SPRDL125Q0124.pdf

PDF 160 KB Posted

Attached to
CIRCUIT CARD ASSEMBLY
Solicitation number
SPRDL125Q0124
Issued by

About this file

This document is a Request for Quotation (RFQ) for a Circuit Card Assembly issued by the Defense Logistics Agency (DLA) Land and Maritime. The solicitation seeks 2 units of a circuit card assembly with National Stock Number 5998-01-546-5217 and part number 13008915, with an option to purchase an additional 2 units. The procurement is not a small business set-aside and will be awarded on a firm fixed-price basis, with delivery required within 730 days after contract award. The items will be shipped FOB Destination to the DLA Distribution Red River facility in Texarkana, TX.

Key requirements include providing only the approved manufacturer's part number (DRS, CAGE 24290, Part Number 13008915), with strict inspection and acceptance at the origin. The contractor must provide supply chain traceability documentation and comply with various federal requirements, including provisions related to trade security controls, ozone-depleting substances, and counterfeit part detection. Offers must be submitted electronically by email to the contract specialist, with the solicitation allowing for potential use of a reverse auction pricing technique during the evaluation process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION This RFQ is is not a small business set-aside Page Of

(This is NOT an Order)

1. Request No. 2. Date Issued 3. Requisition/Purchase Request No. 4. Cert For Nat Def. Under BDSA Rating

See Schedule Reg. 2 and/or DMS Reg. 1 5A. Issued By 6. Deliver by (Date)

See Schedule

7. Delivery

FOB Other Destination

5B. For Information Call: (Name and telephone no.) (No collect calls)

8. To: Name and Address, Including Zip Code 9. Destination (Consignee and address, including Zip Code)

See Schedule

10. Please Furnish Quotations to the Issuing Office in Block 5A On or Before Close of Business (Date)

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please indicate on this form and return it to the address in Block 5B. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services.

Supplies are of domestic origin unless otherwise indicated by quoter. Any interpretations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. Schedule (Include applicable Federal, State, and local taxes)

Item Number (a)

Supplies/Services (b)

Quantity (c)

Unit (d)

Unit Price (e)

Amount (f)

(See Schedule)

12. Discount For Prompt Payment a. 10 Calendar Days b. 20 Calendar Days c. 30 Calendar Days d. Calendar Days % % % Number Percentage

NOTE: Additional provisions and representations are are not attached.

13. Name and Address of Quoter (Street, City, County, State and 14. Signature of Person Authorized to Sign 15. Date of Quotation Zip Code) Quotation

16. Signer

a. Name (Type or Print) b. Telephone

Area Code

c. Title (Type or Print) Number

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 18 (Rev. 8-95) PREVIOUS EDITIONS NOT USABLE 18-118 Prescribed by GSA-FAR (43 CFR) 53.215-1(a)

X

SPRDL1-25-Q-0124 2025JUN18 DOA4

SPRDL1DLA LAND WARREN

WARREN, MI 48397-5000

LAURA CHABIE (586)467-1227

ZGCA

EMAIL: LAURA.CHABIE@DLA.MIL

X

2025JUL18

1 70

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: LAURA CHABIE

Buyer Office Symbol/Telephone Number: ZGCA/(586)467-1227

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

AS7316

All or None

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.

************ End of Narrative ************

*** END OF NARRATIVE A0001 ***

AS7001

Acknowledgment of Amendments

Acknowledge all the amendments received from the Contracting Office by identifying the amendment number and its issue date below:

Amendment Number Date

************ End of Narrative ************

AS7311

2 70

SPRDL1-25-Q-0124

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Electronic Contracting Provision

(a) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website https://SAM.gov. Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.

(b) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract

Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.

(c) Requirements for tracking solicitations and submitting bid submissions:

1. Vendors must be registered for a sam.gov account through https://login.gov in order to manage searches and track solicitations.

Using the Contract Opportunities search function in sam.gov, vendors will be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.

2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request TDPs as directed in Section C of this solicitation.

3. All bids and proposals must be submitted via email to the Contract Specialist on record.

(d) Note to offerors:

Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.

Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

Solicitations may remain posted on sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.

(e) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or

Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the Procuring Contracting Officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

************ End of Narrative ************

AS7316

All or None

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.

************ End of Narrative ************

3 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE A0002 ***

4 70

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CIRCUIT CARD ASSEMB

NSN: 5998-01-546-5217

Mfr CAGE: 19200

Mfr Part Number: 13008915

0001AA PRODUCTION QUANTITY 2 EA $ $ ____________________ ______________ __________________

COMMODITY NAME: CIRCUIT CARD ASSEMB

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: EH4C1015EH PRON AMD: 01

AMS CD: SM2B1100000

Only the following Manufacturer's part number is approved for this procurement.

MFR: DRS

CAGE: 24290

Part Number: 13008915

(End of narrative C001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Packaging and Marking

Inspection and Acceptance

INSPECTION: Origin ACCEPTANCE: Origin

USE WHEN INSPECTION AND ACCEPTANCE IS AT ORIGIN.

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative E001)

5 70

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 W52H094213022V W562RM J 2

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 2 0730

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA,TX,75507-5000

6 70

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0002 CIRCUIT CARD ASSEMB

NSN: 5998-01-546-5217

Mfr CAGE: 19200

Mfr Part Number: 13008915

0002AA UNEXERCISED OPTION QUANTITY 2 EA $ $ ___________________________ ______________ __________________

COMMODITY NAME: CIRCUIT CARD ASSEMB

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED -

OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED

LINE ITEM 52.217-7.

The quantity stated for the option CLIN DOES NOT form a part of the basic contractual quantity.

Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.

The failure of the offeror to insert a unit price applicable to the option quantity must mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offeror will be evaluated for award accordingly.

(End of narrative B001)

Only the following Manufacturer's part number is approved for this procurement.

MFR: DRS

CAGE: 24290

Part Number: 13008915

(End of narrative C001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

7 70

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Packaging and Marking

Inspection and Acceptance

INSPECTION: Origin ACCEPTANCE: Origin

USE WHEN INSPECTION AND ACCEPTANCE IS AT ORIGIN.

Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.

(End of narrative E001)

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 2 0730

FOB POINT: Destination

SHIP TO:

(W562RM) SR W0MC ARMY GENERAL SUPPLY

DLA DISTRIBUTION RED RIVER

HIGHWAY 82 WEST

TEXARKANA,TX,75507-5000

8 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CS7003

Acquisition of Manufacturer's Part Number

This acquisition is restricted to the item description set forth in the Schedule which specifies a manufacturer's part number.

Since complete Government data for the item are not available, it is understood and agreed that references to specifications and drawings herein shall be deemed to include all changes or revisions thereto which the Contractor has made effective as of the date of delivery of any of the items provided for in this contract; provided, that no such change or revision which affects the interchangeability of the item (ability to be interchanged with previous parts or to connect with all mating parts when assembled) shall be effected without the approval of the Procuring Contracting Officer. The Contractor agrees that it will furnish to the Administrative

Contracting Officer or Government Inspector, for the purpose of making inspection under any resulting contract, copies of the applicable specifications and drawings indicating all changes or revisions.

Manufacturer's part number means a product described by the name of an approved source and its corresponding part number cited in the item description; and manufactured by, or under the direction of, that approved source. An offeror of a manufacturer's part number must meet one of the descriptions below.

(1) An approved source offering its part number cited in the item description;

(2) A dealer/distributor offering the product of an approved source and part number cited in the item description;

(3) A manufacturer who produces the offered item under the direction of an approved source; and has authorization from that approved source to manufacture the item, identify it as that approved source's name and part number, and sell the item directly to the

Government.

(4) A dealer/distributor offering the product of a manufacturer that meets the description in subparagraph (3) above.

************ End of Narrative ************

CS7015

Acquisition of Source-Controlled Part Number

Acquisition under this contract is restricted to:

(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package (TDP); and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the TDP; provided (i) that these non-listed part numbers have been furnished to one of the approved manufacturers listed in the TDP, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a non-listed part number as described in this paragraph (2) have completed the REPRESENTATION OF INTENT TO SUPPLY A SOURCE CONTROLLED ITEM narrative and has received approval from the Contracting Office.

************ End of Narrative ************

*** END OF NARRATIVE C0001 ***

CS6334

Technical Data Package Information (Contract Opportunities in SAM.gov) Version

The following "X"d item applies to this solicitation:

[ X ] 1. There is no Technical Data Package (TDP) included with this solicitation.

9 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line-Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLIN's Web-located TDP. To access the TDP, you will have to copy or type the link's URL to your web browser address bar at the top of the screen.

Note: To copy a link from a .pdf file, click on the "Text Select Tool," then highlight the URL, copy and paste it into your browser, and hit the Enter key.

CLIN:

TDP Link (URL):

[ ] 3. The TDP for this solicitation resides within sam.gov under the Contract Opportunities search function https://sam.gov, and is associated with this solicitation number and can be accessed via this URL:

a. Log on to the SAM.gov website.

b. Select Contract Opportunities in the search bar and search by solicitation number.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, vendors and Contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, login to the Joint Certification Program (JCP) https://www.dla.mil/Logistics-

Operations/Services/JCP/. Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

10 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

c. If technical data is otherwise restricted, click the document title to request access. A window will pop-up, select "Request Access" to controlled documents and enter the Reason for Access. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access. Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this Contract

Opportunities-TDP access/approval process through sam.gov.

d. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a sam.gov account through https://login.gov. Any individual(s) no longer with the company should be deleted. Questions related to registration in https://login.gov should be directed to https://login.gov/help/.

Questions related to accounts in sam.gov should be directed to https://sam.gov/content/help. Vendors are responsible for placing correct information in login.gov and sam.gov accounts.

e. It is strongly suggested that you submit an access request and provide the Contract Specialist with the completed "Use and Non-

Disclosure Agreement" at the same time if the solicitation requires both to gain access to view the TDP.

[ ] 4. The Government requires a "Use and Non-Disclosure Agreement" (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled, and is:

[ ] available by emailing the Contract Specialist listed on page 1 of this solicitation.

[ ] available as an attachment to this solicitation.

Follow the instructions on the Agreement and email it to the Contract Specialist at -5-. The Contract Specialist will notify the

Contract Opportunities administrator upon receiving the NDA. The Administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the

TDP. If you have any questions/problems viewing the TDP contact the Contract Specialist.

************ End of Narrative ************

*** END OF NARRATIVE C0002 ***

CS7151

Use of Class 1 Ozone Depleting Substances (CIODS)

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.epa.gov/clean-air-act-overview/clean-air-act-title-vi-

11 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

stratospheric-ozone-protection

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.

(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

No Class II Ozone Depleting Substances shall be required in the performance of this contract without Government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Procuring Contracting Officer immediately in writing.

************ End of Narrative ************

CS7350

Approved Suppliers for Circuit Card Assemblies and Printed Circuit Boards within Federal Supply Class (FSC) 5998 Electrical and

Electronic Assemblies, Boards, Cards, and Associated Hardware (MAR 2023)

(1) Application: (a) Applies to procurements for circuit card assemblies and printed circuit boards within FSC 5998 regardless of the dollar value.

(2) Definitions: As used in this procurement narrative:

(a) Circuit card assembly means any flat board with electronic components placed on it.

(b) Printed circuit Board means any partially manufactured or complete bare printed circuit board or fully or partially assembled printed circuit board.

(3) Restrictions:

(a) Circuit card assemblies and printed circuit boards within this FSC are restricted to the sources of supply listed below.

(b) The Government cannot procure a circuit card assembly or printed circuit board that is manufactured, assembled, or delivered from a

12 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Covered Nation (see Covered Nation definition in DLAD 2.101) under this solicitation or any resulting contract.

(4) Sources of Supply:

(a) The approved source (e.g., Original Component Manufacturer (OCM)/Original Equipment Manufacturer (OEM)) for the item specified in the solicitation and contract; or

(b) The approved source on the Qualified Products List (QPL)/Qualified Manufacturers List (QML)(If applicable); or

(c) The authorized distributors of the OCM/OEM or QPL/QML for the item specified in the solicitation and contract (If applicable) that can provide supply chain traceability documentation of the item.

(d) Distributors with a written authorized distribution agreement from the approved source of supply (i.e., OCM/OEM) of the item specified in the solicitation or contract that can provide supply chain traceability documentation of the item in accordance with narrative C.23 Contractor Retention of Supply Chain Traceability Documentation.

Examples of acceptable supply chain documentation can be found at https://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-

Detection-Avoidance- Program/.

(5) Requirements:

(a) The awardee must also meet the following requirements:

(i) Provide post award traceability documentation. If the contracting officer is unable to obtain traceability accounting for 100% of the material, the contracting officer reserves the right to reject the material based on the above prohibition.

(ii) Obtain written contracting officer approval prior to shipment.

************ End of Narrative ************

CS8001

Contractor Retention of Supply Chain Traceability Documentation

13 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1) By submitting a quotation or offer, the Contractor, is confirming it currently has, or will obtain before delivery, and shall retain supply chain traceability documentation, as described in paragraph (2) below, demonstrating the item conforms to the technical requirements, and for part numbered items, is from an approved manufacturer.

2) Supply Chain Traceability Documentation

Supply chain traceability documentation shall include: basic item description, part number; drawing or specification; national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to Government acceptance. The documentation should also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.

Supply chain traceability documentation shall also include, if available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers. For part numbered items, contractors can find examples of acceptable supply chain traceability documentation at the Counterfeit Detection and Avoidance Program (CDAP) website http://www.dla.mil/LandandMaritime/Business/Selling/Counterfeit-Detection-Avoidance-Program/.

In addition, the contractor will obtain, retain, and provide to the contracting officer written documentation of all inspections and tests necessary to substantiate that the supplies furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. Such records shall include, without limitation, test reports, test data, material certification, and manufacturing process sheets, in addition to any other information identified in the technical specifications applicable to the item.

3) The contractor shall make supply chain traceability documentation available to the contracting officer within three business days upon the contracting officer's request. The contracting officer determines the acceptability and sufficiency of documentation. The contractor shall retain supply chain traceability documentation for ten years after final payment under this contract for audit and other valid government purposes. If the contractor fails to retain or provide the documentation, or the contracting officer finds the documentation to be unacceptable, the contracting officer may take corrective action, including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.

************ End of Narrative ************

*** END OF NARRATIVE C0003 ***

PACKAGING AND MARKING

DS6418

Packaging Requirements (Specifications Standards)

A. The preservation, packing, and marking requirements for the item identified above shall be accomplished in accordance with the requirements in the specification/standard defined below.

B. The following requirements shall apply:

PRESERVATION: MILITARY

LEVEL OF PACKING: B

QUANTITY PER UNIT PACKAGE: 001

SPECIFICATION/STANDARD: DRAWING 9370051

14 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C. Marking: In addition to any special marking markings called out by the specification/standard above;

C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129 including bar coding and a MSL label. The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause

252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.htm for the current DoD Suppliers' Passive RFID Information Guide and Supplier Implementation Plan.

If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.

D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

E. The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions in paragraph G below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO. The Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.

F. Hazardous Materials (as applicable):

F.1. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

F.2. When applicable, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

--International Air Transport Association (IATA) Dangerous Goods Regulations

--International Maritime Dangerous Goods Code (IMDG)

--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).

F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the

United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

F.4. When applicable a Product Safety Data Sheet (SDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

SUPPLEMENTAL INSTRUCTIONS: -Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers.

Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. All variations must be approved by the Contracting Office prior to implementation. The load shall be contained in a manner that will permit safe handling during shipment and storage.

Packaging shall be in accordance with MIL-STD-2073-1 and have successfully passed test levels of ASTM D 4169, Distribution Cycle 18, Assurance Level II, Acceptance Criterion 3, Military packing Level B . The warehouse stacking height shall be 16 ft. The shipping unit shall be the unit pack. Marking shall be in accordance with MIL-STD-129. Testing shall be witnessed by the Government Quality Assurance

Representative. Packaged gross weight and size shall be included on the test report as well as a detailed description of the packaging.

The Contractor is exempted from testing if other data can be provided (see para. 5.6 of MIL-STD-2073-1) and is acceptable to the

Government. Similar items do not require retesting.

15 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PRESERVATION, PACKAGING AND MARKING SHALL BE DONE IAW DRAWING 9370051, WHICH IS ATTACHED BELOW.

************ End of Narrative ************

*** END OF NARRATIVE D0001 ***

INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

CS7015

Acquisition of Source-Controlled Part Number

Acquisition under this contract is restricted to:

(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package (TDP); and

(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the TDP; provided (i) that these non-listed part numbers have been furnished to one of the approved manufacturers listed in the TDP, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a non-listed part number as described in this paragraph (2) have completed the REPRESENTATION OF INTENT TO SUPPLY A SOURCE CONTROLLED ITEM narrative and has received approval from the Contracting Office.

************ End of Narrative ************

ES7001

Inspection and Acceptance Points - Origin

The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.

Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.

INSPECTION POINT:

(Name) (CAGE)

16 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(Address) (City) (State) (Zip)

ACCEPTANCE POINT:

(Name) (CAGE)

Address) (City) (State) (Zip)

************ End of Narrative ************

HS7144

Demilitarization and Trade Security Control Requirements and Procedures

I. Demil and Trade Security Controls (TSCs) Summary:

A. This procurement action has a demilitarization and/or TSC consideration requirement. The demilitarization and trade security control provisions in this solicitation implement the policy and requirements of the "Arms Export Control Act," 22 United States Code

(U.S.C.), Section 2778, the "International Traffic in Arms Regulations (ITAR)" at 22 Code of Federal Regulations (CFR), Parts 120-130, the "Export Administration Regulations (EAR)", at 15 CFR 730-774 and the "Export Administration Act". Regulatory requirements and guidance are contained in Federal Acquisition Regulation (FAR) 45.6, "Reporting, Redistribution, and Disposal of Contractor Inventory" and Defense Federal Acquisition Regulation Supplement (DFARS) 245.604, "DISPOSAL OF SURPLUS PROPERTY."

B. Demilitarization and TSC policy is promulgated via Department of Defense (DoD) regulations and in the establishment of contract requirements. Accordingly, the Government's right to require demilitarization under this clause is a contractual right, subject to the authority and discretion of the Procuring Contracting Officer (PCO). Therefore the PCO may or may not forward Contractor demilitarization waiver request to the DoD Demilitarization Program Manager for review and approval, even when there is certifiable

Contractor's compliance with all existing TSC regulations. The waiver approval process is described in paragraph VII of this clause.

C. The DoD policy and requirements for demilitarization and TSCs are contained in the DoD 4160.21-M-1, Demilitarization and TSCs

Manual. This manual is hereby incorporated by reference, and its terms, conditions, and procedures are valid and enforceable as contractual requirements. If there is a conflict between the Demilitarization and TSCs Manual and the Demilitarization and TSC Clause herein, the Demilitarization and TSCs Manual takes precedence.

D. This contract requires the manufacture, assembly, test, maintenance, repair, and/or delivery of military/defense items. This clause sets forth the requirements for the control and corresponding certification and verification of disposition of "contract excess property." The requirements under this clause are applicable to any Contractor and/or Subcontractor who perform work under this contract. This clause is a mandatory flow-down clause; accordingly, Contractor/Subcontractor must include this clause in subcontracts for work under this solicitation and resulting contract.

E. The demilitarization and TSC requirements apply to all materials and property (Government furnished equipment (GFE)), special tools and special test equipment, manufactured parts in whatever stage of assembly, and associated technical data including technical manuals, drawings, process sheets, and working papers) bought, assembled, produced, or provided by the Government under this contract regardless of the type of contract and regardless of who has title to the material. The intent is to control military/defense items in accordance with statutory and regulatory requirements. Bidders'/Offerors' proposed prices under this solicitation and any resulting contract should include any and all cost(s) to comply with this clause and the Government's demilitarization and TSC requirements.

F. In general, the demilitarization requirements must be met upon completion of the contract. For indefinite delivery contracts as defined by FAR 16.501-2, demilitarization requirements must be met upon the expiration of the potential contractual performance period as described in section A of the contract and/or in section B (the schedule) of the contract; or upon contract termination if the contract is terminated earlier. Contractor(s) awarded a contract with demilitarization requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the Contractor to fulfill its demilitarization obligations under this clause. The Contractor will provide a copy of demilitarization certificates to the PCO within 30 days for inclusion in the contract file.

G. Paragraph VIII. c. of this clause applies to the demilitarization of excess U.S. Government furnished equipment (GFE)/technical data provided to a Contractor in support of this contract; see excess GFE definition II. b. below. If the Contractor is not using GFE in performance of this contract, disregard this paragraph.

17 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

H. The Contractor agrees that demilitarization performed under this contract will be conducted in accordance with this clause or DoD

4160.21-M-1, Demilitarization and TSCs Manual, and all demilitarized material will meet or exceed the definition of scrap as defined by this clause.

II. Definitions:

A. "Contract excess property" is property of the type covered by this contract for which the Contractor does not claim payment or has been denied payment and all GFE not returned to the Government upon completion of the contract. This includes, but is not limited to, rejects and overruns. Contract excess property (whether title to the property is in the Government or not) includes completed or partially completed parts, components, subassemblies, assemblies, end items, special tools and test equipment, and all associated technical manuals, technical data, packaging and labeling. Contract excess property shall be controlled and final disposition determined by assigned demilitarization code unless waived by the DoD Demilitarization PM.

B. "Excess GFE" is equipment/technical data provided by the U. S. Government to the Contractor that the Contractor no longer needs to satisfy the contract's requirements, which the Government does not want returned during or at the completion of the contract.

C. "Demilitarization" is the act of destroying the military offensive and defensive characteristics inherent in certain types of equipment and material to the degree necessary to preclude its restoration to a usable condition. The term includes mutilation, dumping at sea, cutting, crushing, shredding, melting, burning or alteration designed to prevent the further use of this equipment and material for its originally intended military purpose. It applies equally to material in unserviceable and serviceable condition.

D. "Scrap" is material that has no value except for its basic material content.

E. "Munitions list item (MLI)" is any item contained in the U. S. Munitions List, 22 CFR 120-130.

F. "Commerce control list item (CCLI)" is a multi-use (military, commercial and other strategic use) item under the jurisdiction of the Bureau of Export Administration, U. S. Department of Commerce, through the Export Administration Regulations, 15 CFR 730-774. The types of items on the CCL may be commodities (i. e., equipment, materials, electronics), software, or a particular technology.

G. "Trade security control (TSC)" is control procedures designed to preclude the sale or shipment of Munitions List or Commerce

Control List items to any entity whose interests are inimical to those of the United States. These controls are also applicable to such other selected entities as may be designated by the Deputy Under Secretary of Defense (Trade Security Policy).

H. "Commercial type property" is material, equipment, software, or technology not generally considered to be unique and peculiar to

DoD and possessing commercial marketability.

I. "Significant military equipment (SME)" is material for which special export controls are warranted because of their capacity for substantial military utility or capability. Items designated as SME require worldwide demilitarization as prescribed in DoD 4160.21-M-1, Demilitarization and TSCs Manual, appendix 4.

J. "Ammunition, explosives, and dangerous articles (AEDA)" is any substance that by its composition and chemical characteristics, alone or when combined with another substance, is or becomes an explosive or propellant or is hazardous or dangerous to personnel, animal or plant-life, structures, equipment or the environment as a result of blast, fire, fragment, radiological or toxic effects.

AEDA is not a criterion for demilitarization. AEDA items not on the Munitions List would be coded A or Q.

III. Applicability:

This solicitation/contract is for the production of MLIs or CCLIs and contract excess may require demilitarization and TSCs. This clause is applicable to prime and Subcontractors.

IV. Contractor Demilitarization and TSCs:

A. The Contractor will demilitarization and apply TSCs as required on all contract excess property as dictated by the Government assigned demilitarization code and its definition and the demilitarization and trade security controls matrix in paragraph IX of this clause. Demilitarization codes and definitions can be accessed per paragraph VIII of this clause.

B. The Contractor will contact the PCO for declassification, safety and demilitarization instructions for contract excess property with an assigned demilitarization code of "P", "F", or G".

C. The Contractor will demilitarization all associated excess technical data.

V. Demilitarization Certification and Verification (DC&V):

A. During or upon completion of manufacturing under this contract, the prime Contractor shall notify the PCO in a timely manner that a

18 70

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Government representative is required to witness demilitarization of contract excess property produced under this contract whether the prime Contractor or a Subcontractor is performing the demilitarization.

B. Subcontractors shall notify the prime Contractor in a timely manner who shall notify the PCO that a Government representative is required to witness demilitarization of contract excess property produced under this contract.

C. The Government Quality Assurance Representative (QAR) will forward all demilitarization certificates and the final DD Form 250 to the PCO so that final payment can be made. The PCO will not release the final DD Form 250 for payment unless all pertinent demilitarization certificates from all prime and subcontractors involved have been received. If the Contractor is using the Wide Area

Workflow (WAWF) Receipt-Acceptance system, the QAR will ensure all demilitarization certificates are attached to the final WAWF

Receiving Report before accepting the shipment. The Demilitarization Certification and Verification Certificate will become part of the contract file.

D. A Contractor's representative certifies and a technically qualified U.S. Government QAR (United States citizen) is designated as the U.S. Government official responsible for executing the Demilitarization verification unless another U.S. Government official is designated in writing by the PCO. Both shall actually witness the demilitarization; and both shall sign and date the DA Form 7579 available at http://www.apd.army.mil/.

VI. Demilitarization Waivers:

A. The Contractor may request a demilitarization waiver for contractual requirements. However, any waiver must be predicated upon disposition of material in a manner that is consistent with the guidelines and intent of applicable demilitarization and TSC laws and regulations. All requests for demilitarization waivers must be submitted in writing through the PCO and the Army's Demilitarization PM to the DoD Demilitarization PM. Waiver request must be approved prior to Contractor disposition of any contract excess property and prior to the release of final DD Form 250 for payment. All waiver requests must specify the items, quantity, proposed disposition of the material, and any additional terms. If written approval of the request for a demilitarization waiver is not granted within 45 days of submission, the demilitarization request shall be deemed disapproved. The Contractor is not entitled to demilitarization waiver.

Contact the PCO for additional specific guidance.

B. When a demilitarization waiver is approved, all packaging and Government property containing non-removable markings shall have these markings permanently obliterated before any non-demilitarized disposition.

VII. Disputes - any disputes concerning this clause shall be addressed in accordance with the "Disputes" clause in this solicitation/contract.

VIII. Contractor Access and Identification of Demilitarization Requirements:

A. Contractors will identify demilitarization requirements by accessing the assigned demilitarization code via the Internet using the following steps:

1. Logon to Army Electronic Product Support (AEPS) Website https://aeps.ria.army.mil/. This displays the U.S. Army Materiel

Command Army Electronic Product Support Website entrance portal.

2. Click on "Accept." This displays the Public Applications page.

3. If you have an AEPS account, go to step 4 below. First time users, click on "How to Enter AEPS" and then follow instructions for Government Contractors to establish an AEPS account.

4. Click on "Enter AEPS" and enter your UserID and Password.

5. Under Popular Applications, click on "Contractor Demilitarization Code Query" which displays an interactive searchable database containing all part numbers that have been assigned a National Stock Number (NSN) in the FLIS.

6. Click on the icon "Demilitarization Code Definitions" provided on this web page. Print these definitions for future reference and close the screen.

B. The Contractor's…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .