This file is a PowerPoint presentation for a Pre-Solicitation Conference for the KC-46 Landing Gear Strategy. The acquisition is a small business set-aside Requirements Type Contract (RTC) for overhaul and remanufacturing support of KC-46 Main and Nose Landing Gear (MLG/NLG) with a 5-year base period and 5-year option. The contract will cover 43 total Depot Level Reparables (DLRs), including full shipset overhauls with a 10-year time change interval and an 82-day Exchange Lead Time (ELT), as well as sub-component and field-level support.
The contract will be a single award with Firm Fixed Price pricing, including an Economic Price Adjustment (EPA) clause, and will be managed by the 417th SCMS at Hill AFB. Key performance requirements include delivering 'A' condition assets, meeting specific remanufacture turnaround times, and providing engineering support with FAA compliance. The solicitation is anticipated for release in January 2026, with a competitive source selection using trade-off procedures. Contractors will be evaluated on their overhaul capabilities, technical expertise, component sourcing, and capacity to meet throughput requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KC-46 Landing Gear Strategy Pre-Solicitation Conference Presented by: EHCC, DLA Weapons Support, 417th SCMS November 19, 2025
Points of Contact
Contracting Officer: Kyle Swaner
| (385) 519-8684 |
| kyle.swaner@us.af.mil |
Program Manager: Austin Gardner
| (801) 781-0877 |
| austin.gardner@us.af.mil |
Warfighter Always
PEOPLE PRECISION POSTURE PARTNERSHIPS
CUI
Agenda
Introductions – Government Expectations – Program Overview Contract Overview Sections L & M Break Total Evaluated Price (TEP) Worksheet Technical Requirements Document (TRD) Milestone Schedule Wrap Up & Action Item Review
PEOPLE PRECISION POSTURE PARTNERSHIPS
Purpose
The purpose of this conference is to engage with interested contractors in a review of the Draft Request for Proposal (RFP) and to outline Government expectations. Specific focus will be placed on Sections L and M, as well as the Total Evaluated Price (TEP) worksheet and Technical Requirements Document (TRD). Industry representatives are expected to have reviewed the Draft RFP and its attachments prior to the meeting and be prepared to discuss any remaining questions or concerns in preparation for the final RFP release, anticipated in January 2026. This will be a single, comprehensive meeting for all interested contractors.
This meeting should not be construed as a guarantee of solicitation or eventual contract award.
PEOPLE PRECISION POSTURE PARTNERSHIPS
Disclaimers and Ground Rules (Cont.)
No agreements, promises, commitments or compensation are made or implied by the Government or Contractors. This conference is voluntary.
The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances, including internal and external comments. The formal solicitation is the only document that should be relied upon in determining the Government’s requirements Copies of slides, attendee list, and all Q&As will be made available via SAM.gov posting following the conference All posted Q&As will be non-attributable No proprietary information will be divulged No information provided will be contractually binding and will be for planning purposes only
PEOPLE PRECISION POSTURE PARTNERSHIPS
Disclaimers and Ground Rules (Cont.)
All communication from industry shall come through the PCO assigned to this acquisition Questions may be asked throughout the briefing as they arise If a contractor chooses, questions may be submitted in writing after today’s briefing Please submit all questions to the PCO, Mr. Kyle Swaner Companies should not include any proprietary information in questions for which they would like a Government response. All questions answered will be posted to SAM.gov Written feedback and questions shall be submitted via email to the PCO NLT November 28, 2025
PEOPLE PRECISION POSTURE PARTNERSHIPS
APEX Accelerators APEX Accelerators - Formerly Procurement Technical Assistance Centers (PTAC) APEX Accelerator offers expert guidance, training, and support to help small businesses navigate the complexities of government procurement and increase chances of success.
No Cost Guidance Suitability Assessments Registration and Certification Assistance (SAM.gov, SPRS, JCP, WAWF/PIEE) Proposal Preparation Assistance Training and Education To find an office near you visit:
https://www.apexaccelerators.us
PEOPLE PRECISION POSTURE PARTNERSHIPS
Background
The KC-46 Tanker is a commercial derivative of the Boeing 767-2C aircraft, finished to meet unique KC-46 Tanker requirements. The KC-46A fleet will be in need of full overhauls of the installed landing gear (1x nose and 2x main) and Sub-component/Field level support Interim Contract Support (ICS) with Boeing for KC-46 Landing Gear transitioning to AFLCMC KC-46 Program Office and 424th / 417th SCMS for management and support The 424th has transferred management of the landing gear to the 417th at Hill AFB.
429th Enterprise Hill Commodity Council (EHCC) and DLA Weapons Support has taken the lead to scope and strategize an LTC for KC-46 LG support
PEOPLE PRECISION POSTURE PARTNERSHIPS
Program Goals
100% overhaul/remanufacture support for MLG and NLG 10yr time change interval (TCI) under an outcome-based/Long Term Contract (LTC) Landing Gear Overhaul accomplished IAW with OEM CMMs and latest OEM technical data 100% Sub-Component/Field level support Landing Gear Engineering expertise/support Implementation of industry/commercial variant best practices Management of cycle-times to maximize landing gear component life and minimize overhaul costs
PEOPLE PRECISION POSTURE PARTNERSHIPS
Program Scope / Requirements KC-46 LG Items 43 Total Depot Level Reparables (DLRs) NSNs Including shipsets (1x NLG and 2x MLG) (3 NSNs, PNs: 202513111-100, 200, & 300) Top Level Requirements Remanufacture Support (10yr TCI and field level sub-component requirements) Exchange Lead Time (ELT) for Shipset support (82-day ELT) Remanufacture Turn Around Time (RTAT) for sub-component support Incentives/Disincentives tied to outlined performance metrics (Days Late) Engineering Support FAA Compliance Technical Data/CMM Access
PEOPLE PRECISION POSTURE PARTNERSHIPS
KC-46 LG Strategy Competitive Small Business Set-Aside NAICS: 336413 Size Standard: 1,250 Contract Type: Single Award, Requirements Type Contract (RTC) Contractor 100% responsible for all outcomes Disincentives will be applied to late deliveries Period of Performance: 5-year basic w/ 5-year option Pricing: Firm Fixed Price W/ EPA Shipsets - Price Per Remanufacture (PPR) Sub-Components - Price Per Eaches (PPE) Economic Price Adjustment (EPA) clause is intended to provide a mechanism for annually adjusting the Unit Prices set forth in this contract to reflect changes in economic conditions, specifically fluctuations in labor and material costs related to the remanufacture and overhaul of KC-46 Landing Gear.
PEOPLE PRECISION POSTURE PARTNERSHIPS
KC-46 LG Strategy (cont.)
Contractor to serve as the sole remanufacturing source for all 417th KC-46 competitive landing gear requirements (43 DLRs) Responsible for delivering ‘A’ condition assets in accordance with established metrics and technical requirements document (TRD).
Shipset:
Annual Delivery Order (DO) issued and developed from KC-46 LG TCI schedule Exchange Lead Time (ELT) measurement 82-day ELT (75 days for remanufacture and 7 days for transportation/shipment to the AF) Each shipset exchange measured independently Sub-component:
Standalone DOs issued as demands arise, requirements developed in AF ESCAPE/SPM systems Remanufacture Turn Around Time (RTAT) measurement Government will provide an unserviceable asset (‘F’ condition), contractor will be required to deliver a remanufactured, serviceable (‘A’ condition) asset within the negotiated RTAT Each DO CLIN measured independently
PEOPLE PRECISION POSTURE PARTNERSHIPS
KC-46 LG Strategy (cont.)
Trade-off source selection procedures IAW Sections L&M Technical proposal must demonstrate:
KC46-2C LG or commercial equivalent overhaul/remanufacture capability FAA compliance Ability to meet ELT for overhaul shipsets RTAT timeframes on sub-components Engineering expertise Ability to source all necessary subcomponents for remanufacture Sufficient capacity to meet throughput requirements Each offeror will be required to price all NIINs Anticipated 6-month proposal period
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0001 – Landing Gear TCI Shipset Overhauls Contract CLIN Schedule CLIN: 0001 - Landing Gear TCI Shipset Overhauls Schedule B CLINs: 5001, 5002, 5003 Priced on Schedule B and will be subject to annual escalation IAW EPA clause Annual order placed for anticipated overhauls for year Each CLIN will be for 12 Lots (LO) which will be invoiced monthly 82-Day Exchange Lead Time (ELT) I/A: Destination FOB: Destination (Contractor Transportation) Disincentives & Incentives apply for OTD performance Upon completion of the Period of Performance (PoP), reconciliation process will take place Delivery, Packaging, and Transportation terms to be cited on Annual Delivery Order
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0001 – Landing Gear TCI Shipset Overhauls
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0002 – Landing Gear Subcomponent Overhauls
CLIN: 0002 - Landing Gear Subcomponent Overhauls Schedule B CLINs: 5004 - 5043 Priced on Schedule B and will be subject to annual escalation IAW EPA clause Orders placed on an “as needed” basis CLINs will be funded for an exact quantity of parts (EA) to be overhauled and returned.
RTAT based on contractor proposed timeframes I/A: Origin (DCMA) FOB: Origin (DCMA Transportation) Disincentives apply for OTD performance Final invoice to include any calculated disincentives Delivery, Packaging, and Transportation terms to be cited on each Delivery Order
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0002 – Landing Gear Subcomponent Overhauls
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0003 – Over And Above
CLIN: 0003 – Over And Above CLIN will be utilized on an as needed basis when Over and Above (O&A) requirements as described in TRD Appendix A, Section 8.0 occur This includes replacement parts or additional processes required outside of the standard overhaul process included under the Fixed Price in CLIN 0001 For shipsets, this only applies to specified parts listed in Attachment 1, Tab 3. These are high cost/ low failure items that could significantly impact the FFP of CLIN 0001 Costs to be negotiated at time of need
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0003 – Over And Above
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0004 – Shipset OTD Incentive
CLIN: 0004 – Shipset OTD Incentive This CLIN will fund the incentive tied to OTD performance of the TCI Shipset Overhauls on CLIN 0001.
This CLIN will only be invoiced at the end of the PoP once the incentive payment is determined through reconciliation IAW TRD Appendix B, Section 5.10
CLIN: 0005 – CDRLs A001-A022
CLIN: 0005 – Shipset OTD CDRLs A001 – A022 This CLIN implements the required data deliverable under this contract. Attachment 14, KC46 LG PBL CDRL Listing & Matrix (Contractor) list all CDRLs applicable to this contract as well as their Frequency, DID, TRD References, and POC’s.
CDRLs are anticipated to be Not Separately Priced (NSP).
Each order (TCI Shipsets & Subcomponents) will identify the CDRLs from the matrix that are applicable to each specific order.
PEOPLE PRECISION POSTURE PARTNERSHIPS
CLIN: 0004 – Shipset OTD Incentive
CLIN: 0005 – CDRLs A001-A022
PEOPLE PRECISION POSTURE PARTNERSHIPS
Contract Clauses H0001 – Economic Price Adjustment (EPA) This Economic Price Adjustment (EPA) clause is intended to provide a mechanism for annually adjusting the Unit Prices set forth in this contract to reflect changes in economic conditions, specifically fluctuations in labor and material costs related to the remanufacture and overhaul of KC46 Landing Gear.
H0002 – Price Adjustment for Component Maintenance Manual (CMM) Differences
This clause establishes the process by which the Contractor may request an equitable adjustment to the firm fixed price (FFP) of this contract based on differences identified between the Component Maintenance Manuals (CMMs) for the commercial Boeing 767-300F aircraft and the KC-46 aircraft, which will be provided to the Contractor after contract award. The intent of this clause is to address unforeseen costs directly attributable to differences in the overhaul requirements as specified in the respective CMMs. This adjustment, if any, is a onetime adjustment, and no further requests will be considered.
PEOPLE PRECISION POSTURE PARTNERSHIPS
Contract Clauses H0003 – Addition/Deletion of Items This clause addresses the process for adding or deleting National Stock Numbers (NSNs) to the list of subcomponents eligible for remanufacture under this contract (reference Section J, Attachment 1, "KC46 LG PBL NSN List").
252.204-7019 - NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS
Multiple contractor fill-ins including but not limited to:
Inspection And Acceptance F.O.B. Origin 52.204-24 - REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT
52.204-26 - COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES - REPRESENTATION
252.204-7016 - COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES – REPRESENTATION
52.209-7 - INFORMATION REGARDING RESPONSIBILITY MATTERS
52.209-11 - REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW 52.219-28 – Post-Award Small Business Program Representation 52.225-18 – Place of Manufacture
PEOPLE PRECISION POSTURE PARTNERSHIPS
PEOPLE PRECISION POSTURE PARTNERSHIPS
image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image3.png image1.jpeg image2.png image4.png image5.png
File details come from the government source that posted it. Updated .