This is a Request for Quotation (RFQ) for a Gearshaft Assembly, Bevel component issued by DLA Weapons Support (Warren). The solicitation seeks 29 units of Gearshaft Assembly (Manufacturer's Part Number 10953665, NSN 1025-00-868-8060) with an unexercised option for an additional 29 units. This is a Total Small Business Set-Aside procurement with a firm fixed price arrangement. The required delivery schedule specifies 280 calendar days after contract award for the base quantity and 280 days after exercise of the option for the optional quantity. Delivery is FOB Destination to DLA Distribution Anniston at 7 Frankford Avenue, Building 362, Anniston, AL 36201-4199. All-or-none offers are mandatory; quotations for less than the total quantities are ineligible for award. Only one award will be made as a result of this solicitation.

The quotation must be submitted via email to the Contract Specialist listed on the cover page by the closing date and time specified. Offerors must be registered in SAM.gov and comply with detailed technical requirements specified in the Technical Data Package (TDP), including specifications for heavy phosphate coating, military-level preservation and packing in accordance with MIL-STD-2073-1, and inspection at origin coordinated with DCMA before shipment. The solicitation requires compliance with ISO 9001:2015 quality standards, MIL-STD 1916 for acceptance sampling, and supply chain traceability documentation demonstrating the item conforms to technical requirements and is from an approved manufacturer. Contractors must retain documentation for ten years post-final payment and make it available to the contracting officer within three business days upon request. Demilitarization and trade security control requirements apply to contract excess property in accordance with DoD 4160.21-M-1. Electronic communication via email is mandatory for all unclassified written submissions after award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Section A - Solicitation/Contract Form

Gearshaft Assembly, BevelInstrument Name:

Product Service Code : 1025

A.1 This requirement was previously solicited under solicitation SPRDL1-26-Q-0071. This requirement is now being re-solicited under the new SIIN, SPRDL1-26-Q-A008.

AS7001 Acknowledgment of Amendments

Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:

Amendment Number Date

AS7311 Electronic Contracting Provision

(a) All DLA Weapons Support (Warren)solicitations will be publicized on the Contract Opportunities website https://SAM.gov. Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.

(b) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract Specialist listed on the solicitation. The email shall include subject header: Proposal Submission - SPRDL1-XX-X-XXXX (company name) on the solicitation.

(c) Requirements for tracking solicitations and submitting bid submissions:

1. Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in sam.

gov, vendors will be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.

SPRDL127QA008

2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request TDPs as directed in Section C of this solicitation.

3. All bids and proposals must be submitted via email to the Contract Specialist on record.

(d) Note to offerors:

Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Weapons Support (Warren). In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.

Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.

(e) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data /information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the National Apex Accelerator Alliance website at http://www.napex.us to locate a regional center.

AS7316 All or None

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN

THIS SOLICITATION ARE INELIGIBLE FOR AWARD.

*** END OF NARRATIVE 1 ***

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 GEARSHAFT ASSEMBLY,

Manufacturer's Part Number:

10953665

National Stock Number:

1025008688060

Manufacturer's CAGE: 19207

CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W52H096252023V

Product Service Code: 1025

North American Industry Classification System (NAICS):

333612

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: D 10953665:

19207

Bill to Party: W52H09

Claimant Program Code: A4A

Pricing Arrangement: Firm Fixed Price

29 Each

Additional Descriptive Data:

This procurement is a Total Small Business Set-Aside.

(End of narrative)

Description/Specs./Work Statement

TOP DRAWING NR: TDP D 10953665:19207

DATE: 23-JAN-2026

Packaging and Marking

PACKAGING/PACKING/SPECIFICATIONS: SEE PACKAGING REQUIREMENTS

NARRATIVE

UNIT PACK: 001

LEVEL PRESERVATION: Military

Level Packing: B

Inspection and Acceptance

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order.

Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative)

See narrative FS6051 for delivery schedule.

FOB Point: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON, AL, 36201-4199

(End of narrative)

Option Line Item

Unexercised Option CLIN

Manufacturer's Part Number:

10953665

National Stock Number:

1025008688060

Manufacturer's CAGE: 19207

CLIN only - Requisition Document Number (MILSTRIP, DLMS, FEDSTRIP): W52H096252023V

Product Service Code: 1025

North American Industry Classification System (NAICS):

333612

Defense Priorities Allocation System (DPAS) Priority Rating: DO- A4

Drawing Number: D 10953665:

19207

Bill to Party: W52H09

Claimant Program Code: A4A

29 Each

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

OPTION QUANTITY, PURSUANT TO THE NARRATIVE ENTITLED 'SEPARATELY

PRICED OPTION FOR INCREASED QUANTITY' IN SECTION I OF THE BASIC

CONTRACT.

The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract IAW option narrative entitled "Separately Priced Options for Increased Quantity", at the discretion of the Government.

(End of narrative)

Description/Specs./Work Statement

TOP DRAWING NR: TDP D 10953665:19207

DATE: 23-JAN-2026

Packaging and Marking

PACKAGING/PACKING/SPECIFICATIONS: SEE PACKAGING REQUIREMENTS

NARRATIVE

UNIT PACK: 001

LEVEL PRESERVATION: Military

Level Packing: B

Inspection and Acceptance

INSPECTION: Origin ACCEPTANCE: Origin

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order.

Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative)

See narrative FS6051 for delivery schedule.

FOB Point: Destination

SHIP TO:

(W562RP) SR W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON

7 FRANKFORD AVE 362

ANNISTON, AL, 36201-4199

(End of narrative)

Section C - Description/Specifications/Statement of Work

CS6100 Drawings - Specifications

In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement, and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.

Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing D 10953665:19207, with revisions in effect as of 01/23/2026, are applicable to this procurement with the following exceptions:

Vendors to access this information with the technical data posted on Contract Opportunities.

CS6334 Technical Data Package Information (Contract Opportunities in SAM.gov) Version

The following "X"d item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.\

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN's Web-located TDP. To access the TDP, you will have to copy or type the link's URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the "Text Select Tool," then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN: N/A

TDP Link (URL): N/A

[X] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov, and is associated with this solicitation number and can be accessed via this URL:

https://sam.gov/workspace/contract/opp/64df3f723ec243b09ec8bcd3ea34644e/view

a. Log on to the SAM.gov website.

SPRDL127QA008

https://sam.gov/workspace/contract/opp/64df3f723ec243b09ec8bcd3ea34644e/view

b. Select Contract Opportunities in the search bar and search by solicitation number.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25.

This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified, and you may proceed to the next step. To obtain DLA Enhanced Validation(DEV)certification, login to the Joint Certification Program (JCP) https://www.dla.mil/Logistics-Operations/Services/JCP/. Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select "Request Access" to controlled documents and enter the Reason for Access.

This will generate an email to the Contract Opportunities system administrator at DLA Weapons Support (Warren) with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 - 3 working days to complete this Contract Opportunities- TDP access/approval process through SAM.gov.

d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a SAM.gov account through https://login.gov. Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/. Questions related to accounts in SAM.

gov should be directed to https://sam.gov/content/help. Vendors are responsible for placing correct information in login.gov and SAM.gov accounts.

e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed "Use and Non-Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

[ ] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled N/A, and is:

[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement and email it to the Contract Specialist at N/A. The Contract Specialist will notify the Contract Opportunities administrator upon receiving the NDA.

The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.

CS6510 Heavy Phosphate Coating Requirement

The following requirements regarding heavy phosphate coatings are applicable to this solicitation and any resultant contract in addition to those requirements set forth in specification MIL-DTL- 16232G.

a. Paragraph 3.1 of MIL-DTL-16232G refers to "Preproduction Inspection." The heavy phosphate coating procedures should be sent by the Contractor to the Contracting Office, DLA Weapons Support (Warren), at DLAWarrenPostAward@dla.mil. The contract number must be cited on all phosphate coating procedures being submitted to DLA Weapons Support (Warren) for review and approval. Procedures shall include product name and manufacturer of all chemicals/materials to be used. All processes, equipment, controls along with testing and test frequencies used for phosphating including application of supplemental finishes shall be described in detail.

b. Paragraph 3.2.5-c of MIL-DTL-16232G refers to the "Chromic acid rinse, (Classes 1, 2 and 3)."

The final rinse shall be checked by a standard free and total acid titration along with a pH reading "prior to starting production and at least every 8 hours thereafter."

c. Paragraph 4.7.3 of MIL-DTL-16232G refers to "Weight per unit area of phosphate coatings." The frequency for testing coating weight is "per lot, at least every 8 hours."

d. Paragraph 4.7.5 of MIL-DTL-16232G refers to "Accelerated corrosion resistance." Accelerated corrosion resistance shall be determined in accordance with 4.7.5.1. The frequency for testing accelerated corrosion resistance per ASTM B117 is "per lot, at least every 8 hours."

e. The "product name" along with the manufacturer of the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure and shall be traceable to the applicable Qualified Products List (QPL) or Qualified Products Database (QPD) at Assist Online. QPD products may be obtained at the quick search site, type the specification number (i.e., 3150) in the second block and click the "Submit" button. Then click on the specification (i.e., MIL-PRF-3150). In the next screen, click on the word "Qualification".

To obtain MIL Specs, MIL Standards, QPL and QPD products see http://quicksearch.dla.mil/. To obtain MIL Specs, MIL Standards, QPD products see https://assist.dla.mil/online/start/.

f. A thickness range for the supplemental dry film lubricant or CARC paint (primer/topcoat) shall be stated in the procedure along with a frequency for testing. A daily frequency is required.

g. Heat cured dry film lubricant shall be air dried for 1.0 hour (until dry to touch) after dipping /spraying or flash dried at 155-175 degrees F for 10-30 minutes and then heat cured at a temperature of 375-425 degrees F for 55-65 minutes per paragraph 4.3.2.3 of MIL-PRF-46010.

h. Air cure dry film lubricant shall be air dried at room temperature for 24 hours minimum.

i. Adhesion testing shall be stated in the procedure for a supplemental coating of dry film lubricant per ASTM D2510 or CARC paint per ASTM D3359, method B along with the frequency for testing.

A daily frequency is required.

j. Salt spray testing of parts with phosphate and supplemental dry film lubricant per ASTM B117 for 100 hours shall be stated in the procedure along with the frequency for testing. The frequency for testing is "per lot or weekly." Parts shall show no more than 3 rust spots per 3" x 6" area with none larger than 1.0mm in diameter. Salt spray testing of parts with phosphate and primer per ASTM B117 for 336 hours shall be included in the procedure for supplemental coatings of CARC paint along with a frequency for testing. The frequency for salt spray testing is "per lot or monthly." Parts shall show no visible rust exceeding rust grade no. 9 per ASTM B610, no more than 5 blisters per 4" x 6" area with none larger than 3/64 inch in diameter. Under film attack at the scribe shall not exceed 1/8 inch.

k. Topcoat color shall be visual/equipment checked against the specified chip no. of FED-STD-595 per paint batch. The procedure shall include the specified color chip number.

l. Cure of the paint shall be checked daily by solvent wipe per paragraph 4.2.3.2 of MIL-DTL- 53072. The manufacturer of the MEK solvent shall be stated in the procedure.

CS7002 Drawing Limitations

(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate to permit manufacture, and:

(1) depict the completed (item(s), and

(2) serve as the basis for inspection of the completed item(s).

(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.

(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.

(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the Contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Procuring Contracting Officer or Contract Specialist prior to the solicitation closing date.

(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.

CS7004 Configuration Control - Engineering Changes

(a) The Contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance

(s) (RFVs) for the requirements in the Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions (NORs) necessary to completely define the requested change.

Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

(d) Forms - If any of the above listed forms are not included with the solicitation or contract, the Contractor may locate forms on the DOD Forms Website https://www.esd.whs.mil/Directives/forms /dd1500_1999/ or contact the Contract Specialist listed on page 1 of the solicitation or contract for copies of the forms.

CS7151 Use of Class 1 Ozone Depleting Substances (CIODS)

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:

https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-stratospheric-ozone-protection

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

CS8001 Contractor Retention of Supply Chain Traceability Documentation

1) By submitting a quotation or offer, the Contractor, if it is not the manufacturer of the item, is confirming it currently has and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.

2) Supply Chain Traceability Documentation

i. Supply chain traceability documentation shall include basic item description, part number;

drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

ii. Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.

dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/.

iii. In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

*** END OF NARRATIVE 1 ***

Requirements GEARSHAFT ASSEMBLY, BEVEL NSN: 1025-00-868-8060 Mfr CAGE: 19207 Mfr Part Number:

10953665

Section D - Packaging and Marking

DS6419 Packaging Requirements (Special Packaging Instructions)

A. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1 and the Special Packaging Instruction (SPI) contained in the TDP.

PRESERVATION: MILITARY

LEVEL OF PACKING: B

QUANTITY PER UNIT PACKAGE: 001

SPI NUMBER: 10953665, DATED 17 MAY 74, REV A

B. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

C. Marking: In addition to any special markings called out on the SPI;

C.1. All unit packages, intermediate packs, exterior shipping containers, and as applicable, unitized loads shall be marked in accordance with MIL-STD-129 including bar coding and a MSL label. The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211- 7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. Boxes /pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two-foot intervals.

E. This SPI has been validated, and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided Contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

F. Hazardous Materials (as applicable):

F.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

F.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

--International Air Transport Association (IATA) Dangerous Goods Regulations

--International Maritime Dangerous Goods Code (IMDG)

--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO

P4030.19/DLAM 4145.3 (for military air shipments).

F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

F.4. When applicable, a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

G. SUPPLEMENTAL INSTRUCTIONS: SEE SECTION C FOR CHANGES/UPDATES TO SPI.

-CHANGE NSN ON SPI TO 1025-00-868-8060.

*** END OF NARRATIVE 1 ***

Section E - Inspection and Acceptance

ES6019 Use of MIL-STD 1916

a. The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the Procuring Contracting Officer (PCO). The Contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.

b. MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding

ES7001 Inspection and Acceptance Points - Origin

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN. Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

(Name) (CAGE)

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

(Name) (CAGE)

(Address) (City) (State) (Zip)

ES7012 Rework and Repair of Nonconforming Material

a. Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review and approval prior to implementation.

c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Procuring Contracting Officer for review and written approval prior to implementation.

d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances, and a description of the action taken or to be taken to prevent recurrence.

e. The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

ES7043 Interchangeability of Components

(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under Government design control.

(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.

(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for:

(1) an "excusable delay" as defined in the DEFAULT clause of this contract.

(2) be the basis for an increase in contract price or delivery schedule extension.

*** END OF NARRATIVE 1 ***

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed- Price.

1996-08

52.246-16 Responsibility for Supplies. 1984-04

FAR Clauses Incorporated by Full Text

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-11 Higher-Level Contract Quality Requirement.

2014-12

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001:2015 (21 Oct 2015) or Equivalent, Tailored by excluding paragraph 8.3[Contracting Officer insert the title, number (if any), date, and tailoring (if any) of the higher-level quality standards.]

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

Overall Contract Inspection/Acceptance Locations

0001 Inspection and Acceptance Location

Both Source Instructions: DODAAC SPRDL1 is a place holder for solicitation purposes only.

Inspection and Acceptance will be completed at the Contractor's Facility and will be updated at the time of award per narrative ES7001 Inspection and Acceptance Points

- Origin.

DoDAAC: SPRDL1 CountryCode: USA

DLA LAND WARREN

ZGA, 6501 EAST ELEVEN MILE ROAD

WARREN, MI 48397

UNITED STATES

Option Line Item

Inspection and Acceptance Location

Both Source Instructions: DODAAC SPRDL1 is a place holder for solicitation purposes only.

Inspection and Acceptance will be completed at the Contractor's Facility and will be updated at the time of award per narrative ES7001 Inspection and Acceptance Points

- Origin.

DoDAAC: SPRDL1 CountryCode: USA

DLA LAND WARREN

ZGA, 6501 EAST ELEVEN MILE ROAD

WARREN, MI 48397

UNITED STATES

Section F - Deliveries or Performance

FS6051 Delivery Schedule

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a) (1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247- 34(a)(1)-(2) by the time specified in the individual contract. The Contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires delivery to be made according to the following schedule:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT

AWARD

N/A N/A N/A

N/A N/A N/A

(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST

(FAT), OR IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT

AWARD

0001 29 280 DARO

0002 29 280 days after exercise of option

(d) Accelerated delivery schedule is acceptable.

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost;

fill in the appropriate information here:

(1) OFFEROR'S PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE

TEST (FAT)

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

(2) OFFEROR'S PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST

ARTICLE TEST (FAT), or IF FAT IS WAIVED

ITEM NO. QTY WITHIN DAYS AFTER DATE OF

CONTRACT AWARD

FS7003 Depot Addresses for the Applicable Mode of Shipments: In-The-Clear Addresses

For Delivery, consult the Transportation Office for the applicable Depot as referenced below or Commercial carriers should consult the Transportation Facilities Guide (TFG) within the Global Freight Management (GFM) system for detailed instructions.

DLA Distribution- Susquehanna

Defense Dist. Depot

Susquehanna

New Cumberland, PA 17070-5001

Rail/ Motor SPLC*: 206721 and 209405

MILSTRIP Address Code: W25G1U

Transportation Office: (717) 770-6091 or 1-800-307-8496

DLA Distribution- San Joaquin

XU Def Dist. Depot

San Joaquin

25600 S. Chrisman Rd.

Rec Whse 10

Tracy, CA 95304-5000

Rail/ Motor SPLC*: 875670 / 875675 / 875694

MILSTRIP Address Code: W62G2T

Transportation Office: (209) 839-5396

DLA Distribution- Anniston

Anniston Army Depot

Bynum, AL 36201-5021

Rail/ Motor SPLC*: 471995 / 471996 / 471974

MILSTRIP Address Code: W31G1Z

Transportation Office: (445)737-9211 or (256)954-2712

DLA Distribution- Letterkenny

Letterkenny Army Depot

Chambersburg, PA 17201-4150

Rail/ Motor SPLC*: 209741 / 209770 / 209740

MILSTRIP Address Code: W25G1R

Transportation Office: (717) 267-5220

DLA Distribution- Red River

Red River Army Depot

Texarkana, TX 75507-5000

Rail/ Motor SPLC*: 661136 / 661157 / 661150

MILSTRIP Address Code: W45G19 / W562RM / SW3227

Prior to delivery, contact DLA Distribution Red River, TX Truck Control for an appointment: 903- 716-3577 or ddrt.truck@dla.mil

For Truck Deliveries, enter the following address for GPS:

RRAD Commercial Truck Entrance

100 Armory Dr. BLDG 740

New Boston, TX 75570

(903) 334-1246 / 1245

DLA Distribution- Tooele

Tooele Army Depot

Warner, UT 84074-5003

Rail/ Motor SPLC*: 764538 and 764535

MILSTRIP Address Code: W67G23

Transportation Office: (435) 833-2992 or (435) 833-5117

*SPLC indicates Standard Point Locator Code.

NOTE: The following is applicable only when so specified in an individual order or delivery increment:

This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:

New Cumberland Army Depot

Red River Army Depot

Sharpe Army Depot (San Joaquin) prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.

Appointments for FOB Origin shipments should be coordinated with DCMA Transportation. For FOB Origin shipments, or for FOB Destination shipments outside of the Continental United States, Contractors performing under DCMA Administered contracts may request support with shipment and labeling via the Shipping Instructions Request (SIR) Module found at https://www.dcma.mil.

This module is available under the eTools tab and can be used by suppliers to send requests for shipping instructions to the DCMA Transportation Office. Contractor user permission is gained via the External Web Access Management (EWAM) within DCMA eTools at https://www.dcma.mil /aboutetools/ utilizing a commercial user account. Once registered, when preparing for shipment a contractor can use the SIR module to request shipping instruction assistance from the cognizant DCMA Transportation Officer (TO) at the responsible Contract Management Office (CMO). The DCMA Transportation Officer reviews contractor request for shipping instructions and determines the necessary shipping documents needed. Upon completion of processing, the applicable documents and labels will be available for retrieval within the DCMA SIR tool. For further assistance, online training is available at https://www.dcma.mil/eTools/Training-A-Z/, or by contacting the DCMA IT Help Desk at 888-576-3262.

*** END OF NARRATIVE 1 ***

0001 From date of lead time event to delivery 280 Calendar Days

Date of Award DoDAAC: W562RP

29 EachQuantity

Address and POC Ship To DoDAAC: W562RP CountryCode: USA

W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON, 7 FRANKFORD AVE BLDG 362 ANNISTON, AL

36201-4199 UNITED STATES

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Contractor

Point Type: Destination

Option Line Item

From date of lead time event to delivery 280 Calendar Days

Date of Award DoDAAC: W562RP

29 EachQuantity

Address and POC Ship To DoDAAC: W562RP CountryCode: USA

W0LX ARMY GENERAL SUPPLY

DLA DISTRIBUTION ANNISTON, 7 FRANKFORD AVE BLDG 362 ANNISTON, AL

36201-4199 UNITED STATES

Special Handling/Notes FoB Details

Party to Pay Transportation Cost: Contractor

Point Type: Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.242-15 Stop-Work Order. 1989-08

52.242-17 Government Delay of Work. 1984-04

52.247-34 F.o.b. Destination. 1991-01

52.247-48 F.o.b. Destination-Evidence of Shipment.

1999-02

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.231-7000 Supplemental Cost Principles 1991-12

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .