Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRDL1-19-R-0093
X
2019MAY13
2019JUN1304:30pm
DOA4
2019MAY13 SEE SCHEDULE
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
CHRISTOPHER CRUZ
(586)467-1205
ZGBA
CHRISTOPHER.CRUZ1.CIV@MAIL.MIL
X 1 25
1 59
X 1
X 5 X 10
X 13 X 15 X 17
X 20
X 22
X 23
X 35
X 36
X 52
X 59
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: CHRISTOPHER CRUZ
Buyer Office Symbol/Telephone Number: ZGBA/(586)467-1205
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
A-1 52.204-4016 WARREN ELECTRONIC CONTRACTING OCT/2015
(TACOM)
(a) All DLA Land Warren solicitations will be publicized on the Federal Business Opportunities website (fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the
Federal Business Opportunities (FBO) system.
(c) Requirements for the online FBO bid submission:
1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
2. Vendors must be registered in the System for Award Management (SAM) at (sam.gov) (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
4. FBO will send an email to the vendors registered email address confirming the electronic submission.
5. For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1
Submitting an Electronic Response (fbo.gov).
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses. In this case, send any late quotes, if applicable, directly to the contract specialist identified on the cover page of this solicitation.
(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
2 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at ahttps://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
[End of Provision]
A-2 52.214-4003 ALL OR NONE MAR/1998
(TACOM)
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
[End of clause]
A-3 52.215-4000 ACKNOWLEDGMENT OF AMENDMENTS OCT/1993
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
(End of Provision)
A-4 52.215-4801 NOTICE OF REVERSE AUCTION PROVISION JAN/2014
(DLA LAND-
WARREN)
This solicitation contains standard DLA Land Warren provision 52.215-9023, Reverse Auction. After receipt of proposals, the contracting officer will determine if a reverse auction will be conducted. However, the use of a reverse auction does not preclude additional methods of price and/or cost analysis.
If a reverse auction is held, Contractors must be registered in the reverse auction system in order to participate in the auction.
Additionally, the Contractor representative participating in the auction must have taken the on-line reverse auction training prior to the reverse auction. Registration, on-line training, and other information regarding the reverse auction can be found at . If a reverse auction is held and a Contractor that provided a proposal to the solicitation does not participate in the auction, the initially proposed price(s) will be considered and evaluated.
3 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
[End of Provision]
This procurement is a 100% Sole-Source to Honeywell International Inc.,(CAGE: 59364) formally Allied-Signal Aerospace, Co., or any authorized distributor.
*** END OF NARRATIVE A0001 ***
4 59
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY THE ITEM AND THE
FOURTH (LAST) DIGIT SIGNIFIES THE APPLICABLE CONTRACT
YEAR, i.e., CLIN 0011 IS FOR THE FIRST ITEM - FIRST
ORDERING YEAR, CLIN 0012 IS FOR THE FIRST ITEM -
SECOND ORDERING YEAR, CLIN 0013 IS FOR THE FIRST ITEM
- THIRD ORDERING YEAR, ETC.
THE FINAL LINE(S) ASSOCIATED WITH EACH PART, SUCH AS
FAT, TECHNICAL MANUALS, SERVICES, OR TRAINING, WILL
BECOME THE LAST ITEM NUMBER IN NUMERICAL SEQUENCE FOR
EACH ITEM, e.g. 0016 (5 YEAR LONG TERM CONTRACT), OR
0014 (3 YEAR LONG TERM CONTRACT). IF MORE THAN ONE IS
BEING PROCURED, THE NUMBERS WILL BE 0026 OR 0024
DEPENDING ON THE LENGTH OF THE LONG TERM CONTRACT.
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS
THROUGH 729 DAYS AFTER THE CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 THROUGH
1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 THROUGH
1,824 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS
ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING YEAR.
The information presented below applies to Item No.
0011 Through 0015:
Minimum 5 Year Quantity: 9 EACH
Maximum 5 Year Quantity: 196 EACH (Inclusive of
Option Years, if applicable)
ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.
NOTE: EACH ORDERING YEAR ESTIMATE, AS WELL AS EACH
OPTION YEAR ESTIMATE, IF APPLICABLE, IS A 12 MONTH
AVERAGE MONTHLY DEMAND WITH CONTRACT FACTORS BUILT IN
AND A 25% INCREASE PER YEAR.
ALL OFFERS MUST INCLUDE A SIGNED SF 33/SF 1449.
5 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SEE PARAGRAPH (d) OF CLAUSE 52.204-4016, TACOM WARREN
ELECTRONIC CONTRACTING, OF THIS SOLICITATION FOR
INSTRUCTIONS ON HOW TO SUBMIT YOUR OFFER.
(End of narrative A001)
0011 Production Quantity EST 67 EA $ $ ___________________ ______________ __________________
NSN: 4810-01-377-6936
COMMODITY NAME: PARTS KIT, VALVE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 5705518
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: NO TDP
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE REQUIREMENTS FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0012 Production Quantity EST 32 EA $ $ ___________________ ______________ __________________
NSN: 4810-01-377-6936
COMMODITY NAME: PARTS KIT, VALVE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 5705518
6 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: NO TDP
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE REQUIREMENTS FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0013 Production Quantity EST 32 EA $ $ ___________________ ______________ __________________
NSN: 4810-01-377-6936
COMMODITY NAME: PARTS KIT, VALVE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 5705518
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: NO TDP
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE REQUIREMENTS FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
7 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0014 Production Quantity EST 32 EA $ $ ___________________ ______________ __________________
NSN: 4810-01-377-6936
COMMODITY NAME: PARTS KIT, VALVE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
Mfr Part Number: 5705518
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: NO TDP
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE REQUIREMENTS FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0015 Production Quantity EST 33 EA $ $ ___________________ ______________ __________________
NSN: 4810-01-377-6936
COMMODITY NAME: PARTS KIT, VALVE
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 19207
8 59
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Mfr Part Number: 5705518
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: NO TDP
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE REQUIREMENTS FOR DETAILS
UNIT PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
9 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION SEP/2015
(TACOM)
The following Xd item applies to this solicitation:
[X ] 3. The TDP for this solicitation resides within FedBizOpps (), and is associated with this solicitation number and can be accessed via this URL:
https://www.fbo.gov/notices/027363b22011ac42b67dde6c70b3c20e
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)
or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to htt ps://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at TACOM Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted.
Questions related to registration in FBO should be directed to The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the contract specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at - on the right is User Guides - click on Vendor.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled N/A, and is:
[ ] available by emailing the contract specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email/fax it to the contract specialist at N/A. The contract specialist will notify the
FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist.
10 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
[End of Clause]
C-2 52.211-4008 DRAWING LIMITATIONS NOV/2005
(TACOM)
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the _____________________________ manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited _____________________________ in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
[End of clause]
C-3 52.211-4011 ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS FEB/1998
(TACOM)
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the provision entitled NOTICE REGARDING "SOURCE-CONTROLLED" COMPONENTS. (In Section L or near the end of this solicitation.) It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with ________ previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer.
[End of Clause]
C-4 52.211-4015 CONFIGURATION CONTROL - ENGINEERING CHANGES JAN/2016
(TACOM/ARDEC)
(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
11 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD
Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate froms on the
DOD Forms Website (http://www.dtic.mil/whs/directives/forms/) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.
(End of clause)
C-5 52.223-4002 USE OF CLASS I OZONE-DEPLETING SUBSTANCES (CIODS) OCT/2008
(TACOM)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) _________________________________________________________ of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html.
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, __________________________________ explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not _____________________________________ explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
[End of Provision]
12 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
D-1 52.211-4515 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) DEC/2014
(TACOM)
(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of MIL-STD-2073-1, and the Special Packaging Instruction, see below.
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIAL PACKAGING INSTRUCTION NUMBER. - AK13776936
(a) REVISION B
(b) DATE OF REVISION 11/21/2006
(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A
(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging Instructions in
Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the "Advanced" tab.
Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")
(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and
Military Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide.
When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
13 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(e) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO
P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(g) SUPPLEMENTAL INSTRUCTIONS: N/A
[End of Clause]
14 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.211-4029 INTERCHANGEABILITY OF COMPONENTS MAY/1994
(TACOM)
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or ______________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
[End of clause]
E-4 52.246-4028 INSPECTION AND ACCEPTANCE POINTS: ORIGIN NOV/2005
(TACOM)
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: ___________________________________________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: ____________________________________________________________________________
(Name) (CAGE)
(Address) (City) (State) (Zip)
[End of Clause]
E-5 52.246-4803 DRAWINGS FOR INSPECTION JUN/2013
(DLA LAND
WARREN)
(a) When requested, the Contractor shall make available to the Government Inspector the drawings and specifications to which the product
15 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
was manufactured. Upon completion of product inspection and acceptance by the Government inspector, all drawings and specifications will be returned to the Contractor.
(b) If the Contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.), the Contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
(c) The Government may rely on the Contractor's Certificate of Conformance, IAW FAR 52.246-15, that the item tendered for acceptance conforms to the contract requirements. However, conditions may warrant that the Contractor be required to make available to the
Government the drawings, specifications, or other technical data such that the Government can determine if the item meets the contract requirements. These conditions may include, but are not limited to, the following: 1) Complex items or items which have quality characteristics for which contractual conformance must be established through precise measurements and functional operation, either as an individual item or in conjunction with other items. 2) Items used in critical applications or items denoted as critical on technical data. 3) Items with known quality conformance issues. 4) Items with an unstable design history. 5) Contractor changes in technical requirements, technical data, and/or production processes which impact the fit, form, or function of the item.
[End of clause]
16 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION NOV/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 52.242-4457 DELIVERY SCHEDULE FOR DELIVERY ORDERS SEP/2008
(TACOM)
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires deliveries according to the following schedule on all orders:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:
(i) If FAT is required, start deliveries N/A days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, start deliveries 180 days after delivery order date.
(iii) You will deliver 6 units every thirty days.
(iv) You can deliver more units every thirty days at no additional cost to the government.
(d) Accelerated delivery schedule is acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:
(i) If FAT is required, deliveries will start ___ days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, deliveries will start ___ days after delivery order date.
[End of clause]
17 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
F-7 52.247-4456 LONG TERM CONTRACTS - FOB DESTINATION OCT/1999
(TACOM)
For the purpose of offerors compiling FOB Destination offers, the final destination for the supplies will be one or more of the following destinations; in the following estimated percentages, if listed: 50% to DDSP New Cumberland Facility (AN5) & 50% to XU Def
Dist Depot San Joaquin (AQ5)
(End of Clause)
F-8 52.247-4009 DELIVERY OF SUPPLIES FROM FOREIGN FIRMS TO U.S. PORT OF ENTRY AUG/2003
(TACOM)
This clause applies only to foreign firms when shipments are required to destinations within the Continental United States (CONUS).
(1) The F.O.B. point for this acquisition is DESTINATION. You must arrange and pay for (i) transportation to the U.S. port of entry, (ii) port handling, (iii) customs clearance, and (iv) all transportation from the port of entry to the consignee(s) listed in this solicitation.
(2) Acceptance will be at destination if the awardee is an OCONUS (Outside Continental United States) foreign firm.
(3) Identification of shipment. The Contractor must insure that all shipments be clearly marked in accordance with MIL-STD-
129 and other marking requirements specified in the Schedule. The Duty-Free Entry clauses in this contract contain instructions on the documentation required to accompany the shipment for duty-free entry.
(4) Notification of Shipment. The Contractor shall send electronic notification to the Procuring Contracting Officer (PCO) when shipment is made, which includes the following information:
(i) Mode of transportation, carrier, bill of lading number, customs broker (if any), and estimated time of arrival of materiel at OCONUS port authority
(ii) Mode of transportation, carrier, bill of lading number, and estimated dates for pick-up from CONUS port authority and delivery to final destination.
(5) You assume all responsibility for risk of loss or damage to the supplies until received at the destination. See the clause entitled RESPONSIBILITY FOR SUPPLIES (FAR 52.246-16).
[End of Clause]
F-9 52.247-4017 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR NOV/2009
(TACOM) ADDRESSES
Rail/ MILSTRIP
Motor Address Rail Motor Parcel Post
SPLC* Code Ship To: Ship To: Mail To:______ ________ ________ ________ ___________
206721/ W25G1U Transportation Officer Transportation Officer Transportation Officer
209405 Defense Dist Depot Defense Dist Depot Defense Dist Depot
Susquehanna Susquehanna Susquehanna
New Cumberland, PA New Cumberland, PA New Cumberland, PA 17070-5001
NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.
Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.
875670/ W62G2T Transportation Officer Transportation Officer Transportation Officer
875675 XU Def Dist Depot XU Def Dist Depot Dist Depot San Joaquin
18 59
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
San Joaquin San Joaquin P O Box 96001
25600 S Chrisman Rd 25600 S Chrisman Rd Stockton, CA 95296-0130
Rec Whse 10 Rec Whse 10
Tracy, Ca 95376-5000 Tracy, Ca 95376-5000
471995/ W31G1Z Transportation Officer Transportation Officer Transportation Officer
471996 Anniston Army Depot, Anniston Army Depot, Anniston Army Depot, Bynum, AL Bynum, AL Anniston, AL 36201-5021
209741/ W25G1R Transportation Officer Transportation Officer Transportation Officer
209770 Letterkenny Army Depot, Letterkenny Army Depot, Letterkenny Army Depot, Culbertson, PA Chambersburg, PA Chambersburg, PA 17201-4150
661136/ W45G19 Transportation Officer Transportation Officer Transportation Officer
661157 W562RM Red River Army Depot, Red River Army Depot, Red River…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.