SPRDL124R0021-0005.pdf
PDF 22 KB Posted
- Attached to
- Wire Race Ring Kit
- Solicitation number
- SPRDL1-24-R-0021
About this file
This is Amendment 0005 to solicitation SPRDL1-24-R-0021, issued by DLA Land Warren for Wire Race Ring Kit (NSN: 1015-01-628-8229, P/N: 57K6506). The amendment makes three key changes: 1) extends the closing date for receipt of offers to February 5, 2025 at 1:00 PM EST, 2) increases the quantity under CLIN 0001AA from 20 each to 35 each, and 3) deletes option CLIN 0002AA and all associated option narratives and clauses.
The solicitation is for a Firm Fixed Price contract with delivery to Anniston, AL within 650 days after award. The item requires military preservation level packaging and level B packing. Inspection and acceptance will be at origin. The amendment includes provisions for electronic submission of offers via email to the contracting specialist, with PDF format preferred. Two signed copies of the amendment must be returned with offers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRDL124R0021-0006.pdf | ||
| SPRDL124R0021-0004.pdf | ||
| Conformed RFP SPRDL124R0021.pdf | ||
| SPRDL124R0021-0003.pdf | ||
| SPRDL124R0021-0002.pdf | ||
| SPRDL124R0021-0001.pdf | ||
| SPRDL124R0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0005 2025JAN21
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
JANECA DENT
EMAIL: JANECA.DENT@DLA.MIL
SPRDL1-24-R-0021
2023DEC19
X
X 2025FEB05 01:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 8
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JANECA DENT
Buyer Office Symbol/Telephone Number: ZGAA/(586)467-1233
Type of Contract 1: Firm Fixed Price
Kind of Contract: Other
*** End of Narrative A0000 ***
The purpose of amendment 0005 to solicitation SPRDL1-24-R-0021 is to change the following:
1. Extend the closing date and time for receipt of offers to 1:00 pm EST on 5 February 2025.
2. Change the quantity of CLIN 0001AA as reads "20 each" to read, "35 each", an increase of 15 each.
3. Delete the option CLIN 0002AA and all applicable option narratives and clauses.
4. All other terms and conditions remain unchanged and in full force and effect.
*** END OF NARRATIVE A0006 ***
2 8
SPRDL1-24-R-0021
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 WIRE RACE RING KIT
NSN: 1015-01-628-8229
Mfr CAGE: 19207
Mfr Part Number: 57K6506
0001AA PRODUCTION QUANTITY 55 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: WIRE RACE RING KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH3C0507EH PRON AMD: 02
AMS CD: SM2B1100000
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING REQUIREMENTS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H093179022V W562RP J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 55 0650
FOB POINT: Destination
SHIP TO:
(W562RP) SR W0LX ARMY GENERAL SUPPLY
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
3 8
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002AA DELETED _______
4 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
***SECTION I (CONTRACT CLAUSES) NARRATIVE(S)***
I.3 Mandatory Use of Contractor to Government Electronic Communication______________________________________________________________________
(a) All references in the contract to the submission of written documentation shall mean electronic submission.
(b) This shall include all written unclassified communications between the Government and the Contractor except contract awards and contract modifications which shall be posted on the internet. Return receipt shall be used if a commercial application is available.
Classified information shall be handled in full accordance with the appropriate security requirements.
(c) Upon award, the Contractor shall designate the personnel with signature authority who can contractually bind the Contractor.
Additionally, the Contractor shall provide the Procuring Contracting Officer (PCO) with a list of e-mail addresses for all administrative and technical personnel assigned to this contract.
(d) Unless exempted by the PCO in writing, all unclassified written communication after contract award shall be transmitted electronically.
************ End of Narrative I.3 ************
*** END OF NARRATIVE I0001 ***
5 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
***SECTION L (INSTRS., CONDS., AND NOTICES FOR OFFERORS) NARRATIVE(S)***
L.4 Data and Communications Submitted to the Government Electronically________________________________________________________________________
(a) The Government often employs Contractors as system administrators to operate and maintain Government computer systems. These systems include local area networks, web sites, databases, other electronic records, e-mail accounts, other electronic data transfer mechanisms and computer software. The employees of these contracted system administrators sign nondisclosure agreements obligating them not to reveal information contained in files, documents, computers or systems that they administer. However, unless such information is protected in some way, contracted system administrators do have the ability to access such information.
(b) Potential Contractors as well as any other parties are thus advised to take steps needed to prevent access by contracted system administrators to information submitted electronically to the Government. Absent such steps, it is assumed that contracted system administrators are permitted the capability to access the data. The access will be limited to that which is necessary for the contract system administrator to perform its duties for the Government. The access shall be subject to the condition that third party information is not to be revealed by the contracted system administrator.
************ End of Narrative L.4 ************
L.5 Source Notes on Drawings - Conform to Mil Tech Data Requirements______________________________________________________________________
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Offerors shall bear the responsibility of verifying that the approved part as supplied will conform with all such specific technical requirements.
************ End of Narrative L.5 ************
L.11 Acquisition of New Facilities, Special test Equipment or Special Tooling_____________________________________________________________________________
It is not the intent of the Government to acquire, or to have acquired for its account, any facilities, special test equipment, or special tooling. The Government shall under no circumstances reimburse the Offeror for the cost of any new facilities, special test equipment, or special tooling as a separate item. An Offeror may, however, amortize the cost of any such facilities, special test equipment, or special tooling it may require in the submitted price of the items. Such facilities, special test equipment or special tooling shall not be subject to Government option rights to take title to the same except as specified in the DEFAULT, TERMINATION FOR
THE CONVENIENCE OF THE GOVERNMENT, and/or PROGRESS PAYMENT clauses of this contract.
************ End of Narrative L.11 ************
L.15 Agency Protests____________________
Companies protesting this procurement may file a protest 1) with the Procuring contracting officer, 2) with the General Accounting
Office, or 3) pursuant to Executive Order No. 12979, with the Agency for a decision by the Activity's Chief of the Contracting Office.
Protests filed with the agency should clearly state that they are an "Agency Level Protest under Executive Order No. 12979." (Note: DLA procedures for Agency Level Protests filed under Executive Order No. 12979 allow for a higher level decision on the initial protest than would occur with a protest to the Procuring Contracting Officer; this process is not an appellate review of a Procuring Contracting
Officer's decision on a protest previously filed with the Procuring Contracting Officer). Absent a clear indication of the intent to file an agency level protest, protests will be presumed to be protests to the Procuring contracting officer.
NOTE: DLA Agency Protests for DLA Warren shall be filed with:
Chief of the Contracting Office
DLA Land Warren
Mail Stop 729; ZG
6501 E. Eleven Mile Road
Warren, MI 48397-5000
Contracting Officer Protests shall be submitted to the Contracting Officer designated in the solicitation or award.
************ End of Narrative L.15 ************
6 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
L.24 Notice of Offerors Intending to Offer Other Than New Material___________________________________________________________________
(a) The Government intends to acquire only new material. Unless this contract otherwise requires virgin material or supplies composed of, or manufactured from, virgin material, the Contractor shall provide supplies that are new, as defined in this clause.
(b) Definitions:
(1) "New" means composed of previously unused components, whether manufactured from virgin material, recovered material in the form of raw material, or materials and by-products generated from, and reused within, an original manufacturing process; provided that the supplies meet contract requirements, including but not limited to, performance, reliability, and life expectancy.
(2) "Reconditioned" means restored to the original normal operating condition by readjustments and material replacement.
(3) "Recovered material" means waste materials and by-products that have been recovered or diverted from solid waste including post-consumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(4) "Remanufactured" means factory rebuilt to original specifications.
(5) "Virgin material" means previously unused raw material, including previously unused copper, aluminum, lead, zinc, iron, other metal or metal ore, or any undeveloped resource that is, or with new technology will become, a source of raw materials.
(6) "Residual Inventory" means inventory from a transferred or terminated Government or commercial contract.
(c) Used, reconditioned, remanufactured supplies, unused former Government surplus property, or residual inventory shall not be used unless the Contractor has proposed the use of such supplies, and the Procuring Contracting Officer has authorized their use.
(d) Offers to provide other than new material shall be submitted to the Procuring Contracting Officer for approval:
(1) Offerors of other than new material must provide sufficient information from which a determination of acceptability can be made. Contractors who intend to offer other than new material must contact the Contracting Office listed on the first page of this solicitation to obtain an Other Than New Material Worksheet. Form must be completely filled out and is to accompany your offer.
(e) If the use of used, reconditioned, remanufactured items, unused former Government surplus property, or residual inventory are approved by the Procuring Contracting Officer, we may require you to meet specific marking, inspection, and testing requirements beyond those found in this solicitation. We will negotiate these additional requirements with you before award and put them in any resulting contract.
************ End of Narrative L.24 ************
L.25 E-mail Offer Submissions_____________________________
(a) Vendors shall email offers to the Contracting Specialist identified on the cover page of the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.
(b) Submissions must be received by the deadline as stated in the solicitation. All electronics formats are acceptable, PDF format is preferred.
(c) An electronic read-receipt is recommended for submission confirmation. Vendors will receive an e-mail reply by the Contracting
Specialist stating whether the e-mail was received by the deadline.
(d) Questions regarding email submissions should be directed to the Contracting Specialist identified on the cover page of the solicitation.
************ End of Narrative L.25 ************
*** END OF NARRATIVE L0001 ***
7 8
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
M-1 DELETED 52.217-5 EVALUATION OF OPTIONS JUL/1990
8 8
| SECTION A |
| SECTION B |
| SECTION I |
| SECTION L |
| SECTION M |
File details come from the government source that posted it. Updated .