Solicitation - SPRDL127RA048 Issued.pdf

PDF 5 MB Posted

Attached to
Inertial Navigation with case
Solicitation number
SPRDL1-27-R-A048
Issued by

About this file

This is a solicitation for the procurement of Inertial Navigation Units with Case under Defense Logistics Agency (DLA) Weapons Support (Warren). The government seeks to acquire between 18 and 438 units of NSN 6605-01-578-7163 (Government P/N 13023681, Manufacturer P/N HG9740AH6) manufactured by Honeywell Inc. (CAGE 0BFA5) over a five-year contract period with guaranteed minimum quantities of 18 units. The acquisition is structured with five ordering years: CLINs 0011-0015 specify 88, 88, 88, 87, and 87 units respectively for Years 1-5, followed by CLIN 0016 for First Article Test Report submission. Pricing is on a firm fixed-price basis, with delivery on FOB Destination to DLA Distribution Red River in Texarkana, Texas. The delivery schedule mandates start of deliveries 720 calendar days after award for the first ordering year (pending First Article Test completion), with subsequent years requiring delivery commencement 330 days after the delivery order date at a rate of 36 units every thirty days.

All offerors must submit the full quantity across all CLINs, as the solicitation contains an "All or None" provision precluding partial offers. Offerors who are not manufacturers must provide supply chain traceability documentation demonstrating conformance to technical requirements and approved manufacturing sources at the time of offer submission. First Article Testing is required per FAR 52.209-3, with testing specifications detailed in PRF 13051009. Items are source-controlled to Honeywell's Technical Data Package (TDP 13023681:19200, revised 03/05/2026), accessible via SAM.gov, with qualified products limited to approved sources per the QPL. Inspection and acceptance occur at the contractor's facility (origin), and all items require military preservation and packing per MIL-STD-2073-1 Level B, with palletization required for shipments exceeding 50 cubic feet. The solicitation incorporates standard FAR and DFARS clauses, including provisions for electronic invoicing via Wide Area Workflow (WAWF), demilitarization and trade security controls compliance, and higher-level quality standards (ISO 9001:2015). Offerors must be registered in SAM.gov and may be subject to reverse auction pricing after solicitation closure.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

Inertial Navigation Unit with CaseInstrument Name:

Product Service Code : 6605

AS7001

Acknowledgment of Amendments

Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:

Amendment Number Date

************ End of Narrative ************

AS7311

Electronic Contracting Provision

(a) All DLA Weapons Support (Warren)solicitations will be publicized on the Contract Opportunities website https://SAM.gov. Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.

(b) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract Specialist listed on the solicitation. The email shall include subject header: Proposal Submission - SPRDL1- XX-X-XXXX (company name) on the solicitation.

(c) Requirements for tracking solicitations and submitting bid submissions:

1. Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in sam.gov, vendors will be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.

SPRDL127RA048

2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request TDPs as directed in Section C of this solicitation.

3. All bids and proposals must be submitted via email to the Contract Specialist on record.

(d) Note to offerors:

Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Weapons Support (Warren). In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.

(e) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the National Apex Accelerator Alliance website at http://www.napex.us to locate a regional center.

************ End of Narrative ************

AS7317

All or None - Commercial Product Acquisition

This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS. Paragraph (h) is modified to state offerors must provide the total quantity of the items in this solicitation. ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION. OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL NOT

BE CONSIDERED FOR AWARD.

************ End of Narrative ************

AS7400

Army Contract Writing System (ACWS) Transition Information for Offerors

a. The Army Contracting Enterprise (ACE) is in the process of deploying new solicitation and contract writing software to Army contracting offices worldwide. Known as the Army Contract Writing System (ACWS), this modern software suite will soon replace most existing Army contract writing systems, including the system used to create and release this Solicitation.

b. During this transition period, Offerors are hereby advised:

The Contracting Office may use any combination of contract writing systems to create and release documents related to this solicitation (e.g. solicitation amendments and awards, if any). Due to this:

i. This solicitation may contain different offer submission instructions than other solicitations released by the same Contracting Office (e.g. requiring offer submission via the PIEE Solicitation Module vs. e-mail). Offerors should review all offer submission instructions contained in the solicitation documents and direct any questions or concerns to the Contract Specialist or Contracting Officer.

ii. If the Contracting Office switches contract writing systems prior to award, documents you receive from the Contracting Officer or view on SAM.gov or other forums may appear noticeably different than the initial solicitation or previous solicitations or awards from the same Contracting Office. This is normal and expected.

iii. A change between contract writing systems may cause important information concerning solicitation response (amendments) or accepted terms (awards) to take on different formatting or appear in different parts of later documents issued. Offerors shall review all documents carefully to locate this important information and direct any questions or concerns to the Contract Specialist or Contracting Officer.

The Government does not intend to use the transition between contract writing systems to effect any changes to solicitation or award terms and conditions without accompanying document narratives explicitly stating such changes are deliberate and desired. While the Contract Specialist and Contracting Officer will take care to minimize or eliminate any inadvertent changes when adapting to the new contract writing software, you, as the Offeror, may still be the first to spot such errors. Therefore, Offerors shall:

i. Notify the Contracting Officer immediately if any observed changes, removals, or additions affect your award eligibility, violate or alter existing quote/proposal terms, or could affect Contract performance post-award.

ii. Take special care to ensure all fill-in Clauses are populated and remain populated across documents received from the Contracting Office throughout the Solicitation and Award process.

iii. Contact the Contracting Officer listed on the first page of the solicitation or solicitation amendment for guidance if you notice or suspect any inadvertent change has occurred between document issuances.

If problems stemming from this transition affect award documents, the Contracting Officer will correct problems affecting award documents (if any) stemming from the transition, via bilateral modification, at no cost to the Contractor. Any such modification will reconcile the award with the latest version of this solicitation reflecting deliberate action by the Contracting Officer (e.g.

the first issuance if no amendments, or the latest amendment with accompanying narratives), inclusive of any documented pre-award negotiations or accepted supplemental offer terms.

In the unlikely event a network disruption, contract writing system error, or financial system error threatens timely award of the requirement set forth in this solicitation, the Contracting Officer:

i. May elect to use alternative mechanisms to obligate funds and allow work or deliveries to legally begin to the benefit of, and with legal protection for, both parties.

ii. Will incorporate the latest version of this Solicitation into such mechanisms to serve as a framework for contract execution until any such system problems are resolved.

iii. Will ensure any action taken does not conflict with the stated offer evaluation and award methodology of this requirement.

iv. Will issue a complete, properly formatted award accurately reflecting this requirement and all applicable terms and conditions once systems return to normal.

************ End of Narrative ************

*** END OF NARRATIVE 1 ***

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

CLIN Narratives:

The Supply Chain Traceability Documentation referred to in clause CS8001 (DLA WRN) Contractor Retention of Supply Chain Traceability Documentation is required to be submitted at the time of offer submission by all offerors other than the manufacturer of the item. Failure to submit acceptable traceability will constitute an offer that does not meet the terms and conditions of the solicitation and therefore will not be eligible for award

(End of Narrative)

IN THE FIRST FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW, THE NUMBERING

SYSTEM THAT IS USED IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY THE ITEM. THE FOURTH (LAST DIGIT) INDICATES THE

CONTRACT YEAR, i.e., CLIN 0011 IS FOR THE FIRST ITEM - FIRST ORDERING YEAR, CLIN

0012 IS FOR THE FIRST ITEM - SECOND ORDERING YEAR, CLIN 0013 IS FOR THE FIRST

ITEM - THIRD ORDERING YEAR, ETC.

THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH PART, SUCH AS FAT, TECHNICAL

MANUALS, SERVICES, OR TRAINING, WILL BECOME THE LAST ITEM NUMBER IN

NUMERICAL SEQUENCE FOR EACH ITEM, e.g. 0016 (5-YEAR LONG-TERM CONTRACT) OR

0014 (3-YEAR LONG-TERM CONTRACT).

THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE SOLICITATION AND RESULTING

CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF AWARD PLUS 364 DAYS.

SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS THROUGH 729 DAYS AFTER

CONTRACT AWARD.

THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS THROUGH 1,094 DAYS AFTER

CONTRACT AWARD.

FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS THROUGH 1,459 DAYS

AFTER CONTRACT AWARD.

FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS THROUGH 1,824 DAYS AFTER

CONTRACT AWARD.

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS THE PRICE FOR THE

ORDERING YEAR IN WHICH THE ORDER IS ISSUED. THE DELIVERY DATE DOES NOT

DETERMINE THE ORDERING YEAR.

The information presented below applies to Item No. 0011 Through 0015:

Guaranteed Minimum 5 Year Quantity (GMQ): 18 EACH

Maximum 5 Year Contract Quantity: 438 EACH

ONLY THE GMQ IS GUARANTEED.

NOTE: EACH ORDERING YEAR QUANTITY IS AN ESTIMATE.

(End of narrative)

A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE WITH THE CLAUSE

ENTITLED "FIRST ARTICLE APPROVAL-- CONTRACTOR TESTING", FAR 52.209-3.

(End of narrative)

First Article Test is required. Waiver may be authorized; see waiver provision in Section L.

Note:

DODAAC SPRDL1 is for invoice purposes only. Please refer to FAR Clause 52.209-3 for Report Submission information and procedures.

(End of narrative)

The Technical Data Package (TDP) is Source Controlled to Contractor: Honeywell Inc, Cage 0BFA5, USG Part Number: 13023681, MPN: HG9740AH6. Approved Sources must meet the requirements of the TDP.

(End of narrative)

Qualified Products List (QPL) Item: Items under this solicitation are subject to QPL specifications.

See QPL for qualified sources.

(End of narrative)

Inspection/Acceptance - Prior to Shipment:

Inspection/Acceptance at Origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative)

*** END OF NARRATIVE 1 ***

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0011 First Ordering Year Inertial Navigation Unit with Case NSN:

6605-01-578-7163 Government P

/N: 13023681 / MPN: HG9740AH6

National Stock Number: 6605-01- 578-7163

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

88 Each

Surveillance Criticality Designator:

C

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

0012 Second Ordering Year Inertial Navigation Unit with Case

National Stock Number: 6605-01- 578-7163

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

Surveillance Criticality Designator:

C

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

88 Each

Pricing Arrangement: Firm Fixed Price

0013 Third Ordering Year Inertial Navigation Unit with Case

National Stock Number: 6605-01- 578-7163

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

Surveillance Criticality Designator:

C

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

88 Each

0014 Fourth Ordering Year Inertial Navigation Unit with Case

National Stock Number: 6605-01- 578-7163

87 Each

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

Surveillance Criticality Designator:

C

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

0015 Fifth Ordering Year Inertial Navigation Unit with Case

National Stock Number: 6605-01- 578-7163

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

87 Each

North American Industry Classification System (NAICS):

334511

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

Surveillance Criticality Designator:

C

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

0016 First Article Test Report Inertial Navigation Unit with Case NSN:

6605-01-578-7163 USG Part Number: 13023681 MFPN:

HG9740AH6

National Stock Number: 6605-01- 578-7163

Manufacturer's Part Number:

HG9740AH6

Manufacturer's CAGE: 0BFA5

Product Service Code: 6605

North American Industry Classification System (NAICS):

334511

1 Lot

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: 13023681

Surveillance Criticality Designator:

C

Test Specification Number: PRF 13051009

Qualified Product List: See TDPL for Qualified Product List

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

Section C - Description/Specifications/Statement of Work

CS6100

Drawings - Specifications

In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement, and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere. Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing 13023681:19200 , with revisions in effect as of 03 /05/2026 , are applicable to this procurement with the following exceptions: Vendors to access this information with the technical data posted on Contract Opportunities.

************ End of Narrative ************

CS6334

Technical Data Package Information (Contract Opportunities in SAM.gov) Version

The following "X"d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN's Web-located TDP. To access the TDP, you will have to copy or type the link's URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the "Text Select Tool," then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: -1-

TDP Link (URL): -2-

[ X ] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov, and is associated with this solicitation number and can be accessed via this URL: https://sam.gov/workspace/contract/opp /76ff59834dde4af2988181c0cd8a2559/view

a. Log on to the SAM.gov website.

b. Select Contract Opportunities in the search bar and search by solicitation number.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified, and you may proceed to the next step. To obtain DLA Enhanced Validation(DEV)certification, login to the Joint Certification Program (JCP) https://www.

dla.mil/Logistics-Operations/Services/JCP/. Click on documents and follow instructions provided.

Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select "Request Access" to controlled documents and enter the Reason for Access. This will generate an email to the Contract Opportunities system administrator at DLA Weapons Support (Warren) with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 - 3 working days to complete this Contract Opportunities- TDP access/approval process through SAM.gov.

d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a SAM.gov account through https://login.gov. Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/. Questions related to accounts in SAM.

gov should be directed to https://sam.gov/content/help. Vendors are responsible for placing correct information in login.gov and SAM.gov accounts.

e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed "Use and Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

[ ] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled -4-, and is:

[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement and email it to the Contract Specialist at -5-. The Contract Specialist will notify the Contract Opportunities administrator upon receiving the NDA.

The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.

************ End of Narrative ************

CS7004

Configuration Control - Engineering Changes

(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance

(s) (RFVs) for the requirements in the Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change.

Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

(d) Forms - If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the DOD Forms Website https://www.esd.whs.mil/Directives/forms /dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.

************ End of Narrative ************

CS7015

Acquisition of Source-Controlled Part Number

Acquisition under this contract is restricted to:

(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package (TDP); and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the TDP; provided (i) that these non-listed part numbers have been furnished to one of the approved manufacturers listed in the TDP, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a non-listed part number as described in this paragraph (2) have completed the REPRESENTATION OF INTENT TO SUPPLY A SOURCE CONTROLLED ITEM narrative and has received approval from the Contracting Office.

CS7151

Use of Class 1 Ozone Depleting Substances (CIODS)

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:

https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

(a) No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

************ End of Narrative ************

CS8001

Contractor Retention of Supply Chain Traceability Documentation

1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.

2) Supply Chain Traceability Documentation

i. Supply chain traceability documentation shall include basic item description, part number;

drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

ii. Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.dla.mil/LandandMaritime /Business/Selling/Counterfeit-Detection-Avoidance-Program/.

iii. In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

************ End of Narrative ************

*** END OF NARRATIVE 1 ***

Requirements Inertial Navigation Unit with Case NSN: 6605-01-578-7163 USG Part Number: 13023681 MFPN:

HG9740H6

Section D - Packaging and Marking

DS6420

Packaging Requirements (Common Selective Group)

A. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1.

Preservation: MILITARY

Level of Packing: B

Quantity per Unit Package: 001

B. MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:

Preservation Method Code -10- (Table J.I. and J.IA.)

Cleaning Procedure Code -1- (Table J.II)

Preservative Material Code -00- (Table J.III)

Wrapping Material Code -00- (Table J.IV)

Cushioning and Dunnage Code -00- (Table J.V)

Thickness of Cushioning or Dunnage Code -0- (Table J.VI)

Unit Container Code -ZZ- (Table J.VII)

Intermediate Container Code -00- (Table J.VII)

Quantity per Intermediate Container Code -AAA- (Appendix J.4.11)

Packing Code -ZZ- (Table J.IX and J.IXA)

Special Marking Code -00- (Table J.X)

C. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

D. Marking: In addition to any special marking called out above;

D.1. All unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129 including bar coding and a MSL label. The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211- 7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

E. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes /pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two-foot intervals.

F. These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages Contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD/RFW clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at Contractor's expense.

G. Hazardous Materials (as applicable):

G.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

G.2. When applicable, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

--International Air Transport Association (IATA) Dangerous Goods Regulations

--International Maritime Dangerous Goods Code (IMDG)

--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM

4145.3 (for military air shipments).

G.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

G.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

H. SUPPLEMENTAL INSTRUCTIONS: ITEM WEIGHT: 35.0 LBS

ITEM DIMENSIONS: 22.5 X 21.0 X 17.0

UNIT PACK WEIGHT: 35.0 LBS

UNIT PACK DIMENSIONS: 22.5 X 21.0 X 17.0

UNIT PACK CUBE: 4.648

************ End of Narrative ************

*** END OF NARRATIVE 1 ***

Section E - Inspection and Acceptance

ES6026

First Article Test (Contractor Testing)

a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

c. The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously, and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the First Article Test Report.

(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the Contractor's facility and certifications are submitted with the First Article Test Report.

d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

e. A First Article Test Report shall be compiled by the Contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing /specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to Jacob Silcox at Jacob.

silcox@dla.mil, Derek Rutkowski at derek.rutkowski@dla.mil, and usarmy.ria.devcom-ac.mbx.rdar-qep@army.mil.

f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the Contractor and not due to changes directed by the Government shall be borne by the Contractor.

************ End of Narrative ************

ES7001

Inspection and Acceptance Points - Origin

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

(Name) (CAGE)

Address) (City) (State) (Zip)

************ End of Narrative ************

ES7012

Rework and Repair of Nonconforming Material

a. Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review and approval prior to implementation.

c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Procuring Contracting Officer for review and written approval prior to implementation.

d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances, and a description of the action taken or to be taken to prevent recurrence.

e. The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

************ End of Narrative ************

ES7050

Drawings for Inspection

(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings and specifications will be returned to the Contractor.

(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.

(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items, 2) Items used in critical applications or items denoted as critical on technical data, 3) Items with known quality conformance issues, 4) Items with an unstable design history, and/or 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.

************ End of Narrative ************

ES7102

Acceptance Inspection Equipment (AIE)

(a) The Contractor shall use a calibration system with traceability to a national or international standard for the AIE used on this contract.

(b) The Contractor shall provide all AIE (except for any AIE listed as available in Section H or Appendix I) necessary to assure conformance of material to the contract requirements.

(c) AIE shall be available for use on the First Article (FA) submission, if FA is required, or prior to use for acceptance of production material on this contract.

(d) Contractor furnished AIE shall be made to the AIE designs specified in Section C, or to any other design provided the Contractor's proposed AIE design is approved by the Government.

Contractor's proposed AIE design for inspection of characteristics listed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .