About this file
This document is an Amendment of Solicitation (Standard Form 30) for solicitation SPRDL1-25-R-0119 issued by DLA Land Warren. The amendment extends the solicitation closing date to December 4, 2025 and adds several key contract clauses including those related to contractor business systems, accounting system administration, and DoD progress payment rates. The solicitation is for a Bracket Assembly, with a base quantity of 494 units and an unexercised option quantity of 247 units.
The amendment introduces requirements for first article testing, with 3 test samples to be consumed during testing. Contractors must submit a First Article Test Report documenting all inspections and tests, with the Defense Contract Management Agency (DCMA) Administrative Contracting Officer delegated authority to approve the report. Delivery will be to DLA Distribution Anniston in Alabama, with a delivery timeline of 850 days after award for the base quantity. The contract is firm fixed price and includes special packaging instructions for military-level preservation and packing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRDL125R0119-0002.pdf | ||
| SPRDL1-25-R-0119.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2025AUG08
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
JUSTIN STONER
EMAIL: JUSTIN.STONER@DLA.MIL
SPRDL1-25-R-0119
2025AUG08
X
X 2025DEC04 12:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 16
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JUSTIN STONER
Buyer Office Symbol/Telephone Number: ZGAC/(445)737-0498
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
AS7001
Acknowledgment of Amendments
Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:
Amendment Number Date
************ End of Narrative ************
AS7311
Electronic Contracting Provision
(a) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website https://SAM.gov. Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.
(b) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract
Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-25-R-0119 (company name) on the solicitation.
(c) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations.
Using the Contract Opportunities search function in sam.gov, vendors will be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request TDPs as directed in Section C of this solicitation.
3. All bids and proposals must be submitted via email to the Contract Specialist on record.
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
2 16
SPRDL1-25-R-0119
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
(e) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
************ End of Narrative ************
AS7316
All or None
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
************ End of Narrative ************
*** END OF NARRATIVE A0001 ***
The purpose of Amendment 001 to Request For Proposal (RFP) SPRDL1-25-R-0119 is to accomplish the following.
1. Solicitation number SPRDL1-25-R-0119 is reopened, with an extended close date of 04 December 2025.
2. Add the following clauses:
52.232-13
52.232-16
252.232-7004
252.242-7005
252.242-7006
. Update Section E to:
a. Add Section E Narrative ES6333 - Inspection and Acceptance First Article Approval.
b. Remove Section E Narrative ES7222 - 250 Mile Radius First Article Test.
c. Update Section E Narrative ES6304 to include First Article Test quantity (003).
3 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Except as otherwise stated within, all other Solicitation terms and conditions remain unchanged and in full effect.
*** END OF NARRATIVE A0002 ***
4 16
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 BRACKET ASSEMBLY
NSN: 1015-01-340-5944
Mfr CAGE: 19200
Mfr Part Number: 12591221
0001AA PRODUCTION CLIN - BRACKET ASSEMBLY 494 EA $ $ __________________________________ ______________ __________________
COMMODITY NAME: BRACKET ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4C0145EH PRON AMD: 01
AMS CD: SM2B1100000
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12591221:19200
DATE: 01-FEB-2024
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H093360022V W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 494 0850
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
DLA DISTRIBUTION ANNISTON
7 FRANKFORD AVE 362
ANNISTON,AL,36201-4199
5 16
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB FIRST ARTICLE TEST AND REPORT 4 LO $ ** NSP ** _____________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST AND REPORT
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 4 0425
6 16
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 UNEXERCISED OPTION QTY
NSN: 1015-01-340-5994
Mfr CAGE: 19200
Mfr Part Number: 12591221
0002AA UNEXERCISED OPTION - BRACKET ASSEMBLY 247 EA $ $ _____________________________________ ______________ __________________
COMMODITY NAME: UNEXERCISED OPTION QTY
CLIN CONTRACT TYPE:
Firm Fixed Price
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12591221:19200
DATE: 01-FEB-2024
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 247 0395
FOB POINT: Destination
SHIP TO:
(SPRDL1) DLA LAND WARREN
ZGA
6501 EAST ELEVEN MILE ROAD
WARREN,MI,48397-5000
7 16
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
8 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
ES6026
First Article Test (Contractor Testing)
a. The first article shall be examined and tested in accordance with contract requirements, the item specification(s), Quality Assurance
Provisions (QAPs) and all drawings listed in the Technical Data Package.
b. The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.
c. The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the Contractor's facility and certifications are submitted with the First Article Test Report.
d. Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
e. A First Article Test Report shall be compiled by the Contractor documenting the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. Evidence of the QAR's verification will be provided. One copy of the First Article Test Report will be copy furnished to the Contracting Officer.
f. Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the additional first article testing resulting from any of the causes listed herein that were instituted by the Contractor and not due to changes directed by the Government shall be borne by the Contractor.
************ End of Narrative ************
ES6304
Notice Regarding First Article Test Sample
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 003 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 003 that successfully passes all specified tests, less the destructive tests, if any, may serve as a manufacturing standard for the remainder of the contract.
9 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design, 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the Contractor will notify the Procuring Contracting Officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
************ End of Narrative ************
ES6333
Inspection and Acceptance First Article Approval
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with QAPS 1259372 AND 12592373.
(2) The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
************ End of Narrative ************
ES7001
Inspection and Acceptance Points - Origin
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
10 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Address) (City) (State) (Zip)
************ End of Narrative ************
ES7012
Rework and Repair of Nonconforming Material
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review and approval prior to implementation.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Procuring Contracting
Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the non-conformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
************ End of Narrative ************
ES7032
Notice Regarding First Article
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
************ End of Narrative ************
11 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ES7043
Interchangeability of Components
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOVERNMENT DESIGN CONTROL. Once the Government accepts the first production test item, or accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for:
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
************ End of Narrative ************
ES7050
Drawings for Inspection
(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings and specifications will be returned to the Contractor.
(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the
Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items, 2) Items used in critical applications or items denoted as critical on technical data, 3) Items with known quality conformance issues, 4) Items with an unstable design history, and/or 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.
************ End of Narrative ************
ES7345
Delegation of Authority for First Article Approval
The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is hereby delegated the authority to approve or disapprove the First Article Test Report submitted in accordance with this contract (FAR 52.209-3 First Article Testing- Contractor
First Article). Any reference to Procuring Contracting Officer (PCO) as it relates to the submission of, and approval/disapproval of the
FAT Report shall be deemed to mean the DCMA ACO. ACO approval will be predicated upon Quality Assurance Representative (QAR) acceptance of the FAT Report. ACO approval authorizes the Contractor to proceed with production.
************ End of Narrative ************
12 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE E0001 ***
13 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 ADDED 252.242-7005 CONTRACTOR BUSINESS SYSTEMS (JAN 2025) JAN/2025
I-2 ADDED 252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION (JAN 2025) JAN/2025
I-3 ADDED 252.232-7004 DOD PROGRESS PAYMENT RATES (MAR 2020) (DEVIATION 2020-O0010) MAY/2023
If the Contractor is a small business concern, the Progress Payments clause of this contract is modified to change each mention of the progress payment rate and liquidation rate (excepting paragraph (k), Limitations on Undefinitized Contract Actions) to 95 percent.
(End of clause)
14 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 SPECIALPACKAGING INSTRUCTIONS (SPI) - AM12591221 28-OCT-2025
15 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 ADDED 52.232-13 NOTICE OF PROGRESS PAYMENTS APR/1984
16 16