACRN Mark For

B FB2029 PAC FIRST ARTICLE - DO NOT POST IN SUPPLY

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

B FB2029 1 EA *255 Calendar Days

Proposed Delivery

B FB2029 1 EA

Container and shipping vouchers shall be conspicuously marked as follows, with large red lettering:

FIRST ARTICLE, DO NOT PLACE IN AIR FORCE SUPPLY

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

44 EA

CLIN ACRN ACRN Total

0001AC AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Bid A - First Article Required

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 PAD Account 09 Type / Ship To Quantity (U/I) *ARO Approval of

First Article _ Req No / Pri

Required Delivery

A FB2029 44 EA *90 Calendar Days

Proposed Delivery

A FB2029 44 EA

Bid B - First Article NOT Required Item No.

0001AD

Firm Fixed Price Quantity U/I Unit Price Amount

45 EA

CLIN ACRN ACRN Total

0001AD AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 ORIGIN

Type / Ship To PACRN Mark For A FB2029 PAE Account 09 Type / Ship To Quantity (U/I) On or Before _ Req No / Pri

Bid B - First Article NOT Required Required Delivery

A FB2029 45 EA 1 AUG 2023

Proposed Delivery

A FB2029 45 EA

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

COUNTERFEIT PREVENTION PLAN

IAW DD 1423-1 ATTACHED HERETO

Priority: R

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423-1 ATTACHED HERE TO Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri

Required Delivery

+ IAW1423 1 LO *30 Calendar Days

Proposed Delivery

+ IAW1423 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + IAW1423

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056

HILL AFB UT 84056 49 84056-5713

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: B FB2029

809 MXSS/MXDEB

BLDG 849 ATTN: NON-ACCOUNTABLE BAY

(DEAR JOHN BAY)

TRANSPORTATION OFFICE

HILL AIR FORCE BASE UT 84056-5713

UNITED STATES

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

File details come from the government source that posted it. Updated .