This is a Justification and Approval (J&A) document for other than full and open competition for a federal procurement action.
The Defense Logistics Agency Weapons Support (DLAWS) in Warren proposes to award a New Firm Fixed Price Five-Year Long-Term contract to Pearson Engineering Ltd. (CAGE K0824) for Electronic Components Assembly parts used on the Assault Breacher Vehicle (ABV). The total estimated contract value ranges from a minimum of $4 to a maximum of $138. The specific part is the LMS (Lane Marking System) Control Unit, identified by manufacturer part number ER8981 and government part number ER8981, under Purchase Request Order Number EH5L0235EH. The Lane Marking System is an electronically controlled pneumatic system that marks safe lanes in minefields using compressed air to fire marker poles; the Electronic Components Assembly serves as the control unit enabling system configuration, operational status monitoring, and marker pole deployment.
The justification for sole-source procurement under 10 U.S.C. § 3204(a)(1) is based on "Only One Responsible Source" and lack of alternative supplies. Pearson Engineering is the sole design source, holds all technical data, and refused to sell the Technical Data Package to the Government. The company has demonstrated production capability and passed qualification tests. Engineering estimates for developing an alternative source total significant costs and timeframes for TDP development, product tooling, manufacturing tooling, and testing/qualification—expenses that cannot be recovered given the low procurement volume and would cause unacceptable operational readiness delays. Market research via Sources Sought Notice yielded only one response (Allied Defense Industries, an authorized Pearson distributor), and industry conferences identified no alternative contractors meeting requirements. The contract is under the Integrated Logistics Support Center Detroit and subject to availability of funds, with the acquisition method coded as direct acquisition from the actual manufacturer for the second or subsequent time.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRDL1-25-R-0215(JA-01078)
Previous J&A: SPRDL1-18-R-0068
The Lane Marking System (LMS) is an electronically controlled pneumatic system that uses compressed air to fire marker poles into the ground vertically to mark out safe lanes in a minefield after the clearance of mines. These poles enable following vehicles or troops on foot to safely pass through the minefield during the day or night.
The Electronic Components Assembly, also known as the LMS Control Unit or the LMS Control Box, allows the commander to power up the LMS system, configure the system, observe operational status, deploy/stow the marker pole dispensers, and arm and fire the marker poles.
a. Background:
The Government does not have the pertinent technical data to enable competitive re-procurement.
Pearson Engineering Ltd., (CAGE K0824), is the sole design source for this item. The ABV program requested to purchase the Technical Data Package (TDP) for this item from Pearson Engineering, Ltd., but Pearson Engineering, Ltd. consistently declined to sell the TDP to the Government.
Pearson Engineering Ltd. has demonstrated the ability to maintain the processes to successfully produce a finished item. This source has been approved and is fully qualified to produce assemblies to Government specifications for the ABV. Pearson Engineering passed the production qualification and verification tests for the ABV, including the demonstration of supplying components that fully meet the ABV performance requirements. These tests were required to demonstrate that this supplier could provide components to the Army that were of high quality and ready for fielding and incorporation into the Army’s supply system. Pearson Engineering Ltd. continues to provide an excellent LMS Control Unit of high quality and reliability.
The Engineering estimate for the cost and schedule to develop an alternative source includes TDP development, product tooling, manufacturing tooling, and testing and qualification as detailed below:
Process Cost Total Time
a. TDP Development
b. Product Tooling
c. Manufacturing and Tooling
d. Testing and Qualification:
Total
SPRDL1-25-R-0215(JA-01078)
Previous J&A: SPRDL1-18-R-0068
This estimate is an engineering estimate based on engineering experience with similar parts. The cost of qualifying for another source for this LMS Control Unit would be approximately as summarized in the table above. This estimate is based on historical costs of comparable component design efforts.
TDP Development: The estimated cost of TDP development for this item is This includes reverse engineering of the Electronic Components Assembly to develop the required technical data to produce it and develop the quality checks to ensure they are dependable and reliable. The TDP would also require documentation on production and manufacturing processes that could affect reliability and dependability, as required.
The total estimated time to complete this phase could be .
Product Tooling: The estimated cost of Product Tooling is and includes making or buying durable tooling to make the components requiring milling, welding, attaching, fabricating, and any Additive Manufacturing (AM), as required. The estimated time for this phase could be .
Manufacturing and Tooling: The estimated cost of Manufacturing and Tooling is , and includes processing assembly equipment, assembly fixtures and gauges, and installation attachments and tools as needed. The estimated time to complete this phase would be approximately .
Testing and Qualification: The estimated cost of Testing and Qualification is and includes a combination of with adjudication. The
The vehicle test
Qualification involves analyzing the test results compared to the requirements with standards and providing a sufficient report. The estimated time for this phase could be .
The dollar value of this part, currently at for the LMS Control Unit compared to the cost of developing a new engineered part, at , does not justify the expense associated with full and open competition. The expense of TDP development, product, and manufacturing and tooling, and testing and evaluation would be avoided by utilizing the current supplier since all these items have all been previously certified with the current source. The cost of this process would not be recoverable given the expected low volume of subsequent replacement orders. Additionally, the duration to complete this process plus enable the new supplier to produce units would exceed the time required to complete the J&A and have the Original Equipment Manufacturer