Conformed_Reprint_of_SPRDL118C0228_&_P00001.pdf
PDF 117 KB Posted
- Attached to
- ADP INPUT/OUTPUT AND STORAGE DEVICES
- Solicitation number
- SPRDL118R0071
About this file
Conformed contract includes modification P00001 within contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRDL118R0071-0001.pdf | ||
| SPRDL118R0071.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
SEE SCHEDULE
SPRDL1-18-C-0228 2018APR16
ELAINE IONESCU (586)467-1230
ELAINE.M.IONESCU.CIV@MAIL.MIL
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000 X
X 100
334118
X DOA4
X
SEE SCHEDULE
S1403A
DCMA CHICAGO
1523 WEST CENTRAL ROAD
BLDG 203
ARLINGTON HEIGHTS IL 60005-2451
3HL51
KVH INDUSTRIES, INC.
8412 185TH ST
TINLEY PARK, IL 60487-9237
HQ0339
DFAS - COLUMBUS CENTER
WEST ENTITLEMENT OPERATIONS
P O BOX 182317
COLUMBUS OH 43218-2317
SEE SCHEDULE
SEE CONTRACT ADMINISTRATION DATA $223,860.00
X X
/SIGNED REPRINT/
ELAINE IONESCU
ELAINE.M.IONESCU.CIV@MAIL.MIL (586)467-1230 2018APR16
1 34
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
THE FOLLOWING MODIFICATIONS HAVE BEEN INCORPORATED
P00001
Buyer Name: ELAINE IONESCU
Buyer Office Symbol/Telephone Number: ZGAB/(586)467-1230
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Type of Business: Other Small Business Performing in U.S.
Surveillance Criticality Designator: B
*** End of Narrative A0000 ***
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.204-4850 ACCEPTANCE APPENDIX DEC/2015
(TACOM)
(a) Contract Number SPRDL1-18-C-0228 is awarded to KVH Industries, Inc. Reference Block 17, SF 26, or Block 28, SF 1449, contractor is not required to sign the contract.
(b) The contractor, in its proposal in response to Solicitation SPRDL1 18 R 0071, provided data for various solicitation clauses, and that data has been added in this contract.
(c) Any attachments not included within this document will be provided by DLA Land Warren directly to the Administrative Contracting
Officer (ACO) via e-mail as required. Technical data packages that are only available on CD-ROM will be mailed by DLA Land Warren to the ACO. Within one week of this award, any office still requiring a copy can send an e-mail request to the buyer listed on the front page of this contract.
(d) A FAT waiver has been approved for KVH Industries, Inc. All FAT related clauses have been removed from the contract.
(e) The following Amendment(s) to the solicitation are incorporated into this contract: Amd 0001
[End of Clause]
1. The purpose of Amendment 0001 to Solicitation SPRDL1 18 R 0071 is to extend the due date for proposals to 9 March 2018.
2. All other terms and conditions remain the same.
*** END OF NARRATIVE A0001 ***
1. The purpose of the Modification P00001 to contract SPRDL1-18-C-0228 is to award option CLIN 0002AA. This is in accordance with the
Special Provision Clause 52.217-4001 entitled "Separately Priced for Increased Quantity" located in the basic contract.
2. PRON EH8RC593EH is hereby added to Section B as Item 0002AA (CLIN).
3. Original option Quantity: 26
Previous Quantity Exercised: 0
Exercised this Modification: 26
Remaining Option Quantity: 0
4. As a result of this modification P00001 the total dollar value of the contract is increased by $111,930.00 from $111,930.00 to
$223,860.00
5. All other terms and conditions of the basic contract remain unchanged and in full force and effect.
2 34
SPRDL1-18-C-0228 REPRINT
KVH INDUSTRIES, INC.
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE A0002 ***
3 34
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
THIS PROCUREMENT IS A TOTAL SMALL BUSINESS SET ASIDE.
(End of narrative A001)
0001 DISPLAY UNIT
NSN: 7025-01-621-5510
Mfr CAGE: 19200
Mfr Part Number: 13034156
0001AA PRODUCTION QUANTITY 26 EA $ 4,305.00000 $ 111,930.00 ___________________ ______________ __________________
COMMODITY NAME: DISPLAY UNIT
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH7C1672EH PRON AMD: 02 ACRN: AA
AMS CD: SM2B1100000
PSC: 7025
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13034156
DATE: 31-AUG-2017
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
INSPECTION/ACCEPTANCE AT ORIGIN MEANS THAT YOU MUST
CONTACT THE DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA)
TO ARRANGE FOR A GOVERNMENT INSPECTION BEFORE YOU
SHIP THE SUPPLIES CALLED OUT IN THIS CONTRACT/ORDER.
FAILURE TO HAVE THE ITEMS INSPECTED AND ACCEPTED WILL
RESULT IN THEIR REJECTION AT THE DESTINATION. THE
REJECTED SUPPLIES WILL BE RETURNED TO YOU AT YOUR
EXPENSE.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H097226Z365 W562RP J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
4 34
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
001 26 13-OCT-2018
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
THIS PROCUREMENT IS A TOTAL SMALL BUSINESS SET ASIDE.
(End of narrative A002)
0002 DISPLAY UNIT
NSN: 7025-01-621-5510
Mfr CAGE: 19200
Mfr Part Number: 13034156
OPTION QUANTITY, PURSUANT TO THE CLAUSE ENTITLED
OPTION FOR INCREASED QUANTITY---SEPARATELY PRICED
LINE ITEM (52.217-4001).
The quantity stated for the option CLIN DOES form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
(End of narrative A001)
0002AA EXERCISED OPTION QUANTITY 26 EA $ 4,305.00000 $ 111,930.00 _________________________ ______________ __________________
COMMODITY NAME: DISPLAY UNIT
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH8RC593EH PRON AMD: 02 ACRN: AA
AMS CD: SM2B1100000
PSC: 7025
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 13034156
DATE: 31-AUG-2017
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
5 34
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
INSPECTION/ACCEPTANCE AT ORIGIN MEANS THAT YOU MUST
CONTACT THE DEFENSE CONTRACT MANAGEMENT AGENCY (DCMA)
TO ARRANGE FOR A GOVERNMENT INSPECTION BEFORE YOU
SHIP THE SUPPLIES CALLED OUT IN THIS CONTRACT/ORDER.
FAILURE TO HAVE THE ITEMS INSPECTED AND ACCEPTED WILL
RESULT IN THEIR REJECTION AT THE DESTINATION. THE
REJECTED SUPPLIES WILL BE RETURNED TO YOU AT YOUR
EXPENSE.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W52H098267Z331 W562RP J 2
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 26 01-APR-2019
FOB POINT: Destination
SHIP TO:
(W562RP) SR ARMY GENERAL SUPPLY LMP STOCK RE
CENTRAL RECEIVING POINT
7 FRANKFORD AVE BLDG 362
ANNISTON,AL,36201-4199
6 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-4072 TECHNICAL DATA PACKAGE INFORMATION SEP/2015
(TACOM)
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: NA
TDP Link (URL): NA
[ X ] 3. The TDP for this solicitation resides within FedBizOpps (), and is associated with this solicitation number and can be accessed via this URL: https://www.fbo.gov/fedteds/SPRDL118R0071
a. Log on to the FBO web site.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.)
or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you are currently certified, your MPIN will be verified and you may proceed to the next step. To obtain certification, go to htt ps://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at TACOM Warren with all the information needed for them to grant you access. FBO will subsequently automatically generate an email stating when you have permission to view or download TDP items. Allow 2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in your company need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP. Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted.
Questions related to registration in FBO should be directed to The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible
7 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
for placing correct information in FBO.
g. It is strongly suggested that you submit the explicit access request and provide the contract specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at - on the right is User Guides - click on Vendor.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by an authorized representative of your firm before you are granted access to the technical data. The appropriate Agreement is titled NA, and is:
[ ] available by emailing the contract specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email/fax it to the contract specialist at NA. The contract specialist will notify the
FBO administrator upon receiving the NDA. The administrator will grant approval to view/download the TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist.
[End of Clause]
2 52.211-4008 DRAWING LIMITATIONS NOV/2005
(TACOM)
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the _____________________________ manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited _____________________________ in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
[End of clause]
3 52.223-4002 USE OF CLASS I OZONE-DEPLETING SUBSTANCES (CIODS) OCT/2008
(TACOM)
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) _________________________________________________________ of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: http://www.epa.gov/ozone/science/ods/index.html.
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, __________________________________ explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
8 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not _____________________________________ explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
[End of Provision]
4 52.248-4502 CONFIGURATION MANAGEMENT DOCUMENTATION JUL/2001
TACOM (RI)
The contractor may submit Engineering Change Proposals (ECPs), Value Engineering change Proposals (VECPs), (Code V shall be assigned to an engineering change that will effect a net life cycle cost), including Notice of Revisions (NORs), and Request for Deviations (RFDs), for the documents in the Technical Data Package (TDP). The contractor shall prepare these documents in accordance with the Data Item
Descriptions cited in block 04 on the enclosed DD Form 1423, Contract Data Requirements List.
Contractor ECPs/VECPs shall describe and justify all proposed changes and shall include NORs completely defining the change to be made.
Contractors may also submit RFD, which define a temporary departure from the Technical Data package or other baseline documentation under Government control. The contractor shall not deliver any units incorporating any change/deviation to Government documentation until notified by the Government that the change/deviation has been approved and the change/deviation has been incorporated in the contract.
If the Government receives the same or substantially the same VECPs from two or more contractors, the contracts whose VECP is received first will be entitled to share with the Government in all instant, concurrent, future, and collateral savings under the terms of the VE clause in the contract.
Duplicate VECPs, which are received subsequently, will be returned to the contractor(s) without formal evaluation, regardless of whether or not the first VECP has been approved and accepted by the Government.
(End of Clause)
9 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PACKAGING AND MARKING
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-4501 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS) DEC/2007
TACOM (RI)
A. Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, Revision D, Date 15 Dec 99 including Notice 1, dated
10 May 02 and the Special Packaging Instruction (SPI) contained in the TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
SPI NUMBER 13034156 DATED 27 MAR 13, REV - _________________________________
B. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
C. Marking: In addition to any special markings called out on the SPI;
C.1. All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R including bar coding and a MSL label. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item
Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
D. Heat Treatment and Marking of Wood Packaging Materials: All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
E. This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the
SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to
PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
F. Hazardous Materials (as applicable):
F.1..Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
F.2. Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
--International Air Transport Association (IATA) Dangerous Goods Regulations
10 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
--International Maritime Dangerous Goods Code (IMDG)
--Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
--Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO
P4030.19/DLAM 4145.3 (for military air shipments).
F.3. If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United
Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
F.4. When applicable, a Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
G. SUPPLEMENTAL INSTRUCTIONS: NA
(End of Clause)
11 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
2 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
MyriadPro-(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 (15 Nov 2008)
Tailored by excluding paragraph 7.3
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
3 52.246-4028 INSPECTION AND ACCEPTANCE POINTS: ORIGIN NOV/2005
(TACOM)
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT: KVH Industries, Inc. 3HL51
(Name) (CAGE)
8412 W. 185th Street, Tinley Park, IL 60487
(Address) (City) (State) (Zip)
ACCEPTANCE POINT: SAME AS ABOVE
[End of Clause]
4 52.246-4528 REWORK AND REPAIR OF NONCONFORMING MATERIAL MAY/1994
TACOM RI
a. Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
b. Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
c. Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
d. Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
e. The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
12 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(End of Clause)
13 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
2 52.247-34 F.O.B. DESTINATION NOV/1991
3 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
4 52.242-4022 DELIVERY SCHEDULE SEP/2008
(TACOM)
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires delivery to be made according to the following schedule:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
NA
(2) GOVERNMENT REQUIRED DELIVERY SCHEDULE IF THERE IS NO FIRST ARTICLE TEST (FAT), OR IF FAT IS WAIVED
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
0001AA 26 180
0002AA 26 180 (if/when exercised)
(d) Accelerated delivery schedule is acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITH FIRST ARTICLE TEST (FAT)
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
(2) OFFERORS PROPOSED ACCELERATED DELIVERY SCHEDULE WITHOUT FIRST ARTICLE TEST (FAT), or IF FAT IS WAIVED
ITEM NO. QTY WITHIN DAYS AFTER DATE OF CONTRACT AWARD
[End of Clause]
5 52.247-4009 DELIVERY OF SUPPLIES FROM FOREIGN FIRMS TO U.S. PORT OF ENTRY AUG/2003
14 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(TACOM)
This clause applies only to foreign firms when shipments are required to destinations within the Continental United States (CONUS).
(1) The F.O.B. point for this acquisition is DESTINATION. You must arrange and pay for (i) transportation to the U.S. port of entry, (ii) port handling, (iii) customs clearance, and (iv) all transportation from the port of entry to the consignee(s) listed in this solicitation.
(2) Acceptance will be at destination if the awardee is an OCONUS (Outside Continental United States) foreign firm.
(3) Identification of shipment. The Contractor must insure that all shipments be clearly marked in accordance with MIL-STD-
129 and other marking requirements specified in the Schedule. The Duty-Free Entry clauses in this contract contain instructions on the documentation required to accompany the shipment for duty-free entry.
(4) Notification of Shipment. The Contractor shall send electronic notification to the Procuring Contracting Officer (PCO) when shipment is made, which includes the following information:
(i) Mode of transportation, carrier, bill of lading number, customs broker (if any), and estimated time of arrival of materiel at OCONUS port authority
(ii) Mode of transportation, carrier, bill of lading number, and estimated dates for pick-up from CONUS port authority and delivery to final destination.
(5) You assume all responsibility for risk of loss or damage to the supplies until received at the destination. See the clause entitled RESPONSIBILITY FOR SUPPLIES (FAR 52.246-16).
[End of Clause]
6 52.247-4017 DEPOT ADDRESS FOR THE APPLICABLE MODE OF SHIPMENTS: IN-THE-CLEAR NOV/2009
(TACOM) ADDRESSES
Rail/ MILSTRIP
Motor Address Rail Motor Parcel Post
SPLC* Code Ship To: Ship To: Mail To:______ ________ ________ ________ ___________
206721/ W25G1U Transportation Officer Transportation Officer Transportation Officer
209405 Defense Dist Depot Defense Dist Depot Defense Dist Depot
Susquehanna Susquehanna Susquehanna
New Cumberland, PA New Cumberland, PA New Cumberland, PA 17070-5001
NOTE: All deliveries to New Cumberland MUST be scheduled at least 10 days prior to the delivery date. The carrier or contractor must call the New Cumberland DDSP customer service number, 800-307-8496 and provide the following information: contract number, item name, National Stock Number, total weight and cube, and vendor. All shipments to this MILSTRIP address code (W25G1U) are for mission stock and they will need to know that as well, but if you have instructions from the Contracting Officer to use MILSTRIP address code W25N14 instead, you must inform the appointment-taker that the delivery is for Consolidation and Containerization Point (CCP) stock.
Appointments for FOB Origin shipments should be coordinated with DCMA Transportation.
875670/ W62G2T Transportation Officer Transportation Officer Transportation Officer
875675 XU Def Dist Depot XU Def Dist Depot Dist Depot San Joaquin
San Joaquin San Joaquin P O Box 96001
25600 S Chrisman Rd 25600 S Chrisman Rd Stockton, CA 95296-0130
Rec Whse 10 Rec Whse 10
Tracy, Ca 95376-5000 Tracy, Ca 95376-5000
471995/ W31G1Z Transportation Officer Transportation Officer Transportation Officer
471996 Anniston Army Depot, Anniston Army Depot, Anniston Army Depot, Bynum, AL Bynum, AL Anniston, AL 36201-5021
209741/ W25G1R Transportation Officer Transportation Officer Transportation Officer
209770 Letterkenny Army Depot, Letterkenny Army Depot, Letterkenny Army Depot, Culbertson, PA Chambersburg, PA Chambersburg, PA 17201-4150
15 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
661136/ W45G19 Transportation Officer Transportation Officer Transportation Officer
661157 W562RM Red River Army Depot, Red River Army Depot, Red River Army Depot, Defense, TX Texarkana, TX Texarkana, TX 75507-5000
NOTE: Drivers must schedule an appointment for delivery at least 24 hours in advance. Deliveries will be scheduled for Monday-Friday, 0700-1300. E-mail or fax the PCO at CML (903)334-2208 or CML (903)334-2881. POC's are available Monday-Saturday, 0700-1730 with the exception of government holidays. For directions, please call CML (903)334-3060. Trucks enter through the commercial carrier route entrance and report to building 23 Truck Control 30 minutes prior to their scheduled appointment. Carriers that arrive at Truck Control without appointments will be placed at the end of the day's schedule unless there is an earlier opening and will be worked/unloaded as soon as possible.
POCs: ddrt-appt@dla.mil, Randy Cox, CML (903)334-2945, Randy.Cox@dla.mil; Angela Carr, CML (903)334-4950 Angela.Carr@dla.mil; Jane
Haley, CML (903)334-4671 Jane.Haley@dla.mil; Darlene Phelps, CML (903)334-3818 Darlene.Phelps@dla.mil.
764538/ W67G23 Transportation Officer Transportation Officer Transportation Officer
764535 Tooele Army Depot, Tooele Army Depot, Tooele Army Depot, Warner, UT Tooele, UT Tooele, UT 84074-5003
***SPLC indicates Standard Point Locator Code. _ _ _ _
NOTE: The following is applicable only when so specified in an individual order or delivery increment:_____ ____
This requirement is a depot replenishment buy, a portion of which is or may be required to fill Direct Support System (DSS) requisitions. Shipment shall be made, as specified, to one or more of:
New Cumberland Army Depot
Red River Army Depot
Sharpe Army Depot prior to shipments to any other depots as may be designated. When more than one depot is designated for DSS shipments, priority shipments will be made equally to each of the designated destinations.
[End of Clause]
16 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
PRON/ PRON/
AMS CD/ AMS CD/
LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED
ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________
0001AA EH7C1672EH 2 AA $ 111,930.00
SM2B1100000
0002AA EH8RC593EH 2 AA $ 111,930.00
SM2B1100000
TOTAL $ 223,860.00
OBLIGATED OBLIGATED
ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________
AA 97 X4930AC9D 6D 26KB S20113 W56HZV $ 223,860.00 __________________
TOTAL $ 223,860.00
LINELINE
ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________
0001AA AA 97 0X0X4930AC9D S20113 6D0000SM2B110000026KB S20113 W56HZV
0002AA AA 97 0X0X4930AC9D S20113 6D0000SM2B110000026KB S20113 W56HZV
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at ; and
(2) Be registered to use WAWF at following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo Invoice/Receiving Report
17 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
See schedule
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC See page 1 or schedule
Issue By DoDAAC "
Admin DoDAAC "
Inspect By DoDAAC "
Ship To Code "
Ship From Code N/A
Mark For Code "
Service Approver (DoDAAC) "
Service Acceptor (DoDAAC) "
Accept at Other DoDAAC "
LPO DoDAAC "
DCAA Auditor DoDAAC "
Other DoDAAC(s) "
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email
Notifications" field of WAWF once a document is submitted in the system.
elaine.ionescu@dla.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
NA
(2) For technical WAWF help, contact the WAWF helpdesk at 866-
618-5988.
(End of clause)
18 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.204-4005 REQUIRED USE OF ELECTRONIC CONTRACTING AUG/2015
(a) All contract awards, modifications, and delivery orders issued by DLA Land Warren will be issued electronically. The contractor has the option to receive these actions either via the Worldwide Web (WWW) or Electronic Data Interchange (EDI). Many provisions/clauses appear "by reference," meaning only clause titles and regulation cite are listed; their full texts can be found at the website: http://farsite.hill.af.mil/
(b) In order to be eligible to receive an award under this solicitation, the successful offeror must be registered with the Department of Defense (DOD) System for Award Management (SAM). The SAM registration process may be done electronically at the World Wide Web (WWW) site: https://www.sam.gov/portal/public/SAM.
(c) The contractor will receive an electronic notice of the Award, Modification, or Delivery Order via e-mail.
[End of Clause]
2 52.245-4500 DEMILITARIZATION AND TRADE SECURITY CONTROL REQUIREMENTS AND OCT/2006
TACOM LCMC PROCEDURES
(RI)
I. Demil and Trade Security Controls (TSCs) Summary:
A. This procurement action has a demil and/or TSC consideration requirement. The demil and trade security control provisions in this solicitation implement the policy and requirements of the Arms Export Control Act, 22 United States Code (U.S.C.), Section 2778, the
International Traffic in Arms Regulations (ITAR) at 22 Code of Federal Regulations (CFR), Parts 120-130, the Export Administration
Regulations (EAR), at 15 CFR 730-774 and the Export Administration Act. Regulatory requirements and guidance are contained in Federal
Acquisition Regulation (FAR) 45.6, Reporting, Redistribution, and Disposal of Contractor Inventory and Defense Federal Acquisition
Regulation Supplement (DFARS) 245.604, Restrictions on Purchase or Retention of Contractor Inventory.
B. Demil and TSC policy is promulgated via Department of Defense (DoD) regulations and in the establishment of contract requirements.
Accordingly, the Governments right to require demilitarization under this clause is a contractual right, subject to the authority and discretion of the Procuring Contracting Officer (PCO). Therefore the PCO may or may not forward Contractor demilitarization waiver request to the DoD Demilitarization Program Manager for review and approval, even when there is certifiable Contractors compliance with all existing TSC regulations. The waiver approval process is described in paragraph VII of this clause.
C. The DoD policy and requirements for demil and TSCs are contained in the DoD 4160.21-M-1, Demil and TSCs Manual. This manual is hereby incorporated by reference, and its terms, conditions, and procedures are valid and enforceable as contractual requirements. If there is a conflict between the Demil and TSCs Manual and the Demil and TSC Clause herein, the Demil and TSCs Manual takes precedence.
D. This contract requires the manufacture, assembly, test, maintenance, repair, and/or delivery of military/defense items. This clause sets forth the requirements for the control and corresponding certification and verification of disposition of contract excess property.
The requirements under this clause are applicable to any Contractor and/or Subcontractor who perform work under this contract. This clause is a mandatory flow-down clause; accordingly, Contractor/Subcontractor must include this clause in subcontracts for work under this solicitation and resulting contract.
E. The demil and TSC requirements apply to all materials and property (Government furnished equipment (GFE)), special tools and special test equipment, manufactured parts in whatever stage of assembly, and associated technical data including technical manuals, drawings, process sheets, and working papers) bought, assembled, produced, or provided by the Government under this contract regardless of the type of contract and regardless of who has title to the material. The intent is to control military/defense items in accordance with statutory and regulatory requirements. Bidders/offerors proposed prices under this solicitation and any resulting contract should include any and all cost(s) to comply with this clause and the Governments demil and TSC requirements.
F. In general, the demil requirements must be met upon completion of the contract. For indefinite delivery contracts as defined by FAR
16.501-2, demil requirements must be met upon the expiration of the potential contractual performance period as described in section A of the contract and/or in section B (the schedule) of the contract; or upon contract termination if the contract is terminated earlier.
Contractor(s) awarded a contract with demil requirements shall be responsible for maintaining an inventory system capable of recording, safeguarding and tracking all material, work in process, components associated or related to the performance of the contract for the purpose (not intended to be exclusive) of enabling the Contractor to fulfill its demil obligations under this clause. The Contractor
19 34
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
will provide a copy of demil certificates to the PCO within 30 days for inclusion in the contract file.
G. Paragraph VIII. c. of this clause applies to the demil of excess U.S. Government furnished equipment (GFE)/technical data provided to a Contractor in support of this contract; see excess GFE definition II. b. below. If the Contractor is not using GFE in performance of this contract, disregard this paragraph.
H. The Contractor agrees that demil performed under this contract will be conducted in accordance with this clause or DoD 4160.21-M-1, Demil and TSCs Manual, and all demilitarized material will meet or exceed the definition of scrap as defined by this clause.
II. Definitions:
A. Contract excess property is property of the type covered by this contract for which the contractor does not claim payment or has been denied payment and all GFE not returned to the Government upon completion of the contract. This includes, but is not limited to, rejects and overruns.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.