SPRDL1-19-R-0336.pdf
PDF 124 KB Posted
- Attached to
- Pump, Axial Pistons Federal contract opportunity
- Solicitation number
- SPRDL1-19-R-0336
About this file
Solicitation: Closes 18 October 2019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPI_11654401_Pump,_Axial_Pistons.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRDL1-19-R-0336
X
2019SEP16
2019OCT18
DOA4
2019SEP16 SEE SCHEDULE
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
RALPH MCCARTHY
(586)467-1173
ZGAC
RALPH.F.MCCARTHY.CIV@MAIL.MIL
1 61
X 1
X 5 X 11
X 14 X 16 X 18
X 22
X 24
X 25
X 36
X 54
X 61
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: RALPH MCCARTHY
Buyer Office Symbol/Telephone Number: ZGAC/(586)467-1173
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.2 Women Owned Small Business (WOSB) Program Repository Provision
This solicitation is set-aside for either Economically Disadvantaged Women Owned Small Business (EDWOSB) or Women Owned Small Business
(WOSB) concerns.
To be eligible for award, the offeror must have submitted documents verifying its eligibility at the time of initial offer to the WOSB
Program Repository per FAR 19.1503.
Guidance for the WOSB Program Repository can be found on the U.S. Small Business Administration webpage: http://www.sba.gov/WOSB .
Offeror must add the following email addresses for access/verification to your WOSB Program Repository:
Contracting Officer: Jeffrey Mahlmeister at jeffrey.mahlmeister@dla.mil and
Contract Specialist: Ralph McCarthy at ralph.mccarthy@dla.mil
************ End of Narrative A.2 ************
A.4 Acknowledgment of Amendments
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
************ End of Narrative A.4 ************
A.6 Notice of Reverse Auction Provision
After receipt of proposals, the contracting officer will determine if a reverse auction will be conducted. However, the use of a reverse auction does not preclude additional methods of price and/or cost analysis.
If a reverse auction is held, Contractors must be registered in the reverse auction system in order to participate in the auction.
Additionally, the Contractor representative participating in the auction must have taken the on-line reverse auction training prior to
2 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the reverse auction. Registration, on-line training, and other information regarding the reverse auction can be found at https://dla.procurexinc.com . If a reverse auction is held and a Contractor that provided a proposal to the solicitation does not participate in the auction, the initially proposed price(s) will be considered and evaluated.
************ End of Narrative A.6 ************
A.8 Electronic Contracting Provision
(a) All DLA Land Warren solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the
Federal Business Opportunities (FBO) system.
(c) Requirements for the online FBO bid submission:
1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
2. Vendors must be registered in the System for Award Management (SAM) at sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
4. FBO will send an email to the vendors registered email address confirming the electronic submission.
5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section
4.3.1 Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses. In this case, send any late quotes, if applicable, directly to the contract specialist identified on the cover page of this solicitation.
(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at https://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
************ End of Narrative A.8 ************
A.9 All or None Provision
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
3 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
************ End of Narrative A.9 ************
*** END OF NARRATIVE A0001 ***
4 61
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
This Procurement is Set-Aside for Woman Owned Small
Business Concerns.
(End of narrative A001)
IN THE FIRST FOUR DIGIT ITEM NUMBERS (CLINS) THAT
FOLLOW, THE NUMBERING SYSTEM THAT IS USED IS AS
FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY THE ITEM. THE FOURTH
(LAST DIGIT) INDICATES THE CONTRACT YEAR, i.e., CLIN
0011 IS FOR THE FIRST ITEM - FIRST ORDERING YEAR,
CLIN 0012 IS FOR THE FIRST ITEM - SECOND ORDERING
YEAR, CLIN 0013 IS FOR THE FIRST ITEM - THIRD
ORDERING YEAR, ETC.
THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH PART,
SUCH AS FAT, TECHNICAL MANUALS, SERVICES, OR
TRAINING, WILL BECOME THE LAST ITEM NUMBER IN
NUMERICAL SEQUENCE FOR EACH ITEM, e.g.
0016 (5-YEAR LONG-TERM CONTRACT) OR 0014
(3-YEAR LONG-TERM CONTRACT).
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF___________________
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS____________________
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS___________________
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS____________________
THROUGH 1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS___________________
THROUGH 1,824 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS
ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING YEAR.
The information presented below applies to Item No.
0011 Through 0015:
Guaranteed Minimum 5 Year Quantity (GMQ): 15 EACH
(This will be awarded at the time of the basic contract award)
Maximum 5 Year Contract Quantity: 521 EACH
ONLY THE GMQ IS GUARANTEED.
NOTE: EACH ORDERING YEAR QUANTITY IS AN ESTIMATE.
5 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative A002)
0011 FIRST ORDERING YEAR EST: 221 EA $ $ ___________________ ______________ __________________
NSN: 4320-00-174-3439
COMMODITY NAME: PUMP, AXIAL PISTONS
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 11654401
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11654401
DATE: 02-JUL-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
6 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST: 75 EA $ $ ____________________ ______________ __________________
NSN: 4320-00-174-3439
COMMODITY NAME: PUMP, AXIAL PISTONS
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 11654401
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11654401
DATE: 02-JUL-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
7 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST: 75 EA $ $ ___________________ ______________ __________________
NSN: 4320-00-174-3439
COMMODITY NAME: PUMP, AXIAL PISTONS
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 11654401
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11654401
DATE: 02-JUL-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
8 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FOURTH ORDERING YEAR EST: 75 EA $ $ ____________________ ______________ __________________
NSN: 4320-00-174-3439
COMMODITY NAME: PUMP, AXIAL PISTONS
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 11654401
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11654401
DATE: 02-JUL-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
9 61
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0015 FIFTH ORDERING YEAR EST: 75 EA $ $ ___________________ ______________ __________________
NSN: 4320-00-174-3439
COMMODITY NAME: PUMP, AXIAL PISTONS
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 11654401
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11654401
DATE: 02-JUL-2019
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
10 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Use of MIL-STD 1916
The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.
************ End of Narrative C.1 ************
C.5 Technical Data Package Information (FBO) Version
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A
TDP Link (URL): N/A
[ X ] 3. The TDP for this solicitation resides within FedBizOpps (https://http://www.fbo.gov ), and is associated with this solicitation number and can be accessed via this URL: https://www.fbo.gov/notices/3458c9b19110818e31a786abadaed961
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to https://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided.
Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the
Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at DLA Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
11 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted.
Questions related to registration in FBO should be directed to https://www.fbo.gov/index The FBO helpdesk phone number is (866) 606-
8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the contract specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at https://http://www.fbo.gov - on the right is User Guides - click on Vendor.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled N/A, and is:
[ ] available by emailing the contract specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email/fax it to the contract specialist at N/A. The contract specialist will notify the
FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist
************ End of Narrative C.5 ************
C.11 Drawing Limitations
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
************ End of Narrative C.11 ************
C.13 Configuration Control Engineering Changes
(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
12 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form 1695-1
Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate forms on the
DOD Forms Website (http://www.dtic.mil/whs/directives/forms/ ) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.
************ End of Narrative C.13 ************
C.18 Use of Class 1 Ozone Depleting Substances (CIODS)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html .
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing
************ End of Narrative C.18 ************
*** END OF NARRATIVE C0001 ***
13 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.6 Packaging Requirements (Special Packaging Instructions)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER: See SPI 11654401 uploaded to FBO
(a) REVISION: B
(b) DATE OF REVISION: As listed on SPI
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: Uploaded to FBO.gov
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/ for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging
Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the
"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and
Military Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide.
When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the
14 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO
P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: In lieu of MIL-P-116, refer to MIL-STD-2073-1. In lieu of Method IA-15, refer to Method 42. In lieu of VV-L-800, refer to MIL-PRF-32033. In lieu of MIL-B-121, refer to MIL-PRF-121, Type II. In lieu of PPP-P-291, refer to A-A-1051. In lieu of PPPB-636, refer to ASTM D5118. In lieu of A-A-883, refer to ASTM D1974, Method 2B6. In lieu of MIL-B-117, refer to MIL-DTL-117.
Add second Class WR ASTM D5118 fibreboard box. Change ICQ to 000.
************ End of Narrative D.6 ************
*** END OF NARRATIVE D0001 ***
15 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.18 Inspection and Acceptance Points - Origin
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
Address) (City) (State) (Zip)
************ End of Narrative E.18 ************
E.26 Interchangeability of Components
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for:
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
************ End of Narrative E.26 ************
*** END OF NARRATIVE E0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
16 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
17 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F.3 Delivery Schedule for Delivery Orders
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires deliveries according to the following schedule on all orders:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:
(i) If FAT is required, start deliveries N/A days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, start deliveries 180 days after delivery order date.
(iii) You will deliver 100 units every thirty days.
(iv) You can deliver more units every thirty days at no additional cost to the government.
(d) Accelerated delivery schedule is acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:
(i) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, deliveries will start ___ days after delivery order date.
************ End of Narrative F.3 ************
F.4 Long Term Contracts FOB Destination
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed:
Plant 7008 (wolf Anniston Munitions Center): 100%
************ End of Narrative F.4 ************
F.5 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR ADDRESSES
Rail/ Motor SPLC*: 206721 and 209405
MILSTRIP Address Code: W2561U
Rail Ship to: Transportation Officer
Defense Dist. Depot
Susquehanna
New Cumberland, PA
18 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Motor Ship to: Transportation Officer
Defense Dist. Depot
Susquehanna
New Cumberland, PA
Parcel Post Mail to: Transportation Officer
Defense Dist. Depot
Susquehanna
New Cumberland, PA 17070-5001
NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.
Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.
Rail/ Motor SPLC*: 875670 and 875675
MILSTRIP Address Code: W62G2T
Rail Ship to: Transportation Officer
XU Def Dist. Depot
San Joaquin
2600 S. Chrisman Rd.
Rec Whse 10
Tracy, CA 95376-5000
Motor Ship to: Transportation Officer
XU Def Dist. Depot
San Joaquin
2600 S. Chrisman Rd.
Rec Whse 10
Tracy, CA 95376-5000
Parcel Post Mail to: Transportation Officer
Dist. Depot San Joaquin
P.O. Box 96001
Stockton, CA 95296-0130
Rail/ Motor SPLC*: 471995 and 471996
MILSTRIP Address Code: W31G1Z
Rail Ship to: Transportation Officer
Anniston Army Depot
Bynum, AL
Motor Ship to: Transportation Officer
Anniston Army Depot
Bynum, AL
Parcel Post Mail to: Transportation Officer
Anniston Army Depot
Bynum, AL 36201-5021
Rail/ Motor SPLC*: 209741 and 209770
MILSTRIP Address Code: W25G1R
Rail Ship to: Transportation Officer
Letterkenny Army Depot
Culbertson, PA
Motor Ship to: Transportation Officer
Letterkenny Army Depot
Chambersburg, PA
19 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Parcel Post Mail to: Transportation Officer
Letterkenny Army Depot
Chambersburg, PA 17201-4150
Rail/ Motor SPLC*: 661136 and 661157
MILSTRIP Address Code: W45G19 and W562RM
Rail Ship to: Transportation Officer
Red River Army Depot
Defense, TX
Motor Ship to: Transportation Officer
Red River Army Depot
Texarkana, TX
Parcel Post Mail to: Transportation Officer
Red River Army Depot
Texarkana, TX 75507-5000
NOTE: Drivers must schedule an appointment for delivery at least 24 hours in advance. Deliveries will be scheduled for Monday-Friday, 0700-1300. E-mail or fax the PCO at CML (903)334-2208 or CML (903)334-2881. POC's are available Monday-Saturday, 0700-1730 with the exception of government holidays. For directions, please call CML (903)334-3060. Trucks enter through the commercial carrier route entrance and report to building 23 Truck Control 30 minutes prior to their scheduled appointment. Carriers that arrive at Truck Control without appointments will be placed at the end of the day's schedule unless there is an earlier opening and will be worked/unloaded as soon as possible.
POCs: ddrt-appt@dla.mil, Randy Cox, CML (903)334-2945, Randy.Cox@dla.mil
Angela Carr, CML (903)334-4950 Angela.Carr@dla.mil
Jane Haley, CML (903)334-4671 Jane.Haley@dla.mil
Darlene Phelps, CML (903)334-3818 Darlene.Phelps@dla.mil.
Rail/ Motor SPLC*: 764538 and 764535
MILSTRIP Address Code: W67G23
Rail Ship to: Transportation Officer
Tooele Army Depot
Warner, UT
Motor Ship to: Transportation Officer
Tooele Army Depot
Warner, UT
Parcel Post Mail to: Transportation Officer
Tooele Army Depot
Warner, UT 84074-5003
*** SPLC indicates Standard Point Locator Code.
NOTE: The following is applicable only when so specified in an individual order or delivery increment:
This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:
New Cumberland Army Depot
Red River Army Depot
Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.
************ End of Narrative F.5 ************
*** END OF NARRATIVE F0001 ***
20 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION NOV/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
21 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION G - CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018
(a) Definitions.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.