SPRDL118R0248-0001.pdf
PDF 21 KB Posted
- Attached to
- PANORAMIC TELESCOPE Federal contract opportunity
- Solicitation number
- SPRDL1-18-R-0248
About this file
Solicitation Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL118R0248-0002.pdf | ||
| SPRDL118R0248.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2018MAY01
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
AMY ROBOSAN
EMAIL: AMY.S.ROBOSAN.CIV@MAIL.MIL
SPRDL1-18-R-0248
2018MAR28
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 7
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: AMY ROBOSAN
Buyer Office Symbol/Telephone Number: ZGA/(586)467-1195
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
Amendment 0001 to solicitation SPRDL1-18-R-0248
1. F4 glass will be provided as Government Furnished Material. GFM is not authorized to be used to support any other contract. TACOM will only provide enough F4 glass to satisfy deliveries orders under this contract.
As a result of the GFM F4 glass the following clauses are hereby added:
252.211-7007 Reporting of Government-Furnished Property
52.247-55 F.O.B. Point for Delivery of Government -Furnished Property
252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property
252.245-7002 Reporting Loss of Government Property
252.245-7003 Contractor Property Management System Administration
252.245-7004 Reporting, Reutilization, and Disposal
52.245-9 Use and Charges
52.245-1 Government Property
2. FAT will not be waived for any offeror. Narrative C001 under CLIN 0016 is hereby amended
From:
First Article Test is required. Waiver may be authorized; see waiver provision in section L.
To: First Article Test is required. Waiver will not be authorized for any offeror.
Provision 52.209-4008 Caution Concerning the Pricing of First Article Approval is added.
Provision 52.209-4007 Provision for Waiver of Required First Article Test is deleted.
Clause 52.242-4457 Delivery Schedule for Delivery Orders is amended.
3. Clause 52.246-4533 Surface Quality Standards is hereby added to the solicitation.
*** END OF NARRATIVE A0002 ***
2 7
SPRDL1-18-R-0248 0001
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0016 FIRST ARTICLE TEST REPORT 1 EA $ $ _________________________ ______________ __________________
NSN: 1240-01-483-6103
COMMODITY NAME: FIRST ARTICLE TEST REPORT
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE CLAUSE
ENTITLED "FIRST ARTICLE APPROVAL--CONTRACTOR TESTING",
FAR 52.209-3.
(End of narrative B001)
First Article Test is required.
Waiver will not be authorized for any offeror.
(End of narrative C001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Government Approval/Disapproval Days: 30
3 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.246-4533 SURFACE QUALITY STANDARDS MAR/2001
TACOM (RI)
a. Surface quality standards for optical elements (Scratch and Dig) per MIL-PRF-13830B, are required to perform acceptance inspection under this contract and are available as listed:
DRAWING: 7641866
REVISION: Any Rev N thru U
QUANTITY: 01
COST: $2000
EST WT: 5 lb
The standards will be furnished to the Contractor on a loan basis for use on this contract. The standards shall not be used on other contracts unless written authorization is received from the Contracting Officer. The Administering Contracting Officer (ACO) designated by the agency administering the contract, or the Contracting Officer (CO) if an ACO was not assigned shall submit the Contractor's request for equipment to US ARMY - ARDEC/RDAR-EIQ-EC,BLDG 92,Picatinny Arsenal, NJ 07806-5000. Shipping costs shall be borne by the shipper.
b. The contractor shall hereby indicate the facility to which this Government Furnished Property should be shipped:
c. Upon receipt, the Contractor should retain shipping containers for return of the standards. All costs of packing, packaging, shipping, and insurance shall be borne by the Contractor.
d. The Contractor shall be responsible for shipping the surface quality standards to the Government for certification at 12 month intervals. Notification and shipping instructions shall be provided to the Contractor by US ARMY - ARDEC/RDAR-EIQ-EC,BLDG 92,Picatinny
Arsenal, NJ 07806-5000. The notification shall include the standard's serial number and will be sent 30 days prior to the actual due date for certification.
e. Within 30 calendar days after completion of delivery of all items on this contract requiring scratch and digs, the Contractor shall assure that the Government owned standards referenced in paragraph a above are in the same condition as when received. Upon verification by a Government representative that the standards are undamaged, the Contractor shall prepare the standards for delivery in accordance with best commercial practices. The Contractor shall ship the standards with a DD Form 1149 to US ARMY-ARDEC/RDAR-EIQ-
EC,BLDG 92,Picatinny Arsenal, NJ 07806-5000
(End of Clause)
4 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
F-1 ADDED 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
F-2 ADDED 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012
F-3 CHANGED 52.242-4457 DELIVERY SCHEDULE FOR DELIVERY ORDERS SEP/2008
(TACOM)
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires deliveries according to the following schedule on all orders:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:
(i) If FAT is required, start deliveries 510 days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, start deliveries N/A days after delivery order date.
(iii) You will deliver 15 units every thirty days.
(iv) You can deliver more units every thirty days at no additional cost to the government.
(d) Accelerated delivery schedule is acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:
(i) If FAT is required, deliveries will start ___ days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, deliveries will start _N/A__ days after delivery order date.
[End of clause]
5 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 ADDED 52.245-1 GOVERNMENT PROPERTY JAN/2017
I-2 ADDED 52.245-9 USE AND CHARGES APR/2012
I-3 ADDED 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY APR/2012
I-4 ADDED 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY DEC/2017
I-5 ADDED 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION APR/2012
I-6 ADDED 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL DEC/2017
6 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 DELETED 52.209-4007 PROVISION FOR WAIVER OF REQUIRED FIRST ARTICLE APPROVAL MAY/2006
(TACOM)
L-2 ADDED 52.209-4008 CAUTION CONCERNING THE PRICING OF FIRST ARTICLE APPROVAL APR/1986
(TACOM)
We caution you to enter prices for first article items and for production items that reflect a fair apportionment of total contract costs, based upon the value we will receive for those items. As the Government, we have the right to reject an offer if it is materially unbalanced as to price. An offer is materially unbalanced as to price when, in the judgment of the Procuring Contracting
Officer (PCO), it cites prices that are significantly less than cost for some work, and significantly more than cost for other work.
[End of Provision]
7 7
| SECTION A |
| SECTION B |
| SECTION E |
| SECTION F |
| SECTION I |
| SECTION L |
File details come from the government source that posted it.