SPI.pdf

PDF 14 KB Posted

Attached to
Cylinder Assemblies Federal contract opportunity
Solicitation number
SPRDL1-18-R-0117
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

View the file

Other files for this federal contract opportunity

Other files attached to Cylinder Assemblies, newest first.
File Type Posted
SPRDL118R0117-0001.pdf PDF
SPI_AK12079240.pdf PDF
SPI.pdf PDF
SPRDL118R0117.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THIS ADDRESS.

FORM APPROVED

OMB No. 0704-0188

3040-01-2079026 08/26/09

AK12079026

C

4. NATIONAL STOCK NO.

2. CAGE 3. SPI NO.

6. REVISION 5. DATE

1. PART OR DRAWING NO. (CAGE) NOMENCLATURE

XSW

WEATHERIS

SPECIAL PACKAGING INSTRUCTION

6-372-002501 (12361) CYLINDER 19207

1 EACH NONE 0115.0 0002.866

MIL-STD-2073-1D, METHOD 20

MIL-STD-2073-1D AND NOTE B

MIL-STD-2073-1D AND NOTE B

10. UNIT PACK CU. (CU. FT.) 11. UNIT PACK SIZE (IN)

12. MILITARY PRESERVATION

17. NOTES / DRAWING

15. PACKING

14. DRYING

13. CLEANING

7. QUP 8. ICQ 9. UNIT PACK WT. (LB)

20.

DESCRIPTION

18.

STEPS

19.

REQ'D

A. INSPECT PRESERVATION, UNIT PACK, AND PACKING IN ACCORDANCE WITH MIL-STD-2073-1D AND THE APPLICABLE

CONTAINER SPECIFICATION.

B. CLEAN AND DRY ITEMS BY ANY SUITABLE PROCESS BEFORE APPLICATION OF PACKAGING MATERIALS.

C. WITH CYLINDER RODS FULLY RETRACTED, FILL WITH MANUFACTURER'S RECOMMENDED LUBRICANT.

THOUROUGHLY DRAIN EXCESS.

D. SEAL ALL OPENINGS WITH CAPS/PLUGS OF APPROPRIATE SIZE.

E. APPLY PRESERVATIVE TO ALL UNPAINTED/UNPLATED EXTERIOR SURFACES.

F. APPLY MATERIAL BETWEEN POINTS OF CONTACT OF ITEM WITH BLOCKING OR CONTAINER.

G. BLOCKING, BRACING, CUSHIONING AND IMMOBILIZATION OF THE ITEM(S) WITHIN THE CONTAINER SHALL MEET THE REQUIREMENTS OF MIL-STD-2073-1D, INCLUDING THE APPLICABLE ROUGH HANDLING TEST.

H. BOX SHALL BE CONSTRUCTED OF 1" NOMINAL LUMBER WITH 2" NOMINAL LUMBER ENDS AND NO END CLEATS

REQUIRED.

I. THE UNIT CONTAINER IS THE SHIPPING CONTAINER.

NOTE: UNIT PACK WEIGHT, SIZE AND CUBE ARE ESTIMATED AND PROVIDED FOR GOVERNMENT USE ONLY.

MIL-STD-2073-1D AND NOTE I

NOT APPLICABLE

MIL-STD-129

045.5 011.2 009.7X X

b. LEVEL B

16. MARKING

a. LEVEL A

1C 2D 3E 4F 5G 6H

A/R A/R A/R A/R A/R A/R

PRESERVATIVE: SEE NOTES

CAPS/PLUGS: NAS847

PRESERVATIVE: MIL-PRF-16173, GR 4

WRAP: MIL-PRF-121, TY II

BLOCKING AND BRACING: ASTM-D6199

CONTAINER: ASTM-D6880, CL 2, ST 1 (MOD)

DD FORM 2169, JUN 1997 PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages

File details come from the government source that posted it.